CN109711743A - A kind of wire examination method that construction tunnel vehicle is turned out for work, computer installation and computer readable storage medium - Google Patents
A kind of wire examination method that construction tunnel vehicle is turned out for work, computer installation and computer readable storage medium Download PDFInfo
- Publication number
- CN109711743A CN109711743A CN201811641360.4A CN201811641360A CN109711743A CN 109711743 A CN109711743 A CN 109711743A CN 201811641360 A CN201811641360 A CN 201811641360A CN 109711743 A CN109711743 A CN 109711743A
- Authority
- CN
- China
- Prior art keywords
- vehicle
- information
- construction tunnel
- work
- turned out
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Time Recorders, Dirve Recorders, Access Control (AREA)
Abstract
The present invention provides a kind of wire examination method that construction tunnel vehicle is turned out for work, this method includes obtaining the running track information of construction tunnel vehicle, obtain the location information at construction tunnel hole, in chronological sequence vehicle is driven into a construction tunnel hole by sequence and the vehicle is driven out to a construction tunnel hole and is confirmed as vehicle and turns out for work once, obtain weight information when weight information and the vehicle when vehicle drives into construction tunnel hole are driven out to construction tunnel hole, calculate vehicle turn out for work it is primary in vehicle weight difference, judge whether the vehicle weight difference of vehicle in primary confirmation message of turning out for work is greater than weight difference threshold value, if more than, vehicle is then confirmed as effectively to turn out for work once, primary confirmation message that vehicle is effectively turned out for work is recorded in attendance list information associated by vehicle.The present invention also provides the computer installation of the above method and computer readable storage mediums.The present invention, which has the characteristics that accurately to turn out for work to construction tunnel vehicle, to be examined.
Description
Technical field
The present invention relates to construction tunnel field of traffic, be specifically related to a kind of wire examination method that construction tunnel vehicle is turned out for work,
Computer installation and computer readable storage medium.
Background technique
Currently, carrying out operation in construction tunnel to drag-out slag car, concrete tank etc. in the work progress of construction tunnel
The management system that uses of vehicle be performance appraisal system, i.e. the benchmark of vehicle number of turning out for work is added and is turned out for work number beyond benchmark.
Administrative staff execute need that the number of turning out for work of vehicle record during performance appraisal then calculate vehicle performance, but
It is that administrative staff turn out for work number progress statistical generally using the modes such as artificial statistics or report calculating to vehicle, there is error
The problems such as rate is high, and the attendance record of vehicle can not accurately be provided for inquiring and checking.
Summary of the invention
The first object of the present invention is to provide a kind of wire examination method that accurate construction tunnel vehicle is turned out for work.
The second object of the present invention is to provide the computer installation for realizing above-mentioned construction tunnel vehicle attendance method.
The third object of the present invention is to provide computer-readable the depositing for realizing above-mentioned construction tunnel vehicle attendance method
Storage media.
In order to realize the first above-mentioned purpose, a kind of wire examination method that construction tunnel vehicle is turned out for work provided by the invention includes
The running track information of construction tunnel vehicle is obtained, the running track information of vehicle includes the location information of vehicle, velocity information
And transmits information, the location information at construction tunnel hole is obtained, detects that vehicle drives into the number at construction tunnel hole
With the number for being driven out to construction tunnel hole, in chronological sequence vehicle is driven into a construction tunnel hole by sequence and the vehicle is driven out to
Construction tunnel hole is confirmed as vehicle and turns out for work once, and vehicle primary confirmation message of turning out for work is recorded in associated by vehicle
Attendance list information, when obtaining weight information and the vehicle of the vehicle when driving into construction tunnel hole and being driven out to construction tunnel hole
Weight information, calculate vehicle and turn out for work weight value and the vehicle of the vehicle in primary confirmation message when driving into construction tunnel hole
The weight difference between weight value when being driven out to construction tunnel hole judges that vehicle is turned out for work vehicle in primary confirmation message
Whether weight difference is greater than weight difference threshold value, if more than being then confirmed as vehicle and effectively turning out for work once, vehicle is effectively turned out for work primary
Confirmation message be recorded in attendance list information associated by vehicle.
By above scheme as it can be seen that passing through the number for driving into construction tunnel hole to vehicle and time for being driven out to construction tunnel hole
Number, in chronological sequence vehicle is driven into a construction tunnel hole by sequence and the vehicle is driven out to a construction tunnel hole and is confirmed as
Attendance, and to obtain this time attendance in vehicle weight difference, judge vehicle in current attendance weight difference whether
Greater than weight difference threshold value, if more than vehicle once effective attendance is then indicated.
Further embodiment is that the weight difference of vehicle is less than weight difference threshold in primary confirmation message if vehicle is turned out for work
Value, then be confirmed as that the invalid attendance of vehicle is primary, and the primary confirmation message of the invalid attendance of vehicle is recorded in associated by vehicle and is examined
Diligent list information.
As it can be seen that the weight difference of vehicle is less than weight difference threshold value in primary confirmation message if vehicle is turned out for work, then it represents that vehicle
Once invalid attendance.
Further embodiment is that primary confirmation message that vehicle is effectively turned out for work is recorded in attendance list associated by vehicle
It after information, executes: receiving the oil-filling data information of input vehicle, generate every kilometer of vehicle according to the running track information of vehicle
Every gas mileage information of vehicle is recorded in attendance list information associated by vehicle by fuel consumption information.
As it can be seen that after receiving oil-filling data information corresponding to the vehicle being manually entered, according to the running track information of vehicle
Every gas mileage information of vehicle can be generated.
Further embodiment is, after every gas mileage information of vehicle is recorded in attendance list information, executes: according to vehicle
Running track information generate daily travel information and daily driving time information corresponding to vehicle, and will be corresponding to vehicle
Daily travel information and daily driving time information be recorded in attendance list information associated by vehicle.
As it can be seen that daily travel information and day traveling corresponding to vehicle being generated according to the running track information of vehicle
Temporal information.
Further embodiment is that daily travel information corresponding to vehicle and daily driving time information are recorded in vehicle
After associated attendance list information, executes: receiving the characteristic information of input, identify vehicle corresponding to characteristic information, it will
Attendance list information associated by vehicle is sent to display interface and shows, characteristic information is the license plate number information of vehicle, number letter
Breath.
As it can be seen that vehicle corresponding to characteristic information can be inquired after input feature vector information, by attendance associated by vehicle
List information is sent to display interface and shows, in this manner it is possible to which attendance list associated by vehicle is printed for management
Personnel check.
In order to realize the second above-mentioned purpose, computer installation provided by the invention includes processor and memory, at this
Reason device is used to realize the wire examination method that above-mentioned construction tunnel vehicle is turned out for work in memory when executing the computer program stored
Each step.
In order to realize above-mentioned third purpose, computer readable storage medium provided by the invention is stored thereon with calculating
Machine program, and computer program is processed by the processor each of the wire examination method for realizing that above-mentioned construction tunnel vehicle is turned out for work when execution
Step.
Detailed description of the invention
Fig. 1 is the flow chart for the wire examination method embodiment that a kind of pair of construction tunnel vehicle of the invention is turned out for work.
The invention will be further described with reference to the accompanying drawings and embodiments.
Specific embodiment
A kind of wire examination method that construction tunnel vehicle is turned out for work provided by the invention, which is applied, can obtain vehicle in construction tunnel
Running track information and vehicle weight information terminal device on, typically apply on the terminal devices such as computer.This hair
Bright computer installation can be above-mentioned electronic equipment, and computer storage medium can be with the various of data storage function
Storage medium, such as FLAASH, EEPROM nonvolatile memory.
The wire examination method embodiment that construction tunnel vehicle is turned out for work:
The preferred terminal device of the present embodiment is the equipment such as desktop computer or server, referring to Fig. 1, the present embodiment
Step S1 is first carried out in method, obtains the motion track information of vehicle in construction tunnel.Wherein, the motion track information packet of vehicle
Include location information, the velocity information, transmits information of vehicle.In through this embodiment, to the vehicle entered in construction tunnel
Installation positioning label, terminal device is in the movement rail for obtaining vehicle in construction tunnel by map system such as GIS map system
Mark information.Or GPS positioning device is installed in vehicle, terminal device then by GPS positioning device obtain information come
The information such as motion profile, driving direction, the travel speed of vehicle are determined, to get the motion profile of vehicle in construction tunnel
Information.
Then, step S2 is executed, the location information at construction tunnel hole is obtained.For example, by being set at construction tunnel hole
Locating base station is set to obtain the location information at construction tunnel hole.
Then, step S3 is executed, detects that vehicle drives into the number at construction tunnel hole and is driven out to construction tunnel hole
Number confirms that turning out for work for vehicle and records number.For example, according to detect vehicle drive into construction tunnel hole number and be driven out to
The number at construction tunnel hole, in chronological sequence vehicle is driven into a construction tunnel hole by sequence and the vehicle is driven out to and once applies
Work tunnel portal is confirmed as vehicle and turns out for work once, and vehicle primary confirmation message of turning out for work is recorded in attendance associated by vehicle
List information, in this way, record has the number of turning out for work of the vehicle in attendance list information associated by vehicle.
Then, step S4 is executed, weight information and the vehicle when vehicle drives into construction tunnel hole is obtained and is driven out to construction
Weight information when tunnel portal.For example, by installing sensor on vehicle, vehicle drives into construction tunnel hole or is driven out to and applies
The weight information of vehicle on sensor is read when work tunnel portal.Or weighbridge is set at construction tunnel hole, pass through weighbridge
The weight letter that obtains the weight information of vehicle when vehicle drives into construction tunnel hole or is driven out to construction tunnel hole, and will acquire
Breath is sent to server or preset terminal device.
Then, step S5 is executed, effective attendance number of vehicle is confirmed and records.For example, calculating vehicle turns out for work one
Weight value and the vehicle when vehicle drives into construction tunnel hole in secondary confirmation message are driven out to weight when construction tunnel hole
Weight difference between value, judges whether the vehicle weight difference of vehicle in primary confirmation message of turning out for work is greater than weight difference threshold
Value, if vehicle is turned out for work, the weight difference of vehicle is greater than weight difference threshold value in primary confirmation message, then it represents that vehicle is driven out to or sails
Not all it is complete vehicle curb condition when into construction track hole, then is confirmed as the vehicle and effectively turns out for work that once the vehicle is effectively turned out for work once
Confirmation message be recorded in attendance list information associated by vehicle, in this way, remembering in the attendance list information associated by vehicle
Record has the number of effectively turning out for work of the vehicle.
If vehicle is turned out for work, the weight difference of vehicle is less than weight difference threshold value in primary confirmation message.Indicate that the vehicle is driven out to
Or driving into when constructing track hole is all complete vehicle curb condition, then it is assumed that the invalid attendance of vehicle is primary, the invalid attendance of vehicle is primary
Confirmation message is recorded in attendance list information associated by vehicle.Recording in attendance list information in this way associated by vehicle has
The number of turning out for work in vain of the vehicle.
Then, step S6 is executed, the oil-filling data information of the vehicle of input is received, it is raw according to the running track information of vehicle
At vehicle every gas mileage information and record.For example, the oil-filling data information for the vehicle that administrative staff input in terminal device,
The running track information that terminal device passes through vehicle again calculates every gas mileage information of vehicle, by every gas mileage of vehicle
Information is recorded in attendance list information associated by vehicle.
Then, step S7 is executed, according to daily travel information corresponding to the running track information of vehicle generation vehicle
With daily driving time information and record.For example, calculating the daily travel information of vehicle according to the running track information of vehicle
With daily driving time information.And the daily travel information of calculated vehicle and daily driving time information are recorded in vehicle institute
Associated examination list information.
Finally, executing step S8, the characteristic information of input is received, identifies vehicle corresponding to characteristic information and by vehicle
Associated attendance list information is sent to display interface and is shown.Wherein, characteristic information include vehicle license plate number information,
Number information.User can inquire vehicle corresponding to characteristic information after terminal device China input feature vector information, and
Attendance list information associated by the vehicle can be viewed in the display interface, in this way, administrative staff can set in terminal
The attendance information list of vehicle accurately is inquired for upper, and further verification is printed into attendance list.
It can be seen that vehicle is driven into a construction tunnel hole and the vehicle by chronological sequence sequence by the present embodiment
It is driven out to a construction tunnel hole and is confirmed as vehicle and turn out for work once, the number of turning out for work of vehicle is recorded in examination associated by vehicle
In list information, and by calculate vehicle turn out for work vehicle in primary confirmation message drive into construction tunnel hole when weight
The weight difference between weight value when value and the vehicle are driven out to construction tunnel hole, detection vehicle are turned out for work primary confirmation message
The weight difference of middle vehicle is greater than weight difference threshold value and further judges that vehicle is effectively turned out for work once, and effective by vehicle turns out for work one
It is secondary to be recorded in examination list information associated by vehicle, in this way, administrative staff can inquire feature according to characteristic information
The examination list information of vehicle corresponding to information achievees the purpose that accurately to examine vehicle number of turning out for work.
Computer installation embodiment:
The computer installation of the present embodiment include processor, memory and storage in memory and can be in processor
The computer program of upper operation, such as the message handling program for realizing above- mentioned information processing method.Processor executes calculating
The each step for the wire examination method that above-mentioned construction tunnel vehicle is turned out for work is realized when machine program.
For example, computer program can be divided into one or more modules, one or more module, which is stored in, is deposited
It in reservoir, and is executed by processor, to complete modules of the invention.One or more modules can be can complete it is specific
The series of computation machine program instruction section of function, the instruction segment is for describing execution of the computer program in terminal device
Journey.
It should be noted that terminal device can be desktop PC, notebook, palm PC and cloud server etc.
Calculate equipment.Terminal device may include, but be not limited only to, processor, memory.It will be understood by those skilled in the art that this hair
Bright schematic diagram is only the example of terminal device, does not constitute the restriction to terminal device, may include than illustrate it is more or
Less component perhaps combines certain components or different components, such as terminal device can also be set including input and output
Standby, network access equipment, bus etc..
Processor alleged by the present invention can be central processing unit (Central Processing Unit, CPU), may be used also
To be other general processors, digital signal processor (Digital Signal Processor, DSP), specific integrated circuit
(Application Specific Integrated Circuit, ASIC), ready-made programmable gate array (Field-
Programmable Gate Array, FPGA) either other programmable logic device, discrete gate or transistor logic,
Discrete hardware components etc..General processor can be microprocessor or the processor is also possible to any conventional processor
Deng processor is the control centre of terminal device, utilizes the various pieces of various interfaces and the entire terminal device of connection.
Memory can be used for storing computer program and/or module, and processor is stored in memory by operation or execution
Interior computer program and/or module, and the data being stored in memory are called, realize the various functions of terminal device.
Memory can mainly include storing program area and storage data area, wherein storing program area can storage program area, at least one
Application program needed for function (such as sound-playing function, image player function etc.) etc.;Storage data area can be stored according to hand
Machine uses created data (such as audio data, phone directory etc.) etc..In addition, memory may include high random access
Memory can also include nonvolatile memory, such as hard disk, memory, plug-in type hard disk, intelligent memory card (Smart
Media Card, SMC), secure digital (Secure Digital, SD) card, flash card (Flash Card), at least one disk
Memory device, flush memory device or other volatile solid-state parts.
Computer readable storage medium:
If the integrated module of terminal device be realized in the form of SFU software functional unit and as the sale of independent product or
In use, can store in a computer readable storage medium.Based on this understanding, the present invention realizes above-mentioned implementation
All or part of the process in example method, can also instruct relevant hardware to complete, the computer by computer program
Program can be stored in computer readable storage medium, and the computer program is when being executed by processor, it can be achieved that above-mentioned construction
The each step for the wire examination method that tunnel vehicle is turned out for work.
Wherein, computer program includes computer program code, and computer program code can be source code form, object
Code form, executable file or certain intermediate forms etc..Computer-readable medium may include: that can carry computer program
Any entity or device of code, recording medium, USB flash disk, mobile hard disk, magnetic disk, CD, computer storage, read-only memory
(ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electric carrier signal, electricity
Believe signal and software distribution medium etc..It should be noted that the content that computer-readable medium includes can be managed according to the administration of justice
Local legislation and the requirement of patent practice carry out increase and decrease appropriate, such as in certain jurisdictions, according to legislation and patent
Practice, computer-readable medium does not include electric carrier signal and telecommunication signal.
It should be noted that the above is only a preferred embodiment of the present invention, but the design concept invented is not limited thereto,
All insubstantial modifications made using this design to the present invention, are also each fallen within the scope of guarantor of the invention.
Claims (7)
1. a kind of wire examination method that construction tunnel vehicle is turned out for work, which is characterized in that this method comprises:
The running track information of construction tunnel vehicle is obtained, the running track information of the vehicle includes the position letter of the vehicle
Breath, velocity information and transmits information;
The location information for obtaining the construction tunnel hole, detect the vehicle drive into the construction tunnel hole number and
Be driven out to the number at the construction tunnel hole, in chronological sequence sequence by the vehicle drive into the primary construction tunnel hole and
The vehicle, which is driven out to the primary construction tunnel hole, to be confirmed as the vehicle and turns out for work once, and the vehicle is turned out for work once really
Recognize information and is recorded in attendance list information associated by the vehicle;
It obtains weight information and the vehicle when vehicle drives into the construction tunnel hole and is driven out to the construction tunnel hole
When weight information;
The vehicle is calculated to turn out for work weight value of the vehicle described in primary confirmation message when driving into the construction tunnel hole
Weight difference between weight value of vehicle when being driven out to the construction tunnel hole, judge the vehicle turn out for work it is primary really
Whether the weight difference for recognizing vehicle in information is greater than weight difference threshold value;
If more than, then it is confirmed as the vehicle and effectively turns out for work once, the confirmation message record that the vehicle is effectively turned out for work primary
The attendance list information associated by the vehicle.
2. a kind of wire examination method that construction tunnel vehicle is turned out for work according to claim 1, it is characterised in that:
If the vehicle is turned out for work, the weight difference of vehicle described in primary confirmation message is less than weight difference threshold value, is confirmed as institute
It states that the invalid attendance of vehicle is primary, the primary confirmation message of the invalid attendance of the vehicle is recorded in attendance associated by the vehicle
List information.
3. a kind of wire examination method that construction tunnel vehicle is turned out for work according to claim 1, it is characterised in that:
It is described that the vehicle is effectively turned out for work after primary confirmation message is recorded in attendance list information associated by the vehicle,
It executes: receiving the oil-filling data information for inputting the vehicle, the vehicle is generated according to the running track information of the vehicle
Every gas mileage information of the vehicle is recorded in attendance list information associated by the vehicle by every gas mileage information.
4. a kind of wire examination method that construction tunnel vehicle is turned out for work according to claim 3, it is characterised in that:
It is described every gas mileage information of the vehicle is recorded in the attendance list information after, execute: according to the vehicle
Running track information generate daily travel information and daily driving time information corresponding to the vehicle, and by the vehicle
Corresponding daily travel information and daily driving time information is recorded in attendance list information associated by the vehicle.
5. a kind of wire examination method that construction tunnel vehicle is turned out for work according to claim 4, it is characterised in that:
It is described that daily travel information corresponding to the vehicle and daily driving time information are recorded in associated by the vehicle
Attendance list information after, execute: receive the characteristic information of input, identify vehicle corresponding to the characteristic information, by institute
It states attendance list information associated by vehicle and is sent to display interface and show, the characteristic information is that the license plate number of the vehicle is believed
Breath, number information.
6. a kind of computer installation, including processor and memory, the processor is used to executing to be stored in the memory
The step of wire examination method that such as construction tunnel vehicle described in any one of claim 1 to 5 is turned out for work is realized when computer program.
7. a kind of computer readable storage medium, is stored thereon with computer program, it is characterised in that: the computer program quilt
The step of wire examination method that such as construction tunnel vehicle described in any one of claim 1 to 5 is turned out for work is realized when processor executes.
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811641360.4A CN109711743A (en) | 2018-12-29 | 2018-12-29 | A kind of wire examination method that construction tunnel vehicle is turned out for work, computer installation and computer readable storage medium |
JP2021537464A JP7146097B2 (en) | 2018-12-29 | 2019-09-29 | Attendance evaluation method for tunnel construction vehicle, computer device, and computer-readable storage medium |
PCT/CN2019/108853 WO2020134271A1 (en) | 2018-12-29 | 2019-09-29 | Construction tunnel vehicle attendance checking method, computer device, and computer readable storage medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811641360.4A CN109711743A (en) | 2018-12-29 | 2018-12-29 | A kind of wire examination method that construction tunnel vehicle is turned out for work, computer installation and computer readable storage medium |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109711743A true CN109711743A (en) | 2019-05-03 |
Family
ID=66260275
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811641360.4A Pending CN109711743A (en) | 2018-12-29 | 2018-12-29 | A kind of wire examination method that construction tunnel vehicle is turned out for work, computer installation and computer readable storage medium |
Country Status (3)
Country | Link |
---|---|
JP (1) | JP7146097B2 (en) |
CN (1) | CN109711743A (en) |
WO (1) | WO2020134271A1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020134271A1 (en) * | 2018-12-29 | 2020-07-02 | 中铁十九局集团第六工程有限公司 | Construction tunnel vehicle attendance checking method, computer device, and computer readable storage medium |
CN112793604A (en) * | 2021-02-04 | 2021-05-14 | 株洲中车时代电气股份有限公司 | Pressure wave protection valve control method, device and system of rail train and server |
CN114936456A (en) * | 2022-05-18 | 2022-08-23 | 西南交通大学 | Tunnel construction organization scheme simulation method, computer device and computer readable storage medium |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU2012101222B4 (en) * | 2012-07-30 | 2013-03-28 | Dktob Pty Ltd | Radio Frequency Identification (RFID) beacon including controllable signal direction and range |
CN202854872U (en) * | 2012-09-07 | 2013-04-03 | 郑州新水工机械有限公司 | Vehicle integrated management system for mixing station |
CN105229692A (en) * | 2015-01-30 | 2016-01-06 | 株式会社小松制作所 | Construction management system |
CN106331141A (en) * | 2016-08-31 | 2017-01-11 | 合肥市正捷智能科技有限公司 | Vehicle management system |
CN106846822A (en) * | 2017-03-03 | 2017-06-13 | 杭州江河机电装备工程有限公司 | Concrete delivery truck management system and method |
CN206274405U (en) * | 2016-12-08 | 2017-06-23 | 成都信息工程大学 | A kind of bluetooth Time Attendance Device |
CN108399519A (en) * | 2018-02-11 | 2018-08-14 | 成都兴联宜科技有限公司 | A kind of concrete mixing plant Information Management System |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050028723A1 (en) * | 2002-02-19 | 2005-02-10 | Ancel Thomas A. | Loading dock traffic automation and inventory control system |
CN100476895C (en) * | 2003-11-10 | 2009-04-08 | 株式会社小松制作所 | Working machine fuel managing system and fuel managing method |
CN101958012A (en) * | 2010-10-21 | 2011-01-26 | 广东理文造纸有限公司 | IC (Integrated Circuit) access control system |
CN104992564A (en) * | 2015-06-26 | 2015-10-21 | 苏州木兰电子科技有限公司 | System for counting passing vehicles based on RFID tag |
CN106651269A (en) * | 2016-12-30 | 2017-05-10 | 重庆多道电子技术有限公司 | System for automatically counting freight vehicle transportation times in mining area based on positional data |
CN107203804B (en) * | 2017-05-19 | 2021-04-09 | 苏州易信安工业技术有限公司 | Data processing method, device and system |
CN107239926A (en) * | 2017-06-23 | 2017-10-10 | 重庆多道电子技术有限公司 | It is a kind of based on method of the position data to the automatic counting of goods stock |
CA3052235C (en) * | 2017-07-21 | 2021-10-26 | Komatsu Ltd. | Conveyance system, control apparatus, and conveyance method |
CN109711743A (en) * | 2018-12-29 | 2019-05-03 | 中铁十九局集团第六工程有限公司 | A kind of wire examination method that construction tunnel vehicle is turned out for work, computer installation and computer readable storage medium |
-
2018
- 2018-12-29 CN CN201811641360.4A patent/CN109711743A/en active Pending
-
2019
- 2019-09-29 WO PCT/CN2019/108853 patent/WO2020134271A1/en active Application Filing
- 2019-09-29 JP JP2021537464A patent/JP7146097B2/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU2012101222B4 (en) * | 2012-07-30 | 2013-03-28 | Dktob Pty Ltd | Radio Frequency Identification (RFID) beacon including controllable signal direction and range |
CN202854872U (en) * | 2012-09-07 | 2013-04-03 | 郑州新水工机械有限公司 | Vehicle integrated management system for mixing station |
CN105229692A (en) * | 2015-01-30 | 2016-01-06 | 株式会社小松制作所 | Construction management system |
CN106331141A (en) * | 2016-08-31 | 2017-01-11 | 合肥市正捷智能科技有限公司 | Vehicle management system |
CN206274405U (en) * | 2016-12-08 | 2017-06-23 | 成都信息工程大学 | A kind of bluetooth Time Attendance Device |
CN106846822A (en) * | 2017-03-03 | 2017-06-13 | 杭州江河机电装备工程有限公司 | Concrete delivery truck management system and method |
CN108399519A (en) * | 2018-02-11 | 2018-08-14 | 成都兴联宜科技有限公司 | A kind of concrete mixing plant Information Management System |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020134271A1 (en) * | 2018-12-29 | 2020-07-02 | 中铁十九局集团第六工程有限公司 | Construction tunnel vehicle attendance checking method, computer device, and computer readable storage medium |
CN112793604A (en) * | 2021-02-04 | 2021-05-14 | 株洲中车时代电气股份有限公司 | Pressure wave protection valve control method, device and system of rail train and server |
CN114936456A (en) * | 2022-05-18 | 2022-08-23 | 西南交通大学 | Tunnel construction organization scheme simulation method, computer device and computer readable storage medium |
Also Published As
Publication number | Publication date |
---|---|
WO2020134271A1 (en) | 2020-07-02 |
JP7146097B2 (en) | 2022-10-03 |
JP2022508433A (en) | 2022-01-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Biagioni et al. | Easytracker: automatic transit tracking, mapping, and arrival time prediction using smartphones | |
US9928667B2 (en) | Determining vehicle occupancy using sensors | |
CN112380448B (en) | Vehicle data processing method and device, computer equipment and storage medium | |
CN107230046A (en) | The reminding method and mobile terminal of a kind of trip information | |
CN107945198A (en) | Method and apparatus for marking cloud data | |
US9582943B1 (en) | Driving data collection | |
CN109711743A (en) | A kind of wire examination method that construction tunnel vehicle is turned out for work, computer installation and computer readable storage medium | |
CN105547311A (en) | Route planning method, mobile terminal, and system | |
US20170132935A1 (en) | Vehicle managing method based on v2x and system thereof | |
CN103430203A (en) | Telematics smart pinging systems and methods | |
CN111737377B (en) | Method and device for identifying drift trajectory, computing equipment and storage medium | |
CN106663253A (en) | Ticketing method and system | |
CN104680647A (en) | Card swiping management device, system and method | |
CN112651307A (en) | Personnel trajectory tracking method, system, device and storage medium | |
CN106575403A (en) | Information-providing system, information apparatus, and information-providing method | |
CN111222898B (en) | Method for counting network taxi and computer readable storage medium | |
CN106530679A (en) | Micro bus operation management system and micro bus operation management method | |
CN108320184A (en) | For the method, apparatus of vehicle charging, equipment, system and storage medium | |
CN113903090A (en) | Block chain-based highway cost determination method and system | |
CN207475609U (en) | The vehicle-mounted interactive communication system of Internet of Things based on cloud platform | |
JP2010117840A (en) | Road snow ice work management system | |
CN116011909A (en) | Behavior monitoring method and system for freight driver and electronic equipment | |
CN116205460A (en) | Bus stop announcement generation method, device and application based on passenger portrait and ETA data | |
CN104584054A (en) | Telematics smart pinging systems and methods | |
CN108376415A (en) | A kind of method and device of track filling |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190503 |
|
RJ01 | Rejection of invention patent application after publication |