[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN109629856A - A kind of container house and its installation method using closed corridor - Google Patents

A kind of container house and its installation method using closed corridor Download PDF

Info

Publication number
CN109629856A
CN109629856A CN201810893796.6A CN201810893796A CN109629856A CN 109629856 A CN109629856 A CN 109629856A CN 201810893796 A CN201810893796 A CN 201810893796A CN 109629856 A CN109629856 A CN 109629856A
Authority
CN
China
Prior art keywords
corridor
plate
module
middle layer
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810893796.6A
Other languages
Chinese (zh)
Inventor
杨洁
张旭
张术东
冮明姝
付海军
韩仕超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201810893796.6A priority Critical patent/CN109629856A/en
Publication of CN109629856A publication Critical patent/CN109629856A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • E04B1/34315Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
    • E04H2001/1283Small buildings of the ISO containers type

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

A kind of container house using closed corridor, including main tank module and corridor box module, corridor box module are made of corridor board group part and corridor structure column assembly;Corridor board group part includes corridor module one, corridor module two, bottom corridor plate, middle layer corridor plate and top layer corridor plate, and corridor structure column assembly includes corridor structural column one and corridor structural column two;Bottom corridor plate is connect by connector with main body tank module, and it is connected between bottom corridor plate and one end of middle layer corridor plate by corridor structural column one, the other end of middle layer corridor plate is connect with main body tank module, and the other end of middle layer corridor plate is connect by corridor structural column two with one end of top layer corridor plate, the other end of top layer corridor plate is connect with main body tank module;Corridor module one and corridor module two are separately connected between bottom corridor plate and middle layer corridor plate, between middle layer corridor plate and top layer corridor plate.The container house entirety reasonable stress, overall stability are high.

Description

A kind of container house and its installation method using closed corridor
Technical field
The invention belongs to steel structure modularization technical field of buildings, are related to a kind of container house using closed corridor And its installation method.
Background technique
Container house uses modular design concept and production technology, and a room tank module has been made in factory At on-site hoisting landing can be used alone, and can also form spacious use space and lamination by various combination, extensively For the office in construction site, meeting room, dining room and toilet etc..
Currently, when the room case group in construction site uses closed corridor, it is general to use Production Office case respectively and walk Then corridor case carries out the method for assembly connection at the scene.
This method has the following disadvantages:
1, case equipment installation in corridor is few, using simple, is still made of container body, expensive, increases cost.
2, it needs to increase connecting angle pieces using being reliably connected between corridor cabinet and office box body junction and cabinet Material investment.
3, cabinet is at high cost in factory's production, whole Transporting.
Summary of the invention:
The purpose of the present invention is overcoming above-mentioned the deficiencies in the prior art, and provide a kind of using closed corridor Container house, the container house entirety reasonable stress, overall stability are high.
It is a further object of the present invention to provide the installation methods of the above-mentioned container house using closed corridor.
As above design, the technical scheme is that a kind of container house using closed corridor, including main box Module and corridor box module, it is characterised in that: corridor box module is made of corridor board group part and corridor structure column assembly;It walks Corridor board group part includes corridor module one, corridor module two, bottom corridor plate, middle layer corridor plate and top layer corridor plate, corridor structure Column assembly includes corridor structural column one and corridor structural column two;Bottom corridor plate is connected by connector and main body tank module It connects, and is connected between bottom corridor plate and one end of middle layer corridor plate by corridor structural column one, the other end of middle layer corridor plate It is connect with main body tank module, and the other end of middle layer corridor plate is connect by corridor structural column two with one end of top layer corridor plate, The other end of top layer corridor plate is connect with main body tank module;Between bottom corridor plate and middle layer corridor plate, middle layer corridor plate and top It is separately connected corridor module one and corridor module two between the plate of layer corridor, corridor module one is placed in corridor most end bay, corridor module Two are placed in the middle part of corridor.
Above-mentioned corridor module one includes that the corridor plate that the Vierendeel girder being made of four channel steels, two corner fittings form and two walk Corridor structural column.
Above-mentioned corridor module two includes the corridor plate and a corridor that the frame being made of four channel steels, a corner fittings form Structural column.
It is added on the outside of above-mentioned corridor box module and is stably connected with plate.
Above-mentioned corridor structural column one and two both ends of corridor structural column are equipped with column bottom positioning pin.
A kind of installation method of above-mentioned container house using closed corridor, characterized by the following steps:
1. after the installation for completing main body tank module at the scene, bottom corridor plate one end is passed through connector and main body tank module It is installed;
2. by the column bottom positioning pin at one both ends of corridor structural column by the other end of bottom corridor plate and middle layer corridor plate One end connection, the other end of middle layer corridor plate are installed by connector and main body tank module, form bottom corridor box body formwork Block;
3. in bottom corridor, the fast outside of box body formwork, which is added, is stably connected with plate, then by corridor module one and corridor module two into Row connection;
4. middle layer corridor plate is connect by the column bottom positioning pin by two both ends of corridor structural column with one end of top layer corridor plate, The other end of top layer corridor plate is installed by connector and main body tank module, forms top layer corridor box module;
5. being added on the outside of the box module of top layer corridor and being stably connected with plate, corridor module one and corridor module two are connected It connects;
6. last laying floor layer and installation corridor door and window, the closed corridor of container house are completed.
The present invention has the advantage that and good effect:
1, the present invention can be installed on corridor intraoral illumination pipeline in adjacent main tank module, to realize that corridor cabinet is not set The purpose of pipeline.
2, corridor box module is split into corridor board group part and corridor structural column by the present invention, and corridor board group part includes corridor Module one, corridor module two, bottom corridor plate, middle layer corridor plate and top layer corridor plate, corridor structural column include corridor structural column One and corridor structural column two, transport to scene is installed.After the installation for completing main body case, corridor cabinet steel column angle is not used The connection method of part and main body case corner fittings, and directly realized and connected with main tank module by bolt, and connecting node is both safe It is reliable and convenient and efficient, construction efficiency is greatly improved, while meeting the requirement of construction precision.
3, the present invention can finally add on the outside of the box module of corridor is stably connected with plate, makes whole reasonable stress, guarantees knot The overall stability of structure.
4, present invention production is more standardized, and construction production is simple.Compared to the knot that room tank module in corridor saves about 2/3 The cost of structure column and one layer of corridor roof box, and transportation cost substantially reduces after the fractionation of corridor box module.
Detailed description of the invention:
Fig. 1 is the schematic diagram that main tank module is connected with corridor cabinet;
Fig. 2 is the a-a sectional view of Fig. 1;
Fig. 3 is the b-b sectional view of Fig. 1;
Fig. 4 is the schematic diagram of corridor module one;
Fig. 5 is the schematic diagram of corridor module two;
Fig. 6 is the schematic diagram of corridor structural column one;
Fig. 7 is the schematic diagram of corridor structural column two;
Fig. 8 is bottom corridor plate and main body case module connection diagram, wherein Fig. 8-1 is the portion the A enlarged drawing of Fig. 8, figure 8-2 is that a-a sectional view, the 8-3 of Fig. 8-1 are the b-b sectional views of Fig. 8-1;
Fig. 9 is the schematic diagram that corridor structural column one is connect with bottom corridor plate and middle layer corridor plate, wherein Fig. 9-1 is Fig. 9 The portion B enlarged drawing, Fig. 9-2 be that c-c sectional view, the 9-3 of Fig. 9-1 are the d-d sectional views of Fig. 9-1;
Figure 10 is the schematic diagram after being attached corridor module one and corridor module two after connection middle layer corridor plate, In, Figure 10-1 is the portion the C enlarged drawing of Figure 10;
Figure 11 is the schematic diagram that corridor structural column two is connect with middle layer corridor plate with top layer corridor plate, wherein Figure 11-1 is The portion D enlarged drawing, Figure 11-2 of Figure 11 is that e-e sectional view, the 11-3 of Figure 11-1 are the f-f sectional views of Figure 11-1;
Figure 12 is after connection after the plate of top layer corridor, then the signal after corridor module one and corridor module two are attached Figure, wherein Figure 12-1 is the portion E enlarged drawing.
In figure: 1-main body tank module;2-corridor modules one;3-corridor modules two;4-bottom corridor board group parts one; 5-middle layer corridor board group parts two;6-top layer corridor board group parts three;7-corridor structural columns one;8-corridor structural columns two;9, 10-are stably connected with plate.
Specific embodiment:
It is as shown in Figure 1, 2, 3: a kind of container house using closed corridor, including main tank module and corridor cabinet Module, it is characterised in that: corridor box module is made of corridor board group part and corridor structure column assembly;Corridor board group part includes walking Corridor module one, corridor module two, bottom corridor plate, middle layer corridor plate and top layer corridor plate, corridor structure column assembly includes corridor Structural column one and corridor structural column two;Bottom corridor plate is connect by connector with main body tank module, and bottom corridor plate It is connected between one end of middle layer corridor plate by corridor structural column one, the other end and main body tank module of middle layer corridor plate connect Connect, and the other end of middle layer corridor plate is connect by corridor structural column two with one end of top layer corridor plate, top layer corridor plate it is another One end is connect with main body tank module;Divide between bottom corridor plate and middle layer corridor plate, between middle layer corridor plate and top layer corridor plate Not Lian Jie corridor module one and corridor module two, corridor module one is placed in corridor most end bay, and corridor module two is placed in the middle part of corridor.
The corridor module is divided into two kinds, as shown in Figure 4;Corridor module 1 includes the frame being made of four channel steels The corridor board group part and two corridor structural columns that beam, two corner fittings form, are used for corridor most end bay.It is as shown in Figure 5: corridor module 23 include the corridor board group part and a corridor structural column that the Vierendeel girder being made of four channel steels, a corner fittings form, and is used for away Remaining of corridor in addition to most end bay across.
It is as shown in Figure 6,7: for corridor structural column 1 and corridor structural column 28, made according to different layers high request factory, Containing two newel post's bottom positioning pins.
The installation method of the container house using closed corridor is:
1, as shown in Figure 8;After the installation for completing main body tank module 1 at the scene, plate 4 one end in bottom corridor is passed through into connecting plate It is installed with bolt and main body tank module;
2, as shown in Figure 9: by the column bottom positioning pin at one 7 both ends of corridor structural column by the other end of bottom corridor plate 4 and One end of middle layer corridor plate 5 connects, and the other end of middle layer corridor plate 5 is pacified by connector with bolt and main body tank module 1 Dress forms corridor box module;
3, as shown in Figure 10: being added on the outside of the box module of corridor and be stably connected with plate, by corridor module 1 and corridor module 23 are attached, while guaranteeing the overall stability of structure;
4, as shown in figure 11: by the column bottom positioning pin at 28 both ends of corridor structural column by middle layer corridor plate 5 and top layer corridor One end of plate 6 connects, and the other end of top layer corridor plate 6 is installed by bolt with main body tank module 1, forms top layer corridor case Module;
5, as shown in figure 12: being added on the outside of the box module of top layer corridor and be stably connected with plate, by corridor module 1 and corridor Module 23 is attached, while guaranteeing the overall stability of structure.
6, last laying floor layer and installation corridor door and window, the closed corridor of container house are completed.

Claims (6)

1. a kind of container house using closed corridor, including main tank module and corridor box module, it is characterised in that: Corridor box module is made of corridor board group part and corridor structure column assembly;Corridor board group part includes corridor module one, corridor mould Block two, bottom corridor plate, middle layer corridor plate and top layer corridor plate, corridor structure column assembly include corridor structural column one and corridor knot Structure column two;Bottom corridor plate is connect by connector with main body tank module, and the one of bottom corridor plate and middle layer corridor plate It being connected between end by corridor structural column one, the other end of middle layer corridor plate is connect with main body tank module, and middle layer corridor plate The other end is connect by corridor structural column two with one end of top layer corridor plate, and the other end and main body tank module of top layer corridor plate connect It connects;One and of corridor module is separately connected between bottom corridor plate and middle layer corridor plate, between middle layer corridor plate and top layer corridor plate Corridor module two, corridor module one are placed in corridor most end bay, and corridor module two is placed in the middle part of corridor.
2. a kind of container house using closed corridor according to claim 1, it is characterised in that: the corridor mould Block one includes the corridor plate and two corridor structural columns that the Vierendeel girder being made of four channel steels, two corner fittings form.
3. a kind of container house using closed corridor according to claim 1, it is characterised in that: the corridor mould Block two includes the corridor plate and a corridor structural column that the frame being made of four channel steels, a corner fittings form.
4. a kind of container house using closed corridor according to claim 1, it is characterised in that: the corridor case It is added on the outside of module and is stably connected with plate.
5. a kind of container house using closed corridor according to claim 1, it is characterised in that: the corridor knot Structure column one and two both ends of corridor structural column are equipped with column bottom positioning pin.
6. a kind of installation method of the container house using closed corridor a kind of according to claim 1, feature exist In: include the following steps:
1. after the installation for completing main body tank module at the scene, bottom corridor plate one end is carried out by connector and main body tank module Installation;
2. by the column bottom positioning pin at one both ends of corridor structural column by one end of the other end of bottom corridor plate and middle layer corridor plate Connection, the other end of middle layer corridor plate are installed by connector and main body tank module, form bottom corridor box module;
3. in bottom corridor, the fast outside of box body formwork, which is added, is stably connected with plate, then corridor module one and corridor module two are connected It connects;
4. middle layer corridor plate is connect by the column bottom positioning pin by two both ends of corridor structural column with one end of top layer corridor plate, top layer The other end of corridor plate is installed by connector and main body tank module, forms top layer corridor box module;
5. being added on the outside of the box module of top layer corridor and being stably connected with plate, corridor module one and corridor module two are attached;
6. last laying floor layer and installation corridor door and window, the closed corridor of container house are completed.
CN201810893796.6A 2018-08-08 2018-08-08 A kind of container house and its installation method using closed corridor Pending CN109629856A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810893796.6A CN109629856A (en) 2018-08-08 2018-08-08 A kind of container house and its installation method using closed corridor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810893796.6A CN109629856A (en) 2018-08-08 2018-08-08 A kind of container house and its installation method using closed corridor

Publications (1)

Publication Number Publication Date
CN109629856A true CN109629856A (en) 2019-04-16

Family

ID=66066244

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810893796.6A Pending CN109629856A (en) 2018-08-08 2018-08-08 A kind of container house and its installation method using closed corridor

Country Status (1)

Country Link
CN (1) CN109629856A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104712150A (en) * 2013-12-12 2015-06-17 扬州通利冷藏集装箱有限公司 Outdoor corridor and transportation method thereof
CN205024835U (en) * 2015-08-28 2016-02-10 中建八局第三建设有限公司 Box movable board house in built -in corridor
KR101644921B1 (en) * 2016-02-01 2016-08-03 빌드윈 주식회사 Construction methods of joining two or more container houses along their long sides
CN206888595U (en) * 2017-07-13 2018-01-16 惠州惠集特种装备制造有限公司 A kind of loose mail transports field assembled house box
CN109025381A (en) * 2018-07-25 2018-12-18 中冶天工集团有限公司 A kind of container house and its installation method using closed corridor

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104712150A (en) * 2013-12-12 2015-06-17 扬州通利冷藏集装箱有限公司 Outdoor corridor and transportation method thereof
CN205024835U (en) * 2015-08-28 2016-02-10 中建八局第三建设有限公司 Box movable board house in built -in corridor
KR101644921B1 (en) * 2016-02-01 2016-08-03 빌드윈 주식회사 Construction methods of joining two or more container houses along their long sides
CN206888595U (en) * 2017-07-13 2018-01-16 惠州惠集特种装备制造有限公司 A kind of loose mail transports field assembled house box
CN109025381A (en) * 2018-07-25 2018-12-18 中冶天工集团有限公司 A kind of container house and its installation method using closed corridor

Similar Documents

Publication Publication Date Title
CN104755678B (en) Modular building
US6651393B2 (en) Construction system for manufactured housing units
CN102216539B (en) Unitised building system
US10947720B2 (en) Block construction of prefabricated buildings
CN204627053U (en) A kind of multiple field steel work ITS
US20070163184A1 (en) Transportable modular building and method of constructing thereof
CN102003082B (en) Combined box-type house and mounting method thereof
HU221798B1 (en) Prefabricated building systems
CN206667479U (en) A kind of modular combination prefabricated house
CN108560725A (en) A kind of container house column and panel wall system
CN106677349A (en) Modularly combined trailer coach and building method
CN110306674A (en) Adjustable ganglionic layer high modularization steel construction SOHO building system and construction method
CN106628012A (en) Modularized ship cabin and manufacturing and installing method thereof
CN109183988A (en) A kind of profile steel house and construction method
CN107905385A (en) The assembled arthitecutral structure and method of construction that steel construction is combined with concrete structure
CN109025381A (en) A kind of container house and its installation method using closed corridor
CN106193402B (en) Girder truss integrated form flooring module and its installation method
CN211622838U (en) Three-layer modularization fire station
CN109629856A (en) A kind of container house and its installation method using closed corridor
CN113863499A (en) Connecting structure of end frame and member
CN103866859A (en) Multi-layer moving combined house
KR102099018B1 (en) Method for building of modular structure using construction module
CN209482473U (en) A kind of sliceable building block and movable building
CN106759853B (en) Structure and heat preservation integrated assembly type box-type structure system and construction method thereof
CN211622837U (en) Two-layer modular fire station

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190416

RJ01 Rejection of invention patent application after publication