CN109598052B - Intelligent ammeter life cycle prediction method and device based on correlation coefficient analysis - Google Patents
Intelligent ammeter life cycle prediction method and device based on correlation coefficient analysis Download PDFInfo
- Publication number
- CN109598052B CN109598052B CN201811440265.8A CN201811440265A CN109598052B CN 109598052 B CN109598052 B CN 109598052B CN 201811440265 A CN201811440265 A CN 201811440265A CN 109598052 B CN109598052 B CN 109598052B
- Authority
- CN
- China
- Prior art keywords
- life cycle
- meter
- representing
- manufacturer
- failure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 51
- 238000004458 analytical method Methods 0.000 title claims abstract description 24
- 238000013528 artificial neural network Methods 0.000 claims abstract description 18
- 238000004422 calculation algorithm Methods 0.000 claims abstract description 15
- 230000000737 periodic effect Effects 0.000 claims abstract description 15
- 238000012795 verification Methods 0.000 claims abstract description 4
- 238000004364 calculation method Methods 0.000 claims description 33
- 238000012937 correction Methods 0.000 claims description 16
- 238000003860 storage Methods 0.000 claims description 11
- 238000012549 training Methods 0.000 claims description 11
- 238000004590 computer program Methods 0.000 claims description 8
- 238000009434 installation Methods 0.000 claims description 8
- 230000005611 electricity Effects 0.000 claims description 7
- 238000012986 modification Methods 0.000 claims description 6
- 230000004048 modification Effects 0.000 claims description 6
- 238000004519 manufacturing process Methods 0.000 claims description 3
- 230000008569 process Effects 0.000 claims description 3
- 238000012804 iterative process Methods 0.000 claims description 2
- 230000000694 effects Effects 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 8
- 238000012423 maintenance Methods 0.000 description 7
- 238000012545 processing Methods 0.000 description 3
- 238000007418 data mining Methods 0.000 description 2
- 238000005457 optimization Methods 0.000 description 2
- 238000011160 research Methods 0.000 description 2
- 238000013179 statistical model Methods 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 238000010219 correlation analysis Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000012938 design process Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000000691 measurement method Methods 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 238000012797 qualification Methods 0.000 description 1
- 238000005070 sampling Methods 0.000 description 1
- 238000007619 statistical method Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- Geometry (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention provides a method and a device for predicting the life cycle of an intelligent electric meter based on correlation coefficient analysis. The method comprises the following steps: firstly, calculating the periodic correlation of three factors of a verification unit, an ammeter manufacturer and a fault reason; then obtaining a prediction model of the prediction replacement period of the electric meter, and initializing the values of all items appearing in the model; then, determining the weight by adopting a heuristic method through iterative search, and correcting by using an updating weight mode based on a neural network algorithm; and finally designing an early warning model. The technical effects of accurate prediction of the service life cycle of the intelligent electric meter and replacement early warning are achieved.
Description
Technical Field
The invention relates to the technical field of data mining in computer science, in particular to a method and a device for predicting the life cycle of an intelligent electric meter based on correlation coefficient analysis.
Background
The intelligent electric energy meter is a novel electric energy meter which is popularized to a living application layer in a large quantity in recent years. With the worldwide development of the "smart grid" and Advanced Measurement Infrastructure (AMI) and related technologies, smart meters, which are their basic components and core devices, are attracting a large number of meter manufacturers. The smart meter needs to have high reliability and long service life under normal conditions and can continuously and uninterruptedly work under unattended conditions.
In order to effectively manage the smart meter and maintain the national power, it is very important to be able to accurately predict and estimate the life characteristics of the smart meter. Factors influencing reliability credibility of the intelligent electric meter are as follows: function, complexity, design, manufacturing process, failure criteria, operating conditions, installation maintenance, etc.
In the prior art, some scholars conduct relevant research on maintenance of the intelligent electric meter, wherein a new repairable system maintenance period prediction method based on a fault statistical model is built, and a top measurement method of the repairable system fault statistical model and the maintenance period is provided. The method has practical applicability in predicting the maintenance period of the maintainable system, but cannot be directly applied to equipment such as a smart meter which is more prone to rotation than maintenance. Furthermore, the basic concept of the credibility of electrical measuring devices is set forth in the national standard of the people's republic of China GB 17215.911-200X/IEC/TR 62059-11: 2002. But no relevant analysis is performed on the life cycle of the smart meter.
Disclosure of Invention
In view of the above, the present invention provides a method and an apparatus for predicting a life cycle of a smart meter based on correlation coefficient analysis, so as to solve or at least partially solve the technical problem in the prior art that the life cycle of the smart meter cannot be accurately predicted.
In order to solve the technical problem, a first aspect of the present invention provides a method for predicting a life cycle of a smart meter based on correlation coefficient analysis, including:
step S1: calculating and verifying the periodic correlation among three factors of a unit, an electric meter manufacturer and a fault reason, wherein the periodic correlation specifically comprises the following steps:mu 'and sigma' respectively represent the average value and the variance of the service life of each corresponding ammeter in the same unit with different fault reasons of the same ammeter manufacturer;
step S2: according to the period correlation, a life cycle prediction model of the intelligent electric meter is constructed, and the prediction model specifically comprises the following steps:
wherein M represents the total number of the manufacturers of the electric meter, N represents the total number of the fault reasons, W represents the total number of units, min (M, N) represents the minimum value in M, N,
wherein, ω is1、ω2As a weighting factor, the initial value is 1.00,representing the number weighted life cycle average of all meters produced by meter manufacturer j in all units; omegaDiLife cycle impact weight in units of i; omegaFjMainErrorLife cycle impact weight representing the primary cause of failure for meter manufacturer j; omegaDiCorrelationErrorLife cycle influence weight representing the correlation fault cause of unit i;
step S3: and predicting the life cycle of the intelligent electric meter based on the life cycle prediction model of the intelligent electric meter.
In one embodiment, after step S2, the method further comprises:
updating weight mode pair weight factor omega based on preset neural network algorithm1And ω2The correction is carried out so that the correction is carried out,
and optimizing the prediction model based on the corrected weight factor.
In one embodiment, the method further comprises:
obtaining a predicted life cycle and an average error rate according to a prediction result obtained through the prediction model;
acquiring early warning time corresponding to the intelligent ammeter based on the predicted life cycle and the average error rate;
and setting early warning reminding according to the early warning time.
In one embodiment, the weighting parameters in step S2ωDi、ωFjMainErrorAnd ωDiCorrelationErrorThe calculation method of (c) is as follows:
is calculated byWherein,record, maxN, representing the h-th meter of the manufacturer j that manufactured the smart meterFjRepresents the maximum number of records of the meter factory j, maxError represents the maximum fault rate allowed by a single batch, the default value is 2 percent, and ErrorFjhH-th record, T, representing the number of faulty meters of meter factory jErrorTimeIndicating the time of failure, T, of the watchInstallTimeRepresents the initial installation time of the electricity meter,indicating the number of plant j fault tables;
wherein,the number of the a-th electric meters in the unit i is represented; max NiaThe maximum value of the number of records in the unit i,the a-th life cycle record representing the unit i,the calculation method comprises the following steps: represents the life cycle average of all meters used in unit i, sum represents the total number of units;
ωFjMainErroris calculated by Number weighted life cycle mean, T, representing the major cause of failure for meter manufacturer jallThe number representing all the causes of failure weights the mean of the life cycle averages,the calculation method comprises the following steps:max NFjMainErrorthe maximum number of records of life cycle of the main cause of failure K of meter manufacturer j,a kth record of the number of meters indicating the main causes of failure for meter manufacturer j;
ωDiCorrelationErrorthe calculation method of (2) is as follows:wherein,the quantity representing all the causes of failure is weighted by the life cycle average,NAllErrorthe maximum number of categories representing the cause of the fault,the number representing the cause of the fault i, weights the life cycle, wherein,number weighted life cycle mean value representing correlation fault cause of meter manufacturer jmax N represents the maximum number of records of the correlation failure cause of the manufacturer j,the ith cycle representing the cause of the fault j is rotated.
In one embodiment, the life cycle data of the smart meter of a real unit i-meter manufacturer j is predefinedAs reference data, the weight factor omega is subjected to weight updating based on the updating weight mode of the preset neural network algorithm1And ω2The correction specifically includes:
step S4.1: randomly extracting 2/3 electric meters from all the pre-acquired intelligent electric meter information records to serve as a training set, then randomly extracting 2/3 electric meters from the training set to serve as a training sample set, and taking the rest 1/3 of all the intelligent electric meter information records as a reference set, wherein the number of individuals in the reference set is A and is a positive integer;
performing prediction by taking the prediction object as an individual in the reference set to obtain a predicted value
Step S4.3: determining whether the absolute value of the difference between the predicted value and the reference value is less than a threshold value delta, i.e.If yes, go to step S4.4;
Step S4.5: and judging whether each individual in the reference set is predicted to be finished or not, if so, finishing, and if not, continuing iteration and executing the step S4.2.
Based on the same inventive concept, the second aspect of the present invention provides a device for predicting life cycle of a smart meter based on correlation coefficient analysis, comprising:
the calculation and verification module is used for calculating and verifying the periodic correlation among three factors, namely a unit, an electric meter manufacturer and a fault reason, wherein the periodic correlation specifically comprises the following steps:mu 'and sigma' respectively represent the average value and the variance of the service life of each corresponding ammeter in the same unit with different fault reasons of the same ammeter manufacturer;
the model building module is used for building a life cycle prediction model of the intelligent electric meter according to the cycle correlation, and the prediction model specifically comprises the following steps:
wherein M represents the total number of the manufacturers of the electric meter, N represents the total number of the fault reasons, W represents the total number of units, min (M, N) represents the minimum value in M, N,
wherein, ω is1、ω2As a weighting factor, the initial value is 1.00,representing the number weighted life cycle average of all meters produced by meter manufacturer j in all units; omegaDiLife cycle impact weight in units of i; omegaFjMainErrorLife cycle impact weight representing the primary cause of failure for meter manufacturer j; omegaDiCorrelationErrorLife cycle influence weight representing the correlation fault cause of unit i;
and the prediction module is used for predicting the service life of the intelligent electric meter based on the service life prediction model of the intelligent electric meter.
In one embodiment, the method further comprises a prediction model optimization module for, after building the prediction model:
updating weight mode pair weight factor omega based on preset neural network algorithm1And ω2The correction is carried out so that the correction is carried out,
and optimizing the prediction model based on the corrected weight factor.
In one embodiment, the system further comprises an early warning setting module, specifically configured to:
obtaining a predicted life cycle and an average error rate according to a prediction result obtained through the prediction model;
acquiring early warning time corresponding to the intelligent ammeter based on the predicted life cycle and the average error rate;
and setting early warning reminding according to the early warning time.
In one embodiment, the weight parameters in the model building moduleωDi、ωFjMainErrorAnd ωDiCorrelationErrorThe calculation method of (c) is as follows:
is calculated byWherein,record, maxN, representing the h-th meter of the manufacturer j that manufactured the smart meterFjRepresents the maximum number of records of the meter factory j, maxError represents the maximum fault rate allowed by a single batch, the default value is 2 percent, and ErrorFjhH-th record, T, representing the number of faulty meters of meter factory jErrorTimeIndicating the time of failure, T, of the watchInstallTimeRepresents the initial installation time of the electricity meter,indicating the number of plant j fault tables;
wherein,the number of the a-th electric meters in the unit i is represented; max NiaThe maximum value of the number of records in the unit i,the a-th life cycle record representing the unit i,the calculation method comprises the following steps: represents the life cycle average of all meters used in unit i, sum represents the total number of units;
ωFjMainErroris calculated by Number weighted life cycle mean, T, representing the major cause of failure for meter manufacturer jallThe number representing all the causes of failure weights the mean of the life cycle averages,the calculation method comprises the following steps:max NFjMainErrorthe maximum number of records of life cycle of the main cause of failure K of meter manufacturer j,a kth record of the number of meters indicating the main causes of failure for meter manufacturer j;
ωDiCorrelationErrorthe calculation method of (2) is as follows:wherein,the quantity representing all the causes of failure is weighted by the life cycle average,NAllErrorthe maximum number of categories representing the cause of the fault,the number representing the cause of the fault i, weights the life cycle, wherein,number weighted life cycle mean value representing correlation fault cause of meter manufacturer jmax N represents the maximum number of records of the correlation failure cause of the manufacturer j,the ith cycle representing the cause of the fault j is rotated.
Based on the same inventive concept, a third aspect of the present invention provides a computer-readable storage medium having stored thereon a computer program which, when executed, performs the method of the first aspect.
One or more technical solutions in the embodiments of the present application have at least one or more of the following technical effects:
the invention provides a life cycle prediction method of an intelligent electric meter based on correlation coefficient analysis. The invention provides a life cycle prediction method of an intelligent ammeter based on correlation coefficient analysis, which can obtain a prediction model of the life cycle of the ammeter according to unit influence factors, manufacturer influence factors and fault type influence factors as main parameters and by taking a neural network algorithm as parameter training assistance.
Furthermore, a heuristic method is adopted to iteratively search and determine the weight, and an updating weight mode based on a neural network algorithm is used for correction, so that the constructed prediction model can be optimized, and the prediction accuracy is further improved.
Furthermore, the invention also provides an early warning mechanism, and when the intelligent ammeter is actually applied, a power management department can utilize the model to carry out regular sampling inspection on the intelligent ammeter when the service life cycle of the intelligent ammeter is close.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a flowchart of a life cycle prediction method for an intelligent electric meter based on correlation coefficient analysis according to an embodiment of the present invention;
FIG. 2 is a flow chart of a method for determining weights by iterative search using a heuristic approach based on neural networks;
FIG. 3 is a block diagram of an apparatus for predicting life cycle of a smart meter based on correlation coefficient analysis according to an embodiment of the present invention;
fig. 4 is a block diagram of a computer-readable storage medium according to an embodiment of the present invention.
Detailed Description
The invention aims to provide a method and a device for predicting the life cycle of an intelligent electric meter based on correlation coefficient analysis, aiming at the problems of reliability of the intelligent electric meter caused by long-term unattended operation and the problem that the life cycle of the intelligent electric meter cannot be accurately predicted by the conventional method.
In order to achieve the above object, the main concept of the present invention is as follows: by applying the basic principle of data mining, the periodic correlation among three factors of a unit, an ammeter manufacturer and a fault reason is calculated and verified, a prediction model based on relevant parameter analysis is constructed, and the service life of the intelligent ammeter is predicted by using the prediction model.
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all embodiments of the present invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example one
The embodiment provides a smart meter life cycle prediction method based on correlation coefficient analysis, please refer to fig. 1, and the method includes:
step S1 is first executed: calculating and verifying the periodic correlation among three factors of a unit, an electric meter manufacturer and a fault reason, wherein the periodic correlation specifically comprises the following steps:the μ 'and σ' respectively represent the average value and the variance of the life of each electric meter corresponding to the same electric meter manufacturer in the same unit with different fault causes.
Specifically, correlation coefficient analysis is a statistical analysis method for studying the correlation between two or more equally positioned random variables. For example, between the height and weight of a person; the correlation between the relative humidity in the air and the rainfall is a problem of relevant analytical research. Correlation analysis can be applied to various fields such as industry and agriculture, hydrology, meteorology, social economy, biology and the like by finding various correlation characteristics among random variables.
In a specific implementation process, the method utilizes fault information data, provided by a certain unit, of the intelligent electric meters in the operation process of each power bureau, and analyzes the performance difference factors of the meters caused by the difference of the unit using the intelligent electric meters and the manufacturer of the intelligent electric meters. And the design and manufacturing process are different according to different manufacturers. The "fault type" can express the difference of possible element components of the intelligent electric meter. The "unit using the electricity meter" may cause differences in operating environments such as geographical environment, temperature, humidity, and the like, and differences in installation and maintenance conditions.
Then, step S2 is executed: according to the period correlation, a life cycle prediction model of the intelligent electric meter is constructed, and the prediction model specifically comprises the following steps:
wherein M represents the total number of the manufacturers of the electric meter, N represents the total number of the fault reasons, W represents the total number of units, min (M, N) represents the minimum value in M, N,
Wherein, ω is1、ω2As a weighting factor, the initial value is 1.00,representing the number weighted life cycle average of all meters produced by meter manufacturer j in all units; omegaDiLife cycle impact weight in units of i; omegaFjMainErrorLife cycle impact weight representing the primary cause of failure for meter manufacturer j; omegaDiCorrelationErrorLife cycle impact weight, T, representing the cause of a correlation failure in unit iDiFjFor the weight-influencing parameters, it is, in general,when only the primary cause of the fault is considered,
specifically, the step is to initialize a prediction model of the life cycle of the smart meter and calculate various weight parameters influencing the life cycle.
Specifically, the weight parameter in step S2ωDi、ωFjMainErrorAnd ωDiCorrelationErrorThe calculation method of (c) is as follows:
is calculated byWherein,record, maxN, representing the h-th meter of the manufacturer j that manufactured the smart meterFjRepresents the maximum number of records of the meter factory j, maxError represents the maximum fault rate allowed by a single batch, the default value is 2 percent, and ErrorFjhH-th record, T, representing the number of faulty meters of meter factory jErrorTimeIndicating the time of failure, T, of the watchInstallTimeRepresents the initial installation time of the electricity meter,indicating the number of plant j fault tables;
wherein,the number of the a-th electric meters in the unit i is represented; max NiaThe maximum value of the number of records in the unit i,the a-th life cycle record representing the unit i,the calculation method comprises the following steps: represents the life cycle average of all meters used in unit i, sum represents the total number of units;
ωFjMainErroris calculated by Number weighted life cycle mean, T, representing the major cause of failure for meter manufacturer jallThe number representing all the causes of failure weights the mean of the life cycle averages,the calculation method comprises the following steps:max NFjMainErrorthe maximum number of records of life cycle of the main cause of failure K of meter manufacturer j,a kth record of the number of meters indicating the main causes of failure for meter manufacturer j;
ωDiCorrelationErrorthe calculation method of (2) is as follows:wherein,the quantity representing all causes of failure weights the life cycle mean,NAllErrorthe maximum number of categories representing the cause of the fault,the number representing the cause of the fault i, weights the life cycle, wherein,number weighted life cycle mean value representing correlation fault cause of meter manufacturer jmax N represents the maximum number of records of the correlation failure cause of the manufacturer j,the ith cycle representing the cause of the fault j is rotated.
Step S3 is executed next: and predicting the life cycle of the intelligent electric meter based on the life cycle prediction model of the intelligent electric meter.
Specifically, the life cycle of the smart meter can be predicted through the constructed prediction models mu 'and sigma', and the prediction result is the life cycle of the smart meter, such as 5 years, 10 years and the like.
To improve the accuracy of the prediction, in one embodiment, after step S2, the method further comprises:
updating weight mode pair weight factor omega based on preset neural network algorithm1And ω2The correction is carried out so that the correction is carried out,
and optimizing the prediction model based on the corrected weight factor.
In particular, a heuristic method may be employed to iteratively search for the determined weight factors based on the neural network.
In one embodiment, the life cycle data of the smart meter of a real unit i-meter manufacturer j is predefinedAs reference data, the weight factor omega is subjected to weight updating based on the updating weight mode of the preset neural network algorithm1And ω2The correction specifically includes:
step S4.1: randomly extracting 2/3 electric meters from all the pre-acquired intelligent electric meter information records to serve as a training set, then randomly extracting 2/3 electric meters from the training set to serve as a training sample set, and taking the rest 1/3 of all the intelligent electric meter information records as a reference set, wherein the number of individuals in the reference set is A and is a positive integer;
performing prediction by taking the prediction object as an individual in the reference set to obtain a predicted value
Step S4.3: determining whether the absolute value of the difference between the predicted value and the reference value is less than a threshold value delta, i.e.If yes, go to step S4.4;
Step S4.5: and judging whether each individual in the reference set is predicted to be finished or not, if so, finishing, and if not, continuing iteration and executing the step S4.2.
Specifically, referring to fig. 2, a flowchart of a method for determining weights by using heuristic iterative search based on a neural network is shown, where life cycle data of a smart meter of a real unit i-meter manufacturer j is predefinedAs reference data. In specific implementation, an individual variable X may be set, the initial value is 1, the corresponding individual is used as a prediction object, and then through iteration, every time an individual is calculated, X is added by 1, until all the individuals in the reference set are calculated, the iteration is completed. In the iterative process, the updating condition and the updating mode of the specific weight factor are included. Through the updated weight factors, the prediction model can be optimized, and the prediction effect is further improved. In addition, after the weight factor is updated, the periodic correlation is further verified, and a fuzzy early warning function is added, so that the practicability of the method is improved.
In one embodiment, the method further comprises:
obtaining a predicted life cycle and an average error rate according to a prediction result obtained through the prediction model;
acquiring early warning time corresponding to the intelligent ammeter based on the predicted life cycle and the average error rate;
and setting early warning reminding according to the early warning time.
In particular, in order to make the prediction model in the present invention better applicable, it can be realized by: in practical application, fuzzy early warning can be added, the predicted life cycle is set as A, the average error rate is set as B, and when the early warning time of the intelligent ammeter is T-A-B. When the automatic early warning is reminded, the intelligent electric meter is subjected to spot check. If the qualification rate of the spot check reaches 95%, the current batch of the electric meters are continuously used, otherwise, the rotation processing is carried out.
The invention provides a life cycle prediction method of an intelligent electric meter based on correlation coefficient analysis. The invention provides a life cycle prediction method of an intelligent ammeter based on correlation coefficient analysis, which takes a unit influence factor, a manufacturer influence factor and a fault type influence factor as main parameters and takes a neural network algorithm as parameter training assistance to obtain a prediction model of the life cycle of the ammeter.
Based on the same inventive concept, the application also provides a device corresponding to the method for predicting the life cycle of the smart meter based on the correlation coefficient analysis in the first embodiment, which is detailed in the second embodiment.
Example two
The present embodiment provides a smart meter life cycle prediction method and device based on correlation coefficient analysis, please refer to fig. 3, the device includes:
the calculation and verification module 301 is configured to calculate and verify a periodic correlation among three factors, namely a unit, an electric meter manufacturer, and a fault reason, where the periodic correlation specifically includes:mu 'and sigma' respectively represent the average value and the variance of the service life of each corresponding ammeter in the same unit with different fault reasons of the same ammeter manufacturer;
the model building module 302 is configured to build a life cycle prediction model of the smart meter according to the cycle correlation, where the prediction model specifically includes:
wherein M represents the total number of the manufacturers of the electric meter, N represents the total number of the fault reasons, W represents the total number of units, min (M, N) represents the minimum value in M, N,
Wherein, ω is1、ω2As a weighting factor, the initial value is 1.00,representing the number weighted life cycle average of all meters produced by meter manufacturer j in all units; omegaDiLife cycle impact weight in units of i; omegaFjMainErrorLife cycle impact weight representing the primary cause of failure for meter manufacturer j; omegaDiCorrelationErrorLife cycle influence weight representing the correlation fault cause of unit i;
and the predicting module 303 is used for predicting the life cycle of the intelligent electric meter based on the life cycle prediction model of the intelligent electric meter.
In one embodiment, the method further comprises a prediction model optimization module for, after building the prediction model:
updating weight mode pair weight factor omega based on preset neural network algorithm1And ω2The correction is carried out so that the correction is carried out,
and optimizing the prediction model based on the corrected weight factor.
In one embodiment, the system further comprises an early warning setting module, specifically configured to:
obtaining a predicted life cycle and an average error rate according to a prediction result obtained through the prediction model;
acquiring early warning time corresponding to the intelligent ammeter based on the predicted life cycle and the average error rate;
and setting early warning reminding according to the early warning time.
In one embodiment, the weight parameters in the model building moduleωDi、ωFjMainErrorAnd ωDiCorrelationErrorThe calculation method of (c) is as follows:
is calculated byWherein,record, maxN, representing the h-th meter of the manufacturer j that manufactured the smart meterFjRepresents the maximum number of records of the meter factory j, maxError represents the maximum fault rate allowed by a single batch, the default value is 2 percent, and ErrorFjhH-th record, T, representing the number of faulty meters of meter factory jErrorTimeIndicating the time of failure, T, of the watchInstallTimeRepresents the time of initial installation of the electricity meter,indicating the number of plant j fault tables;
wherein,the number of the a-th electric meters in the unit i is represented; max NiaThe maximum value of the number of records in the unit i,the a-th life cycle record representing the unit i,the calculation method comprises the following steps: represents the life cycle average of all meters used in unit i, sum represents the total number of units;
ωFjMainErroris calculated by Number weighted life cycle mean, T, representing the major cause of failure for meter manufacturer jallThe number representing all the causes of failure weights the mean of the life cycle averages,the calculation method comprises the following steps:max NFjMainErrorthe maximum number of records of life cycle of the main cause of failure K of meter manufacturer j,number of meters indicating the major cause of failure of meter manufacturer jk records are recorded;
ωDiCorrelationErrorthe calculation method of (2) is as follows:wherein,the quantity representing all causes of failure weights the life cycle mean,NAllErrorthe maximum number of categories representing the cause of the fault,the number representing the cause of the fault i, weights the life cycle, wherein,number weighted life cycle mean value representing correlation fault cause of meter manufacturer jmax N represents the maximum number of records of the correlation failure cause of the manufacturer j,the ith cycle representing the cause of the fault j is rotated.
Since the device described in the second embodiment of the present invention is a device used for predicting the life cycle of the smart meter based on the correlation coefficient analysis in the first embodiment of the present invention, a person skilled in the art can understand the specific structure and deformation of the device based on the method described in the first embodiment of the present invention, and thus the details are not described herein. All the devices adopted in the method of the first embodiment of the present invention belong to the protection scope of the present invention.
EXAMPLE III
Based on the same inventive concept, the present application further provides a computer-readable storage medium 400, please refer to fig. 4, on which a computer program 411 is stored, which when executed implements the method in the first embodiment.
Since the computer-readable storage medium introduced in the third embodiment of the present invention is a computer-readable storage medium used for implementing the correlation coefficient analysis-based smart meter life cycle prediction in the first embodiment of the present invention, based on the method introduced in the first embodiment of the present invention, persons skilled in the art can understand the specific structure and deformation of the computer-readable storage medium, and thus details are not described herein. The computer readable storage medium used in the method according to the embodiment of the present invention is within the scope of the present invention.
As will be appreciated by one skilled in the art, embodiments of the present invention may be provided as a method, system, or computer program product. Accordingly, the present invention may take the form of an entirely hardware embodiment, an entirely software embodiment or an embodiment combining software and hardware aspects. Furthermore, the present invention may take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, and the like) having computer-usable program code embodied therein.
The present invention is described with reference to flowchart illustrations and/or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of the invention. It will be understood that each flow and/or block of the flow diagrams and/or block diagrams, and combinations of flows and/or blocks in the flow diagrams and/or block diagrams, can be implemented by computer program instructions. These computer program instructions may be provided to a processor of a general purpose computer, special purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, create means for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
While preferred embodiments of the present invention have been described, additional variations and modifications in those embodiments may occur to those skilled in the art once they learn of the basic inventive concepts. Therefore, it is intended that the appended claims be interpreted as including preferred embodiments and all such alterations and modifications as fall within the scope of the invention.
It will be apparent to those skilled in the art that various modifications and variations can be made in the embodiments of the present invention without departing from the spirit or scope of the embodiments of the invention. Thus, if such modifications and variations of the embodiments of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to encompass such modifications and variations.
Claims (6)
1. The intelligent ammeter life cycle prediction method based on correlation coefficient analysis is characterized by comprising the following steps:
step S1: calculating and verifying the periodic correlation among three factors of a unit, an electric meter manufacturer and a fault reason, wherein the periodic correlation specifically comprises the following steps:mu 'and sigma' respectively represent the average value and the variance of the service life of each corresponding ammeter in the same unit with different fault reasons of the same ammeter manufacturer;
step S2: according to the period correlation, a life cycle prediction model of the intelligent electric meter is constructed, and the prediction model specifically comprises the following steps:
wherein M represents the total number of manufacturers of the electric meter, N represents the total number of fault causes, W represents the total number of units, min (M, N) represents the minimum value in M, N,
wherein, ω is1、ω2As a weighting factor, the initial value is 1.00,representing the number weighted life cycle average of all meters produced by meter manufacturer i in all units;represents the life cycle impact weight in units of K;life cycle impact weight representing the major cause of failure for meter manufacturer i;the life cycle of the correlation failure cause representing the unit K affects the weight, wherein, when only the primary failure cause is considered,
step S3: predicting the life cycle of the intelligent electric meter based on the life cycle prediction model of the intelligent electric meter;
after step S2, the method further includes:
updating weight mode pair weight factor omega based on preset neural network algorithm1And ω2The correction is carried out so that the correction is carried out,
optimizing the prediction model based on the corrected weight factor;
when the weight factor is corrected based on the updating weight mode of the preset neural network algorithm, real life cycle data of the intelligent electric meter of a unit K electric meter manufacturer i is predefinedThe reference data specifically include: setting an individual variable X with an initial value of 1, taking the corresponding individual as a prediction object, then adding 1 to X through iteration after each individual is calculated until all the individuals in the reference set are calculated, and then finishing the iterationIn the iterative process, the updating condition and the updating mode of the specific weight factor are included;
after updating the weight factors, the method further comprises verifying the periodic correlation;
the method further comprises the following steps:
obtaining a predicted life cycle and an average error rate according to a prediction result obtained through the prediction model;
acquiring early warning time corresponding to the intelligent ammeter based on the predicted life cycle and the average error rate;
and setting early warning reminding according to the early warning time.
2. The method of claim 1, wherein the weight parameter in step S2 Andthe calculation method of (c) is as follows:
Wherein,record, maxN, representing the h-th meter of the meter manufacturer iFiRepresents the maximum number of records of the meter manufacturer i, and maxError represents the maximum allowable number of a single batchHigh failure rate, default 2%, ErrorFihH-th record, T, indicating the number of faulty meters from the meter manufacturer iErrorTimeIndicating the time of failure, T, of the watchInstallTimeRepresents the initial installation time of the electricity meter,representing the number of fault meters of a meter manufacturer i;
is calculated byWherein, TDkWhich represents the life cycle in units of K,denotes the average life cycle, T, of all unitsDkThe calculation method is as follows:
the number of the a-th electric meters in the unit K is represented; maxNKaRepresents the maximum value of the number of recording pieces in the unit K,the a-th life cycle record representing the unit K,the calculation method comprises the following steps: represents the life cycle average of all meters in units of K usage, sum represents the total number of units;
is calculated by Number weighted life cycle average representing the major cause of failure for meter manufacturer i,the number representing all the causes of failure weights the mean of the life cycle averages,the calculation method comprises the following steps:maxNFiMainErrorthe maximum number of records of life cycles of the main cause of failure of the meter manufacturer i,a kth record of the number of meters indicating the major cause of failure for meter manufacturer i;
the calculation method of (2) is as follows:wherein,the quantity representing all causes of failure weights the life cycle mean,NAllErrorthe maximum number of categories representing the cause of the fault,the number representing the cause of failure, j, weights the life cycle, where,number weighted life cycle mean value representing relevant fault causes for meter manufacturer imaxN represents the maximum number of records of the correlation failure cause of the manufacturer i,indicating the i-th cycle rotation of meter manufacturer i.
3. The method of claim 2, wherein a real unit of smart meter life cycle data for K meter manufacturer i is predefinedAs reference data, the weight factor omega is subjected to weight updating based on the updating weight mode of the preset neural network algorithm1And ω2The correction specifically includes:
step S4.1: randomly extracting 2/3 electric meters from all the pre-acquired intelligent electric meter information records to serve as a training set, then randomly extracting 2/3 electric meters from the training set to serve as a training sample set, and taking the rest 1/3 of all the intelligent electric meter information records as a reference set, wherein the number of individuals in the reference set is A and is a positive integer;
step S4.2: using formulas in predictive modelsAndperforming prediction by taking the prediction object as an individual in the reference set to obtain a predicted value
Step S4.3: determining whether the absolute value of the difference between the predicted value and the reference value is less than a threshold value delta, i.e.If yes, go to step S4.4;
4. Smart electric meter life cycle prediction device based on correlation coefficient analysis, its characterized in that includes:
the calculation and verification module is used for calculating and verifying the periodic correlation among three factors of a unit, an ammeter manufacturer and a fault reason, wherein the period isThe correlation is specifically:mu 'and sigma' respectively represent the average value and the variance of the service life of each corresponding ammeter in the same unit with different fault reasons of the same ammeter manufacturer;
the model building module is used for building a life cycle prediction model of the intelligent electric meter according to the cycle correlation, and the prediction model specifically comprises the following steps:
wherein M represents the total number of manufacturers of the electric meter, N represents the total number of fault causes, W represents the total number of units, min (M, N) represents the minimum value in M, N,
wherein, ω is1、ω2As a weighting factor, the initial value is 1.00,representing the number weighted life cycle average of all meters produced by meter manufacturer i in all units;represents the life cycle impact weight in units of k;life cycle impact weight representing the major cause of failure for meter manufacturer i;life cycle influence weight representing the cause of a correlation failure in unit k, whereWhen only the primary cause of the fault is considered,the prediction module is used for predicting the life cycle of the intelligent ammeter based on the life cycle prediction model of the intelligent ammeter;
the apparatus further comprises a weight modification module configured to:
updating weight mode pair weight factor omega based on preset neural network algorithm1And ω2The correction is carried out so that the correction is carried out,
optimizing the prediction model based on the corrected weight factor;
when the weight factor is corrected based on the updating weight mode of the preset neural network algorithm, real life cycle data of the intelligent electric meter of a unit K electric meter manufacturer i is predefinedThe reference data specifically include: setting an individual variable X, setting the initial value to be 1, taking the corresponding individual as a prediction object, adding 1 to X through iteration after one individual is calculated, and completing the iteration until all the individuals in the reference set are calculated, wherein the iteration process comprises the specific updating condition and the specific updating mode of the weight factor;
the device also comprises a fuzzy early warning module used for:
obtaining a predicted life cycle and an average error rate according to a prediction result obtained through the prediction model;
acquiring early warning time corresponding to the intelligent ammeter based on the predicted life cycle and the average error rate;
and setting early warning reminding according to the early warning time.
5. The apparatus of claim 4, in which the weight parameters in the model building moduleAndthe calculation method of (c) is as follows:
is calculated byWherein,record, maxN, representing the h-th meter of the meter manufacturer iFiRepresents the maximum number of records of the manufacturer i of the electric meter, maxError represents the maximum fault rate allowed by a single batch, the default value is 2 percent, and ErrorFihH-th record, T, indicating the number of faulty meters from the meter manufacturer iErrorTimeIndicating the time of failure, T, of the watchInstallTimeRepresents the initial installation time of the electricity meter,representing the number of fault meters of a meter manufacturer i;
is calculated byWherein, TDkWhich represents the life cycle in units of K,denotes the average life cycle, T, of all unitsDkThe calculation method is as follows:
the number of the a-th electric meters in the unit K is represented; maxNKaRepresents the maximum value of the number of recording pieces in the unit K,the a-th life cycle record representing the unit K,the calculation method comprises the following steps: represents the life cycle average of all meters in units of K usage, sum represents the total number of units;
is calculated by Number weighted life cycle average representing the major cause of failure for meter manufacturer i,the number representing all the causes of failure weights the mean of the life cycle averages,the calculation method comprises the following steps:maxNFiMainErrorthe maximum number of records of life cycles of the main cause of failure of the meter manufacturer i,a kth record of the number of meters indicating the major cause of failure for meter manufacturer i;
the calculation method of (2) is as follows:wherein,the quantity representing all the causes of failure is weighted by the life cycle average,NAllErrorthe maximum number of categories representing the cause of the fault,the number representing the cause of failure, j, weights the life cycle, where,number weighted life cycle mean value representing relevant fault causes for meter manufacturer imax N represents the maximum number of records of the cause of the correlation failure of the manufacturer i,indicating electric meter manufacturing plantThe ith cycle of quotient i is rotated.
6. A computer-readable storage medium, on which a computer program is stored, characterized in that the program, when executed, implements the method of any one of claims 1 to 3.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811440265.8A CN109598052B (en) | 2018-11-29 | 2018-11-29 | Intelligent ammeter life cycle prediction method and device based on correlation coefficient analysis |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811440265.8A CN109598052B (en) | 2018-11-29 | 2018-11-29 | Intelligent ammeter life cycle prediction method and device based on correlation coefficient analysis |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109598052A CN109598052A (en) | 2019-04-09 |
CN109598052B true CN109598052B (en) | 2022-07-05 |
Family
ID=65959833
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811440265.8A Active CN109598052B (en) | 2018-11-29 | 2018-11-29 | Intelligent ammeter life cycle prediction method and device based on correlation coefficient analysis |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109598052B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110287640B (en) * | 2019-07-03 | 2023-10-13 | 辽宁艾特斯智能交通技术有限公司 | Lighting equipment service life prediction method and device, storage medium and electronic equipment |
CN110261811A (en) * | 2019-07-05 | 2019-09-20 | 北京志翔科技股份有限公司 | Intelligent electric meter batch method for early warning and system |
CN110967695A (en) * | 2019-10-28 | 2020-04-07 | 兰州大方电子有限责任公司 | Radar echo extrapolation short-term prediction method based on deep learning |
CN115358347B (en) * | 2022-09-30 | 2023-01-31 | 山西虚拟现实产业技术研究院有限公司 | Method for predicting remaining life of intelligent electric meter under different subsystems |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102708306A (en) * | 2012-06-19 | 2012-10-03 | 华北电网有限公司计量中心 | Prediction method for q-precentile life of intelligent meter |
CN103018706A (en) * | 2012-11-16 | 2013-04-03 | 浙江省电力公司电力科学研究院 | Method and system for forecasting rotation cycle of intelligent electric meter |
CN105022019A (en) * | 2015-06-23 | 2015-11-04 | 国家电网公司 | Method of comprehensively estimating reliability of single-phase intelligent electric energy meter |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103383445A (en) * | 2013-07-16 | 2013-11-06 | 湖北省电力公司电力科学研究院 | System and method for forecasting service life and reliability of intelligent electric meter |
TWI539298B (en) * | 2015-05-27 | 2016-06-21 | 國立成功大學 | Metrology sampling method with sampling rate decision scheme and computer program product thereof |
CN106054105B (en) * | 2016-05-20 | 2019-01-15 | 国网新疆电力公司电力科学研究院 | A kind of reliability prediction correction model method for building up of intelligent electric meter |
CN108680890A (en) * | 2018-08-23 | 2018-10-19 | 重庆市计量质量检测研究院 | Intelligent electric energy meter life characteristics detection method |
CN109344967B (en) * | 2018-08-31 | 2021-09-14 | 武汉大学 | Intelligent electric meter life cycle prediction method based on artificial neural network |
-
2018
- 2018-11-29 CN CN201811440265.8A patent/CN109598052B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102708306A (en) * | 2012-06-19 | 2012-10-03 | 华北电网有限公司计量中心 | Prediction method for q-precentile life of intelligent meter |
CN103018706A (en) * | 2012-11-16 | 2013-04-03 | 浙江省电力公司电力科学研究院 | Method and system for forecasting rotation cycle of intelligent electric meter |
CN105022019A (en) * | 2015-06-23 | 2015-11-04 | 国家电网公司 | Method of comprehensively estimating reliability of single-phase intelligent electric energy meter |
Non-Patent Citations (2)
Title |
---|
智能电能表全生命周期质量跟踪策略探讨;张强等;《东北电力技术》;20150920(第09期);全文 * |
智能电表故障大数据分析探究;贺宁;《中小企业管理与科技(上旬刊)》;20160705(第07期);全文 * |
Also Published As
Publication number | Publication date |
---|---|
CN109598052A (en) | 2019-04-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110442936B (en) | Equipment fault diagnosis method, device and system based on digital twin model | |
CN109598052B (en) | Intelligent ammeter life cycle prediction method and device based on correlation coefficient analysis | |
JP2021064370A (en) | Method and system for semi-supervised deep abnormality detection for large-scale industrial monitoring system based on time-series data utilizing digital twin simulation data | |
CN107506868B (en) | Method and device for predicting short-time power load | |
CN114297036B (en) | Data processing method, device, electronic equipment and readable storage medium | |
CN116757534A (en) | Intelligent refrigerator reliability analysis method based on neural training network | |
CN107730127B (en) | Relay storage degradation data prediction method based on output characteristic initial distribution | |
Dong et al. | Short-term building cooling load prediction model based on DwdAdam-ILSTM algorithm: A case study of a commercial building | |
Liu et al. | Combined forecasting method of dissolved gases concentration and its application in condition-based maintenance | |
KR20200008621A (en) | Electrical Equipment Safety Evaluation System Using Artificial Intelligence Technique | |
CN112686481A (en) | Runoff forecasting method and processor | |
CN107992991A (en) | Annual electricity sales amount Forecasting Methodology based on external environmental factor and Co-integration Theory | |
CN109344967B (en) | Intelligent electric meter life cycle prediction method based on artificial neural network | |
CN111178585A (en) | Fault reporting amount prediction method based on multi-algorithm model fusion | |
KR20190123040A (en) | Solar power generation prediction model management APPARATUS AND METHOD for setting the renewal cycle of the deep run-based solar power generation prediction model | |
CN113988210A (en) | Method and device for restoring distorted data of structure monitoring sensor network and storage medium | |
CN116388150A (en) | Matching short-term load prediction method based on digital twin and neural network technology | |
CN116930609A (en) | Electric energy metering error analysis method based on ResNet-LSTM model | |
Ghassemi et al. | Optimal surrogate and neural network modeling for day-ahead forecasting of the hourly energy consumption of university buildings | |
CN115239971A (en) | GIS partial discharge type recognition model training method, recognition method and system | |
CN113589172A (en) | Service life estimation method for power grid components | |
CN109190749A (en) | A kind of prediction technique and device for the intelligent electric meter service life | |
CN117330963A (en) | Energy storage power station fault detection method, system and equipment | |
CN114184211B (en) | Method for judging consistency of performance change mechanism in inertial navigation reliability test | |
CN116960962A (en) | Mid-long term area load prediction method for cross-area data fusion |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |