CN109597728A - The control method and device of test equipment, computer readable storage medium - Google Patents

The control method and device of test equipment, computer readable storage medium Download PDF

Info

Publication number
CN109597728A
CN109597728A CN201811362490.4A CN201811362490A CN109597728A CN 109597728 A CN109597728 A CN 109597728A CN 201811362490 A CN201811362490 A CN 201811362490A CN 109597728 A CN109597728 A CN 109597728A
Authority
CN
China
Prior art keywords
test
equipment
crash
threshold
tested
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811362490.4A
Other languages
Chinese (zh)
Other versions
CN109597728B (en
Inventor
王小海
周慧鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Oppo Chongqing Intelligent Technology Co Ltd
Original Assignee
Oppo Chongqing Intelligent Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Oppo Chongqing Intelligent Technology Co Ltd filed Critical Oppo Chongqing Intelligent Technology Co Ltd
Priority to CN201811362490.4A priority Critical patent/CN109597728B/en
Publication of CN109597728A publication Critical patent/CN109597728A/en
Application granted granted Critical
Publication of CN109597728B publication Critical patent/CN109597728B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/22Detection or location of defective computer hardware by testing during standby operation or during idle time, e.g. start-up testing
    • G06F11/2273Test methods

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Test And Diagnosis Of Digital Computers (AREA)
  • Testing Electric Properties And Detecting Electric Faults (AREA)
  • Retry When Errors Occur (AREA)

Abstract

The invention discloses a kind of control methods of test equipment, including, obtain the test result at least one tested electronic equipment;Wherein, the test result includes the number of the test crash of at least one tested electronic equipment;If the test result meets preset condition, stop the test process of the test equipment;Wherein, the preset condition refers to that the number of the test crash is greater than preset threshold.The embodiment of the present invention also discloses the control device and computer readable storage medium of a kind of test equipment.

Description

The control method and device of test equipment, computer readable storage medium
Technical field
The present invention relates to the control methods and electronic equipment of automatic test field more particularly to a kind of test equipment, meter Calculation machine readable storage medium storing program for executing.
Background technique
With the development of electronic technology, automatic test can greatly facilitate the production activity of people;Specifically, automatically Changing test is to convert manual drive test to a kind of process of machine execution;Compared to manual test, automatic test can be with A large amount of human resources and time resource are saved, testing efficiency is improved.
In current mobile phone or other intelligent terminals in research and development of products or fabrication stage, wanted to reach the use of consumer It asks, engineer can carry out the test of software and hardware by test equipment to the terminal before factory.However, in current survey The failure of test equipment can not be timely found during examination, test equipment still is continuing to survey when test equipment failure Examination, cannot actively stop testing, therefore, be easy to cause the problem of test result inaccuracy;In addition, in the prior art, usually Artificial judgment equipment whether failure, artificial subjective factor influences the judgement of failure, therefore, it is impossible to accomplish accurate and uniformly judge Test equipment whether failure.
Summary of the invention
In order to solve the above technical problems, the embodiment of the invention provides a kind of control method and device of test equipment, meter Calculation machine readable storage medium storing program for executing.
The embodiment of the present invention provides a kind of control method of test equipment, which comprises
Obtain the test result at least one tested electronic equipment;Wherein, the test result include it is described at least The number of the test crash of one tested electronic equipment;
If the test result meets preset condition, stop the test process of the test equipment;Wherein, the default item Part refers to that the number of the test crash is greater than preset threshold.
In the above-mentioned methods, the number of the test crash includes the number or accumulative test crash of follow-on test failure Number;
Correspondingly, if the test result meets preset condition, stop the test equipment and tested, comprising:
If the number of the follow-on test failure is greater than first threshold or the number of the accumulative test crash is greater than second Threshold value stops the test process of the test equipment.
In the above-mentioned methods, when the testing time includes the number of accumulative test crash, the method also includes:
According to prefixed time interval, processing is zeroed out to the accumulative testing time;
Alternatively, being zeroed out processing to the accumulative testing time when the total degree of test reaches preset times.
In the above-mentioned methods, further includes:
Obtain the solution confidential information of input;
If the solution confidential information and preset password match of the input, start to test the tested electronic equipment.
In the above-mentioned methods, if the test parameter meets preset condition, stop to the tested electronic equipment into Before row test, the method also includes:
Based on the current test item of the test equipment, the first threshold and second threshold are obtained from server Value.
The embodiment of the present invention also provides a kind of control device of test equipment, and described device includes:
Acquiring unit, for obtaining the test result for being directed at least one tested electronic equipment;Wherein, the test result The number of test crash including at least one tested electronic equipment;
Processing unit stops the test process of the test equipment for meeting preset condition when the test result;Its In, the preset condition refers to that the number of the test crash is greater than preset threshold.
In above-mentioned apparatus, the number of the test crash includes the number or accumulative test crash of follow-on test failure Number;
The processing unit, the number specifically for working as follow-on test failure are greater than first threshold or described accumulative The number of test crash is greater than second threshold, stops the test process of the test equipment.
In above-mentioned apparatus, the acquiring unit is also used to obtain the solution confidential information of input;
The processing unit is also used to solution confidential information and preset password match when the input, starts to described tested Electronic equipment is tested.
The present invention also provides a kind of test equipment, including memory and processor, the memory, which is stored with, to be handled The computer program run on device, which is characterized in that the processor realizes the control of above-mentioned test equipment when executing described program Step in method processed.
The embodiment of the invention also provides a kind of computer readable storage mediums, are stored thereon with computer program, described Computer program is executed by processor the step of realizing any of the above-described method.
The control method and device of test equipment provided in an embodiment of the present invention, computer readable storage medium obtain needle The test result of electronic equipment is tested at least one;Wherein, the test result includes that at least one described tested electronics is set The number of standby test crash;If the test result meets preset condition, stop the test process of the test equipment;Its In, the preset condition refers to that the number of at least one tested testing for electrical equipment failure is greater than preset threshold;In this way, logical The test result for judging test equipment is crossed, whether abnormal determines test equipment, while actively stopping surveying when test equipment exception Examination;In this way, tester can intervene the test equipment to stop working;Furthermore it is possible to stop test by setting Condition carries out unified and accurately controls test equipment.
Detailed description of the invention
Fig. 1 is a kind of flow diagram of the control method for test equipment that an exemplary embodiment of the invention provides;
Fig. 2 is the flow diagram of the control method for another test equipment that an exemplary embodiment of the invention provides;
Fig. 3 is a kind of composed structure signal of the control device for figure test equipment that an exemplary embodiment of the invention provides Figure;
Fig. 4 is a kind of hardware entities schematic diagram of test equipment of an exemplary embodiment of the invention.
Specific embodiment
The characteristics of in order to more fully hereinafter understand the embodiment of the present application and technology contents, with reference to the accompanying drawing to this Shen Please the realization of embodiment be described in detail, appended attached drawing purposes of discussion only for reference is not used to limit the embodiment of the present invention.
Fig. 1 is the flow diagram of the control method of test equipment provided in an embodiment of the present invention, as shown in Figure 1, described The control method of test equipment the following steps are included:
Step 101 obtains the test result that electronic equipment is tested at least one.
Wherein, the test result includes the number of the test crash of at least one tested electronic equipment.
In other embodiments of the invention, step 101 obtains the test result at least one tested electronic equipment It can be realized by test equipment;Here, test equipment can be any type of electronic equipment with test function, such as Industrial computer.Test equipment can test any type of electronic equipment;Here, tested electronic equipment can be hand Any type of electronic equipment such as machine, tablet computer, laptop, wearable device.
In practical applications, a test equipment can only test a tested electronic equipment in synchronization, together When, every test equipment can be tested during the test for a function of tested electronic equipment;Ordinary circumstance Under, test equipment needs the corresponding test of objective function to be tested by connecting with testing service device, from the downloading of testing service device Use-case, the test case based on the function test the objective function of tested electronic equipment, and obtain final test knot Fruit.
In other embodiments of the invention, the test result for being tested electronic equipment includes being successfully tested and test crash two Kind result.Wherein, test crash includes the following three types situation again: test equipment indicates test crash;The survey of tested electronic equipment Trying duration is more than preset duration;The test value of tested electronic equipment does not meet test threshold range.In conclusion to tested electricity Sub- equipment carries out, as long as there is at least one of three cases above, to think this test crash in test process.
In other embodiments of the invention, test equipment can after terminating to each tested testing for electrical equipment, Test result is shown within display screen;In addition, test equipment can also refresh display screen after each test terminates The yield of middle test, that is, the probability being successfully tested.
In other embodiments of the invention, test equipment can obtain the knot of each tested testing for electrical equipment failure Fruit obtains the number of test crash in test process, in this way, test equipment can be based on the number of the above test crash, to survey The test process of examination equipment is effectively controlled.
If step 102, the test result meet preset condition, stop the test process of the test equipment.
Wherein, the preset condition refers to that the number of the test crash is greater than preset threshold.
In other embodiments of the invention, if step 102 test result meets preset condition, stop the test The test process of equipment can be realized by test equipment.Here, test equipment is able to record the survey of each tested electronic equipment Test result can in real time judge the test result;When the number of test crash reaches pre-set threshold value, Test equipment directly stops the test to tested electronic equipment.Specifically, test equipment is big in the number for detecting test crash When preset threshold, test equipment locks current test program, so that test equipment can not continue to tested electronics Equipment is tested.
Further, after test equipment locks, test equipment can give a warning prompting to tester, allow tester Intervention processing is carried out to the test equipment.It, can be defeated in test equipment after tester repairs test equipment successfully Enter to solve confidential information, after solving confidential information and preset password match, test equipment restarting starts to the tested electronic equipment It is tested.
In other embodiments of the invention, the number of the test crash may include the number of follow-on test failure, Or the number of accumulative test crash.Here, the number of follow-on test failure is greater than first threshold or the accumulative test crash When number is greater than second threshold, so that it may think that failure occurs in current test equipment, therefore, stop the test equipment Test process.
The control method of test equipment provided in an embodiment of the present invention obtains the survey at least one tested electronic equipment Test result;Wherein, the test result includes the number of the test crash of at least one tested electronic equipment;If the survey Test result meets preset condition, stops the test process of the test equipment;Wherein, the preset condition refers to described at least one The number of a tested testing for electrical equipment failure is greater than preset threshold;In this way, the test result by judging test equipment, determines Whether test equipment is abnormal, while actively stopping test when test equipment exception;In this way, tester can be to stopping working Test equipment intervened;Furthermore it is possible to stop the condition of test by setting, carry out unified and accurately control test Equipment.
Based on previous embodiment, the embodiment of the invention also provides a kind of signals of the process of the control method of test equipment Figure, as shown in Fig. 2, the control method of the test equipment the following steps are included:
Step 201, test equipment obtain the test result at least one tested electronic equipment.
Wherein, the test result includes the number of the test crash of at least one tested electronic equipment.
In practical applications, a test equipment can only test a tested electronic equipment in synchronization, together When, every test equipment can be tested during the test for a function of tested electronic equipment;Ordinary circumstance Under, test equipment needs the corresponding test of objective function to be tested by connecting with testing service device, from the downloading of testing service device Use-case, the test case based on the function test the objective function of tested electronic equipment, and obtain final test knot Fruit.
In other embodiments of the invention, the test result for being tested electronic equipment includes being successfully tested and test crash two Kind result.Wherein, test crash includes the following three types situation again: test equipment indicates test crash;The survey of tested electronic equipment Trying duration is more than preset duration;The test value of tested electronic equipment does not meet test threshold range.In conclusion to tested electricity Sub- equipment carries out, as long as there is at least one of three cases above, to think this test crash in test process.
In other embodiments of the invention, test equipment can after terminating to each tested testing for electrical equipment, Test result is shown within display screen;In addition, test equipment can also refresh display screen after each test terminates The yield of middle test, that is, the probability being successfully tested.
In other embodiments of the invention, test equipment can obtain the knot of each tested testing for electrical equipment failure Fruit obtains the number of test crash in test process, in this way, test equipment can be based on the number of the above test crash, to survey The test process of examination equipment is effectively controlled.
If the number of step 202, the follow-on test failure is greater than the number of first threshold or the accumulative test crash Greater than second threshold, stop the test process of the test equipment.
In other embodiments of the invention, first threshold is greater than to the number of tested electronic equipment follow-on test failure, Or when being greater than second threshold to the number of the accumulative test crash of tested electronic equipment, it is believed that event occurs in current test equipment Barrier then stops test process immediately, realizes the locking to test equipment;That is, first threshold is follow-on test failure Number is locked, second threshold is the locking number of accumulative failure.
In other embodiments of the invention, the project of test is different, and the first threshold and second threshold of setting are just not yet Together;That is, first threshold and second threshold are set according to the demand of test item.In general, the first threshold Value value can be 3~5 times, and the value of second threshold can be 5~10 times.For example, when test item is network connection test, The value of first threshold can be 3 times, and second threshold is 5 times.In practical applications, test equipment before test, is servicing When device downloads respective items purpose test case, while downloading corresponding first threshold and second threshold.Specifically:
Based on the current test item of the test equipment, the first threshold and second threshold are obtained from server Value.
It should be noted that test case and first threshold, second threshold on server, can be carried out by tester Periodic maintenance.That is, tester can modify test case and corresponding first threshold according to actual test case Value, second threshold.
In addition, accumulative test crash number also increases as when there are many tested number of electronic devices, in order to avoid Test in the case of the tested electronic equipment of enormous amount, calculate the inaccuracy of accumulative test crash number, need timing or Processing quantitatively is zeroed out to the number of accumulative test crash, to guarantee the normal operation of test equipment.It specifically, can be with Processing is zeroed out by following two mode:
According to prefixed time interval, processing is zeroed out to the accumulative testing time;
Alternatively, being zeroed out processing to the accumulative testing time when the total degree of test reaches preset times.
Wherein, the prefixed time interval can be fixed time interval, it can be understood as be according to the preset time Period is zeroed out processing to the accumulative testing time;In another embodiment, the prefixed time interval can be by According to the time interval that time algorithm obtains, for example, time interval next time is two seconds more than last time interval.In this way, can To be neatly zeroed out processing to cumulative number.
Step 203, test equipment obtain the solution confidential information of input.
In other embodiments of the invention, after test equipment locking can not be tested, test equipment can be to Tester gives a warning prompting, and tester is allowed to carry out intervention processing to the test equipment.
Further, after tester repairs test equipment successfully, solution confidential information can be inputted in test equipment, After solving confidential information and setting password match, test equipment restarting starts to test the tested electronic equipment.Specifically Ground, test equipment show the prompt information of input password within display screen, and tester is allowed to input solution confidential information.Wherein, it solves Confidential information includes numerical ciphers information, finger print information, iris information etc..
If the solution confidential information and preset password match of step 204, the input, test equipment start to the tested electronics Equipment is tested.
In other embodiments of the invention, only when tester input solution confidential information and preset password match it Afterwards, test equipment can continue work, carry out normal test process.
Here, it before test equipment starts to test the tested electronic equipment, needs to current continuous mistake It loses number and the accumulative frequency of failure is zeroed out processing, tested electronic equipment and accumulative survey since newly to follow-on test failure The tested electronic equipment of examination failure is counted.
The control method of test equipment provided in an embodiment of the present invention obtains the survey at least one tested electronic equipment Test result;Wherein, the test result includes the number of the test crash of at least one tested electronic equipment;If the survey Test result meets preset condition, stops the test process of the test equipment;Wherein, the preset condition refers to described at least one The number of a tested testing for electrical equipment failure is greater than preset threshold;In this way, the test result by judging test equipment, determines Whether test equipment is abnormal, while actively stopping test when test equipment exception;In this way, tester can be to stopping working Test equipment intervened;Furthermore it is possible to stop the condition of test by setting, carry out unified and accurately control test Equipment.
The method of embodiment to realize the present invention, the embodiment of the invention provides a kind of control device of test equipment, institutes The control device for stating test equipment can be applied in the test equipment in above method embodiment;As shown in figure 3, described Device includes:
Acquiring unit 31, for obtaining the test result for being directed at least one tested electronic equipment;Wherein, the test knot Fruit includes the number of the test crash of at least one tested electronic equipment;
Processing unit 32 stops the test process of the test equipment for meeting preset condition when the test result; Wherein, the preset condition refers to that the number of the test crash is greater than preset threshold.
In other embodiments of the invention, the test equipment control device further includes display unit 33;
The display unit 33 can show the test result of each tested electronic equipment, and the yield of test.
In other embodiments of the invention, the number of the test crash includes the number of follow-on test failure, or tired Count the number of test crash;
The processing unit 32, the number specifically for working as follow-on test failure are greater than first threshold or described tired The number for counting test crash is greater than second threshold, stops the test process of the test equipment.
In other embodiments of the invention, the acquiring unit 31 is also used to obtain the solution confidential information of input;
The processing unit 32 is also used to solution confidential information and preset password match when the input, starts to the quilt Electronic equipment is surveyed to be tested.
In other embodiments of the invention, the processing unit 32 is also used to according to prefixed time interval, to described tired Meter testing time is zeroed out processing;
Alternatively, being zeroed out processing to the accumulative testing time when the total degree of test reaches preset times.
In other embodiments of the invention, the acquiring unit 33 is also used to the survey current based on the test equipment Examination project obtains the first threshold and the second threshold from server.
The description of apparatus above embodiment, be with the description of above method embodiment it is similar, have same embodiment of the method Similar beneficial effect.For undisclosed technical detail in the application Installation practice, the application embodiment of the method is please referred to Description and understand.
The control device of test equipment provided in an embodiment of the present invention obtains the survey at least one tested electronic equipment Test result;Wherein, the test result includes the number of the test crash of at least one tested electronic equipment;If the survey Test result meets preset condition, stops the test process of the test equipment;Wherein, the preset condition refers to described at least one The number of a tested testing for electrical equipment failure is greater than preset threshold;In this way, the test result by judging test equipment, determines Whether test equipment is abnormal, while actively stopping test when test equipment exception;In this way, tester can be to stopping working Test equipment intervened;Furthermore it is possible to stop the condition of test by setting, carry out unified and accurately control test Equipment.
Fig. 4 is a kind of terminal hardware entity schematic diagram of an exemplary embodiment of the invention, as shown in figure 4, the present invention one Exemplary embodiment provides a kind of test equipment 40, comprising:
Processor 41 and the storage medium 42 for being stored with 41 executable instruction of processor, the storage medium 42 are logical It crosses communication bus 43 and relies on the processor 41 and execute operation, when described instruction is executed by the processor 41, execute above-mentioned The control method of test equipment described in embodiment one.
It should be noted that the various components in test equipment are coupled by communication bus 43 when practical application. It is understood that communication bus 43 is for realizing the connection communication between these components.Communication bus 43 except include data/address bus in addition to, It further include power bus, control bus and status signal bus in addition.But for the sake of clear explanation, by various buses in Fig. 4 All it is designated as communication bus 43.
Accordingly, an exemplary embodiment of the invention provides a kind of computer readable storage medium, is stored thereon with calculating Machine program, the computer program realize the step in the image encryption method provided in above-described embodiment when being executed by processor.
It need to be noted that: the description of medium stored above and apparatus embodiments, with retouching for above method embodiment It is similar for stating, and has with embodiment of the method similar beneficial effect.For in the application storage medium and apparatus embodiments not The technical detail of disclosure please refers to the description of the application embodiment of the method and understands.
It should be understood that " one embodiment " or " embodiment " that specification is mentioned in the whole text mean it is related with embodiment A particular feature, structure, or characteristic includes at least one embodiment of the application.Therefore, occur everywhere in the whole instruction " in one embodiment " or " in one embodiment " not necessarily refer to identical embodiment.In addition, these specific features, knot Structure or characteristic can combine in any suitable manner in one or more embodiments.It should be understood that in the various implementations of the application In example, magnitude of the sequence numbers of the above procedures are not meant that the order of the execution order, the execution sequence Ying Yiqi function of each process It can be determined with internal logic, the implementation process without coping with one exemplary embodiment of the application constitutes any restriction.This above-mentioned Shen Please an exemplary embodiment serial number it is for illustration only, do not represent the advantages or disadvantages of the embodiments.
It should be noted that, in this document, the terms "include", "comprise" or its any other variant are intended to non-row His property includes, so that the process, method, article or the device that include a series of elements not only include those elements, and And further include other elements that are not explicitly listed, or further include for this process, method, article or device institute it is intrinsic Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including being somebody's turn to do There is also other identical elements in the process, method of element, article or device.
In several embodiments provided herein, it should be understood that disclosed device and method can pass through it Its mode is realized.Apparatus embodiments described above are merely indicative, for example, the division of the unit, only A kind of logical function partition, there may be another division manner in actual implementation, such as: multiple units or components can combine, or It is desirably integrated into another system, or some features can be ignored or not executed.In addition, shown or discussed each composition portion Mutual coupling or direct-coupling or communication connection is divided to can be through some interfaces, the INDIRECT COUPLING of equipment or unit Or communication connection, it can be electrical, mechanical or other forms.
Above-mentioned unit as illustrated by the separation member, which can be or may not be, to be physically separated, aobvious as unit The component shown can be or may not be physical unit;Both it can be located in one place, and may be distributed over multiple network lists In member;It can select some or all of units according to the actual needs to realize one exemplary embodiment scheme of the application Purpose.
In addition, each functional unit in each embodiment of the application can be fully integrated in one processing unit, it can also To be each unit individually as a unit, can also be integrated in one unit with two or more units;It is above-mentioned Integrated unit both can take the form of hardware realization, can also realize in the form of hardware adds SFU software functional unit.
Those of ordinary skill in the art will appreciate that: realize that all or part of the steps of above method embodiment can pass through The relevant hardware of program instruction is completed, and program above-mentioned can store in computer-readable storage medium, which exists When execution, step including the steps of the foregoing method embodiments is executed;And storage medium above-mentioned includes: movable storage device, read-only deposits The various media that can store program code such as reservoir (Read Only Memory, ROM), magnetic or disk.
If alternatively, the above-mentioned integrated unit of the application is realized in the form of software function module and as independent product When selling or using, it also can store in a computer readable storage medium.Based on this understanding, the application one shows The part that the technical solution of example property embodiment substantially in other words contributes to the relevant technologies can be in the form of software products It embodies, which is stored in a storage medium, including some instructions are used so that terminal executes sheet Apply for all or part of each embodiment the method.And storage medium above-mentioned includes: movable storage device, ROM, magnetic disk Or the various media that can store program code such as CD.
The above, only presently filed embodiment, but the protection scope of the application is not limited thereto, it is any to be familiar with Those skilled in the art within the technical scope of the present application, can easily think of the change or the replacement, and should all cover Within the protection scope of the application.Therefore, the protection scope of the application should be based on the protection scope of the described claims.

Claims (10)

1. a kind of control method of test equipment, which comprises
Obtain the test result at least one tested electronic equipment;Wherein, the test result include it is described at least one The number of the test crash of tested electronic equipment;
If the test result meets preset condition, stop the test process of the test equipment;Wherein, the preset condition is Refer to that the number of the test crash is greater than preset threshold.
2. the method according to claim 1, wherein the number of the test crash includes follow-on test failure The number of number or accumulative test crash;
Correspondingly, if the test result meets preset condition, stop the test equipment and tested, comprising:
If the number of the follow-on test failure is greater than first threshold or the number of the accumulative test crash is greater than the second threshold Value, stops the test process of the test equipment.
3. according to the method described in claim 2, it is characterized in that, when the testing time includes the number of accumulative test crash When, the method also includes:
According to prefixed time interval, processing is zeroed out to the accumulative testing time;
Alternatively, being zeroed out processing to the accumulative testing time when the total degree of test reaches preset times.
4. the method according to claim 1, wherein the method also includes:
Obtain the solution confidential information of input;
If the solution confidential information and preset password match of the input, start to test the tested electronic equipment.
5. if according to the method described in claim 3, stop it is characterized in that, the test parameter meets preset condition Before testing the tested electronic equipment, the method also includes:
Based on the current test item of the test equipment, the first threshold and the second threshold are obtained from server.
6. a kind of control device of test equipment, described device include:
Acquiring unit, for obtaining the test result for being directed at least one tested electronic equipment;Wherein, the test result includes The number of the test crash of at least one tested electronic equipment;
Processing unit stops the test process of the test equipment for meeting preset condition when the test result;Wherein, The preset condition refers to that the number of the test crash is greater than preset threshold.
7. device according to claim 6, which is characterized in that the number of the test crash includes follow-on test failure The number of number or accumulative test crash;
The processing unit, specifically for being greater than first threshold or the accumulative test when the number of follow-on test failure The number of failure is greater than second threshold, stops the test process of the test equipment.
8. according to the method described in claim 6, it is characterized in that, the acquiring unit, is also used to obtain the solution secret letter of input Breath;
The processing unit is also used to solution confidential information and preset password match when the input, starts to the tested electronics Equipment is tested.
9. a kind of test equipment, including memory and processor, the memory are stored with the calculating that can be run on a processor Machine program, which is characterized in that the processor realizes any one of claim 1 to 5 test equipment when executing described program Control method in step.
10. a kind of computer readable storage medium, is stored thereon with computer program, the computer program is executed by processor The step of realizing any one of claim 1 to 5 the method.
CN201811362490.4A 2018-11-15 2018-11-15 Control method and device of test equipment and computer readable storage medium Active CN109597728B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811362490.4A CN109597728B (en) 2018-11-15 2018-11-15 Control method and device of test equipment and computer readable storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811362490.4A CN109597728B (en) 2018-11-15 2018-11-15 Control method and device of test equipment and computer readable storage medium

Publications (2)

Publication Number Publication Date
CN109597728A true CN109597728A (en) 2019-04-09
CN109597728B CN109597728B (en) 2022-09-06

Family

ID=65958537

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811362490.4A Active CN109597728B (en) 2018-11-15 2018-11-15 Control method and device of test equipment and computer readable storage medium

Country Status (1)

Country Link
CN (1) CN109597728B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114817033A (en) * 2022-04-26 2022-07-29 歌尔股份有限公司 Product testing method and device for automatic production line, terminal equipment and storage medium
WO2022267366A1 (en) * 2021-06-22 2022-12-29 北京百度网讯科技有限公司 Content delivery network processing method and apparatus, and electronic device

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104320793A (en) * 2014-09-29 2015-01-28 上海斐讯数据通信技术有限公司 Mobile phone short message automated test method and system
CN107894950A (en) * 2017-10-30 2018-04-10 北京奇虎科技有限公司 A kind of equipment detection method, device, server and storage medium
US20180225186A1 (en) * 2016-06-09 2018-08-09 Google Llc Automatic qubit calibration

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104320793A (en) * 2014-09-29 2015-01-28 上海斐讯数据通信技术有限公司 Mobile phone short message automated test method and system
US20180225186A1 (en) * 2016-06-09 2018-08-09 Google Llc Automatic qubit calibration
CN107894950A (en) * 2017-10-30 2018-04-10 北京奇虎科技有限公司 A kind of equipment detection method, device, server and storage medium

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022267366A1 (en) * 2021-06-22 2022-12-29 北京百度网讯科技有限公司 Content delivery network processing method and apparatus, and electronic device
CN114817033A (en) * 2022-04-26 2022-07-29 歌尔股份有限公司 Product testing method and device for automatic production line, terminal equipment and storage medium

Also Published As

Publication number Publication date
CN109597728B (en) 2022-09-06

Similar Documents

Publication Publication Date Title
JP7237110B2 (en) FAILURE PREDICTION METHOD, DEVICE, ELECTRONIC EQUIPMENT, STORAGE MEDIUM, AND PROGRAM
US9075911B2 (en) System and method for usage pattern analysis and simulation
CN109752047A (en) Computer room alarm method, device and storage medium based on temperature and humidity
CN108540483A (en) A kind of apparatus monitoring method and device based on block chain
CN106294051B (en) A kind of motor detecting method and terminal
CN107451040A (en) Localization method, device and the computer-readable recording medium of failure cause
EP3214548A1 (en) Systems and methods for operating a virtual power environment
CN107193680A (en) A kind of heartbeat detecting method, equipment and system
CN109597728A (en) The control method and device of test equipment, computer readable storage medium
JP2019144931A (en) Abnormality monitoring apparatus, abnormality monitoring method, and abnormality monitoring program
CN106371958A (en) Server fault diagnosis system and method
CN111983412A (en) Monitoring system, monitoring method, monitoring terminal and storage medium
CN106294036A (en) A kind of hardware fault verification method, device and client
CN105022663B (en) Power system monitoring and control system
CN109478054A (en) Substrate production managing device and substrate production management method
CN108334427A (en) Method for diagnosing faults in storage system and device
CN107368058A (en) It is a kind of for the fault monitoring method of equipment, equipment and computer-readable medium
EP3642718B1 (en) Graphical user interface tool for configuring a vehicle's intrusion detection system
CN109359034A (en) A service system testing method, computer-readable storage medium and terminal device
CN104239727B (en) The display methods of rotary-machine state monitoring system unit working condition trend
CN107528724A (en) A kind of optimized treatment method and device of node cluster
US10452519B2 (en) Integrated resource scheduler, configurator, and visualizer
US20220147839A1 (en) Comparisons of knowledge graphs representing computer systems
CN110345986A (en) A kind of more stress test methods based on accidental resonance and task immigration
CN109558300A (en) A kind of whole machine cabinet alert processing method, device, terminal and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant