CN109594579A
CN109594579A CN201810138781.9A CN201810138781A CN109594579A CN 109594579 A CN109594579 A CN 109594579A CN 201810138781 A CN201810138781 A CN 201810138781A CN 109594579 A CN109594579 A CN 109594579A
Authority
CN
China
Prior art keywords
foundation
column
transmission line
tower
tower foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810138781.9A
Other languages
Chinese (zh)
Inventor
张德胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Urumqi Zhiyuan Ets Intelligent Technology Co Ltd
Original Assignee
Urumqi Zhiyuan Ets Intelligent Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Urumqi Zhiyuan Ets Intelligent Technology Co Ltd filed Critical Urumqi Zhiyuan Ets Intelligent Technology Co Ltd
Priority to CN201810138781.9A priority Critical patent/CN109594579A/en
Publication of CN109594579A publication Critical patent/CN109594579A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D35/00Straightening, lifting, or lowering of foundation structures or of constructions erected on foundations

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Foundations (AREA)

Abstract

The present invention relates to transmission line foundation technical fields, it is a kind of transmission line tower foundation and its reinforcement means, the former include column its, first crossbeam, vertical beam, second cross beam, perpendicular support, bottom plate and foundation bolt, each column for being used to support shaft tower tower leg is fixedly connected to form basic framework by first crossbeam and vertical beam, two second cross beams are respectively symmetrically equipped in the two sides of basic framework, it is connected between two second cross beams of every side by perpendicular support, a bottom plate is equipped with by the connected second cross beam lower end of perpendicular support at every two, the force bearing plate reinforced is equipped between second cross beam and bottom plate, the intersection of each column and bottom plate is equipped with step-like protrusion, each foundation bolt is embedded in bottom plate.Each column for being used to support shaft tower tower leg is connected as one formula structure by first crossbeam and vertical beam by pole and tower foundation of the present invention, and this pole and tower foundation form is not susceptible to differential settlement, the advantage which has structure simple, reliable and stable.

Description

Transmission line tower foundation and its reinforcement means
Technical field
It is a kind of transmission line tower foundation and its reinforcement means the present invention relates to transmission line foundation technical field.
Background technique
Electric power line pole tower is the important component of transmission line structure system, and the pole and tower foundation by being embedded in underground is Electric power line pole tower provides load support.
According to structure type, transmission line of electricity is divided into overhead transmission line and cable run, and overhead transmission line is usually by bar Tower, conducting wire, insulator, line hardware, bracing wire, pole and tower foundation, earthing or grounding means etc. are constituted, and are set up on ground.It is existing Pole and tower foundation generally uses independent foundation, and in order to avoid the injury to human body, transmission line of electricity is usually built in the remote or signs of human habitation Rare area, some transmission lines of electricity are also set up on ruthless area, such as mountain or near coal mine, when transmission line of electricity passes through When coal mine gob etc. may cause uneven settlement of foundation region, uneven settlement of foundation will cause, so that the tower of shaft tower Leg sedimentation is uneven, when it is more than to a certain degree that sedimentation is uneven, necessarily causes top tower structure to be destroyed, to influence to transmit electricity The operational safety of route.
Summary of the invention
The purpose of the present invention is to provide a kind of transmission line tower foundation and its reinforcement means, the tower leg for shaft tower is produced When raw differential settlement, the adjustable height type pole and tower foundation of top tower structure stability requirement can be expired.
Technical solution of the present invention first is that being realized by following measures: a kind of transmission line tower foundation, including Column, first crossbeam, vertical beam, second cross beam, perpendicular support, bottom plate and foundation bolt, each column for being used to support shaft tower tower leg pass through First crossbeam and vertical beam are fixedly connected to form basic framework, are respectively symmetrically equipped with two second cross beams in the two sides of basic framework, It is connected between two second cross beams of every side by perpendicular support, is equipped at every two by the connected second cross beam lower end of perpendicular support The intersection of one bottom plate, the force bearing plate equipped with reinforcing between second cross beam and bottom plate, each column and bottom plate is equipped with step Shape protrusion, each foundation bolt are embedded in bottom plate, are equipped in every second cross beam, force bearing plate and perpendicular support for corresponding lower margin The through-hole that bolt passes through, the top of each foundation bolt sequentially pass through force bearing plate, second cross beam and the upper corresponding through-hole of perpendicular support And it is fastened by gasket and nut.
Here is the further optimization and/or improvements to invention technology described above scheme:
Preferably, gasket is cyclic structure horizontal, that upper surface is inclined surface in lower end surface.
Preferably, the principal post is cube structure or cylindrical structure.
Preferably, the column, first crossbeam, vertical beam, second cross beam, perpendicular support are fixed to one structure.
Preferably, the quantity of the column is four, the rectangular distribution of four columns.
Technical solution of the present invention second is that being realized by following measures: a kind of reinforcing of transmission line tower foundation Method includes reinforcing to pole and tower foundation, brushes and to the paving town of the pole and tower foundation on embedment ground and places obstacles;
The poles foundation reinforcement includes the following steps:
The first step is laid with reinforced network on column, first crossbeam, vertical beam, second cross beam, perpendicular support and plate outer side surface;
Second step is equipped with the fill orifice at transverse and longitudinal interval in grouting template around reinforced network setting grouting template;
Self-compacting concrete is perfused from fill orifice in third step from bottom to top;
4th step after self-compacting concrete condensation and when intensity is more than or equal to 5MPa, removes grouting template;
It is described to brush as the external coating erosion resistant coating after self-compacting concrete is perfused in pole and tower foundation.
Here is the further optimization and/or improvements to invention technology described above scheme:
Preferably, self-compacting concrete includes: II 42.5 cement of P., water, the flyash that volume is 30%, partial size less than 15mm Coarse aggregate, fine aggregate, granulated blast-furnace slag, mountain flour and additive;The additive include polycarboxylate high performance water-reducing agent, Tackifier and swelling agent.
Each column for being used to support shaft tower tower leg is connected as one by pole and tower foundation of the present invention by first crossbeam and vertical beam Formula structure, this pole and tower foundation form is not susceptible to differential settlement, when uneven settlement of foundation, shaft tower base of the invention Plinth structure can satisfy the stability requirement of top shaft tower completely;The pole and tower foundation has many advantages, such as that structure is simple, reliable and stable. When uneven settlement of foundation causes pole and tower foundation run-off the straight, by the height of the adjustable pole and tower foundation quadrangle of gasket, make Column top surface keeps horizontal again, to guarantee the stability requirement of top shaft tower.Transmission line tower foundation provided by the invention Reinforcement means of checking winds and fixing drifting sand, to basis carry out reinforcing and preservative treatment, improve basis anti-blown sand corrode ability, The intensity for increasing basis, improves its service life.
Detailed description of the invention
Attached drawing 1 is schematic view of the front view of the invention.
Attached drawing 2 is left view structural representation of the invention.
The mounting structure schematic diagram of the invention of attached drawing 3.
Number in attached drawing is respectively as follows: column, 2- first crossbeam, 3- vertical beam, 4- second cross beam, the perpendicular support of 5-, 6- bottom plate, 7- Foundation bolt, 8- support shaft tower tower leg, 9- force bearing plate, 10- protrusion, 11- gasket, 12- nut, 13- reinforced network, 14- grouting Template, 141- fill orifice, 15- self-compacting concrete, 16- erosion resistant coating.
Specific embodiment
The present invention is not limited by the following examples, can determine according to the technique and scheme of the present invention with actual conditions specific Embodiment.
Below with reference to examples and drawings, the invention will be further described:
As shown in attached drawing 1,2, which includes column 1, first crossbeam 2, vertical beam 3, second cross beam 4, perpendicular support 5, bottom plate 6 and foundation bolt 7, each column 1 for being used to support shaft tower tower leg 8 are fixedly connected to form by first crossbeam 2 and vertical beam 3 Basic framework is respectively symmetrically equipped with two second cross beams 4 in the two sides of basic framework, between two second cross beams 4 of every side Be connected by perpendicular support 5, be equipped with a bottom plate 6 by connected 4 lower ends of second cross beam of perpendicular support 5 at every two, second cross beam 4 with The intersection of force bearing plate 9 equipped with reinforcing between bottom plate 6, each column 1 and bottom plate 6 is equipped with step-like raised 10, each lower margin Bolt 7 is embedded in bottom plate 6, is equipped in every second cross beam 4, force bearing plate 9 and perpendicular support 5 and is worn for corresponding foundation bolt 7 The through-hole crossed, the top of each foundation bolt 7 sequentially passes through force bearing plate 9, corresponding through-hole is simultaneously in second cross beam 4 and perpendicular support 5 It is fastened by gasket 11 and nut 12.
When uneven settlement of foundation causes pole and tower foundation run-off the straight, pass through the adjustable shaft tower base of adjusting gasket 11 The height of plinth quadrangle, being used in each column top surface of support shaft tower tower leg 8, holding is horizontal again, to guarantee the stabilization of top shaft tower Property require.
The bottom surface of first crossbeam 2, vertical beam 3 and second cross beam 4 is concordant with the bottom surface of column 1, first crossbeam 2,3 and of vertical beam The top surface of second cross beam 4 is below the top surface of column 1.Pole and tower foundation of the present invention leads to each column 1 for being used to support shaft tower tower leg 8 It crosses first crossbeam 2 and vertical beam 3 is connected as one formula structure, this pole and tower foundation form is not susceptible to differential settlement, works as ground When differential settlement, pole and tower foundation structure of the invention can satisfy the stability requirement of top shaft tower completely;The pole and tower foundation Have many advantages, such as that structure is simple, it is reliable and stable.It, can by gasket when uneven settlement of foundation causes pole and tower foundation run-off the straight To adjust the height of pole and tower foundation quadrangle, making column top surface, holding is horizontal again, to guarantee the stability requirement of top shaft tower.
Above-mentioned transmission line tower foundation can be made further optimization and/or improvements according to actual needs:
As another embodiment, as shown in Fig. 1, gasket 11 is ring horizontal, that upper surface is inclined surface in lower end surface Shape structure.
The gasket 11 of the pole and tower foundation of initial construction is annular shape, and bottom surface and top surface are horizontal plane;Work as spot When base differential settlement causes pole and tower foundation to tilt, according to the height that each column settles, then need to carry out foundation bolt 27 tightly Gu before, new gasket is sheathed on foundation bolt 27, since the gasket 28 ' is in the ring that bottom surface is horizontal plane, top surface is inclined surface Shape structure (0 ° < θ < 90 ° of angle between the top surface and bottom surface of gasket 28 '), it is possible to meet the top surface of bottom surface and perpendicular support 25 Mutually it is adjacent to, and the axis perpendicular of top surface and foundation bolt 27 adjusted, it is ensured that the fastening of nut and foundation bolt connects It connects, keeps pole and tower foundation adjusted more safe and reliable.
As another embodiment, as shown in attached drawing 1,2, the principal post 1 is cube structure or cylindrical structure.
As another embodiment, as shown in Fig. 1, the column 1, vertical beam 3, second cross beam 4, is erected first crossbeam 2 Support 5 is fixed to one structure.
As another embodiment, as needed, the quantity of the column 1 is four, 1 rectangular point of four columns Cloth.
As shown in attached drawing 1,2,3, a kind of reinforcement means of transmission line tower foundation includes reinforcing to pole and tower foundation, applies Brush and to embedment ground pole and tower foundation paving town and place obstacles;
The poles foundation reinforcement includes the following steps:
The first step is laid with netted match in column 1, first crossbeam 2, vertical beam 3, second cross beam 4, perpendicular support 5 and 6 outer surface of bottom plate Muscle 13;
Second step is equipped with the fill orifice at transverse and longitudinal interval in grouting template 14 around the reinforced network 13 setting grouting template 14 141;
Self-compacting concrete (15 is perfused from fill orifice 141 in third step from bottom to top;
4th step after the condensation of self-compacting concrete 15 and when intensity is more than or equal to 5MPa, removes grouting template 14;
It is described to brush as the external coating erosion resistant coating 16 after self-compacting concrete 15 is perfused in pole and tower foundation.
As another embodiment, as needed, self-compacting concrete 15 includes: that II 42.5 cement of P., water, volume are 30% coarse aggregate, fine aggregate, granulated blast-furnace slag, mountain flour and the additive of flyash, partial size less than 15mm;The additive Including polycarboxylate high performance water-reducing agent, tackifier and swelling agent.
The above technical characteristic constitutes highly preferred embodiment of the present invention, with stronger adaptability and best implementation effect Fruit can increase and decrease non-essential technical characteristic, according to actual needs to meet the needs of different situations.

Claims (7)

1. a kind of transmission line tower foundation, it is characterised in that including column, first crossbeam, vertical beam, second cross beam, perpendicular support, bottom Plate and foundation bolt, each column for being used to support shaft tower tower leg are fixedly connected to form basic framework by first crossbeam and vertical beam, Two second cross beams are respectively symmetrically equipped in the two sides of basic framework, are connected between two second cross beams of every side by perpendicular support It connects, a bottom plate is equipped with by the connected second cross beam lower end of perpendicular support at every two, is equipped with and reinforces between second cross beam and bottom plate Force bearing plate, the intersection of each column and bottom plate is equipped with step-like protrusion, and each foundation bolt is embedded in bottom plate, every Be equipped with the through-hole passed through for corresponding foundation bolt in second cross beam, force bearing plate and perpendicular support, the top of each foundation bolt according to It is secondary to pass through force bearing plate, second cross beam and the upper corresponding through-hole of perpendicular support and fastened by gasket and nut.
2. transmission line tower foundation according to claim 1, it is characterised in that gasket is horizontal, upper end in lower end surface Face is the cyclic structure of inclined surface.
3. transmission line tower foundation according to claim 2, it is characterised in that the principal post is cube structure or circle Column structure.
4. transmission line tower foundation according to claim 3, it is characterised in that the column, first crossbeam, vertical beam, Two crossbeams, perpendicular support are fixed to one structure.
5. transmission line tower foundation according to any one of claims 1 to 4, it is characterised in that the quantity of the column is Four, the rectangular distribution of four columns.
6. a kind of reinforcement means of transmission line tower foundation, it is characterised in that including reinforcing, the brushing and right to pole and tower foundation It is embedded to the paving town of the pole and tower foundation on ground and places obstacles;
The poles foundation reinforcement includes the following steps:
The first step is laid with reinforced network on column, first crossbeam, vertical beam, second cross beam, perpendicular support and plate outer side surface;
Second step is equipped with the fill orifice at transverse and longitudinal interval in grouting template around reinforced network setting grouting template;
Self-compacting concrete is perfused from fill orifice in third step from bottom to top;
4th step after self-compacting concrete condensation and when intensity is more than or equal to 5MPa, removes grouting template;
It is described to brush as the external coating erosion resistant coating after self-compacting concrete is perfused in pole and tower foundation.
7. the reinforcement means of transmission line tower foundation according to claim 6, it is characterised in that self-compacting concrete packet Include: II 42.5 cement of P., water, the flyash that volume is 30%, partial size are less than coarse aggregate, the fine aggregate, granulated blast-furnace mine of 15mm Slag, mountain flour and additive;The additive includes polycarboxylate high performance water-reducing agent, tackifier and swelling agent.
CN201810138781.9A 2018-02-11 2018-02-11 Transmission line tower foundation and its reinforcement means Pending CN109594579A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810138781.9A CN109594579A (en) 2018-02-11 2018-02-11 Transmission line tower foundation and its reinforcement means

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810138781.9A CN109594579A (en) 2018-02-11 2018-02-11 Transmission line tower foundation and its reinforcement means

Publications (1)

Publication Number Publication Date
CN109594579A true CN109594579A (en) 2019-04-09

Family

ID=65956654

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810138781.9A Pending CN109594579A (en) 2018-02-11 2018-02-11 Transmission line tower foundation and its reinforcement means

Country Status (1)

Country Link
CN (1) CN109594579A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113006123A (en) * 2019-12-20 2021-06-22 天戈通信科技股份有限公司 Prefabricated foundation of communication tower
CN114525806A (en) * 2022-03-31 2022-05-24 四川电力设计咨询有限责任公司 Iron tower single-pile combined foundation and construction method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08128056A (en) * 1994-10-31 1996-05-21 Nippon Steel Metal Prod Co Ltd Fixing method for base plate for construction
CN102425188A (en) * 2011-09-07 2012-04-25 中国电力科学研究院 Height-adjustable tower foundation and adjusting method thereof
CN104179205A (en) * 2014-09-02 2014-12-03 国家电网公司 Anticorrosion reinforcing method of transmission line tower foundation

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08128056A (en) * 1994-10-31 1996-05-21 Nippon Steel Metal Prod Co Ltd Fixing method for base plate for construction
CN102425188A (en) * 2011-09-07 2012-04-25 中国电力科学研究院 Height-adjustable tower foundation and adjusting method thereof
CN104179205A (en) * 2014-09-02 2014-12-03 国家电网公司 Anticorrosion reinforcing method of transmission line tower foundation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113006123A (en) * 2019-12-20 2021-06-22 天戈通信科技股份有限公司 Prefabricated foundation of communication tower
CN114525806A (en) * 2022-03-31 2022-05-24 四川电力设计咨询有限责任公司 Iron tower single-pile combined foundation and construction method thereof

Similar Documents

Publication Publication Date Title
CN105386454B (en) A kind of joint assembling type base for power transmission tower
CN204753354U (en) Cover worker&#39;s board landing stage
CN207513156U (en) Telescopic frame body for building
CN109594579A (en) Transmission line tower foundation and its reinforcement means
CN207700821U (en) A kind of upright bar stringer
CN106498973A (en) A kind of assembled type base for power transmission line iron tower and its installation method
JP2014125830A (en) Split type precast concrete foundation and assembly method therefor
CN206346216U (en) A kind of ruggedized construction of power transmission line iron tower foundation
CN206428588U (en) A kind of road bridge construction prestressed anchor
CN102425188B (en) Method for adjusting height-adjustable tower foundation
CN209243910U (en) A kind of side slope building structure
CN103354319B (en) A kind of 220 kilovolts of outdoor GIS double-dragonfly-typoutlet outlet wire arrangement structure
CN214194574U (en) Be used for loose slope stability punishment structure
CN207109843U (en) A kind of goaf transmission line foundation bracing means
CN204531575U (en) Cement pole Reinforcement Reinforced Concrete Structure
CN109371983A (en) A kind of railroad bridge foundation pit protective device
CN104453336B (en) Base structure of high-pressure steel pipe pole
CN204645800U (en) A kind of power transmission tower
CN103354320B (en) A kind of 110 kilovolts of outdoor GIS double-dragonfly-typoutlet outlet wire arrangement structure
CN210238266U (en) Ribbed wall type bridge abutment
CN111244825A (en) Road-crossing cable laying structure and construction method thereof
CN203312636U (en) Double-flying dragonfly outgoing line arranging structure of 220 kilovolt outdoor GIS
CN207109622U (en) A kind of free frame pin-connected panel railway Evacuation platform of steel
JP2017137620A (en) Split type precast concrete foundation
CN105350814A (en) Power transmission tower

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190409

WD01 Invention patent application deemed withdrawn after publication