CN109558636A - A kind of creation method based on Revit pipe gallery BIM model - Google Patents
A kind of creation method based on Revit pipe gallery BIM model Download PDFInfo
- Publication number
- CN109558636A CN109558636A CN201811272934.5A CN201811272934A CN109558636A CN 109558636 A CN109558636 A CN 109558636A CN 201811272934 A CN201811272934 A CN 201811272934A CN 109558636 A CN109558636 A CN 109558636A
- Authority
- CN
- China
- Prior art keywords
- model
- piping lane
- revit
- established
- bottom plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 25
- 238000010276 construction Methods 0.000 claims abstract description 25
- 238000010586 diagram Methods 0.000 claims abstract description 12
- 238000005194 fractionation Methods 0.000 claims description 5
- 239000003795 chemical substances by application Substances 0.000 claims 2
- 239000002689 soil Substances 0.000 claims 1
- 230000006870 function Effects 0.000 description 4
- 230000005662 electromechanics Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 238000007726 management method Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 239000000567 combustion gas Substances 0.000 description 1
- 238000013499 data model Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000009428 plumbing Methods 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
- 238000012800 visualization Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Geometry (AREA)
- General Physics & Mathematics (AREA)
- Computer Hardware Design (AREA)
- Theoretical Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Computational Mathematics (AREA)
- Architecture (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention provides a kind of creation method based on Revit pipe gallery BIM model, the specific steps are as follows: plans piping lane agent model, piping lane agent model is carried out to split into piping lane module;The CAD diagram paper of piping lane is imported into model file, absolute altitude axis net is established;Construct piping lane modular model;The auxiliary construction established needed for piping lane is arranged, the model of each auxiliary construction is established;Each auxiliary construction is imported into piping lane agent model, the corresponding position of piping lane main body is placed it in, is attached to the top and bottom of each wall are corresponding on piping lane top plate and bottom plate.The calculator memory consumed when constructing pipe gallery BIM model according to the method described in the present invention, reduce the degree-of-difficulty factor of building auxiliary construction model, and reducing building auxiliary construction model, avoids Caton phenomenon, improves work efficiency;In addition, the difficult problem of connection at the method effective solution of interior established model pipeline model inflection point.
Description
Technical field
The present invention relates to pipe gallery technical field of construction, more particularly to one kind to be based on Revit pipe gallery BIM model
Creation method.
Background technique
Pipe gallery is a kind of Urban Underground that is built in for accommodating the structures of two classes and the above municipal engineering pipeline and attached
Belong to facility, is the comprehensive corridor of urban Underground pipeline, i.e., builds a tunnel space in Urban Underground, by electric power, communicate, combustion gas,
The various utilities pipelines such as heat supply, plumbing are integrated in one, and are equipped with special access hole, hoisting port and monitoring system, implement unified
Planning, Uniting, unified construction and management, are the important infrastructure and lifeline for ensureing city operations.
BIM (Building Information Model) is to establish three based on 3-dimensional digital technology with the various relevant informations of architectural engineering
D Data Model is the digital expression to engineering entity and functional characteristic.BIM is mentioned by 3D digital technology for operation management
For dummy model, it has the characteristics that visualization, harmony, simulation.
Pipe gallery profession is numerous, pipeline is complicated, and traditional design method draws plan view, sectional view, can not open up completely
Show the numerous and complicated content of piping lane, and be easy to produce the mistake of chain reaction when adjusting pipeline, therefore frequently with building BIM
The mode of model carries out, during traditional application Revit software creation piping lane threedimensional model, since piping lane is longer, if adopting
With auxiliary construction model is constructed directly in piping lane overall model, not only degree-of-difficulty factor is larger, but also also results in whole mould
Type needs to consume biggish calculator memory during creation, and the unusual Caton of meeting in modeling process reduces working efficiency;
And during pipeline model creation, since piping lane length is larger and very tortuous, there is also pipeline models at inflection point
The very difficult problem of connection.
Summary of the invention
Present invention seek to address that the deficiencies in the prior art, and a kind of creation based on Revit pipe gallery BIM model is provided
Method.
The present invention to achieve the above object, using following technical scheme:
A kind of creation method based on Revit pipe gallery BIM model, the specific steps are as follows:
Step 1 plans piping lane agent model, according to slope change point, pipeline outlet and the piping lane with piping lane
Node and piping lane standard paragraphs that the crosspoint piping lane gradient changes and non-standard segment tie point are the principle of cut-point by piping lane
Agent model carries out splitting into piping lane module;
The CAD diagram paper of piping lane is imported into model file by step 2, and piping lane is carried out using this CAD diagram paper as base map
Modeling, establishes absolute altitude axis net;
Step 3 constructs piping lane modular model according to the absolute altitude axis net that the fractionation module and step 2 of step 1 create;
Step 4 arranges the auxiliary construction established needed for piping lane, is established using the piping lane modular model of step 3 building
The model of each auxiliary construction;
Each auxiliary construction is imported into piping lane agent model by step 5, and places it in pair of piping lane main body
Position is answered, using the order at the top and bottom of the wall attached in Revit software, will be respectively corresponded at the top and bottom of each wall
Be attached on piping lane top plate and bottom plate.
Preferably, the modeling sequence of piping lane modular model is constructed in step 3 are as follows: civil engineering model is first established, it is rear to establish electromechanics
Model.
Preferably, specific step is as follows for building civil engineering model:
Firstly, bottom plate creates bottom plate by floor function with a slope in Revit software, referring to piping lane when bottom plate creates
Skiagraph determine the gradient of bottom plate;
Secondly, being changed to the specification of top plate after bottom plate integrally to be copied to the height of top plate;
Finally, the building wall of piping lane module is created between top plate and bottom plate, it should be according to piping lane module point when creating wall
Section is respectively created.
Preferably, when constructing electromechanical model, since piping lane is longer and more tortuous, directly made of pipeline difficulty compared with
Greatly, so creating pipeline using the method for interior established model.
Preferably, specific step is as follows for interior established model:
Firstly, the interior established model order constructed in order under selection Revit software architecture tabs;
Secondly, the pipeline type selecting in selection filter list;
Finally, clicking conventional model order, lofting tools is selected to be drawn according to pipeline rout and duct size.
The beneficial effects of the present invention are: constructing pipe gallery BIM model according to the method described in the present invention, building is reduced
The degree-of-difficulty factor of auxiliary construction model, and the calculator memory consumed when constructing auxiliary construction model is reduced, it keeps away
Caton phenomenon is exempted from, has improved work efficiency;In addition, being connected at the method effective solution of interior established model pipeline model inflection point
Difficult problem.
Detailed description of the invention
Fig. 1 is flow chart of the invention;
It is described in detail below with reference to the embodiment of the present invention referring to attached drawing.
Specific embodiment
Below with reference to embodiment, the invention will be further described:
A kind of creation method based on Revit pipe gallery BIM model, the specific steps are as follows:
Step 1 plans piping lane agent model, according to slope change point, pipeline outlet and the piping lane with piping lane
Node and piping lane standard paragraphs that the crosspoint piping lane gradient changes and non-standard segment tie point are the principle of cut-point by piping lane
Agent model carries out splitting into piping lane module;
The CAD diagram paper of piping lane is imported into model file by step 2, and piping lane is carried out using this CAD diagram paper as base map
Modeling, establishes absolute altitude axis net;
Step 3 constructs piping lane modular model according to the absolute altitude axis net that the fractionation module and step 2 of step 1 create;
Step 4 arranges the auxiliary construction established needed for piping lane, is established using the piping lane modular model of step 3 building
The model of each auxiliary construction;
Each auxiliary construction is imported into piping lane agent model by step 5, and places it in pair of piping lane main body
Position is answered, using the order at the top and bottom of the wall attached in Revit software, will be respectively corresponded at the top and bottom of each wall
Be attached on piping lane top plate and bottom plate.
Preferably, the modeling sequence of piping lane modular model is constructed in step 3 are as follows: civil engineering model is first established, it is rear to establish electromechanics
Model.
Preferably, specific step is as follows for building civil engineering model:
Firstly, bottom plate creates bottom plate by floor function with a slope in Revit software, referring to piping lane when bottom plate creates
Skiagraph determine the gradient of bottom plate;
Secondly, being changed to the specification of top plate after bottom plate integrally to be copied to the height of top plate;
Finally, the building wall of piping lane module is created between top plate and bottom plate, it should be according to piping lane module point when creating wall
Section is respectively created.
Preferably, when constructing electromechanical model, since piping lane is longer and more tortuous, directly made of pipeline difficulty compared with
Greatly, so creating pipeline using the method for interior established model.
Preferably, specific step is as follows for interior established model:
Firstly, the interior established model order constructed in order under selection Revit software architecture tabs;
Secondly, the pipeline type selecting in selection filter list;
Finally, clicking conventional model order, lofting tools is selected to be drawn according to pipeline rout and duct size.
Embodiment one
A kind of creation method based on Revit pipe gallery BIM model, the specific steps are as follows:
Step 1 plans piping lane agent model, according to slope change point, pipeline outlet and the piping lane with piping lane
Node and piping lane standard paragraphs that the crosspoint piping lane gradient changes and non-standard segment tie point are the principle of cut-point by piping lane
Agent model carries out splitting into piping lane module;
The CAD diagram paper of piping lane is imported into model file by step 2, and piping lane is carried out using this CAD diagram paper as base map
Modeling, establishes absolute altitude axis net;
Step 3 constructs piping lane modular model according to the absolute altitude axis net that the fractionation module and step 2 of step 1 create;
Step 4 arranges the auxiliary construction established needed for piping lane, is established using the piping lane modular model of step 3 building
The model of each auxiliary construction;
Each auxiliary construction is imported into piping lane agent model by step 5, and places it in pair of piping lane main body
Position is answered, using the order at the top and bottom of the wall attached in Revit software, will be respectively corresponded at the top and bottom of each wall
Be attached on piping lane top plate and bottom plate.
Preferably, it includes establishing civil engineering model and establishing electromechanical model that piping lane modular model is constructed in step 3.
Preferably, specific step is as follows for building civil engineering model:
Firstly, bottom plate creates bottom plate by floor function with a slope in Revit software, referring to piping lane when bottom plate creates
Skiagraph determine the gradient of bottom plate;
Secondly, being changed to the specification of top plate after bottom plate integrally to be copied to the height of top plate;
Finally, the building wall of piping lane module is created between top plate and bottom plate, it should be according to piping lane module point when creating wall
Section is respectively created.
Preferably, when constructing electromechanical model, since piping lane is longer and more tortuous, directly made of pipeline difficulty compared with
Greatly, so creating pipeline using the method for interior established model.
Preferably, specific step is as follows for interior established model:
Firstly, the interior established model order constructed in order under selection Revit software architecture tabs;
Secondly, the pipeline type selecting in selection filter list;
Finally, clicking conventional model order, lofting tools is selected to be drawn according to pipeline rout and duct size.
Embodiment two
A kind of creation method based on Revit pipe gallery BIM model, the specific steps are as follows:
Step 1 plans piping lane agent model, according to slope change point, pipeline outlet and the piping lane with piping lane
Node and piping lane standard paragraphs that the crosspoint piping lane gradient changes and non-standard segment tie point are the principle of cut-point by piping lane
Agent model carries out splitting into piping lane module;
The CAD diagram paper of piping lane is imported into model file by step 2, and piping lane is carried out using this CAD diagram paper as base map
Modeling, establishes absolute altitude axis net;
Step 3 constructs piping lane modular model according to the absolute altitude axis net that the fractionation module and step 2 of step 1 create;
Step 4 arranges the auxiliary construction established needed for piping lane, is established using the piping lane modular model of step 3 building
The model of each auxiliary construction;
Each auxiliary construction is imported into piping lane agent model by step 5, and places it in pair of piping lane main body
Position is answered, using the order at the top and bottom of the wall attached in Revit software, will be respectively corresponded at the top and bottom of each wall
Be attached on piping lane top plate and bottom plate.
Preferably, the modeling sequence of piping lane modular model is constructed in step 3 are as follows: civil engineering model is first established, it is rear to establish electromechanics
Model.
Preferably, specific step is as follows for building civil engineering model:
Firstly, bottom plate creates bottom plate by floor function with a slope in Revit software, referring to piping lane when bottom plate creates
Skiagraph determine the gradient of bottom plate;
Secondly, being changed to the specification of top plate after bottom plate integrally to be copied to the height of top plate;
Finally, the building wall of piping lane module is created between top plate and bottom plate, it should be according to piping lane module point when creating wall
Section is respectively created.
The present invention is exemplarily described above in conjunction with specific embodiment, it is clear that the present invention implements not by upper
The limitation of mode is stated, as long as using the various improvement that the inventive concept and technical scheme of the present invention carry out, or not improved straight
It scoops out for other occasions, it is within the scope of the present invention.
Claims (5)
1. a kind of creation method based on Revit pipe gallery BIM model, which is characterized in that specific step is as follows:
Step 1 plans piping lane agent model, intersects according to slope change point, pipeline outlet and the piping lane with piping lane
The node that changes of the point piping lane gradient and piping lane standard paragraphs and non-standard segment tie point are the principle of cut-point by piping lane main body
Model carries out splitting into piping lane module;
The CAD diagram paper of piping lane is imported into model file by step 2, and the modeling of piping lane is carried out using this CAD diagram paper as base map,
Establish absolute altitude axis net;
Step 3 constructs piping lane modular model according to the absolute altitude axis net that the fractionation module and step 2 of step 1 create;
Step 4 arranges the auxiliary construction established needed for piping lane, is established using the piping lane modular model that step 3 constructs each
The model of auxiliary construction;
Each auxiliary construction is imported into piping lane agent model by step 5, and places it in the correspondence position of piping lane main body
It sets, it is using the order at the top and bottom of the wall attached in Revit software, the top and bottom of each wall are corresponding attached
To on piping lane top plate and bottom plate.
2. the creation method according to claim 1 based on Revit pipe gallery BIM model, which is characterized in that step 3
It is middle building piping lane modular model modeling sequence are as follows: first establish civil engineering model, after establish electromechanical model.
3. the creation method according to claim 2 based on Revit pipe gallery BIM model, which is characterized in that building soil
Specific step is as follows for established model:
Firstly, bottom plate creates bottom plate by floor function with a slope in Revit software, referring to the vertical of piping lane when bottom plate creates
Cross-section diagram determines the gradient of bottom plate;
Secondly, being changed to the specification of top plate after bottom plate integrally to be copied to the height of top plate;
Finally, creating the building wall of piping lane module between top plate and bottom plate, it should be segmented and be divided according to piping lane module when creating wall
It does not create.
4. the creation method according to claim 2 based on Revit pipe gallery BIM model, which is characterized in that building machine
When electric model, pipeline is created using the method for interior established model.
5. the creation method according to claim 4 based on Revit pipe gallery BIM model, which is characterized in that interior modeling
Specific step is as follows for type:
Firstly, the interior established model order constructed in order under selection Revit software architecture tabs;
Secondly, the pipeline type selecting in selection filter list;
Finally, clicking conventional model order, lofting tools is selected to be drawn according to pipeline rout and duct size.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811272934.5A CN109558636A (en) | 2018-10-26 | 2018-10-26 | A kind of creation method based on Revit pipe gallery BIM model |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811272934.5A CN109558636A (en) | 2018-10-26 | 2018-10-26 | A kind of creation method based on Revit pipe gallery BIM model |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109558636A true CN109558636A (en) | 2019-04-02 |
Family
ID=65865340
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811272934.5A Pending CN109558636A (en) | 2018-10-26 | 2018-10-26 | A kind of creation method based on Revit pipe gallery BIM model |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109558636A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109960895A (en) * | 2019-04-11 | 2019-07-02 | 华夏天信(北京)智能低碳技术研究院有限公司 | Revit preprocess method based on BIM model |
CN110765535A (en) * | 2019-10-28 | 2020-02-07 | 湖北建科国际工程有限公司 | Method and device for constructing tied arch bridge model based on Revit |
CN113127949A (en) * | 2019-12-31 | 2021-07-16 | 久瓴(上海)智能科技有限公司 | Building model processing method and device, computer equipment and readable storage medium |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107524884A (en) * | 2017-10-18 | 2017-12-29 | 丁志国 | A kind of piping lane monitoring system |
CN108121861A (en) * | 2017-12-13 | 2018-06-05 | 济南市市政工程设计研究院(集团)有限责任公司 | A kind of pipe gallery crosspoint modular design method based on BIM |
CN108343059A (en) * | 2017-01-22 | 2018-07-31 | 杭州南联地基基础工程有限公司 | The two walls unification half that underground pipe gallery combines prefabricated socket inverse makees method of construction |
CN108510589A (en) * | 2018-04-09 | 2018-09-07 | 长沙市海图科技有限公司 | Conversion method and device of the two dimensional pipeline to threedimensional model |
-
2018
- 2018-10-26 CN CN201811272934.5A patent/CN109558636A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108343059A (en) * | 2017-01-22 | 2018-07-31 | 杭州南联地基基础工程有限公司 | The two walls unification half that underground pipe gallery combines prefabricated socket inverse makees method of construction |
CN107524884A (en) * | 2017-10-18 | 2017-12-29 | 丁志国 | A kind of piping lane monitoring system |
CN108121861A (en) * | 2017-12-13 | 2018-06-05 | 济南市市政工程设计研究院(集团)有限责任公司 | A kind of pipe gallery crosspoint modular design method based on BIM |
CN108510589A (en) * | 2018-04-09 | 2018-09-07 | 长沙市海图科技有限公司 | Conversion method and device of the two dimensional pipeline to threedimensional model |
Non-Patent Citations (1)
Title |
---|
葛扬: "一种BIM 技术在综合管廊项目设计中的应用", 《第三届全国BIM学术会议论文集》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109960895A (en) * | 2019-04-11 | 2019-07-02 | 华夏天信(北京)智能低碳技术研究院有限公司 | Revit preprocess method based on BIM model |
CN110765535A (en) * | 2019-10-28 | 2020-02-07 | 湖北建科国际工程有限公司 | Method and device for constructing tied arch bridge model based on Revit |
CN113127949A (en) * | 2019-12-31 | 2021-07-16 | 久瓴(上海)智能科技有限公司 | Building model processing method and device, computer equipment and readable storage medium |
CN113127949B (en) * | 2019-12-31 | 2023-05-09 | 久瓴(上海)智能科技有限公司 | Building model processing method, device, computer equipment and readable storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107391862B (en) | Three-dimensional collaborative design method for prefabricated concrete structure | |
CN106709660B (en) | BIM-based building design method | |
CN106407540B (en) | A kind of underground utilities auxiliary programming checking method based on three-dimension GIS technology | |
CN109359351B (en) | Three-dimensional modeling method for pipeline and pipeline design method | |
CN102201129B (en) | Three-dimensional visual operation maintenance system and method of subway comprehensive pipelines | |
CN105224747B (en) | Urban waterlogging model building method based on CAD engineering drawings information and design of pipe networks computational chart | |
CN105447278A (en) | Method for producing typified form under assistance of BIM (building information modeling) model | |
CN106202825A (en) | Underground pipe gallery method for designing based on BIM | |
CN109558636A (en) | A kind of creation method based on Revit pipe gallery BIM model | |
CN101964084A (en) | Intelligent dynamic network structure modeling and processing method applied to urban integrated pipeline system | |
CN110889160A (en) | Municipal pipeline construction method based on BIM technology | |
CN104392482A (en) | Substation engineering project three-dimensional calculation quantity model generation system and method | |
CN112257160A (en) | BIM-based standardized forward design method for waste incineration power plant | |
CN102750419A (en) | Subway comprehensive pipeline aided design system and method | |
CN108022296A (en) | A kind of BIM interior decorations current floor and region design system and method | |
CN113190938A (en) | Method, system and medium for rapidly establishing municipal pipe network parameterized model | |
CN116070311B (en) | BIM forward design method for long and large bridge | |
CN109271701B (en) | Water supply and drainage BIM forward design method based on reach system | |
CN104700453A (en) | Method for generating three-dimensional model of cable pipe network based on GIS | |
CN103970955B (en) | A kind of ship lock parametric modeling and the dynamic display method of preview | |
CN116383950A (en) | Multi-platform collaborative outdoor rainwater pipe network parameterization design method and system | |
CN113420359B (en) | Method for automatically transmitting parameters to well placement based on REVIT (remote visual inspection) electric power engineering general diagram | |
CN114580057A (en) | Comprehensive pipe rack pipeline outlet design method based on BIM | |
CN115391856B (en) | BIM-based outdoor pipe network parameterized modeling method and system | |
Li | Brief analysis of the application and limitation of BIM in project life cycle management |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190402 |