Gas chamber piston system hangs method for dismounting under a kind of accident condition Download PDF

Info

Publication number
CN109538921A
CN109538921A CN201811381054.1A CN201811381054A CN109538921A CN 109538921 A CN109538921 A CN 109538921A CN 201811381054 A CN201811381054 A CN 201811381054A CN 109538921 A CN109538921 A CN 109538921A
Authority
CN
China
Prior art keywords
piston
gas chamber
column
truss
vertical plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811381054.1A
Other languages
Chinese (zh)
Inventor
张云鹏
刘群杰
吕中亮
张琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Third Metallurgical Group Co Ltd
Original Assignee
China Third Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Third Metallurgical Group Co Ltd filed Critical China Third Metallurgical Group Co Ltd
Priority to CN201811381054.1A priority Critical patent/CN109538921A/en
Publication of CN109538921A publication Critical patent/CN109538921A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17BGAS-HOLDERS OF VARIABLE CAPACITY
    • F17B1/00Gas-holders of variable capacity
    • F17B1/02Details
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/08Wrecking of buildings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The present invention relates to gas chamber piston system hangs method for dismounting under a kind of accident condition, comprising: 1) carries out piston after pressure in gas chamber reaches equilibrium valve and remove operation;2) vertical plate lifting lug is welded on every gas chamber column, vertical plate lifting lug is correspondingly arranged at piston and winds up the lower section of truss;Piston truss upright-column is connect with vertical plate lifting lug by chain hoist, prevents piston in work progress mobile;3) piston is winded up and is reinforced between truss and gas chamber column using the reinforcement that winds up, and is reinforced between gas chamber column and piston truss upright-column using lower edge reinforcement;4) crane reaches on the outside of the corresponding gas chamber of piston starting cutting region, carries out lifting and prepares;5) by starting cutting region along removing by several times by cutting region clockwise or counterclockwise when piston is removed, the piston component after subregion is cut hangs original position by crane respectively, finishes until piston is all removed.Operation of the present invention is simple, highly-safe, and dismounting is high-efficient, and construction cost is low.

Description

Gas chamber piston system hangs method for dismounting under a kind of accident condition
Technical field
The present invention relates to gas chamber technical field of construction more particularly to a kind of thin oil sealing-type dry-type gas chamber accident conditions The suspension method for dismounting of lower piston system.
Background technique
In recent years, as China's industry is grown rapidly, industry constantly upgrades, and smelting equipment is in terms of enlargement, environmental protection Development, the projects such as coal gas, steam combined cycle power generating are more and more by major steel mill's exploitation, construction.Gas chamber is as power generation The auxiliary facility of project enters the peak period of a construction, and the gas chamber built in the past, which also enters, to be concentrated the transformation phase and scrap Phase, date of retirement are essentially the gas chamber of construction in one's early years, the case where piston can not vacantly be fallen after rise are frequently occurred after run throughout the year.
Authorization Notice No. is that the Chinese patent of CN101709829B discloses a kind of " dismantling method of coal gas storage cabinet ", will Piston is down to bottom of cabinet bulk and then is removed;For the thin oil sealing-type dry-type gas chamber under accident condition when piston clamping stagnation exists When a certain position, bottom of cabinet bulk can not be down to;Removing piston system in the case is one and compares difficult task, only The method that can be removed using suspension, suspension removes piston system because piston system weight is big, span is big, and piston has shifting at any time Dynamic possibility, therefore lead to that difficulty of construction is big, risk is big.
Summary of the invention
The present invention provides gas chamber piston system hangs method for dismounting under a kind of accident condition, the side removed using suspension Method removes the piston for being trapped in a certain position because of accident, easy to operate, highly-safe, and dismounting is high-efficient, is constructed into This is low.
In order to achieve the above object, the present invention is implemented with the following technical solutions:
Gas chamber piston system hangs method for dismounting under a kind of accident condition, which comprises the steps of:
1) accident condition lower piston is trapped in a certain position, removes before piston system first with air by the coal gas in gas chamber It cements out, piston is carried out after pressure in gas chamber reaches equilibrium valve and removes operation;
2) vertical plate lifting lug is welded on every gas chamber column, vertical plate lifting lug is correspondingly arranged at piston and winds up under truss Side;Piston truss upright-column is connect with vertical plate lifting lug by chain hoist, prevents piston in work progress mobile;
3) piston is winded up and is reinforced between truss and gas chamber column using the reinforcement that winds up, close to piston lower edge truss Gas chamber column and piston truss upright-column between reinforced using lower edge reinforcement;
4) crane reaches on the outside of the corresponding gas chamber of piston starting cutting region, carries out lifting and prepares;
5) by starting cutting region along being removed by several times by cutting region clockwise or counterclockwise when piston is removed, by subregion Piston component after cutting hangs original position by crane respectively, finishes until piston is all removed.
The reinforcement that winds up, lower edge frame Gu Liang are made of I-steel.
The cutting uses gas cutting mode.
Compared with prior art, the beneficial effects of the present invention are:
The method of the invention removes piston using subregion, without Large-scale Hoisting equipment, without setting up support leg Hand cradle is realized and utilizes less tooling, equipment, that is, dismountable suspension superelevation, the purpose of large span piston system, and speed of constructing It is low to spend fast, easy-to-operate, construction cost, to reduce the cost of enterprise, improves the economic benefit of enterprise.
Detailed description of the invention
Fig. 1 is the schematic diagram of gas chamber piston system hangs method for dismounting under a kind of accident condition of the present invention.
Fig. 2 is the top view before piston system is removed.
Fig. 3 is the schematic diagram of piston system demolishing process.
In figure: 1. wind up 4. lower edge reinforcement of reinforcement 2. chain hoist, 3. vertical plate lifting lug, 5. gas chamber column The 10. piston lower edge truss of truss 6. 7. piston truss upright-column of crane, 8. piston, 9. piston winds up
Specific embodiment
Specific embodiments of the present invention will be further explained with reference to the accompanying drawing:
Gas chamber piston system hangs method for dismounting, includes the following steps: under a kind of accident condition of the present invention
1) it as shown in Figure 1, accident condition lower piston 8 is trapped in a certain position, removes before piston system first with air by coal Coal gas replacement in gas holder comes out, and piston 8 is carried out after pressure in gas chamber reaches equilibrium valve and removes operation;
2) vertical plate lifting lug 3 is welded on every gas chamber column 5, vertical plate lifting lug 3 is correspondingly arranged at piston and winds up truss 9 Lower section;Piston truss upright-column 7 is connect with vertical plate lifting lug 3 by chain hoist 2, prevents piston 8 in work progress mobile;
3) piston is winded up and is reinforced between truss 9 and gas chamber column 5 using the reinforcement 1 that winds up, close to piston lower edge It is reinforced between the gas chamber column 5 and piston truss upright-column 7 of truss 10 using lower edge reinforcement 4;
4) crane 6 reaches piston 8 and originates on the outside of the corresponding gas chamber of cutting region, carries out lifting and prepares (as shown in Figure 2);
5) as shown in figure 3, as starting cutting region along (direction shown in arrow in figure) or inverse time clockwise when piston 8 is removed Needle is removed by several times by cutting region, and the piston component after subregion is cut hangs original position by crane 6 respectively, until piston 8 whole remove finish.
The reinforcement 1 that winds up, lower edge frame are consolidated beam 4 and are made of I-steel.
The cutting uses gas cutting mode.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (3)

1. gas chamber piston system hangs method for dismounting under a kind of accident condition, which comprises the steps of:
1) accident condition lower piston is trapped in a certain position, removes before piston system first with air by the coal gas replacement in gas chamber Out, piston is carried out after pressure in gas chamber reaches equilibrium valve remove operation;
2) vertical plate lifting lug is welded on every gas chamber column, vertical plate lifting lug is correspondingly arranged at piston and winds up the lower section of truss;It will Piston truss upright-column is connect with vertical plate lifting lug by chain hoist, prevents piston in work progress mobile;
3) piston is winded up and is reinforced between truss and gas chamber column using the reinforcement that winds up, close to the coal of piston lower edge truss It is reinforced between gas holder column and piston truss upright-column using lower edge reinforcement;
4) crane reaches on the outside of the corresponding gas chamber of piston starting cutting region, carries out lifting and prepares;
5) subregion is cut along being removed by several times by cutting region clockwise or counterclockwise by starting cutting region when piston is removed Piston component afterwards hangs original position by crane respectively, finishes until piston is all removed.
2. gas chamber piston system hangs method for dismounting under a kind of accident condition according to claim 1, which is characterized in that The reinforcement that winds up, lower edge frame Gu Liang are made of I-steel.
3. gas chamber piston system hangs method for dismounting under a kind of accident condition according to claim 1, which is characterized in that The cutting uses gas cutting mode.
CN201811381054.1A 2018-11-20 2018-11-20 Gas chamber piston system hangs method for dismounting under a kind of accident condition Pending CN109538921A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811381054.1A CN109538921A (en) 2018-11-20 2018-11-20 Gas chamber piston system hangs method for dismounting under a kind of accident condition

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811381054.1A CN109538921A (en) 2018-11-20 2018-11-20 Gas chamber piston system hangs method for dismounting under a kind of accident condition

Publications (1)

Publication Number Publication Date
CN109538921A true CN109538921A (en) 2019-03-29

Family

ID=65848405

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811381054.1A Pending CN109538921A (en) 2018-11-20 2018-11-20 Gas chamber piston system hangs method for dismounting under a kind of accident condition

Country Status (1)

Country Link
CN (1) CN109538921A (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1037490A (en) * 1996-07-22 1998-02-10 Imazu Kensetsu Kk Disassembling method for gas tank
JPH1077745A (en) * 1996-09-02 1998-03-24 Mitsubishi Constr Co Ltd Dismantling method for waterless gas holder and its device
JPH10184037A (en) * 1996-12-25 1998-07-14 Ishii Iron Works Co Ltd Construction method of water-containing type gas holder
CN102486051A (en) * 2010-12-06 2012-06-06 中冶天工集团有限公司 Manual demolishing method of large-area spherical net rack
CN102493676A (en) * 2011-12-20 2012-06-13 中国三冶集团有限公司结构制造安装工程公司 Method for dismounting single-layer dome netty structure of large gas storage cabinet top system
CN105133857A (en) * 2015-08-27 2015-12-09 上海十三冶建设有限公司 Dismantling method for dry man-type gas holder
KR101658907B1 (en) * 2016-04-12 2016-09-22 조남철 Cable Dome demolition method used to remove the tension in the diagonal cable
CN107447073A (en) * 2017-09-19 2017-12-08 中国三冶集团有限公司 80,000 m of one kind3Converter gas cabinet maintenance air source device
CN107543025A (en) * 2016-06-28 2018-01-05 五冶集团上海有限公司 A kind of gas chamber shell dome Demolition Construction method
CN206916176U (en) * 2017-02-23 2018-01-23 陕钢集团汉中钢铁有限责任公司 A kind of gas chamber inflates displacement apparatus

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1037490A (en) * 1996-07-22 1998-02-10 Imazu Kensetsu Kk Disassembling method for gas tank
JPH1077745A (en) * 1996-09-02 1998-03-24 Mitsubishi Constr Co Ltd Dismantling method for waterless gas holder and its device
JPH10184037A (en) * 1996-12-25 1998-07-14 Ishii Iron Works Co Ltd Construction method of water-containing type gas holder
CN102486051A (en) * 2010-12-06 2012-06-06 中冶天工集团有限公司 Manual demolishing method of large-area spherical net rack
CN102493676A (en) * 2011-12-20 2012-06-13 中国三冶集团有限公司结构制造安装工程公司 Method for dismounting single-layer dome netty structure of large gas storage cabinet top system
CN105133857A (en) * 2015-08-27 2015-12-09 上海十三冶建设有限公司 Dismantling method for dry man-type gas holder
KR101658907B1 (en) * 2016-04-12 2016-09-22 조남철 Cable Dome demolition method used to remove the tension in the diagonal cable
CN107543025A (en) * 2016-06-28 2018-01-05 五冶集团上海有限公司 A kind of gas chamber shell dome Demolition Construction method
CN206916176U (en) * 2017-02-23 2018-01-23 陕钢集团汉中钢铁有限责任公司 A kind of gas chamber inflates displacement apparatus
CN107447073A (en) * 2017-09-19 2017-12-08 中国三冶集团有限公司 80,000 m of one kind3Converter gas cabinet maintenance air source device

Similar Documents

Publication Publication Date Title
CN108425509A (en) A kind of grid structure with bolt-sphere joints light-duty steel construction house replaces the construction method of rod piece and bolt sphere
CN101684885B (en) Method for dismounting tank top system of thin oil sealing-type dry-type gas tank
CN203372980U (en) Detachable top cover hanger applicable to pressurized water reactor
CN109538921A (en) Gas chamber piston system hangs method for dismounting under a kind of accident condition
CN209262658U (en) A kind of reinforcement by connection structure when gas chamber piston system hangs are removed
CN205857039U (en) A kind of Collison fence for bridge Integral Steel template
CN104878146B (en) Construction method for replacing corrugated compensator on top of gravity dust collector
CN202017503U (en) Automatic pin puller for hydraulic support
CN206417791U (en) A kind of hanging apparatus for being used to install single ended bolt stretching-machine in groups
CN102817467B (en) Operating platform for high-altitude installation of steel structure
CN106224755B (en) The remodeling method of the rubber diaphragm sealed gas holder of two-part
CN108015519B (en) The drawing process covered in blast furnace
CN202644407U (en) Demoulding device for bottom plate bracket of capping beam constructed by hoop method
CN202337949U (en) Bridge jacking device
CN204238443U (en) A kind of detachable suspension column fastening devices
CN101665218B (en) Method for disassembling DBQ type tower crane machine with small-tonnage crawler crane
CN106013819A (en) Hoisting system and method for hoisting prefabricated exterior wall cladding based on overhead hooking exchange
CN207109599U (en) A kind of form removable of support cast-in-place concrete continuous beam and erecting device
CN104358355A (en) Detachable column base fixing device and construction method thereof
CN205216819U (en) Petrochemical engineering tower
CN104675140B (en) Newly-increased load-bearing pillar is installed and roof truss load transfer method
CN105544955A (en) Elevator shaft tool type operation steel platform and manufacturing method thereof
CN204549893U (en) A kind of tackling system of auxiliary hoist jib hinged-support bearing replacing
CN205150161U (en) Installation superelevation guide rail put up auxiliary device of usefulness during 45000T collection rolled ship construction
CN221894528U (en) But reuse and length-adjustable's pile foundation steel reinforcement cage hoist device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190329