CN109522159A - A kind of project management information standby system and its method - Google Patents
A kind of project management information standby system and its method Download PDFInfo
- Publication number
- CN109522159A CN109522159A CN201811417714.7A CN201811417714A CN109522159A CN 109522159 A CN109522159 A CN 109522159A CN 201811417714 A CN201811417714 A CN 201811417714A CN 109522159 A CN109522159 A CN 109522159A
- Authority
- CN
- China
- Prior art keywords
- information
- project
- unit
- backup
- engineering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 33
- 238000012545 processing Methods 0.000 claims abstract description 12
- 230000005540 biological transmission Effects 0.000 claims description 13
- 238000003908 quality control method Methods 0.000 claims description 9
- 239000000284 extract Substances 0.000 claims description 7
- 239000013589 supplement Substances 0.000 claims description 3
- 238000000605 extraction Methods 0.000 abstract description 4
- 238000005516 engineering process Methods 0.000 abstract description 3
- 238000012795 verification Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 2
- 238000001514 detection method Methods 0.000 description 2
- 238000011161 development Methods 0.000 description 1
- 230000018109 developmental process Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000001914 filtration Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/07—Responding to the occurrence of a fault, e.g. fault tolerance
- G06F11/14—Error detection or correction of the data by redundancy in operation
- G06F11/1402—Saving, restoring, recovering or retrying
- G06F11/1446—Point-in-time backing up or restoration of persistent data
- G06F11/1448—Management of the data involved in backup or backup restore
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/07—Responding to the occurrence of a fault, e.g. fault tolerance
- G06F11/14—Error detection or correction of the data by redundancy in operation
- G06F11/1402—Saving, restoring, recovering or retrying
- G06F11/1446—Point-in-time backing up or restoration of persistent data
- G06F11/1458—Management of the backup or restore process
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F21/00—Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
- G06F21/60—Protecting data
- G06F21/602—Providing cryptographic facilities or services
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F21/00—Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
- G06F21/60—Protecting data
- G06F21/62—Protecting access to data via a platform, e.g. using keys or access control rules
- G06F21/6218—Protecting access to data via a platform, e.g. using keys or access control rules to a system of files or objects, e.g. local or distributed file system or database
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Health & Medical Sciences (AREA)
- Quality & Reliability (AREA)
- Bioethics (AREA)
- General Health & Medical Sciences (AREA)
- Computer Hardware Design (AREA)
- Computer Security & Cryptography (AREA)
- Software Systems (AREA)
- Databases & Information Systems (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
The invention discloses a kind of project management information standby systems, belong to the processing technology field of project management information, it solves the problems, such as that gibberish can not be filtered in existing project management information backup procedure, the present invention includes: Database Unit, mobile terminal, recognition unit, control unit and display unit, the invalid information of project management information can be effectively filtered by controlling, characteristic information is obtained to be backed up, the present invention also provides the backup methods of above-mentioned project management information, so that the information after backup meets the requirement of system, information after backup is clear and complete, extraction is had access to conveniently, it provides convenience to the use of people, it is practical.
Description
Technical field
The invention belongs to the processing technology fields of project management information, specifically, it is standby to be related to a kind of project management information
Part system and method.
Background technique
In existing projects, the processing of information is particularly important, is related to the confidential information and management of engineering
Information etc., therefore, particularly important to the management of engineering information, especially information backup management avoids engineering information
It loses and causes huge economic loss to people;
Chinese Patent Application No.: 201710139045.0, application publication number: CN 106970858A discloses a kind of engineering management
Information backup method and system, its key points of the technical solution are that including the following steps: whether detection has by testing within a preset range
The mobile terminal of card, if so, then sending connection request into mobile terminal;After establishing connection with mobile terminal, further to shifting
Dynamic terminal sends the request of backup;After mobile terminal agrees to backup request, whether detection backup has newly-increased typing in region
Data, if so, then entering next step;According to newly-increased logging data to form the log document in respective backup region in real time simultaneously
It is sent in mobile terminal;Mobile terminal receives this log document and carries out stacking-type storage.Local terminal occur program exception,
When collapse causes the project management information system to exit, due to preserving log document in mobile terminal, user only needed day
Will document send back to local terminal again and replicates the logging data in log document again.
Although above-mentioned project management information backup method and system can be sent out again when system runs quickly and bursts by log document
The information for obtaining and not completing backup is sent, but there is also following deficiencies for its use process:
Checking treatment can not be carried out to information after acquisition of information in above-mentioned project management information backup procedure, the information after backup is miscellaneous
Disorderly without chapter, biggish inconvenience is brought in engineering management, people need during extraction or reading information after backup
Think to screen out gibberish, workload is huge, there is practicability deficiency.
Summary of the invention
It solves the problems, such as
Aiming at the problem that can not filter gibberish in existing project management information backup procedure, the purpose of the present invention is to provide
A kind of project management information standby system and its method, by information checking unit to treated letter in data backup procedure
Breath carries out verification denoising, so that the information after backup is more suitable for the management of engineering project, extraction and tune convenient for later period people
It reads, to solve the problems mentioned in the above background technology.
Technical solution
To achieve the above object, the invention provides the following technical scheme:
A kind of project management information standby system, comprising:
Database Unit, for storing engineering project information in project management, the engineering project information includes several
Project Global Information and detailed programs content information, the project Global Information include project name, project number, responsibility
People, project beginning and ending time, performance;The detailed programs content information includes item types, item amount, project conjunction
Same, project quality control situation, project account and project report administrative situation;
Mobile terminal is used to send backup application to system, and submits related engineering project information data;
Whether recognition unit has mobile terminal to send project management information backup application request to system for identification;
Control unit comprising information collection unit, information checking unit;Wherein:
Information collection unit is used to obtain the project management information sent by mobile terminal, and information includes engineering base
Plinth characteristic parameter and remarks parameter, foundation characteristic parameter are project Global Information and detailed programs content information, and remarks parameter is
Specified otherwise information in project management process, the specific requirement information of specified otherwise information such as project, the burst of project
Event information etc.;
Information checking unit, being used for above-mentioned project backup, to treated, information carries out format check, checking treatment in the process
Whether information afterwards meets backup format requirement, for example whether when lacking project name, project number, person liable, project start-stop
Between, projects Global Information and item types, item amount, Project contract, project quality control situation, the project platform such as performance
Account and project report administrative situation detailed programs content information;
Display unit, be used to show described control unit complete backup after storage to engineering project information in Database Unit with
And display data backup performance.
Preferably, the control unit further include: descriptive entry arranges single, project directory generation unit, job number
Generation unit, in which:
Descriptive entry finishing unit is used to carry out induction-arrangement according to the information that information collection unit obtains, and acquisition, which meets, is
The project of system backup request records require information, and is recorded according to project and the information that will acquire is required to carry out unification to each project
It arranges;
Project directory generation unit, is used for that treated that each project carries out generates information mesh by descriptive entry finishing unit
Record, directory information includes level-one title, second level title and three-level title;
Job number generation unit, is used for project directory generation unit treated that project carry out according to the requirement of setting
System Number, generation belong to the particular item number conveniently having access to.
Preferably, the control unit further include: information copied cells and data transmission unit, in which:
Information copied cells are used to carry out the project information for meeting backup request after information checking cell processing to copy multiple
System;
Data transmission unit, the project information after being used to replicate information copied cells carry out signal and are sent to Database Unit
It is stored;
Preferably, further includes:
Data extracting unit is used to control unit and extracts the engineering project information in Database Unit have access to, mention
The information taken includes project Global Information and contents of a project information.
Preferably, further includes:
Data updating unit is used to store in user data update to the Database Unit, and data updating unit obtains
It is analyzed after the newest information once updated, by the newest information replace or supplement once updated to being stored on database
In engineering information in unit 1;The data updating unit is to provide data base to for providing more personalized service
Plinth.
Preferably, the mobile terminal by bluetooth, 3G, 4G or WIFI in real time with project management information standby system into
Row connection, the mobile terminal is one of PC, mobile phone or tablet computer.
Above-mentioned project management information backup method, the specific steps are as follows:
S1, the identification of recognition unit 6 move about whether terminal 7 has transmission information back-up demand, if so, starting control unit 4
In information collection unit 41 carry out acquisition of information;
S2, the collection of information collection unit 41 need backup item information, obtain the project management sent by mobile terminal 7
Information, information include engineering foundation characteristic parameter and remarks parameter, and foundation characteristic parameter is project Global Information and detailed programs
Content information, remarks parameter are the specified otherwise information in project management process, specified otherwise information such as project it is specific
Require information, the emergency information etc. of project;
The information that S3, descriptive entry finishing unit 42 obtain information collection unit 41 carries out induction-arrangement, and acquisition meets system
The project of backup request records require information, and records according to project that require the information that will acquire to carry out each project unified whole
Reason;
S4, project directory generation unit 43 are by treated each project of descriptive entry finishing unit 42 according to level-one title, two
The requirement of grade title and three-level title carries out generation message catalog;
S5, job number generation unit 44 are numbered the engineering project after message catalog generates is completed;
S6, information checking unit 45 are by treated, information carries out format check, checking treatment during above-mentioned project backup
Whether information afterwards meets backup format requirement, for example whether when lacking project name, project number, person liable, project start-stop
Between, projects Global Information and item types, item amount, Project contract, project quality control situation, the project platform such as performance
Account and project report administrative situation detailed programs content information;If so, the work that then information copied cells 46 pass through information checking
Journey information replicate and occurs into Database Unit 1 to back up by the information after duplication by data transmission unit, if it is not, then
Starting information collection unit 41 collects engineering project information again;
S7, display unit 8 extract the engineering project information in Database Unit 1 by control unit 4 and data extracting unit 2,
And passes through after information cryptographic processing unit 5 obtains decryption instructions and shown, and backup performance.
Beneficial effect
Compared with prior art, the beneficial effects of the present invention are:
1) above-mentioned project management information backup method can extract in mobile terminal effectively in project management information backup procedure
The effective information of acquisition is backed up, and carries out denoising filtering to information, avoid information back-up complete after content it is in disorder,
Rambling information generates, and improves information backup efficiency;
2) backup method effectively can carry out format check to the information of backup in backup procedure, avoid the information of backup
The requirement for being unsatisfactory for project management information backup happens, so that the information of backup facilitates people to extract and have access to, gives people
Use provide convenience;
3) above-mentioned backup method passes through ability after information cryptographic processing unit processing acquisition encrypted instruction in having access to information process
It has access to, avoids the leakage of confidential information, improve the security performance of project management information;
4) above-mentioned backup method can be backed up according to the requirement of standby system, and the project management information of backup is completed, catalogue
It is clear, and data can real-time update, facilitate people to have access to up-to-date information at any time, understand the latest developments of engineering management, it is practical
Property is strong.
Detailed description of the invention
Fig. 1 is the functional block diagram of present system;
Fig. 2 is the flow chart of present system backup method.
In figure: 1, Database Unit;2, data extracting unit;3, data updating unit;4, control unit;41, information is received
Collect unit;42, descriptive entry finishing unit;43, project directory generation unit;44, job number generation unit;45, information school
Verification certificate member;46, information copied cells;47, data transmission unit;5, information cryptographic processing unit;6, recognition unit;7, mobile whole
End;8, display unit.
Specific embodiment
Technical solution of the present invention is described in more detail With reference to embodiment.
Embodiment 1
Referring to Fig. 1, a kind of project management information standby system, comprising:
Database Unit 1, for storing engineering project information in project management, the engineering project information includes several
Project Global Information and detailed programs content information, the project Global Information include project name, project number, responsibility
People, project beginning and ending time, performance;The detailed programs content information includes item types, item amount, project conjunction
Same, project quality control situation, project account and project report administrative situation;
Mobile terminal 7 is used to send backup application to system, and submits related engineering project information data, and mobile terminal is logical
It crosses bluetooth, 3G, 4G or WIFI to be attached with project management information standby system in real time, the mobile terminal is PC, mobile phone
Or one of tablet computer;
Whether recognition unit 6 has mobile terminal 7 to send project management information backup application request to system for identification;
Control unit 4 comprising information collection unit 41, descriptive entry finishing unit 42, project directory generation unit 43, engineering
Number generation unit 44, information checking unit 45, information copied cells 46 and data transmission unit 47;Wherein:
Information collection unit 41 is used to obtain the project management information sent by mobile terminal 7, and information includes engineering
Foundation characteristic parameter and remarks parameter, foundation characteristic parameter are project Global Information and detailed programs content information, remarks parameter
The specified otherwise information in project management process, the specific requirement information of specified otherwise information such as project, project it is prominent
Send out event information etc.;
Descriptive entry finishing unit 42 is used to carry out induction-arrangement according to the information that information collection unit 41 obtains, obtains symbol
The project of collaboration system backup request records require information, and records the information for requiring will acquire according to project and carry out to each project
It is unified to arrange;
Project directory generation unit 43, is used for that treated that each project carries out generation information by descriptive entry finishing unit 42
Catalogue, directory information include level-one title, second level title and three-level title;
Job number generation unit 44 is used for project directory generation unit 43 treated project and carries out requirement according to setting
System Number is carried out, generation belongs to the particular item number conveniently having access to;
Information checking unit 45 is used for during above-mentioned project backup to treated information carries out format check, at verification
Whether the information after reason meets backup format requirement, for example whether lacking project name, project number, person liable, project start-stop
The projects such as time, performance Global Information and item types, item amount, Project contract, project quality control situation, project
Account and project report administrative situation detailed programs content information;
Information copied cells 46 are used to copy the project information for meeting backup request after the processing of information checking unit 45
Duplication;
Data transmission unit 47, the project information after being used to replicate information copied cells 46 carry out signal and are sent to database
Unit 1 is stored;
Display unit 8 is used to show that described control unit 4 to be completed storage after backing up and believed to engineering project in Database Unit 1
Breath and display data backup performance;
Embodiment 2
Referring to Fig. 1, a kind of project management information standby system, on the basis of embodiment 1, further includes:
Data extracting unit 2 is used to control unit 4 and extracts the engineering project information in Database Unit 1 have access to,
The information of extraction includes project Global Information and contents of a project information;
Data updating unit 3 is used to store in user data update to the Database Unit 1, and data updating unit 3 obtains
It is analyzed after taking the newest information once updated, by the newest information replace or supplement once updated to being stored on data
In engineering information in library unit 1;The data updating unit 3 is to provide data to for providing more personalized service
Basis.
A kind of project management information backup method, the specific steps are as follows:
S1, the identification of recognition unit 6 move about whether terminal 7 has transmission information back-up demand, if so, starting control unit 4
In information collection unit 41 carry out acquisition of information;
S2, the collection of information collection unit 41 need backup item information, obtain the project management sent by mobile terminal 7
Information, information include engineering foundation characteristic parameter and remarks parameter, and foundation characteristic parameter is project Global Information and detailed programs
Content information, remarks parameter are the specified otherwise information in project management process, specified otherwise information such as project it is specific
Require information, the emergency information etc. of project;
The information that S3, descriptive entry finishing unit 42 obtain information collection unit 41 carries out induction-arrangement, and acquisition meets system
The project of backup request records require information, and records according to project that require the information that will acquire to carry out each project unified whole
Reason;
S4, project directory generation unit 43 are by treated each project of descriptive entry finishing unit 42 according to level-one title, two
The requirement of grade title and three-level title carries out generation message catalog;
S5, job number generation unit 44 are numbered the engineering project after message catalog generates is completed;
S6, information checking unit 45 are by treated, information carries out format check, checking treatment during above-mentioned project backup
Whether information afterwards meets backup format requirement, for example whether when lacking project name, project number, person liable, project start-stop
Between, projects Global Information and item types, item amount, Project contract, project quality control situation, the project platform such as performance
Account and project report administrative situation detailed programs content information;If so, the work that then information copied cells 46 pass through information checking
Journey information replicate and occurs into Database Unit 1 to back up by the information after duplication by data transmission unit, if it is not, then
Starting information collection unit 41 collects engineering project information again;
S7, display unit 8 extract the engineering project information in Database Unit 1 by control unit 4 and data extracting unit 2,
And passes through after information cryptographic processing unit 5 obtains decryption instructions and shown, and backup performance.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie
In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter
From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power
Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims
Variation is included within the present invention.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped
Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should
It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art
The other embodiments being understood that.
Claims (7)
1. a kind of project management information standby system characterized by comprising
Database Unit, for storing engineering project information in project management, the engineering project information includes several
Project Global Information and detailed programs content information, the project Global Information include project name, project number, responsibility
People, project beginning and ending time, performance;The detailed programs content information includes item types, item amount, project conjunction
Same, project quality control situation, project account and project report administrative situation;
Mobile terminal is used to send backup application to system, and submits related engineering project information data;
Whether recognition unit has mobile terminal to send project management information backup application request to system for identification;
Control unit comprising information collection unit, information checking unit;Wherein:
Information collection unit is used to obtain the project management information sent by mobile terminal, and information includes engineering base
Plinth characteristic parameter and remarks parameter, foundation characteristic parameter are project Global Information and detailed programs content information, and remarks parameter is
Specified otherwise information in project management process, the specific requirement information of specified otherwise information such as project, the burst of project
Event information etc.;
Information checking unit, being used for above-mentioned project backup, to treated, information carries out format check, checking treatment in the process
Whether information afterwards meets backup format requirement, for example whether when lacking project name, project number, person liable, project start-stop
Between, projects Global Information and item types, item amount, Project contract, project quality control situation, the project platform such as performance
Account and project report administrative situation detailed programs content information;
Display unit, be used to show described control unit complete backup after storage to engineering project information in Database Unit with
And display data backup performance.
2. a kind of project management information standby system according to claim 1, which is characterized in that the control unit is also
It include: that descriptive entry arranges list, project directory generation unit, job number generation unit, in which:
Descriptive entry finishing unit is used to carry out induction-arrangement according to the information that information collection unit obtains, and acquisition, which meets, is
The project of system backup request records require information, and is recorded according to project and the information that will acquire is required to carry out unification to each project
It arranges;
Project directory generation unit, is used for that treated that each project carries out generates information mesh by descriptive entry finishing unit
Record, directory information includes level-one title, second level title and three-level title;
Job number generation unit, is used for project directory generation unit treated that project carry out according to the requirement of setting
System Number, generation belong to the particular item number conveniently having access to.
3. a kind of project management information standby system according to claim 1, which is characterized in that the control unit is also
It include: information copied cells and data transmission unit, in which:
Information copied cells are used to carry out the project information for meeting backup request after information checking cell processing to copy multiple
System;
Data transmission unit, the project information after being used to replicate information copied cells carry out signal and are sent to Database Unit
It is stored.
4. a kind of project management information standby system according to claim 1 to 3, which is characterized in that further include:
Data extracting unit is used to control unit and extracts the engineering project information in Database Unit have access to, mention
The information taken includes project Global Information and contents of a project information.
5. a kind of project management information standby system according to claim 4, which is characterized in that further include:
Data updating unit is used to store in user data update to the Database Unit, and data updating unit obtains
It is analyzed after the newest information once updated, by the newest information replace or supplement once updated to being stored on database
In engineering information in unit 1;The data updating unit is to provide data base to for providing more personalized service
Plinth.
6. a kind of project management information standby system according to claim 1, which is characterized in that the mobile terminal is logical
It crosses bluetooth, 3G, 4G or WIFI to be attached with project management information standby system in real time, the mobile terminal is PC, mobile phone
Or one of tablet computer.
7. a kind of project management information backup method a method according to any one of claims 1-3, which is characterized in that specific steps are such as
Under:
S1, the identification of recognition unit 6 move about whether terminal 7 has transmission information back-up demand, if so, starting control unit 4
In information collection unit 41 carry out acquisition of information;
S2, the collection of information collection unit 41 need backup item information, obtain the project management sent by mobile terminal 7
Information, information include engineering foundation characteristic parameter and remarks parameter, and foundation characteristic parameter is project Global Information and detailed programs
Content information, remarks parameter are the specified otherwise information in project management process, specified otherwise information such as project it is specific
Require information, the emergency information etc. of project;
The information that S3, descriptive entry finishing unit 42 obtain information collection unit 41 carries out induction-arrangement, and acquisition meets system
The project of backup request records require information, and records according to project that require the information that will acquire to carry out each project unified whole
Reason;
S4, project directory generation unit 43 are by treated each project of descriptive entry finishing unit 42 according to level-one title, two
The requirement of grade title and three-level title carries out generation message catalog;
S5, job number generation unit 44 are numbered the engineering project after message catalog generates is completed;
S6, information checking unit 45 are by treated, information carries out format check, checking treatment during above-mentioned project backup
Whether information afterwards meets backup format requirement, for example whether when lacking project name, project number, person liable, project start-stop
Between, projects Global Information and item types, item amount, Project contract, project quality control situation, the project platform such as performance
Account and project report administrative situation detailed programs content information;If so, the work that then information copied cells 46 pass through information checking
Journey information replicate and occurs into Database Unit 1 to back up by the information after duplication by data transmission unit, if it is not, then
Starting information collection unit 41 collects engineering project information again;
S7, display unit 8 extract the engineering project information in Database Unit 1 by control unit 4 and data extracting unit 2,
And passes through after information cryptographic processing unit 5 obtains decryption instructions and shown, and backup performance.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811417714.7A CN109522159A (en) | 2018-11-26 | 2018-11-26 | A kind of project management information standby system and its method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811417714.7A CN109522159A (en) | 2018-11-26 | 2018-11-26 | A kind of project management information standby system and its method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109522159A true CN109522159A (en) | 2019-03-26 |
Family
ID=65793657
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811417714.7A Pending CN109522159A (en) | 2018-11-26 | 2018-11-26 | A kind of project management information standby system and its method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109522159A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111401856A (en) * | 2020-03-26 | 2020-07-10 | 广州华商职业学院 | Engineering data management oriented system |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11120056A (en) * | 1997-10-09 | 1999-04-30 | Fuji Electric Co Ltd | Saving and restoring method for project data |
US20030023675A1 (en) * | 1997-07-28 | 2003-01-30 | Ouchi Norman Ken | Workflow systems and methods for project management and information management |
CN105530116A (en) * | 2014-10-24 | 2016-04-27 | 中兴通讯股份有限公司 | Virtual network backup and recovery method and corresponding device |
CN106970858A (en) * | 2017-03-09 | 2017-07-21 | 浙江中诚工程管理科技有限公司 | A kind of project management information backup method and system |
-
2018
- 2018-11-26 CN CN201811417714.7A patent/CN109522159A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030023675A1 (en) * | 1997-07-28 | 2003-01-30 | Ouchi Norman Ken | Workflow systems and methods for project management and information management |
JPH11120056A (en) * | 1997-10-09 | 1999-04-30 | Fuji Electric Co Ltd | Saving and restoring method for project data |
CN105530116A (en) * | 2014-10-24 | 2016-04-27 | 中兴通讯股份有限公司 | Virtual network backup and recovery method and corresponding device |
CN106970858A (en) * | 2017-03-09 | 2017-07-21 | 浙江中诚工程管理科技有限公司 | A kind of project management information backup method and system |
Non-Patent Citations (2)
Title |
---|
柳文等: "基于Web的建筑工程项目动态管理系统设计", 《福建电脑》, no. 06, 1 June 2009 (2009-06-01), pages 113 - 141 * |
范毅明等著: "《医用B超仪与超声多普勒系统》", vol. 1, 第二军医大学出版社, pages: 228 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111401856A (en) * | 2020-03-26 | 2020-07-10 | 广州华商职业学院 | Engineering data management oriented system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103595730B (en) | A kind of ciphertext cloud storage method and system | |
CN105337928B (en) | Method for identifying ID, safety protection problem generation method and device | |
CN105468989B (en) | Cloud storage quota management method based on linux kernel monitoring | |
Wolthusen | Overcast: Forensic discovery in cloud environments | |
CN106503158A (en) | Method of data synchronization and device | |
CN109543078A (en) | Social relationships determine method, apparatus, equipment and computer readable storage medium | |
CN107832448A (en) | Database operation method, device and equipment | |
CN102130993A (en) | Mobile-terminal-based information-recording method and system | |
CN108600284A (en) | A kind of virtual machine high availability implementation method and system based on Ceph | |
CN107277152A (en) | A kind of public cloud data safety backup system | |
CN106155838A (en) | A kind of database back-up data restoration methods and device | |
CN110457529A (en) | Post data processing method, device, computer equipment and storage medium | |
CN109522159A (en) | A kind of project management information standby system and its method | |
US20180024888A1 (en) | Intelligent Backup and Restore System | |
CN114547204A (en) | Data synchronization method and device, computer equipment and storage medium | |
CN103324867A (en) | Terminal and application program management method | |
CN109670793A (en) | A kind of method and device of the digital asset validity period processing based on block chain | |
CN112187898B (en) | Data access system, method and device based on public security network | |
CA3155794A1 (en) | System and method for blockchain based backup and recovery | |
CN103902919B (en) | A kind of method and device recovering log-on message | |
WO2020000198A1 (en) | Block chain-based attendance system | |
CN103440179B (en) | The continuous store method of storage device configurations information | |
CN102685304A (en) | Address book synchronizing method and device | |
CN109656945A (en) | A kind of information processing method | |
CN109726187A (en) | A kind of adaptive authority control method and device towards Hadoop |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190326 |
|
RJ01 | Rejection of invention patent application after publication |