CN109440646A - A kind of pre-buried bracket device of king-post upper beam construction bracket - Google Patents
A kind of pre-buried bracket device of king-post upper beam construction bracket Download PDFInfo
- Publication number
- CN109440646A CN109440646A CN201811186309.9A CN201811186309A CN109440646A CN 109440646 A CN109440646 A CN 109440646A CN 201811186309 A CN201811186309 A CN 201811186309A CN 109440646 A CN109440646 A CN 109440646A
- Authority
- CN
- China
- Prior art keywords
- bracket
- buried
- backing plate
- king
- steel slab
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/14—Towers; Anchors ; Connection of cables to bridge parts; Saddle supports
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The present invention is a kind of pre-buried bracket device of king-post upper beam construction bracket, including pre-buried bracket stress surface, pre-embedded steel slab, bracket backing plate, bracket gusset, bracket backing plate.The pre-buried bracket stress surface provides impetus;The pre-embedded steel slab is to be inserted into high pier construction concrete with a thickness of 5-15cm thick steel plate, and quantity, length, the size highly according to offer support force of pre-embedded steel slab are determining;The bracket backing plate is the steel plate with a thickness of 2-4cm lain in a horizontal plane in immediately below pre-embedded steel slab, is welded with pre-embedded steel slab;Bracket backing plate is close to high pier concrete surface, and upper end intersects vertically and welds with bracket backing plate.Bracket gusset is triangular steel plate, vertical to place, and is welded with ox bracket backing plate and bracket backing plate, is respectively provided with one piece of bracket gusset under every piece of pre-embedded steel slab.
Description
Technical field:
The present invention relates to bridge substructure construction field more particularly to the pre-buried bracket dresses of king-post upper beam construction bracket
It sets.
Background technique:
Upper beam construction is the important partitioned project of bridge construction.
Being constantly progressive and develop with Chinese society, conventional bridge is no longer satisfied the needs of traffic, therefore, oblique pull
This extra-large bridge of bridge, suspension bridge becomes the important component of current urban traffic road.Cable-stayed bridge, suspension cable bridge tower pier stud
Upper beam height is high, and conventional floor stand needs steel-pipe pile, and high-altitude is spliced section by section, not only wastes material, artificial, it is also desirable to longer
Installation and remove the period, and there are many security risk factors in work progress.
Under this form, high pier king-post upper beam gradually becomes the important selection of upper beam construction, but upper cross using bracket
Beam construction needs stress of taking root on king-post using bracket.Therefore, how to ensure to be set as on high tower tower body bracket construction by
The device of power becomes the key of king-post bracket construction.
Summary of the invention:
The technical problems to be solved by the present invention are: providing a pre-buried bracket device of king-post upper beam construction bracket, it is intended to
Enough bearing capacities are provided for king-post upper beam bracket, bracket is allow to weigh the various loads in upper beam work progress.
In order to solve the above-mentioned technical problem, the present invention is achieved by the following technical solutions: the pre-buried bracket stress
Face provides impetus;In described pre-embedded steel slab insertion high pier construction concrete;The bracket backing plate 1 is pre-buried to lie in a horizontal plane in
The steel plate with a thickness of 2-4cm immediately below steel plate is welded with pre-embedded steel slab;Bracket backing plate 2 is close to high pier concrete surface, and upper end is same
Bracket backing plate 1 intersects vertically and welds.Bracket gusset is triangular steel plate, vertical to place, with ox bracket backing plate 1 and bracket backing plate
2 weld, and are respectively provided with one piece of bracket gusset under every piece of pre-embedded steel slab.
Preferably, pre-buried bracket stress surface provides impetus, and bracket is integrally welded with pre-buried bracket stress surface;
Preferably, described pre-embedded steel slab is to be inserted into high pier construction concrete, pre-buried steel with a thickness of 5-15cm thick steel plate
The length of plate, the size highly according to offer support force are determining, and quantity is two or more, but in unified absolute altitude;
Preferably, the bracket backing plate 1 is welded to connect with pre-embedded steel slab.
Preferably, the bracket backing plate 2 is close to king-post concrete surface according to upper end is welded with bracket backing plate 1.
Preferably, the bracket gusset is right angled triangle, and the same pre-embedded steel slab of quantity is mounted on immediately below pre-embedded steel slab,
It is welded respectively with bracket backing plate 1 and bracket backing plate 2 on two sides.
Preferably, the bracket gusset lateral is angle steel, and with bracket link of boards, lateral between different bracket gussets should be
On one horizontal line.
The invention has the beneficial effects that: pre-embedded steel slab is main bearing member, and with a thickness of 5-15cm, pre-buried hole is less than
King-post main reinforcement spacing, therefore pre-embedded steel slab installation will not separate king-post steel plate;Bracket backing plate 1 is mounted below pre-embedded steel slab, can
Multiple pre-embedded steel slabs to link into an integrated entity well, and play the role of stress distribution;The installation of bracket gusset can be fine
Ground reduces the bending stress that pre-embedded steel slab is subject to, and the pressure that pre-embedded steel slab is subject to, which is converted into, pushes away the level of king-post surface concrete
Power;Bracket backing plate 2 is close to concrete cylinder, and welds with bracket gusset and bracket backing plate, can be transmitted to bracket gusset
The power of king-post concrete surface plays the role of stress dispersion;Bracket gusset lateral is integral by each link of boards, can be well
Improve the stability of bracket gusset.Pre-buried bracket overall structure stable connection, each member stress is succinct, and structure is simple, but can
To bear great load.
Detailed description of the invention:
The following further describes the present invention with reference to the drawings.
Fig. 1 is upper beam bracket overall floor plan, for a kind of pre-buried bracket of king-post upper beam construction bracket of the present invention
Setting position schematic diagram;
Fig. 2 is for a kind of pre-buried bracket device side elevational view of king-post upper beam construction bracket of the present invention;
Fig. 3 is for a kind of pre-buried bracket device front elevation view of king-post upper beam construction bracket of the present invention;
In figure: 1, king-post concrete surface;2, pre-buried bracket stress surface;3, pre-embedded steel slab;4, bracket backing plate 1;5, bracket muscle
Plate;6, bracket backing plate 2;7, bracket gusset lateral.
Specific embodiment:
Fig. 1 be upper beam construction bracket, Fig. 2, Fig. 3 be pre-buried bracket side elevation and front elevation view, including pre-buried bracket by
Power face, pre-embedded steel slab, bracket backing plate 1, bracket gusset, bracket backing plate 2, bracket gusset lateral.The pre-buried bracket stress surface will
Bracket is connected with bracket;The pre-embedded steel slab is main bearing member, is inserted into the length in concrete and is greater than outside concrete
Length;Bracket backing plate 1, bracket backing plate 2, bracket gusset and the interconnection of bracket gusset lateral under pre-embedded steel slab is integral, rises
Fine stress and intermal force are arrived.
It is integral in rear long paperback after the accurate processing and fabricating of pre-buried each component of bracket device, then integral installation to king-post.
Its specific mounting means is as follows:
Before pre-buried bracket installation, it should when king-post concrete construction, pre-buried box is set in design position, it is pre-buried
Box is made of steel plate, need to be installed in place in king-post concrete construction and be must assure that pre-buried box fixation, it is ensured that most
Pre-buried bracket installation site is accurate eventually.
Bracket provides job platform and armored concrete mounting bracket for upper beam construction, is tiltedly propped up by main spandrel girder, bracket
Leg and web member composition.Spandrel girder and supporting leg are the main bearing member of bracket, and the master that pre-buried bracket is mainly same as above crossbar bracket holds
Chong Liang is connected with oblique supporting leg, completes the transmitting of power.After pre-buried box is installed in place, pre-buried bracket device integral installation is arrived
Position, then will be in bracket integral installation to pre-buried bracket.
By pre-buried bracket device, upper beam is directly anchored on king-post, since its king-post height is high, keeps bracket fine
Ground reduces waste of material caused by bracket installation from top to bottom and artificial, mechanical investment, considerably reduces construction cost.
It is emphasized that: the above is only presently preferred embodiments of the present invention, not make in any form to the present invention
Limitation, any simple modification, equivalent change and modification to the above embodiments according to the technical essence of the invention,
All of which are still within the scope of the technical scheme of the invention.
Claims (6)
1. a kind of pre-buried bracket device of king-post upper beam construction bracket, which is characterized in that including pre-buried bracket stress surface (2), in advance
Bury steel plate (3), bracket backing plate 1 (4), bracket gusset (5), bracket backing plate 2 (6).
2. the pre-buried bracket device of a kind of king-post upper beam construction bracket according to claim 1, which is characterized in that described pre-
It buries bracket stress surface (2) and impetus is provided.
3. the pre-buried bracket device of a kind of king-post upper beam construction bracket according to claim 1, which is characterized in that described
Pre-embedded steel slab (3) is to be inserted into high pier construction concrete, quantity, length, the height of pre-embedded steel slab with a thickness of 5-15cm thick steel plate
It is determined according to the size for providing support force.
4. the pre-buried bracket device of a kind of king-post upper beam construction bracket according to claim 1, which is characterized in that the ox
Leg backing plate 1 (4) is the steel plate with a thickness of 2-4cm lain in a horizontal plane in immediately below pre-embedded steel slab, is welded with pre-embedded steel slab.
5. the pre-buried bracket device of a kind of king-post upper beam construction bracket according to claim 1, which is characterized in that bracket pad
Plate 2 (6) is close to high pier concrete surface, and upper end intersects vertically and welds with bracket backing plate 1 (4).
6. the pre-buried bracket device of a kind of king-post upper beam construction bracket according to claim 1, which is characterized in that bracket muscle
Plate (5) is triangular steel plate, vertical to place, and is welded with ox bracket backing plate 1 and bracket backing plate 2, is respectively provided under every piece of pre-embedded steel slab
One piece of bracket gusset.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811186309.9A CN109440646A (en) | 2018-10-10 | 2018-10-10 | A kind of pre-buried bracket device of king-post upper beam construction bracket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811186309.9A CN109440646A (en) | 2018-10-10 | 2018-10-10 | A kind of pre-buried bracket device of king-post upper beam construction bracket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109440646A true CN109440646A (en) | 2019-03-08 |
Family
ID=65544970
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811186309.9A Pending CN109440646A (en) | 2018-10-10 | 2018-10-10 | A kind of pre-buried bracket device of king-post upper beam construction bracket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109440646A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110318344A (en) * | 2019-06-28 | 2019-10-11 | 中交二航局第四工程有限公司 | A kind of No. 0 block bracket of novel steel box-girder and No. 0 block erection construction method |
CN113417372A (en) * | 2021-07-01 | 2021-09-21 | 中铁大桥局第七工程有限公司 | Concrete tower column embedded bracket system and installation method |
CN114684624A (en) * | 2022-03-29 | 2022-07-01 | 山东电力工程咨询院有限公司 | Few-column sectional chimney-penetrating coal conveying trestle system and method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101314862B1 (en) * | 2012-08-10 | 2013-10-04 | 해강산업주식회사 | Concrete form apparatus |
CN104532749A (en) * | 2014-12-18 | 2015-04-22 | 中铁建设集团有限公司 | Support used for construction of upper beam of main tower of suspension bridge |
CN205636474U (en) * | 2016-04-29 | 2016-10-12 | 贵州桥梁建设集团有限责任公司 | Assembled bracket structure |
CN106677070A (en) * | 2016-12-31 | 2017-05-17 | 中铁局集团有限公司 | Construction support and method for overhead large-span heavy-duty cross beam |
-
2018
- 2018-10-10 CN CN201811186309.9A patent/CN109440646A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101314862B1 (en) * | 2012-08-10 | 2013-10-04 | 해강산업주식회사 | Concrete form apparatus |
CN104532749A (en) * | 2014-12-18 | 2015-04-22 | 中铁建设集团有限公司 | Support used for construction of upper beam of main tower of suspension bridge |
CN205636474U (en) * | 2016-04-29 | 2016-10-12 | 贵州桥梁建设集团有限责任公司 | Assembled bracket structure |
CN106677070A (en) * | 2016-12-31 | 2017-05-17 | 中铁局集团有限公司 | Construction support and method for overhead large-span heavy-duty cross beam |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110318344A (en) * | 2019-06-28 | 2019-10-11 | 中交二航局第四工程有限公司 | A kind of No. 0 block bracket of novel steel box-girder and No. 0 block erection construction method |
CN110318344B (en) * | 2019-06-28 | 2024-04-19 | 中交二航局第四工程有限公司 | Novel steel box girder No. 0 block support and No. 0 block erection construction method |
CN113417372A (en) * | 2021-07-01 | 2021-09-21 | 中铁大桥局第七工程有限公司 | Concrete tower column embedded bracket system and installation method |
CN113417372B (en) * | 2021-07-01 | 2023-02-28 | 中铁大桥局第七工程有限公司 | Concrete tower column embedded bracket system and installation method |
CN114684624A (en) * | 2022-03-29 | 2022-07-01 | 山东电力工程咨询院有限公司 | Few-column sectional chimney-penetrating coal conveying trestle system and method |
CN114684624B (en) * | 2022-03-29 | 2024-01-19 | 山东电力工程咨询院有限公司 | Few-column sectional type chimney-penetrating coal conveying stack bridge system and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101649604B (en) | Construction bracket of 1# block of inclined pull bridge and constructing method thereof | |
CN102051858B (en) | Jack loading triangular truss hanging basket and load test construction method thereof | |
CN109440646A (en) | A kind of pre-buried bracket device of king-post upper beam construction bracket | |
CN201714050U (en) | Integral triangular support operating platform for elevator shaft | |
CN203668833U (en) | Steel web locating device | |
CN105544398A (en) | Horizontal force self-balancing type splayed heavy type upper air support system and installation method thereof | |
CN202247687U (en) | Universal cast-in-situ trestle for bridge | |
CN101446076A (en) | Cast-in-place support for long cantilever No. 0 block of cable-stayed bridge with tower beam consolidation and putting up method | |
CN100540809C (en) | The replacing supporters for continuous beam without breaking off traffic method | |
CN209194353U (en) | It is a kind of to ride integral type bracket suitable for the construction of Bridge High-pier 0# block | |
CN212404805U (en) | Combined abutment structure for temporary trestle | |
CN103243659B (en) | Cantilever hanging bracket and using method thereof | |
CN105442855B (en) | A kind of high-precision buried equipment, method of large scale embedded board | |
CN100497834C (en) | Construction equipment for integral roof-holding highway bridge top structure | |
CN111560842A (en) | Combined abutment structure for temporary trestle | |
CN108570933B (en) | Method for jacking short-tower cable-stayed bridge | |
CN105484171B (en) | One kind becomes top of the slope and enters precast frame bridges and culverts external tendon prestress strengthening method | |
CN213805443U (en) | Steel construction, frame beam structure, side slope reinforced structure and reinforcement and support structure | |
CN213740636U (en) | Cast-in-place construction auxiliary device of continuous case roof beam cantilever of variable cross section | |
CN211772914U (en) | Pre-buried box structure of 0# piece bracket of continuous beam | |
CN210953063U (en) | Weighing platform structure | |
CN114000410A (en) | Anti-overturning structure of steel box girder | |
CN207331470U (en) | A kind of embedded box anchors assembled bracket | |
CN112779856A (en) | Obliquely-arranged bridge support system | |
CN215252345U (en) | Large longitudinal slope assembly type box girder anti-sliding device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
DD01 | Delivery of document by public notice |
Addressee: Lin Dan Document name: Notification that Application Deemed to be Withdrawn |
|
DD01 | Delivery of document by public notice | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190308 |
|
WD01 | Invention patent application deemed withdrawn after publication |