A kind of running gear of semi-automatic boring coring equipment
Technical field
The present invention relates to boring coring equipment related fields, specially a kind of Running System of semi-automatic boring coring equipment
System.
Background technique
The boring coring equipment of the prior art using simple rotary boring, and using fixed derrick probing, imitate by probing
Rate is low, speed is slow, and nowadays time cost is more and more important to construction enterprises, and the duration of a project is shorter, efficiency is higher, constructs to ring
Border, to neighbouring resident, fewer and fewer to the adverse effect of worker.Thus, the boring coring equipment of the prior art, drilling efficiency
Low, more, the large labor intensity of artificial time-consuming, probing positioning process trouble, equipment transfer difficulty is big, and plant maintenance stability is not high,
Current boring coring equipment is increasingly difficult to meet Current Engineering Construction schedule requirement.
Existing boring coring equipment is in use, it may be desirable to running gear is used, to assist whole device equipment
Movement and angular adjustment, achieve the purpose that precisely to drill, so, design a kind of Running System of semi-automatic boring coring equipment
System.
Summary of the invention
The purpose of the present invention is to provide a kind of running gears of semi-automatic boring coring equipment, solve in background technique
The problem of proposed, meets the actual needs.
To achieve the above object, the invention provides the following technical scheme: a kind of Running System of semi-automatic boring coring equipment
System, including running gear main body and clamp body, it is characterised in that: the running gear main body is by large arm, joint arm, counter-jib
It is formed with walking chassis, described large arm one end is connected with large arm angle oil cylinder, and described joint arm one end is connected with joint arm angle
Oil cylinder, the joint arm angle oil cylinder tail portion are articulated on joint arm, and described counter-jib one end is connected with counter-jib oil cylinder, described
Counter-jib oil cylinder bottom is hinged on counter-jib, and the walking chassis is hydraulic-driven crawler body, and the large arm is installed on row
Chassis upper end is walked, the large arm upper end is equipped with joint arm, and counter-jib, the counter-jib side installation are equipped on the upside of the joint arm
There is pedestal, the counter-jib and pedestal are bolted to connection, and the clamp body is by intermediate plate fixing seat, clamp oil cylinder and consolidates
Determine clamp block composition, there are two the intermediate plate fixing seat settings, and intermediate plate fixing seat side is connected with clamp oil cylinder, the intermediate plate
The fixing seat other side is equipped with fixed clamp block, and the fixed clamp block upper end two sides are chimeric to be equipped with pin shaft, and the pin shaft periphery is arranged
There is stop protective block, the fixed clamp block side both ends are mounted on first baffle, and the first baffle side is equipped with second gear
Plate, the second baffle side are equipped with third baffle, offer a circular groove on the second baffle, outside the circular groove
Side is welded with outer retaining ring, and the outer retaining ring internal layer is equipped with inner shield ring.
As a kind of preferred embodiment of the invention, the large arm and walking chassis are hinged, the large arm angle oil cylinder
Bottom end is also hinged with walking chassis, and the large arm angle oil cylinder tail end and large arm are hinged.
As a kind of preferred embodiment of the invention, the large arm upper end and joint arm are hinged.
As a kind of preferred embodiment of the invention, the joint arm and counter-jib are hinged.
As a kind of preferred embodiment of the invention, counter-jib oil cylinder tail portion is hinged on joint arm.
As a kind of preferred embodiment of the invention, the intermediate plate fixing seat is installed on fixed clamp block by hex bolts
Inner upper end.
As a kind of preferred embodiment of the invention, the first baffle is fixed on fixed clamp block one by hex bolts
Side, the second baffle are fixed on first baffle side by hex bolts, and the third baffle is fixed by outer-hexagonal bolt
In second baffle side.
As a kind of preferred embodiment of the invention, the inner shield ring and outer retaining ring fit, and the inner shield ring passes through
Outer-hexagonal bolt is fixed on the inside of outer retaining ring.
Compared with prior art, beneficial effects of the present invention are as follows:
1. the present invention by adjust lifting angle, joint arm and large arm angle between large arm and walking chassis, joint arm with
Pedestal can be adjusted to best effort level and best effort angle, then be carried out efficiently accurate by counter-jib angle
Probing.The walking chassis that entire running gear uses is hydraulic-driven crawler body, whole all using hydraulic offer power, is
System is reliable, convenient to overhaul, crawler body, and climbing obstacle climbing ability is good, and barycentre steadiness is small by the influence of topography, and cushioning ability is good, beneficial
In the precision and stability for improving drilling operation;The present invention realizes the installation defencive function of clamp body by multiple baffle, and
Equipment is substantially increased by the cooperation of outer retaining ring and inner shield ring conducive to the damping, buffering of main structure body in the process of work
Security performance.
2. when specifically, using the running gear of this kind of semi-automatic boring coring equipment, when large arm angle oil cylinder stretches, just
The angle of large arm and walking chassis can be changed, when joint arm angle oil cylinder stretches, change the angle of joint arm and large arm, counter-jib
When oil cylinder stretches, change the angle of counter-jib and joint arm, counter-jib is fixedly connected with pedestal again, therefore also change pedestal with greatly
The pivot angle in arm center face;By first baffle, the second baffle of outer retaining ring and inner shield ring is installed and third baffle is installed respectively
In fixed clamp block side, cooperate the work of other structures, when which can guarantee equipment work, plays to clamp body
Defencive function is installed.
Detailed description of the invention
Fig. 1 is agent structure schematic diagram of the invention;
Fig. 2 is clamp body detonation configuration structural schematic diagram of the invention;
In figure: 1- running gear main body, 2- large arm, 3- large arm angle oil cylinder, 4- joint arm, 5- joint arm angle oil cylinder,
6- counter-jib, 7- counter-jib oil cylinder, 8- walking chassis, 9- clamp body, 10- intermediate plate fixing seat, 11- clamp oil cylinder, 12- are fixed
Clamp block, 13- pin shaft, 14- stop protective block, 15- first baffle, 16- second baffle, 17- third baffle, the outer retaining ring of 18-, 19-
Inner shield ring.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
The present invention provides a kind of technical solution referring to FIG. 1-2: a kind of running gear of semi-automatic boring coring equipment,
Including running gear main body 1 and clamp body 9, it is characterised in that: running gear main body 1 is by large arm 2, joint arm 4, counter-jib 6
It is formed with walking chassis 8,2 one end of large arm is connected with large arm angle oil cylinder 3, and 4 one end of joint arm is connected with joint arm angle oil cylinder
5,5 tail portion of joint arm angle oil cylinder is articulated on joint arm 4, and 6 one end of counter-jib is connected with counter-jib oil cylinder 7, counter-jib oil cylinder 7
Bottom is hinged on counter-jib 6, and walking chassis 8 is hydraulic-driven crawler body, and large arm 2 is installed on 8 upper end of walking chassis, large arm
2 upper ends are equipped with joint arm 4, and counter-jib 6 is equipped on the upside of joint arm 4, and 6 side of counter-jib is equipped with pedestal, and counter-jib 6 and pedestal are logical
It crosses bolt to be fixedly connected, clamp body 9 is made of intermediate plate fixing seat 10, clamp oil cylinder 11 and fixed clamp block 12, intermediate plate fixing seat
There are two 10 settings, and 10 side of intermediate plate fixing seat is connected with clamp oil cylinder 11, and 10 other side of intermediate plate fixing seat is equipped with grips pincers
Seat 12, fixed 12 upper end two sides of clamp block are chimeric to be equipped with pin shaft 13, and 13 periphery of pin shaft is arranged with stop protective block 14, fixed clamp block 12
Side both ends are mounted on first baffle 15, and 15 side of first baffle is equipped with second baffle 16, and 16 side of second baffle is equipped with the
Three baffles 17 offer a circular groove on second baffle 16, are welded with outer retaining ring 18, outer retaining ring 18 on the outside of the circular groove
Internal layer is equipped with inner shield ring 19.
It is further improved ground, large arm 2 and walking chassis 8 are hinged, and 3 bottom end of large arm angle oil cylinder is also hinged with walking chassis 8,
3 tail end of large arm angle oil cylinder and large arm 2 are hinged.
It is further improved ground, 2 upper end of large arm and joint arm 4 are hinged.
It is further improved ground, joint arm 4 and counter-jib 6 are hinged.
It is further improved ground, 7 tail portion of counter-jib oil cylinder is hinged on joint arm 4.
It is further improved ground, intermediate plate fixing seat 10 is installed on fixed 12 inner upper end of clamp block by hex bolts.
It is further improved ground, first baffle 15 is fixed on fixed 12 side of clamp block by hex bolts, and second baffle 16 is logical
It crosses hex bolts and is fixed on 15 side of first baffle, third baffle 17 is fixed on 16 side of second baffle by outer-hexagonal bolt.
It is further improved ground, inner shield ring 19 and outer retaining ring 18 fit, and inner shield ring 19 is fixed on outer by outer-hexagonal bolt
18 inside of retaining ring.
Working principle: the present invention is pressed from both sides by adjusting lifting angle, joint arm 4 and large arm 2 between large arm 2 and walking chassis 8
To best effort level and best effort angle, then angle, joint arm 4 and 6 angle of counter-jib can be adjusted pedestal
Carry out efficiently precisely probing.The walking chassis 8 that entire running gear uses is hydraulic-driven crawler body, whole all using liquid
Pressure provides power, and system is reliable, convenient to overhaul, crawler body, and climbing obstacle climbing ability is good, and barycentre steadiness is small by the influence of topography, subtracts
Shake ability is good, is beneficial to improve the precision and stability of drilling operation;The present invention realizes clamp body 1 by multiple baffle
Defencive function is installed, and by the cooperation of outer retaining ring 10 and inner shield ring 11, conducive to the damping of main structure body in the process of work
Buffering, substantially increases the security performance of equipment.When specifically, using the running gear of this kind of semi-automatic boring coring equipment,
When large arm angle oil cylinder 3 stretches, the angle of large arm 2 Yu walking chassis 8 can be changed, when joint arm angle oil cylinder 5 stretches, changed
The angle of joint arm 4 and large arm 2, when counter-jib oil cylinder 7 stretches, change counter-jib 6 and joint arm 4 angle, counter-jib 6 again with
Pedestal is fixedly connected, therefore also changes the pivot angle of pedestal and 2 median plane of large arm;By first baffle 7, outer retaining ring and interior gear are installed
The second baffle 8 and third baffle 9 of circle are respectively arranged in fixed 4 side of clamp block, cooperate the work of other structures, the knot
When structure can guarantee equipment work, the installation defencive function to clamp body is played.
Finally, it should be noted that the foregoing is only a preferred embodiment of the present invention, it is not intended to restrict the invention,
Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, still may be used
To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features.
All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in of the invention
Within protection scope.