CN109403296A - A kind of pressure fluid jacking type pile pulling technology - Google Patents
A kind of pressure fluid jacking type pile pulling technology Download PDFInfo
- Publication number
- CN109403296A CN109403296A CN201811253454.4A CN201811253454A CN109403296A CN 109403296 A CN109403296 A CN 109403296A CN 201811253454 A CN201811253454 A CN 201811253454A CN 109403296 A CN109403296 A CN 109403296A
- Authority
- CN
- China
- Prior art keywords
- steel
- pipe pile
- sealing plate
- hydraulic pump
- valve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000005516 engineering process Methods 0.000 title claims abstract description 8
- 239000012530 fluid Substances 0.000 title claims abstract description 7
- 238000007789 sealing Methods 0.000 claims abstract description 43
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 31
- 238000007596 consolidation process Methods 0.000 claims abstract description 5
- 238000003466 welding Methods 0.000 claims abstract description 5
- 230000015572 biosynthetic process Effects 0.000 claims abstract 2
- 230000007717 exclusion Effects 0.000 claims 1
- 238000000034 method Methods 0.000 abstract description 8
- 239000002689 soil Substances 0.000 description 3
- 239000000243 solution Substances 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000002347 injection Methods 0.000 description 2
- 239000007924 injection Substances 0.000 description 2
- 235000008331 Pinus X rigitaeda Nutrition 0.000 description 1
- 235000011613 Pinus brutia Nutrition 0.000 description 1
- 241000018646 Pinus brutia Species 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 239000003208 petroleum Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D9/00—Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
- E02D9/02—Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof by withdrawing
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Mechanical Engineering (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
A kind of pressure fluid jacking type pile pulling technology: whole steel-pipe pile is extracted using the method for high pressure water (or compressed air etc.).The technical program embodiment mainly includes mud exhauster, high-pressure hydraulic pump, valve, sealing plate, steel-pipe pile;The mud exhauster excludes the silt inside steel-pipe pile before pile pulling starts;The sealing plate is equipped with valve and for connecting the flange of high-pressure hydraulic pump;Silt inside the steel-pipe pile cleans out sealing welding at the top of rear sealing plate and steel-pipe pile, and does consolidation process to sealing plate, guarantees that sealing plate can bear sufficiently large upward top lift;The valve is used to be vented when high-pressure hydraulic pump fills the water in steel-pipe pile, and valve is closed after exhaust;The high-pressure hydraulic pump fills the water in steel-pipe pile, and high pressure water acts on one upward top lift of formation on sealing plate, and sealing plate drives steel-pipe pile to move upwards.
Description
Technical field
The invention mainly relates to discarded platform spud leg demolition technique field waterborne, be also related to (across river) bridge over strait, harbour,
It is big straight in the retired building of the dismounting of the provisional large diameter steel pipe pile in the fields such as man-made island, treatment of soft foundation and above-mentioned field
The dismounting of diameter steel-pipe pile;It is specially a kind of to extract steel-pipe pile by the way of jacking with pressure fluids such as high pressure water, compressed airs
Technology.
Background technique
With the development of marine economy, the quantity of marine facility platform is more and more, and the early 21st century, the whole world has more than
7270 marine oil and gas production facilities, the projected life of general marine oil and gas facility at 20 years or so, as marine facility is on active service
The extension of time has quite a few facility to all suffer from the problem of reaching the service life period.According to legal requirement, these are arrived
Up to economic life period, or appropriate retired discarded dismounting processing must not be carried out in the marine facility used.Marine facility
Discarded removal cost is very expensive, and the retired waste disposal of marine oil and gas facility be increasingly becoming offshore petroleum industry one is important
Subject under discussion causes everybody extensive concern.
According to country pertinent regulations, need to will be retired after fixed platform steel-pipe pile below the mud face of present position seabed not
Position excision less than 4.0m, usually used diamond-wire saw cut, abrasive high-pressure water jet are cut, in hydraulic rotary
Cutter is rotatably cut or other vibrations pull out and wait technical methods expense relatively high, under normal circumstances, one pile institute of every cutting
The direct cost of generation is up to ten thousand yuan of 30-50.
Summary of the invention
The purpose of the present invention is to provide a kind of pressure fluid jacking type pile pulling technology scheme, the technical program not only can be with
Salvage material, and cost can be greatly reduced, while work progress can also be made more safe and environment-friendly.
To achieve the above object, The technical solution adopted by the invention is as follows: coming by taking high pressure water as an example in the technical scheme
It is specific to introduce;The technical program embodiment mainly includes mud exhauster, high-pressure hydraulic pump, valve, sealing plate, steel-pipe pile;The mud exhauster
The silt inside steel-pipe pile is excluded before pile pulling starts;The sealing plate is equipped with valve and for connecting the method for high-pressure hydraulic pump
It is blue;Silt inside the steel-pipe pile cleans out sealing welding at the top of rear sealing plate and steel-pipe pile, and does consolidation process to sealing plate,
Guarantee that sealing plate can bear sufficiently large upward top lift;The valve is used to be vented when high-pressure hydraulic pump fills the water in steel-pipe pile,
Valve is closed after exhaust;The high-pressure hydraulic pump fills the water in steel-pipe pile, and high pressure water, which acts on sealing plate, forms one upwards
Top lift, sealing plate drive steel-pipe pile move upwards.
Detailed description of the invention
Fig. 1 is first step schematic diagram of the invention;
Fig. 2 is second step of the invention, third step, the 4th step, the 5th step schematic diagram;
In figure: 1- mud exhauster, 2- steel-pipe pile, 3- water pump, 4- valve, 5- flange, 6- sealing plate, 7- pressure duct, 8- high pressure
Water pump.
Specific embodiment
Below in conjunction with attached drawing 1, attached drawing 2, technical solution in the embodiment of the present invention progress is clear, is fully described by,
Obviously, described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Based on the technology of the present invention
The embodiment of embodiment, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
One, the step method of single steel-pipe pile is extracted:
The first step is filled the water by water pump 3 into steel-pipe pile 2 referring to Fig. 1, mud exhauster 1 is placed in inside steel-pipe pile 2,
The mixture removing of silt and water in steel-pipe pile 2 is finished using mud exhauster 1 simultaneously.
Second step, referring to Fig. 2, the sealing plate 6 and 2 top sealing welding of steel-pipe pile that are equipped with valve 4 and flange 5, and it is right
Sealing plate 6 does consolidation process, guarantees that sealing plate 6 is able to bear sufficiently large upward top lift.
Third step, referring to Fig. 2, high-pressure hydraulic pump 8 is made by 5 airtight connection of flange on pressure duct 7 and sealing plate 6
High-pressure hydraulic pump 8 is connected to steel-pipe pile 2.
4th step starts high-pressure hydraulic pump 8 to 2 internal water flooding of steel-pipe pile, to have at valve 4 referring to Fig. 2, opening valve 4
High-pressure hydraulic pump 8 is closed when water flows out, and closes valve 4.
5th step continues referring to Fig. 2, opening high-pressure hydraulic pump 8 to 2 internal water flooding of steel-pipe pile, sealing plate 6 will by one to
On top lift;With the increase of 2 internal pressure of steel-pipe pile, when the top lift that sealing plate 6 is subject to is greater than mud around 2 outer wall of steel-pipe pile
When soil is to its downward frictional resistance, steel-pipe pile 2 is under the drive of sealing plate 6, relative to ambient earth, steel-pipe pile 2 will generate to
On position it is mobile, by controlling the rate of water injection of high-pressure hydraulic pump 8, steel-pipe pile 2 is kept constantly to move upwards;When steel-pipe pile 2
When moving upward to certain altitude, steel-pipe pile 2 can directly be extracted with crane ship.
During above-mentioned four step, the high pressure water that 2 bottom of steel-pipe pile extrudes can form seepage flow along 2 outer wall of steel-pipe pile,
The combination of soil and steel-pipe pile 2 can be destroyed, so that 2 surrounding frictional resistance of steel-pipe pile be made to reduce;If 2 outside of steel-pipe pile is rubbed
It is excessive to wipe resistance, 2 outboard friction resistance of steel-pipe pile can be reduced by some corresponding ancillary technique means.
Two, the step method that more steel-pipe piles of lateral ties structure are arranged at top is extracted simultaneously:
Mud exhauster is placed in inside steel-pipe pile by the first step, is filled the water by water pump into steel-pipe pile, while using mud exhauster
Silt removing in steel-pipe pile is finished, removes as much as possible using mud exhauster or other ancillary equipments if needed (or rush
Pine) lateral ties member upper silt.
Second step sealing welding at the top of the sealing plate and each steel-pipe pile for being equipped with valve and flange, and does each sealing plate
Consolidation process guarantees that sealing plate can bear sufficiently large upward top lift.
Third step is equipped with a high-pressure hydraulic pump to every steel-pipe pile, by every high-pressure hydraulic pump by pressure duct with it is each
Flange airtight connection on sealing plate, is connected to high-pressure hydraulic pump with steel-pipe pile.
4th step opens the valve on each sealing plate, while starting high-pressure hydraulic pump to steel-pipe pile internal water flooding, to each valve
High-pressure hydraulic pump is closed when there are flowing out at door, closes valve.
5th step starts high-pressure hydraulic pump simultaneously again and continues to each steel-pipe pile internal water flooding, each sealing plate by one to
On top lift;With the increase of each steel-pipe pile internal water pressure, when the top lift that sealing plate is subject to is greater than around steel-pipe pile outer wall
When soil is to its downward frictional resistance, steel-pipe pile is under the drive of sealing plate, and relative to ambient earth, steel-pipe pile will generate upward
Position it is mobile, control the speed that each steel-pipe pile moves upwards by controlling the rate of water injection of each high-pressure hydraulic pump, keep
Each steel-pipe pile is synchronous to be risen, and when arriving certain altitude, is closed each high-pressure hydraulic pump, can directly be pulled out each steel-pipe pile with crane ship
Out.
The high pressure pile pulling technology waterborne that the present invention uses is not limited solely to high pressure water pile pulling, and compressed air etc. can also be used
A variety of media carry out various forms of high pressure pile pullings.
While there has been shown and described that technical solution of the present invention embodiment, for those of ordinary skill in the art and
Speech, it is possible to understand that these embodiments can be carried out with a variety of variations without departing from the principles and spirit of the present invention, repaired
Change, replacement and variant, protection scope of the present invention is defined by the appended claims and the equivalents thereof.
Claims (3)
1. a kind of pressure fluid jacking type pile pulling technology be by the pressure fluids such as high pressure water, compressed air using jacking in the way of
Whole steel-pipe pile is extracted;Technical solution of the present invention embodiment mainly include mud exhauster, high-pressure hydraulic pump (or air compressor machine), valve,
Sealing plate, steel-pipe pile;The mud exhauster is used for the silt being discharged in steel-pipe pile, by the silt inside steel-pipe pile before pile pulling starts
After exclusion, mud exhauster is taken out;The sealing plate is equipped with valve and for connecting high-pressure hydraulic pump for closing steel-pipe pile, sealing plate
Flange, high-pressure hydraulic pump inside flange on sealing plate and steel-pipe pile by being connected to.
2. the silt inside steel-pipe pile cleans out sealing welding at the top of rear sealing plate and steel-pipe pile, and to envelope according to claim 1
Plate does consolidation process, guarantees that sealing plate can bear sufficiently large upward top lift.
3. valve is used to be vented when high-pressure hydraulic pump fills the water in steel-pipe pile according to claim 1, valve is closed after exhaust
Door, is again started up high-pressure hydraulic pump and fills the water in steel-pipe pile, and high pressure water acts on one upward top lift of formation, sealing plate on sealing plate
Steel-pipe pile is driven to move upwards.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811253454.4A CN109403296A (en) | 2018-10-25 | 2018-10-25 | A kind of pressure fluid jacking type pile pulling technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811253454.4A CN109403296A (en) | 2018-10-25 | 2018-10-25 | A kind of pressure fluid jacking type pile pulling technology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109403296A true CN109403296A (en) | 2019-03-01 |
Family
ID=65469829
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811253454.4A Pending CN109403296A (en) | 2018-10-25 | 2018-10-25 | A kind of pressure fluid jacking type pile pulling technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109403296A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112323876A (en) * | 2020-11-03 | 2021-02-05 | 北京顺义建筑企业集团公司 | Method for detecting pile end resistance of pile formed by holding-pressure type hammering and pressure grouting by small-area method |
CN114045831A (en) * | 2021-12-21 | 2022-02-15 | 中交第二航务工程局有限公司 | Novel device for underwater drawing steel pipe pile under space limited condition and construction method |
WO2022038219A1 (en) * | 2020-08-21 | 2022-02-24 | Treehouse Denmark Aps | A method and a tool assembly for the removal of a monopile foundation |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0782744A (en) * | 1993-09-13 | 1995-03-28 | Toshihiko Fujii | Pile-drawing method and casing pipe used therefor |
JPH09268555A (en) * | 1996-03-27 | 1997-10-14 | Daiho Constr Co Ltd | Pile drawing method and device thereof |
CN202530460U (en) * | 2012-02-08 | 2012-11-14 | 中国石油化工股份有限公司 | Auxiliary pile extracting mechanism |
CN103243717A (en) * | 2012-02-08 | 2013-08-14 | 中国石油化工股份有限公司 | Auxiliary pile pulling mechanism and using method thereof |
CN103741691A (en) * | 2014-02-11 | 2014-04-23 | 中国石油大学(华东) | Device and method for dismantling offshore pile pipe through reversed pulling under pressure |
CN103882900A (en) * | 2014-03-20 | 2014-06-25 | 中交第二航务工程局有限公司 | Underwater mud suction device and construction method for conducting underwater cutting pile pulling through underwater mud suction device |
CN104594350A (en) * | 2015-02-09 | 2015-05-06 | 张继红 | Pore pressure counterforce steel pipe pile pulling method and pipe pulling device thereof |
CN108487248A (en) * | 2018-05-30 | 2018-09-04 | 中石化石油工程技术服务有限公司 | Deep-well drawing out soil equipment and its construction method in a kind of snag |
-
2018
- 2018-10-25 CN CN201811253454.4A patent/CN109403296A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0782744A (en) * | 1993-09-13 | 1995-03-28 | Toshihiko Fujii | Pile-drawing method and casing pipe used therefor |
JPH09268555A (en) * | 1996-03-27 | 1997-10-14 | Daiho Constr Co Ltd | Pile drawing method and device thereof |
CN202530460U (en) * | 2012-02-08 | 2012-11-14 | 中国石油化工股份有限公司 | Auxiliary pile extracting mechanism |
CN103243717A (en) * | 2012-02-08 | 2013-08-14 | 中国石油化工股份有限公司 | Auxiliary pile pulling mechanism and using method thereof |
CN103741691A (en) * | 2014-02-11 | 2014-04-23 | 中国石油大学(华东) | Device and method for dismantling offshore pile pipe through reversed pulling under pressure |
CN103882900A (en) * | 2014-03-20 | 2014-06-25 | 中交第二航务工程局有限公司 | Underwater mud suction device and construction method for conducting underwater cutting pile pulling through underwater mud suction device |
CN104594350A (en) * | 2015-02-09 | 2015-05-06 | 张继红 | Pore pressure counterforce steel pipe pile pulling method and pipe pulling device thereof |
CN108487248A (en) * | 2018-05-30 | 2018-09-04 | 中石化石油工程技术服务有限公司 | Deep-well drawing out soil equipment and its construction method in a kind of snag |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2022038219A1 (en) * | 2020-08-21 | 2022-02-24 | Treehouse Denmark Aps | A method and a tool assembly for the removal of a monopile foundation |
CN112323876A (en) * | 2020-11-03 | 2021-02-05 | 北京顺义建筑企业集团公司 | Method for detecting pile end resistance of pile formed by holding-pressure type hammering and pressure grouting by small-area method |
CN114045831A (en) * | 2021-12-21 | 2022-02-15 | 中交第二航务工程局有限公司 | Novel device for underwater drawing steel pipe pile under space limited condition and construction method |
CN114045831B (en) * | 2021-12-21 | 2023-10-27 | 中交第二航务工程局有限公司 | Novel device for water drawing steel pipe pile under space limited condition and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20200291754A1 (en) | Hydrate solid-state fluidization mining method and system under underbalanced reverse circulation condition | |
CN109403296A (en) | A kind of pressure fluid jacking type pile pulling technology | |
CN103334444B (en) | A kind of method for blocking of foundation pit dewatering well pressure release type | |
CN103806422B (en) | A kind of submarine leaked collection system | |
CN109778789A (en) | A kind of Face Slab of Concrete-faced Rockfill is come to nothing the underwater repair system in area | |
CN109707443B (en) | Recoverable tunnel drainage system and method | |
CN103507109B (en) | Underwater dry type cutting cabin and application method thereof | |
CN206128099U (en) | Novel precipitation well shut -in well device | |
CN106759360A (en) | A kind of slag removal grouting apparatus and the slag removal grouting method using the device | |
CN104975612A (en) | Novel water open caisson construction technology | |
CN208309566U (en) | A kind of water-stopping steel sheet pile | |
JPH09287156A (en) | Construction method of compressed air storage plant by use of submerged abandoned mine | |
CN104358231B (en) | A kind of Underwater Slope mold-bagged concrete reinforced construction method | |
CN113737834A (en) | Recyclable negative pressure injection type open caisson structure and construction method | |
CN201554005U (en) | Large-flow and high-speed jet sealing drilling and pouring orifice safety control device under high pressure water | |
CN107642100A (en) | Apparatus and method for FS final spice engagement cavity draining | |
CN209040133U (en) | Well-covering device for dewatering well suitable for rich groundwater region | |
CN106381878A (en) | Environment-friendly dismantling construction method for two-layer steel sheet pile and soil core composite cofferdam | |
CN203527525U (en) | Underwater dry type cutting cabin | |
CN210770491U (en) | Single-ball exhaust valve | |
CN107504315A (en) | A kind of construction method that Jiang Guandao is got over using baric systerm reparation seepage | |
Warnock | Experiences of the Bureau of Reclamation | |
CN111894069A (en) | Underwater environment-friendly cutter suction type dredging device for urban ecological river and construction method thereof | |
CN208685608U (en) | Deep-well drawing out soil equipment in a kind of snag | |
CN203284787U (en) | Composite pipe well precipitation system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190301 |
|
RJ01 | Rejection of invention patent application after publication |