CN109215697A - Control method, device and equipment for the metering of BBU battery power - Google Patents

Control method, device and equipment for the metering of BBU battery power Download PDF

Info

Publication number
CN109215697A
CN109215697A CN201811354546.1A CN201811354546A CN109215697A CN 109215697 A CN109215697 A CN 109215697A CN 201811354546 A CN201811354546 A CN 201811354546A CN 109215697 A CN109215697 A CN 109215697A
Authority
CN
China
Prior art keywords
electric energy
computation chip
mode
energy computation
bbu
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811354546.1A
Other languages
Chinese (zh)
Other versions
CN109215697B (en
Inventor
明勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Inspur Intelligent Technology Co Ltd
Original Assignee
Zhengzhou Yunhai Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Yunhai Information Technology Co Ltd filed Critical Zhengzhou Yunhai Information Technology Co Ltd
Priority to CN201811354546.1A priority Critical patent/CN109215697B/en
Publication of CN109215697A publication Critical patent/CN109215697A/en
Application granted granted Critical
Publication of CN109215697B publication Critical patent/CN109215697B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G11INFORMATION STORAGE
    • G11CSTATIC STORES
    • G11C5/00Details of stores covered by group G11C11/00
    • G11C5/14Power supply arrangements, e.g. power down, chip selection or deselection, layout of wirings or power grids, or multiple supply levels
    • G11C5/141Battery and back-up supplies
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/44Arrangements for executing specific programs
    • G06F9/4401Bootstrapping
    • G06F9/4418Suspend and resume; Hibernate and awake

Landscapes

  • Engineering & Computer Science (AREA)
  • Software Systems (AREA)
  • Theoretical Computer Science (AREA)
  • Power Engineering (AREA)
  • Computer Security & Cryptography (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

A kind of control method for the metering of BBU battery power disclosed by the invention, the object run mode of electric energy chip can be determined by the target information of the electric energy computation chip in the BBU battery of acquisition, and destination register corresponding with object run mode can be triggered, electric energy computation chip is enabled to be switched to object run mode by the operational mode being presently in, wherein, the operational mode of electric energy computation chip includes operating mode or sleep pattern or shutdown mode.Therefore, using this programme, can control electric energy computation chip can switch between three kinds of different modes, guarantee that electric energy computation chip is run with operating mode or sleep pattern or shutdown mode, it avoids electric energy computation chip and is continuously in operating mode, power consumption is reduced, the unnecessary wasting of resources is avoided.In addition, the invention also discloses a kind of control device for the metering of BBU battery power and equipment, effect are as above.

Description

Control method, device and equipment for the metering of BBU battery power
Technical field
The present invention relates to field of batteries, in particular to a kind of control method for the metering of BBU battery power and is set device It is standby.
Background technique
Backup Battery Unit (Battery Backup Unit, BBU) is the reserve battery for being exclusively used in storage equipment, when depositing It is that storage equipment continues to power by BBU reserve battery when the main power supply for storing up equipment breaks down or powers off.BBU battery is general It is made of battery core, electric energy computation chip and controller, electric energy computation chip is controlled for measuring to the electricity of BBU battery The battery core that device processed is used to control BBU battery is the current/voltage for storing equipment and being powered.
Currently, in order to guarantee that electric energy computation chip can continue to monitor the electricity of the battery core of BBU battery, electric energy computation chip by The battery core of BBU reserve battery is continuously electric energy computation chip and provides electricity, so that electric energy computation chip is continuously in work Mode is to guarantee that the lasting electricity to BBU reserve battery of electric energy computation chip measure simultaneously real-time update electrical energy measurement number According to.But in fact, the electric current of the battery core of BBU reserve battery will not change quickly in certain time, therefore, electrical energy measurement The lasting battery core to BBU reserve battery of chip carries out electric quantity metering and update electric energy measurement data can expend largely in real time Electric energy causes the unnecessary wasting of resources.
Therefore, when electricity of the electric energy computation chip to BBU reserve battery carries out real-time monitoring and metering, how electricity is reduced It can consume, be those skilled in the art's problem to be solved to avoid the unnecessary wasting of resources.
Summary of the invention
The purpose of the present invention is to provide a kind of control method, device and equipment for the metering of BBU battery power, in electricity When energy metering chip is monitored and measures to the electricity of BBU reserve battery, power consumption is reduced, unnecessary money is avoided Source waste.
To achieve the above object, the embodiment of the invention provides following technical solutions:
First, the embodiment of the invention provides a kind of control methods for the metering of BBU battery power, comprising:
Obtain the target information of electric energy computation chip in BBU battery;
The object run mode of the electric energy computation chip is determined according to the target information;
Destination register corresponding with the object run mode is triggered, to control the electric energy computation chip by currently transporting Row pattern switching is to the object run mode;
Wherein, the operational mode of the electric energy computation chip includes operating mode or sleep pattern or shutdown mode.
Optionally, the target information includes the information about power and the electric energy computation chip of the electric energy computation chip The present mode of operation.
Optionally, the object run mode that the electric energy computation chip is determined according to the target information includes:
Judge whether the present mode of operation is the operating mode;
If the operating mode, then judge whether the information about power is target electricity;
If the target electricity, then the current operation mode is switched to the sleep pattern or the shutdown mould Formula;
If not the target electricity, then keep the operating mode;
If the non-operating mode of present mode of operation, is switched to the Working mould for the current operation mode Formula.
Optionally, if the object run mode is the operating mode, the electric energy computation chip is default with first Time updates the electric energy measurement data of the BBU battery;
If the object run mode is the sleep pattern, the electric energy computation chip is updated with the second preset time The electric energy measurement data of the BBU battery;
Wherein, second preset time is greater than first preset time;
If the object run mode is the shutdown mode, the electric energy computation chip is out of service.
Optionally, further includes: controlling charge control module in the BBU battery is the electricity that the electric energy computation chip provides Pressure value.
Optionally, the voltage that charge control module provides in the control BBU battery for the electric energy computation chip Value includes:
Controlling the charge control module is that the voltage value that the electric energy computation chip provides is and the electrical energy measurement core The corresponding voltage value of the operational mode that piece is presently in;
Wherein, if the electric energy computation chip is in operating mode, controlling the charge control module is the electric energy Metering chip provides the first voltage value;
If the electric energy computation chip is in sleep pattern, controlling the charge control module is the electrical energy measurement core Piece provides second voltage value;
If the electric energy computation chip is in shutdown mode, controlling the charge control module is the electrical energy measurement core Piece provides third voltage value;
The first voltage value is greater than the second voltage value, and the second voltage value is greater than the third voltage value.
Optionally, the target information for obtaining electric energy computation chip described in BBU battery specifically includes:
The target information of electric energy computation chip in the BBU battery is obtained using the predetermined time as the period.
Second, the embodiment of the invention provides a kind of electrical energy measurement control devices of BBU battery, comprising:
Module is obtained, for obtaining the target information of electric energy computation chip in BBU battery;
Determining module, for determining the object run mode of the electric energy computation chip according to the target information;
Trigger module, for triggering destination register corresponding with the object run mode, to control in terms of the electric energy It measures chip and the object run mode is switched to by present mode of operation;
Wherein, the operational mode of the electric energy computation chip includes operating mode or sleep pattern or shutdown mode.
Optionally, the determining module includes:
First judging unit, for judging whether the present mode of operation is the operating mode;If the work Mode then enters second judgment unit, if the non-operating mode of the present mode of operation, enters the first switch unit;
The second judgment unit, for judging whether the information about power is target electricity, if the target electricity, Then enter the second switch unit, if not the target electricity, then enter holding unit;
Second switch unit, for the current operation mode to be switched to the sleep pattern or the shutdown mould Formula;
The holding unit, for keeping the operating mode.
First switch unit, for the current operation mode to be switched to the operating mode.
Optionally, further includes:
Control module is the electricity that the electric energy computation chip provides for controlling charge control module in the BBU battery Pressure value.
Optionally, the control module includes:
Control unit, for control the charge control module be the voltage value that provides of the electric energy computation chip for institute State the corresponding voltage value of operational mode that electric energy computation chip is presently in;Wherein, if the electric energy computation chip is in work Mode then enters the first control subelement, if the electric energy computation chip is in sleep pattern, it is single to enter the second control Member enters third and controls subelement if the electric energy computation chip is in shutdown mode;
The first control subelement, provides first for controlling the charge control module for the electric energy computation chip Voltage value;
The second control subelement, provides second for controlling the charge control module for the electric energy computation chip Voltage value;
The third controls subelement, provides third for controlling the charge control module for the electric energy computation chip Voltage value;
The first voltage value is greater than the second voltage value, and the second voltage value is greater than the third voltage value.
Optionally, the acquisition module includes:
Acquiring unit, for obtaining the target information of electric energy computation chip in the BBU battery using the predetermined time as the period.
Third, the embodiment of the invention provides a kind of electrical energy measurements of BBU battery to control equipment, comprising:
Memory, for storing computer program;
Processor, for executing the computer program stored in the memory to realize that any of the above mentioned is used for The step of control method of BBU battery power metering.
As it can be seen that a kind of control method for the metering of BBU battery power disclosed by the embodiments of the present invention, can pass through acquisition The target information of electric energy computation chip in BBU battery determines the object run mode of electric energy chip, and can trigger and transport with target The corresponding destination register of row mode, enables electric energy computation chip to be switched to object run mould by the operational mode being presently in Formula, wherein the operational mode of electric energy computation chip includes operating mode or sleep pattern or shutdown mode.Therefore, using we Case, the target information control electric energy computation chip according to electric energy computation chip can switch between three kinds of different modes, that is, protect It demonstrate,proves electric energy computation chip to run with operating mode or sleep pattern or shutdown mode, also avoids electric energy computation chip and be continuously in Operating mode reduces power consumption, further avoids the unnecessary wasting of resources.In addition, the embodiment of the present invention is also disclosed A kind of control device and equipment, effect for the metering of BBU battery power is as above.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is a kind of control method flow diagram for the metering of BBU battery power disclosed by the embodiments of the present invention;
Fig. 2 is a kind of controling device structure diagram for the metering of BBU battery power disclosed by the embodiments of the present invention;
Fig. 3 is a kind of control device structure schematic diagram for the metering of BBU battery power disclosed by the embodiments of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
The embodiment of the invention discloses a kind of control method, device and equipment for the metering of BBU battery power, in electric energy When metering chip is monitored and measures to the electricity of BBU reserve battery, power consumption is reduced, avoids unnecessary resource Waste.
Referring to Figure 1, Fig. 1 is a kind of control method stream for the metering of BBU battery power disclosed by the embodiments of the present invention Journey schematic diagram, this method comprises:
S101, the target information for obtaining electric energy computation chip in BBU battery.
Specifically, the target information of electric energy computation chip includes the fortune that electric energy computation chip is presently in the present embodiment Row mode, the current information about power of electric energy computation chip, the discharge current etc. of the BBU battery battery core of electric energy computation chip metering.
Wherein, as optional embodiment, target information includes the information about power and electrical energy measurement core of electric energy computation chip The operational mode of piece being presently in.After determining the target information of electric energy computation chip, it can be determined according to the target information The object run mode (i.e. to be switched operational mode) of electric energy computation chip can be sent after determining object run mode Control instruction to electric energy computation chip to using the control instruction triggering electric energy computation chip in the object run mode pair The destination register (mode in destination register is corresponding with the object run mode) answered, can be pre- in electric energy computation chip The register of software programming setting electric energy computation chip is first passed through, passes through program configuration electric energy computation chip in each register Each operational mode, the operational mode of electric energy computation chip include operating mode, sleep pattern and shutdown mode.It is corresponding, hair The control instruction sent also includes object run mode corresponding with electric energy computation chip, when electric energy computation chip receives the control After instruction, the register in electric energy computation chip is triggered by the control instruction, and hereafter electric energy computation chip is just by control instruction The operational mode operation deposited in destination register after triggering.In addition, the first control instruction can be and be led to by peripheral control unit It crosses I2C bus and is sent to electric energy computation chip.
It wherein, can be with certain time for the acquisition period of the target information of electric energy computation chip in acquisition BBU battery Section is to obtain the time cycle, and as optional embodiment of the present invention, step S101 includes:
The target information of electric energy computation chip in BBU battery is obtained using the predetermined time as the period.
Specifically, in the present embodiment, the length of predetermined time can determines according to actual conditions, in this preferred embodiment with Predetermined time is to obtain target information the period to also mean that the operational mode for switching electric energy computation chip with predetermined period, corresponding , each operational mode duration of electric energy computation chip is also the same predetermined time, certainly, according to practical feelings Condition, obtaining the time interval in BBU battery between electric energy computation chip can also be different (i.e. each operation of electric energy computation chip Mode duration is the different predetermined time).
Assuming that the mode that the first control instruction for sending of first time cycle includes is operating mode, then second time The mode that the first control instruction that period sends includes is sleep pattern, the first control instruction packet that the third time cycle sends The mode contained is shutdown mode.Certainly, three time cycles send the first control instruction in include mode be not limited to On the sequence mentioned.In addition, the mode that the first control instruction of first time cycle and second time cycle include can be with Identical, second mode for including with the first control instruction of third time cycle can be different, such as first time cycle The mode that the first control instruction with second time cycle includes is sleep pattern, and the first control of third time cycle refers to The mode that order includes is shutdown mode.
S102, the object run mode that the electric energy computation chip is determined according to target information.
Specifically, including the operation that information about power and electric energy computation chip are presently in the present embodiment, in target information Mode, determine that the object run mode of electric energy computation chip can have following two situation according to target information: the first is root Determine the object run mode of electric energy computation chip according to the operational mode that electric energy computation chip is presently in, object run mode with The operational mode that electric energy computation chip is presently in is different.Second is the operation mould being presently according to electric energy computation chip The electricity of formula and electric energy computation chip determines the object run mode of electric energy computation chip.Electric energy computation chip metering electricity be The electricity of battery core, when the electricity of battery core is more, electric energy computation chip can not the electric current to battery core persistently measure, still It when the electricity of battery core is less, needs persistently to measure the electricity of battery core, related personnel is not when battery power being avoided to exhaust The case where capable of knowing.
Therefore, as optional embodiment of the present invention, step S102 includes:
Judge whether present mode of operation is operating mode;
If operating mode, then judge whether information about power is target electricity;
If current operation mode is then switched to sleep pattern or shutdown mode by target electricity;
If non-targeted electricity, keeps operating mode;
If present mode of operation non-operating mode, is switched to operating mode for current operation mode.
Specifically, target electricity is the identification information that battery core has sufficient electricity in the present embodiment, target electricity is specially How much can properly be determined according to the model of battery core.When the electricity abundance of the battery core of electric energy computation chip metering, then electric energy meter Amount chip can not have to the electricity of battery core is measured in real time, at this point, by electric quantity metering chip be set as sleep pattern or Shutdown mode.When battery core is without sufficient electricity, then the electricity for the metering battery core for needing electric quantity metering chip lasting (is located In operating mode), if mode locating for current electric energy computation chip is sleep pattern or shutdown mode, need the mould that will sleep Formula or shutdown mode are switched to operating mode, to measure to the electricity of the battery core of electric energy computation chip.
In addition, it is necessary to explanation, in the electricity abundance of the battery core of electric energy computation chip metering, electric energy computation chip can To switch in turn between Three models, i.e., operational mode locating for the electric energy computation chip after switching three times is all different.When Before, when not considering electricity this factor of abundance of the battery core of electric energy computation chip metering, after electric energy computation chip switches three times The operational mode of electric energy computation chip can also be different.
S103, triggering destination register corresponding with object run mode, to control electric energy computation chip by currently running Pattern switching is to object run mode;Wherein, the operational mode of electric energy computation chip includes operating mode or sleep pattern or pass Machine mode.
The register of software programming setting electric energy computation chip, each register can be first passed through in electric energy computation chip in advance In by program configure electric energy computation chip each operational mode, the operational mode of electric energy computation chip include operating mode, Sleep pattern and shutdown mode.
Specifically, in the present embodiment, when the control instruction that the register of electric energy computation chip includes object run mode is touched After hair, electric energy computation chip is just with the corresponding operational mode operation of the destination register.Below to electric energy in the embodiment of the present invention Each operational mode of metering chip is described in detail.
Wherein, as optional embodiment of the present invention, if object run mode is operating mode, electric energy computation chip with The electric energy measurement data of first preset time update BBU battery;
If object run mode is sleep pattern, electric energy computation chip updates the electricity of BBU battery with the second preset time It can continuous data;
Wherein, the second preset time is greater than the first preset time.
If object run mode is shutdown mode, electric energy computation chip is out of service.
Electric energy computation chip updates the electric energy measurement data of BBU battery with the first preset time.
Specifically, electric energy computation chip updates the electrical energy measurement of BBU battery with the first preset time in this preferred embodiment Data are the electricity for the battery core that electric energy computation chip reads BBU battery by the period of the first preset time, wherein pre- for first If the time embodiment of the present invention is preferably 1 second, in operating mode electric energy computation chip for, electric energy computation chip with Power consumption when first preset time updates the electric energy measurement data of BBU battery is 500uA.
If operational mode is sleep pattern, electric energy computation chip updates the electrical energy measurement of BBU battery with the second preset time Data.
Wherein, the second preset time is greater than the first preset time.
Specifically, electric energy computation chip updates the electrical energy measurement of BBU battery with the second preset time in this preferred embodiment Data are the electricity for the battery core that electric energy computation chip reads BBU battery by the period of the second preset time, wherein second it is default when Between the embodiment of the present invention be preferably 5 seconds, in sleep pattern electric energy computation chip for, electric energy computation chip is with second Power consumption when preset time updates the electric energy measurement data of BBU battery is 110uA.Wherein, in the electrical energy measurement of sleep pattern After the time interval of its more new data of chip extends, due to not having to the electricity of the frequent battery core for reading BBU battery, corresponding electricity The power consumption of energy metering chip is also corresponding to be reduced.It can be according to reality for the specific size of the first preset time and the second preset time Border situation is determined, and the embodiment of the present invention herein and is not construed as limiting.
If operational mode is shutdown mode, electric energy computation chip is out of service.
Specifically, in the present embodiment, after the register of the shutdown mode of electric energy computation chip is triggered, electrical energy measurement Chip is just in shutdown mode, at this point, electric energy computation chip does not just have to the electricity for consuming the battery core of BBU battery again, just quite yet It is disconnected in the battery core with BBU battery.
It should be noted that for the operating mode of electric energy computation chip and sleep pattern, electric energy computation chip fortune Consumed electric energy can be identical when row, unlike, the electric energy computation chip in operating mode updates electrical energy measurement number According to period than in sleep pattern electric energy computation chip update electric energy measurement data period it is short, in this way, be in operating mode Electric energy computation chip total energy consumption be higher than sleep pattern electric energy computation chip total energy consumption.Due to the electric energy meter of shutdown mode Amount chip does not consume energy, so total energy consumption of the electric energy computation chip in shutdown mode is below in operating mode and sleeps Total energy consumption of the electric energy computation chip of sleep mode.At the same time, the present invention compared with the prior art in electrical energy measurement core Piece is continuously in for operating mode, greatly reduces energy consumption.In addition, in the embodiment of the present invention, in same time period, with Electric energy computation chip is continuously in operating mode and compares in the prior art, and the electric energy computation chip in the embodiment of the present invention is certain It is run with three kinds of operational modes in time, the sending cycle of corresponding first control instruction of specific three kinds of operational modes is with practical need Subject to asking.
As it can be seen that a kind of control method for the metering of BBU battery power disclosed by the embodiments of the present invention, can pass through acquisition The target information of electric energy computation chip in BBU battery determines the object run mode of electric energy chip, and can trigger and transport with target The corresponding destination register of row mode, enables electric energy computation chip to be switched to object run mould by the operational mode being presently in Formula, wherein the operational mode of electric energy computation chip includes operating mode or sleep pattern or shutdown mode.Therefore, using we Case, can control electric energy computation chip can switch between three kinds of different modes, i.e. guarantee electric energy computation chip is with operating mode Or sleep pattern or shutdown mode are run, and are avoided electric energy computation chip and are continuously in operating mode, reduce power consumption, keep away The unnecessary wasting of resources is exempted from.
In addition, it is contemplated that its period for reading the electric current of battery core in BBU battery of the electric energy computation chip in sleep pattern It is longer, therefore the battery core in adjustable BBU battery is provided to the size of the voltage value of electric energy computation chip, to further decrease The energy consumption of electric energy computation chip.Therefore, above embodiments are based on, as optional embodiment of the present invention, further includes:
Charge control module is the voltage value that electric energy computation chip provides in control BBU battery.
Specifically, electric energy computation chip (can be charge and discharge control electricity by charge and discharge control module in the present embodiment Road) it is connect with the battery core of BBU battery, in the embodiment of the present invention, for the difference of operational mode locating for electric energy computation chip, adjust Section charge and discharge control module is the size for the voltage/current that electric energy computation chip provides.In addition, updating electricity in electric energy computation chip When energy continuous data, electric energy computation chip offer can also be adjusted to by sending control instruction control charge and discharge control module The size of voltage/current.
Energy consumption gap when being in operating mode and sleep pattern in view of electric energy computation chip is larger, therefore, based on Upper embodiment, as optional embodiment, controlling charge control module is that the voltage value that electric energy computation chip provides includes:
It controls charge control module and provides the operational mode pair being presently in electric energy computation chip for electric energy computation chip The voltage value answered;
Controlling charge control module is that the voltage value that electric energy computation chip provides is presently in electric energy computation chip The corresponding voltage value of operational mode;
Wherein, it if electric energy computation chip is in operating mode, controls charge control module and is provided for electric energy computation chip The first voltage value;
If electric energy computation chip is in sleep pattern, charge control module is controlled as electric energy computation chip, the second electricity is provided Pressure value;
If electric energy computation chip is in shutdown mode, charge control module is controlled as electric energy computation chip, third electricity is provided Pressure value;
The first voltage value is greater than second voltage value, and second voltage value is greater than third voltage value.
Specifically, in the present embodiment, wherein the first voltage value in this preferred embodiment is preferably greater than second voltage Value.When electric energy computation chip updates electric energy measurement data, it can control charge and discharge control module and be provided to electric energy computation chip Update voltage/current value when electric energy measurement data.For example, first controlling charge and discharge when electric energy computation chip is in sleep pattern Electric control module provides second voltage value corresponding with sleep pattern, when the electric energy computation chip in sleep pattern updates electric energy When continuous data, then controls charge and discharge control module and voltage/electricity needed for electric energy computation chip updates electric energy measurement data is provided Stream.Voltage/current needed for updating electric energy measurement data as the first voltage value, second voltage value and electric energy computation chip has Body size, can determines according to actual conditions, and the embodiment of the present invention herein and is not construed as limiting.
A kind of electrical energy measurement control device of BBU battery provided in an embodiment of the present invention is introduced below, is referred to Fig. 2, Fig. 2 are a kind of electrical energy measurement controling device structure diagram of BBU battery provided in an embodiment of the present invention, the device packet It includes:
Module 201 is obtained, for obtaining the target information of electric energy computation chip in BBU battery;
Determining module 202, for determining the object run mode of electric energy computation chip according to target information;
Trigger module 203, for triggering destination register corresponding with object run mode, to control electric energy computation chip Object run mode is switched to by present mode of operation;
Wherein, the operational mode of electric energy computation chip includes operating mode or sleep pattern or shutdown mode.
As it can be seen that a kind of control device for the metering of BBU battery power disclosed by the embodiments of the present invention, can pass through acquisition The target information of electric energy computation chip in BBU battery determines the object run mode of electric energy chip, and can trigger and transport with target The corresponding destination register of row mode, enables electric energy computation chip to be switched to object run mould by the operational mode being presently in Formula, wherein the operational mode of electric energy computation chip includes operating mode or sleep pattern or shutdown mode.Therefore, using we Case, can control electric energy computation chip can switch between three kinds of different modes, i.e. guarantee electric energy computation chip is with operating mode Or sleep pattern or shutdown mode are run, and are avoided electric energy computation chip and are continuously in operating mode, reduce power consumption, keep away The unnecessary wasting of resources is exempted from.
Based on above embodiments, as optional embodiment of the present invention, determining module 202 includes:
First judging unit, for judging whether present mode of operation is operating mode;If operating mode, then enter the Two judging units enter the first switch unit if present mode of operation non-operating mode;
Second judgment unit if target electricity, then enters second and cuts for judging whether information about power is target electricity Unit is changed, if non-targeted electricity, enters holding unit;
Second switch unit, for current operation mode to be switched to sleep pattern or shutdown mode;
Holding unit, for keeping operating mode.
First switch unit, for current operation mode to be switched to operating mode.
Based on above embodiments, as optional embodiment of the present invention, further includes:
Control module is the voltage value that electric energy computation chip provides for controlling charge control module in BBU battery.
Based on above embodiments, as optional embodiment of the present invention, control module includes:
Control unit is that the voltage value that electric energy computation chip provides is and electrical energy measurement core for controlling charge control module The corresponding voltage value of the operational mode that piece is presently in;Wherein, if electric energy computation chip is in operating mode, enter the first control Subunit enters the second control subelement, closes if electric energy computation chip is in if electric energy computation chip is in sleep pattern Machine mode then enters third and controls subelement;
First control subelement, provides the first voltage value for controlling charge control module for electric energy computation chip;
Second control subelement, provides second voltage value for controlling charge control module for electric energy computation chip;
Third controls subelement, provides third voltage value for controlling charge control module for electric energy computation chip;
The first voltage value is greater than second voltage value, and second voltage value is greater than third voltage value.
Based on above embodiments, as optional embodiment of the present invention, obtaining module 201 includes:
Acquiring unit, for obtaining the target information of electric energy computation chip in BBU battery using the predetermined time as the period.
Fig. 3 is referred to, Fig. 3 is a kind of control equipment knot for the metering of BBU battery power provided in an embodiment of the present invention Structure schematic diagram, comprising:
Memory 301, for storing computer program;
Processor 302, for executing the computer program stored in the memory to realize that any of the above embodiment mentions The step of control method for the metering of BBU battery power arrived.
A kind of control equipment for the metering of BBU battery power provided in this embodiment, since processor tune can be passed through The computer program stored with memory realizes the control for the metering of BBU battery power provided such as above-mentioned any embodiment The step of method, so this computer readable storage medium is with same with the above-mentioned control method for the metering of BBU battery power The actual effect of sample.
A kind of control method measured for BBU battery power, device and equipment provided herein are carried out above It is discussed in detail.Specific examples are used herein to illustrate the principle and implementation manner of the present application, above embodiments Explanation be merely used to help understand the present processes and its core concept.It should be pointed out that for the common of the art For technical staff, under the premise of not departing from the application principle, can also to the application, some improvement and modification can also be carried out, these Improvement and modification are also fallen into the protection scope of the claim of this application.
Each embodiment is described in a progressive manner in specification, the highlights of each of the examples are with other realities The difference of example is applied, the same or similar parts in each embodiment may refer to each other.For device disclosed in embodiment Speech, since it is corresponded to the methods disclosed in the examples, so being described relatively simple, related place is referring to method part illustration ?.

Claims (10)

1. a kind of control method for the metering of BBU battery power characterized by comprising
Obtain the target information of electric energy computation chip in BBU battery;
The object run mode of the electric energy computation chip is determined according to the target information;
Destination register corresponding with the object run mode is triggered, to control the electric energy computation chip by currently running mould Formula switches to the object run mode;
Wherein, the operational mode of the electric energy computation chip includes operating mode or sleep pattern or shutdown mode.
2. the control method according to claim 1 for the metering of BBU battery power, which is characterized in that the target letter Breath includes the information about power of the electric energy computation chip and the present mode of operation of the electric energy computation chip.
3. the control method according to claim 2 for the metering of BBU battery power, which is characterized in that described according to institute It states target information and determines that the object run mode of the electric energy computation chip includes:
Judge whether the present mode of operation is the operating mode;
If the operating mode, then judge whether the information about power is target electricity;
If the current operation mode is then switched to the sleep pattern or the shutdown mode by the target electricity;
If not the target electricity, then keep the operating mode;
If the non-operating mode of present mode of operation, is switched to the operating mode for the current operation mode.
4. the control method according to claim 1 for the metering of BBU battery power, which is characterized in that if the target Operational mode is the operating mode, then the electric energy computation chip updates the electric energy of the BBU battery with the first preset time Continuous data;
If the object run mode is the sleep pattern, the electric energy computation chip is described in the update of the second preset time The electric energy measurement data of BBU battery;
Wherein, second preset time is greater than first preset time;
If the object run mode is the shutdown mode, the electric energy computation chip is out of service.
5. the control method according to any one of claims 1-4 for the metering of BBU battery power, which is characterized in that Further include:
Controlling charge control module in the BBU battery is the voltage value that the electric energy computation chip provides.
6. the control method according to claim 5 for the metering of BBU battery power, which is characterized in that the control institute Stating charge control module in BBU battery is that the voltage value that the electric energy computation chip provides includes:
It is to work as with the electric energy computation chip that control the charge control module, which be the voltage value that provides of the electric energy computation chip, The preceding locating corresponding voltage value of operational mode;
Wherein, if the electric energy computation chip is in operating mode, controlling the charge control module is the electrical energy measurement Chip provides the first voltage value;
If the electric energy computation chip is in sleep pattern, controlling the charge control module is that the electric energy computation chip mentions For second voltage value;
If the electric energy computation chip is in shutdown mode, controlling the charge control module is that the electric energy computation chip mentions For third voltage value;
The first voltage value is greater than the second voltage value, and the second voltage value is greater than the third voltage value.
7. the control method according to claim 1 for the metering of BBU battery power, which is characterized in that the acquisition BBU The target information of electric energy computation chip specifically includes in battery:
The target information of electric energy computation chip described in the BBU battery is obtained using the predetermined time as the period.
8. a kind of control device for the metering of BBU battery power characterized by comprising
Module is obtained, for obtaining the target information of electric energy computation chip in BBU battery;
Determining module, for determining the object run mode of the electric energy computation chip according to the target information;
Trigger module, for triggering destination register corresponding with the object run mode, to control the electrical energy measurement core Piece switches to the object run mode by present mode of operation;
Wherein, the operational mode of the electric energy computation chip includes operating mode or sleep pattern or shutdown mode.
9. the control device according to claim 8 for the metering of BBU battery power, which is characterized in that further include:
Control module is the voltage value that the electric energy computation chip provides for controlling charge control module in the BBU battery.
10. a kind of control equipment for the metering of BBU battery power characterized by comprising
Memory, for storing computer program;
Processor, for executing the computer program stored in the memory to realize as described in any one of claim 1 to 7 For BBU battery power metering control method the step of.
CN201811354546.1A 2018-11-14 2018-11-14 Control method, device and equipment for BBU battery electric energy metering Active CN109215697B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811354546.1A CN109215697B (en) 2018-11-14 2018-11-14 Control method, device and equipment for BBU battery electric energy metering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811354546.1A CN109215697B (en) 2018-11-14 2018-11-14 Control method, device and equipment for BBU battery electric energy metering

Publications (2)

Publication Number Publication Date
CN109215697A true CN109215697A (en) 2019-01-15
CN109215697B CN109215697B (en) 2021-02-05

Family

ID=64996671

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811354546.1A Active CN109215697B (en) 2018-11-14 2018-11-14 Control method, device and equipment for BBU battery electric energy metering

Country Status (1)

Country Link
CN (1) CN109215697B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020190690A1 (en) * 2001-06-14 2002-12-19 Yazaki Corporation Power source system for vehicle
US20070018615A1 (en) * 2004-07-13 2007-01-25 Siemens Aktiengesellschaft Device and method for determining operating parameters of a battery
CN201887498U (en) * 2010-11-04 2011-06-29 深圳市新元素医疗技术开发有限公司 Wireless power sensor
US8102151B2 (en) * 2007-10-31 2012-01-24 Samsung Electronics Co., Ltd. Terminal having real time clock (RTC) operator and method of RTC operation using the same
CN102654532A (en) * 2011-05-31 2012-09-05 杭州万工科技有限公司 Method for reducing power consumption of electric energy metering chip
CN103746417A (en) * 2013-12-23 2014-04-23 中国科学院微电子研究所 Low-power-consumption control method and system of battery monitoring chip
CN208076608U (en) * 2018-04-04 2018-11-09 沈机(上海)智能系统研发设计有限公司 Ic for energy metering

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020190690A1 (en) * 2001-06-14 2002-12-19 Yazaki Corporation Power source system for vehicle
US20070018615A1 (en) * 2004-07-13 2007-01-25 Siemens Aktiengesellschaft Device and method for determining operating parameters of a battery
US8102151B2 (en) * 2007-10-31 2012-01-24 Samsung Electronics Co., Ltd. Terminal having real time clock (RTC) operator and method of RTC operation using the same
CN201887498U (en) * 2010-11-04 2011-06-29 深圳市新元素医疗技术开发有限公司 Wireless power sensor
CN102654532A (en) * 2011-05-31 2012-09-05 杭州万工科技有限公司 Method for reducing power consumption of electric energy metering chip
CN103746417A (en) * 2013-12-23 2014-04-23 中国科学院微电子研究所 Low-power-consumption control method and system of battery monitoring chip
CN208076608U (en) * 2018-04-04 2018-11-09 沈机(上海)智能系统研发设计有限公司 Ic for energy metering

Also Published As

Publication number Publication date
CN109215697B (en) 2021-02-05

Similar Documents

Publication Publication Date Title
CN106338690B (en) A kind of reserve battery detection method, device, system and method for supplying power to
JP7214746B2 (en) power control arbitration
CN106532807B (en) A kind of intelligent battery charge-discharge control system and method
KR101529539B1 (en) Method and apparatus of smart power management for mobile communication terminals
US8473768B2 (en) Power control apparatus and method for cluster system
CN101802750B (en) Apparatus and method for reducing power consumption of system on chip
TW200805047A (en) Performance analysis based system level power management
EP3510688B1 (en) Apparatus and method for battery management
CN111845455A (en) Charging control method and device for storage battery of electric vehicle
US11843270B2 (en) Power usage pattern collector and charging controller
CN105549720A (en) Power energy-saving control method and system for intelligent wearable device
EP3258565B1 (en) Control device, control system, control method, and program
CN106291232A (en) A kind of low-power consumption overhead line fault indicator and control method
CN110442222A (en) Hard disk electrification control method and device
CN103227350A (en) Intelligent battery management system and method for medical equipment
CN106602156B (en) Power supply management method and device
CN109215697A (en) Control method, device and equipment for the metering of BBU battery power
CN102931730B (en) Distribution network automation system and battery management method thereof
CN114257474A (en) Power utilization control method and device for intelligent gateway, computer equipment and storage medium
CN115940392A (en) Control method, device, server and medium for battery power backup
CN113733982B (en) Charging control method and device and working machine
CN112231000A (en) Quick low-power SOC sleep wake-up control method and device and storage medium
JP2004297954A (en) Battery management system
CN1540479B (en) Method and device for managing power source of electronic equipment
JPH09197029A (en) Battery control device and electronic equipment and battery control method for battery control device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20210106

Address after: Building 9, No.1, guanpu Road, Guoxiang street, Wuzhong Economic Development Zone, Wuzhong District, Suzhou City, Jiangsu Province

Applicant after: SUZHOU LANGCHAO INTELLIGENT TECHNOLOGY Co.,Ltd.

Address before: Room 1601, floor 16, 278 Xinyi Road, Zhengdong New District, Zhengzhou City, Henan Province

Applicant before: ZHENGZHOU YUNHAI INFORMATION TECHNOLOGY Co.,Ltd.