CN109184746A - A kind of method for embedding combining tunnel lining trolley end mould and waterstop - Google Patents
A kind of method for embedding combining tunnel lining trolley end mould and waterstop Download PDFInfo
- Publication number
- CN109184746A CN109184746A CN201811162958.5A CN201811162958A CN109184746A CN 109184746 A CN109184746 A CN 109184746A CN 201811162958 A CN201811162958 A CN 201811162958A CN 109184746 A CN109184746 A CN 109184746A
- Authority
- CN
- China
- Prior art keywords
- lever
- air bag
- vertical beam
- waterstop
- lining trolley
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 22
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 22
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 18
- 239000010959 steel Substances 0.000 claims abstract description 18
- 238000009434 installation Methods 0.000 claims abstract description 9
- 230000007246 mechanism Effects 0.000 claims description 20
- 239000004567 concrete Substances 0.000 claims description 11
- 239000011241 protective layer Substances 0.000 claims description 8
- 238000007789 sealing Methods 0.000 claims description 6
- 239000002775 capsule Substances 0.000 claims description 2
- 230000006835 compression Effects 0.000 claims description 2
- 238000007906 compression Methods 0.000 claims description 2
- 239000010410 layer Substances 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 9
- 238000007796 conventional method Methods 0.000 abstract description 2
- 230000006378 damage Effects 0.000 description 3
- 238000004513 sizing Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 239000002023 wood Substances 0.000 description 2
- JJLJMEJHUUYSSY-UHFFFAOYSA-L Copper hydroxide Chemical compound [OH-].[OH-].[Cu+2] JJLJMEJHUUYSSY-UHFFFAOYSA-L 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000000835 fiber Substances 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 239000003292 glue Substances 0.000 description 1
- 230000036571 hydration Effects 0.000 description 1
- 238000006703 hydration reaction Methods 0.000 description 1
- 230000008595 infiltration Effects 0.000 description 1
- 238000001764 infiltration Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000012528 membrane Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- 230000005641 tunneling Effects 0.000 description 1
- 230000007306 turnover Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/102—Removable shuttering; Bearing or supporting devices therefor
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
The present invention discloses a kind of combination tunnel lining trolley end mould, including steel end mold device, lever device and several air bags, steel end mold device includes vertical beam, the side of the vertical beam is equipped with the supporting table for buried water stop in installing, the lever device includes lever and lever fixture, the lower end of the lever can be sheathed on the upper end of vertical beam up and downly, the air bag stacks on the middle buried water stop surface placed on the supporting table, the upper surface of the air bag is for placing back-adhering waterstop, the upper end of the lever is equipped with the locating piece of card shelves back-adhering waterstop.The present invention also provides a kind of method for embedding of waterstop, it can be achieved that wide-angle is overturn, dismounting flexibly, reduces construction procedure;Consider the later period installation of waterstop, waterstop need not fold, it is difficult to misplace, and the path that conventional method seeps water relatively after pouring increases, and ensure that construction quality;Using rubber pneumatic bag, zero-clearance is close to, avoid imprecision and the problem of spillage.
Description
Technical field
The present invention relates to tunnel lining trolley end head formwork technical field of construction, specially a kind of combination tunnel lining trolley
Hold the method for embedding of mould and waterstop.
Background technique
Road and rail tunnel is built frequently with New Austrian Tunneling Method, that is, first carries out initial support to tunnel excavation face after excavating, so
After-pouring inverted arch, finally the two lining trolley of arrangement in tunnel, carries out pouring for secondary lining.Since two lining trolley length are limited
, it is poured so the secondary lining in tunnel is all segmented, this is resulted between two adjacent section concretes, and there are gaps, easily
Percolating water.Current way is buried water stop in being arranged between two section concretes.In the prior art, generally all pass through reinforcing bar
Card is fixed, and reinforcing bar card takes a long time when welding and pad connecting line is difficult to ensure on same circular arc line, and waterstop installs matter
Amount is difficult to ensure.
Trolley end mould is generally using full plank sealing end or steel end mould in such a way that plank combines.Steel end mould there is needs
Repeat the problem of dismounting;Carry out assembled closure using plank, there is also many problems: the heat of hydration of concrete makes plank heated
Deformation, so that timber recycling rate of waterused is very low, and then leads to the waste of a large amount of timber;Assembled and disassembly process is very troublesome, takes
When it is laborious, spin out the duration;It is rough just to prop up the sealing end poor effect so that timber, lead to the problem that spillage is serious;Plank
It is lower to block too loose lateral pressure, the easy spillage of concrete, plank blocks too tight easy damaged splash guard, and it is hidden in turn result in tunnel leak
Suffer from.
For hole after two backings of filling and end concrete damage is repaired, vault band is molded into sizing process using more, this is just
It is required that trolley end mould can be provided biggish lateral pressure to prevent concrete destruction at not-go-end mould.And traditional wooden end mould or steel wood
In conjunction with end mould cannot provide larger lateral pressure since there are more splicing seams for wood board splicing, when vault band is molded into slurry
Easy spillage causes concrete damage at the mould of end.
Summary of the invention
In view of above-mentioned background technique, it is an object of the invention to: provide a kind of tunnel double-lining steel capsule locking plug template and its
Application method quickly blocks end, can provide biggish lateral pressure and guarantee that vault band is molded into the progress of sizing process, have
The embedded quality of buried water stop in effect guarantee meets Tunnel Second Lining Construction requirement to reach;Overturning can be realized again, torn open
Dress is flexible, reduces construction procedure.
A kind of combination tunnel lining trolley end mould, including steel end mold device, lever device and several air bags, the steel end
Mold device includes vertical beam, and the side of the vertical beam is equipped with the supporting table for buried water stop in installing, the lever device packet
Lever and lever fixture are included, the lower end of the lever can be sheathed on the upper end of vertical beam, the lever fixture connection up and downly
The lever or vertical beam, the lever fixture can fix the lever in the position of the vertical beam;The air bag stacking is placed on
On middle buried water stop surface in the supporting table, the upper surface of the air bag is for placing back-adhering waterstop, the shelves
The upper end of bar is equipped with the locating piece of card shelves back-adhering waterstop.
It further include having adjusting supporting device, the adjusting supporting device includes connecting rod and telescoping mechanism, the connecting rod
One end for connect with trolley end, the other end of the connecting rod and the bottom end of the telescoping mechanism are hinged, described to stand
The lower end of beam is equipped with the installation free bearing of connection trolley end, and the other side of the vertical beam is equipped with support card slot, the telescoping mechanism
Top can contradict the connection support card slot, so that the vertical beam be driven to swing and adjust the angle around the installation free bearing.Its
In, cylinder, oil cylinder etc. can also be used using screw mechanism automatically or semi-automatically in the telescoping mechanism.
Baffle is additionally provided in the vertical beam, the baffle, supporting table and vertical beam form chamfer triangle, stabilized structure
Reliably.
The lever fixture includes runner and casing, and described sleeve pipe connects the lever or vertical beam, when work the runner
Spiral, which is transferred in described sleeve pipe, holds out against the lever or vertical beam, and other retaining mechanisms (such as lock-screw) also can be used and replace
It changes.
The lacing for facilitating several spacing of positioning to arrange is additionally provided between the lever and the vertical beam.
Each air bag includes airbag body, air bag protective layer and charge and discharge gas nozzle, and the air bag protective layer coats air bag
Ontology, and closely coupled common stretch of the two does not depart from;Charge and discharge gas nozzle is in air bag protective layer, and communicated air bags ontology.
The upper and lower surfaces of each air bag are equipped with the radian being centainly consistent with tunnel/sealing belt shape, section
Face is the rectangle that quadrangle is in arc side, has certain height.
The upper and lower surfaces of each air bag are also respectively with the velcro for facilitating fitting to stack.
It is additionally provided with the positioning ring for matching the lever on each air bag, lever passes through all air bags when use
Positioning ring is positioned.
The present invention also provides a kind of method for embedding of waterstop to be led to using a kind of above-mentioned combination tunnel lining trolley end mould
It crosses installation free bearing and steel end mold device and adjusting supporting device is mounted on the front end of lining trolley by connecting rod respectively, adjust institute
The top for stating telescoping mechanism, which contradicts, connects the support card slot, so that the end face direction lining cutting side to be poured of supporting table, it will
Middle buried water stop is placed in supporting table, and the number of air bag is arranged according to two liner thickness degree of concrete engineering, and air bag is stacked and is placed
On middle buried water stop, the height of up and down adjustment lever makes locating piece hold out against one end of back-adhering waterstop, then passes through
The position of the fixed lever of the lever fixture;Last air bag inflation compress in buried water stop and back-adhering waterstop until
Grouting process finishes.
The beneficial effects of the present invention are:
(1) waterstop installation method is easy, and position is precisely not easy to shift, and pours the road of opposite conventional method infiltration later
Diameter increases, and ensure that the construction quality of end mould concrete.
(2) plug uses rubber pneumatic bag, and zero-clearance is close to;Biggish lateral pressure can be provided, both avoided due to imprecision
The problem of spillage, also ensures that vault band is molded into the implementation of sizing process, and easy to operate, construction intensity is low, has saved a large amount of timber;
(3) the turnover rigid terminal membrane in lower end is used, disassembly flexibly, reduces construction procedure.
Detailed description of the invention
Fig. 1 is working state structure main view of the invention;
Fig. 2 is working state structure left view of the invention;
Fig. 3 is original state structural front view of the invention;
Fig. 4 is the structural schematic diagram of air bag of the invention.
Specific embodiment
The present invention is further detailed with reference to the accompanying drawing.Wherein, the description as described in orientation in text, is made with Fig. 1
For reference standard.
A kind of combination tunnel lining trolley end mould, as shown in Figure 1 to Figure 3, if including steel end mold device 7, lever device 11,
Dry air bag 2 and adjusting supporting device 12, steel end mold device 7 include vertical beam 13, and the side of the vertical beam 13, which is equipped with, to be used for
The supporting table 14 of buried water stop 1 in installation, is additionally provided with baffle 23 in the vertical beam 13, the baffle 23, supporting table 14 and vertical
Beam 13 forms chamfer triangle, and the lower end of the vertical beam 13 is equipped with the installation free bearing of connection trolley end, the vertical beam 13
The other side be equipped with support card slot 8;The lever device 11 includes lever 4 and lever fixture 3, the lower end of the lever 4 can on
Under be actively sheathed on the upper end of vertical beam 13, the lever fixture 3 includes runner 17 and casing 18,18 Intermediate Gray silk of casing, institute
It states casing 18 and connects the lever 4 or vertical beam 13,17 spiral of runner was transferred in described sleeve pipe 18 and held out against the shelves when work
Bar 4 or vertical beam 13 play fixed lever 4;The air bag 2 stacks the middle buried water stop being placed in the supporting table 14
On surface, the upper surface of the air bag 2 is equipped with card shelves back sticking type for placing back-adhering waterstop 24, the upper end of the lever 4
The locating piece 10 of waterstop 24, locating piece 10 use the shive of hemisphere shape;The adjusting supporting device 12 includes connecting rod 6
And telescoping mechanism, for connecting with trolley end, the other end of the connecting rod 6 stretches with described for one end of the connecting rod 6
The bottom end of mechanism is hinged, the telescoping mechanism manually screw mechanism, the cylinder 16 including upper and lower two screw rod 15 and middle part;
Upper and lower two screw rod 15 is connected to the both ends of cylinder 16 by spiral, and the screw thread of the screw rod 15 of 16 upper and lower ends of cylinder is oppositely oriented
Setting, when screwing adjustment cylinder 16, the screw rod 15 of upper and lower ends screws cylinder 16 simultaneously, or screws out cylinder 16 simultaneously, reaches
The purpose elongated or shortened;The lower end setting of the screw rod 15 of lower end is connect for hinged hinge with connecting rod 6, the screw rod of upper end
15, which can contradict connection, presses closer support card slot 8, and entire combination end mould is reached by adjusting the length of adjustment telescoping mechanism and is in perpendicular
Straight working condition, reduce the labor intensity of worker, accelerates construction speed.As shown in figure 3, being in just for whole device
Beginning state;At this point, the screw rod 15 at both ends is most of to screw in cylinder 16;Runner spiral produces lever 4 in lever fixture 3, and lever 4 is most
It may protrude into vertical beam 13, then fixed by lever fixture 3;Air bag 2 has been deflated;Whole system is by may be reversed 7 bottom of steel end mould
The hinge overturning of free bearing is placed on connecting rod 6;Wherein, cylinder, oil cylinder etc. can also be used in the telescoping mechanism.
The lacing for facilitating several spacing of positioning to arrange is additionally provided between the lever and the vertical beam.
As shown in figure 4, each air bag 2 is made of rubber, including airbag body 19, air bag protective layer 20 and charge and discharge
Gas nozzle 21, the air bag protective layer 20 coats airbag body 19, and closely coupled common stretch of the two does not depart from;Charge and discharge gas nozzle 21
In air bag protective layer 20, and communicated air bags ontology 19, the gas that the built-in sealing of 19 ontology of air bag is filled with, by existing material
The selection of matter can make it have good air-tightness and air pressure resistance.It advanced optimizes, the number of charge and discharge gas nozzle 21 can be with one
It is a can also be multiple, to improve inflation/deflation efficiency, while being arranged by aforementioned location, can be convenient and be inflated after mounting
Or bleed air operation.
The upper and lower surfaces of each air bag 2 be equipped with centainly with steel end mold device 7/ or tunnel/or waterstop shape
The radian that shape is consistent, section are the rectangle that quadrangle is in arc side, have certain height.
The upper and lower surfaces of each air bag 2 are also respectively with the velcro 22 for facilitating fitting to stack, and the above is
Seta with ditch, another side are soft fiber.It should be pointed out that the rubber of rubber pneumatic bag 2 downside and top of the bottom
2 arrangement of the upside without velcro 22 of glue air bag.
It is additionally provided with the positioning ring 9 for matching the lever on each air bag 2, lever passes through all air bags when use
Positioning ring 9 positioned.
The working principle of the design: middle buried water stop 1 is placed in supporting table 14, by wooden hemispheroidal locating piece 10
24 one end of back-adhering waterstop is held out against, air bag 2 is inflated, and middle buried water stop 1 is with back-adhering waterstop 24 in the side that air bag provides
It is not easy to shift under to pressure, and back-adhering waterstop outside 24 and rough just branch face are even closer.
The present invention also provides a kind of method for embedding of waterstop to be led to using a kind of above-mentioned combination tunnel lining trolley end mould
It crosses installation free bearing and steel end mold device and adjusting supporting device is mounted on the front end of lining trolley by connecting rod respectively, adjust institute
The top for stating telescoping mechanism, which contradicts, connects the support card slot, so that the end face direction lining cutting side to be poured of supporting table, it will
Middle buried water stop is placed in supporting table, and the number of air bag is arranged according to two liner thickness degree of concrete engineering, and air bag is stacked and is placed
On middle buried water stop, the height of up and down adjustment lever makes lever pass through the positioning ring of air bag, when locating piece holds out against back patch
One end of formula waterstop passes through the position of the fixed lever of the lever fixture;Buried sealing in last air bag inflation compression
Band is with back-adhering waterstop until grouting process finishes;After, air bag is deflated, and lever fixture unclamps lever, and lever is as far as possible
Ground is downwardly into vertical beam, then is fixed by lever fixture;Adjustment support device makes described in the top release of the telescoping mechanism
Card slot is supported, whole device is placed on trolley support base by the hinge overturning of turnable 7 bottom of steel end mould and is stored.
As described above, the only preferred embodiment of the utility model, when cannot be limited with this utility model implementation range,
I.e. generally according to simple equivalent changes and modifications made by the utility model claim and novel description, it is new all still to belong to this
In the range of type patent covers.
Claims (10)
1. a kind of combination tunnel lining trolley end mould, which is characterized in that including steel end mold device, lever device and several gas
Capsule, steel end mold device includes vertical beam, and the side of the vertical beam is equipped with the supporting table for buried water stop in installing, described
Lever device includes lever and lever fixture, and the lower end of the lever can be sheathed on the upper end of vertical beam, the shelves up and downly
Rod chucking appliance, which connects the lever or vertical beam, the lever fixture, can fix the lever in the position of the vertical beam;The air bag
It stacks on the middle buried water stop surface placed on the supporting table, the upper surface of the air bag is for placing back sticking type sealing
Band, the upper end of the lever are equipped with the locating piece of card shelves back-adhering waterstop.
2. a kind of combination tunnel lining trolley end mould according to claim 1, which is characterized in that further include thering is adjusting to support
Device, the adjusting supporting device include connecting rod and telescoping mechanism, and one end of the connecting rod is used to connect with trolley end,
The other end of the connecting rod and the bottom end of the telescoping mechanism are hinged, and the lower end of the vertical beam is equipped with connection trolley end
Free bearing is installed, the other side of the vertical beam is equipped with support card slot, and the top of the telescoping mechanism can contradict the connection support card
Slot.
3. a kind of combination tunnel lining trolley end mould according to claim 2, which is characterized in that the telescoping mechanism uses
Screw body.
4. a kind of combination tunnel lining trolley end mould according to claim 1, which is characterized in that the lever fixture includes
Runner and casing, described sleeve pipe connect the lever or vertical beam, the runner can spiral be transferred in described sleeve pipe and hold out against the shelves
Bar or vertical beam.
5. a kind of combination tunnel lining trolley end mould according to claim 1, which is characterized in that the lever and described vertical
The lacing for facilitating several spacing of positioning to arrange is additionally provided between beam.
6. a kind of combination tunnel lining trolley end mould according to claim 1, which is characterized in that each air bag includes
Airbag body, air bag protective layer and charge and discharge gas nozzle, the air bag protective layer coat airbag body, and charge and discharge gas nozzle is protected embedded in air bag
In layer, and communicated air bags ontology.
7. a kind of combination tunnel lining trolley end mould according to claim 1 or 6, which is characterized in that each air bag
Upper and lower surfaces be equipped with radian, section be quadrangle be in arc side rectangle.
8. a kind of combination tunnel lining trolley end mould according to claim 1 or 6, which is characterized in that each air bag
Upper and lower surfaces be also respectively with velcro.
9. a kind of combination tunnel lining trolley end mould according to claim 1 or 6, which is characterized in that each air bag
On be additionally provided with the positioning ring for matching the lever.
10. a kind of method for embedding of waterstop, which is characterized in that served as a contrast using a kind of combination tunnel described in the claims 2
Steel end mold device and adjusting supporting device are mounted on lining trolley respectively by installation free bearing and connecting rod by platform building cart end mould
Front end, the top for adjusting the telescoping mechanism, which contradicts, connects the support card slot, so that the end face direction of supporting table will pour
Lining cutting side, middle buried water stop is placed in supporting table, according to two liner thickness degree of concrete engineering be arranged air bag number, will
Air bag stacking is placed on middle buried water stop, and the height of up and down adjustment lever makes locating piece hold out against back-adhering waterstop
Then one end passes through the position of the fixed lever of the lever fixture;Buried water stop and back in last air bag inflation compression
Pasting type waterstop is until grouting process finishes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811162958.5A CN109184746A (en) | 2018-09-30 | 2018-09-30 | A kind of method for embedding combining tunnel lining trolley end mould and waterstop |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811162958.5A CN109184746A (en) | 2018-09-30 | 2018-09-30 | A kind of method for embedding combining tunnel lining trolley end mould and waterstop |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109184746A true CN109184746A (en) | 2019-01-11 |
Family
ID=64946636
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811162958.5A Pending CN109184746A (en) | 2018-09-30 | 2018-09-30 | A kind of method for embedding combining tunnel lining trolley end mould and waterstop |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109184746A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110985068A (en) * | 2019-11-27 | 2020-04-10 | 中铁隧道局集团建设有限公司 | Novel tunnel secondary lining end water-stopping sealing dual-purpose water-stopping belt |
CN112695801A (en) * | 2020-12-29 | 2021-04-23 | 中信建设有限责任公司 | Municipal administration utility tunnel hydraulic pressure platform truck |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205370601U (en) * | 2016-02-05 | 2016-07-06 | 中铁八局集团第一工程有限公司 | Two lining construction waterstop positioner in tunnel |
CN106150527A (en) * | 2015-03-24 | 2016-11-23 | 中铁隆工程集团有限公司 | Containing middle buried water stop tunnel double-lining chassis air bag mould end blocking method |
CN106285725A (en) * | 2016-10-27 | 2017-01-04 | 四川皓德斯新材料科技有限公司 | A kind of stopper structure being arranged between formwork jumbo and country rock and installation method thereof |
CN106837385A (en) * | 2017-04-07 | 2017-06-13 | 中国水利水电第五工程局有限公司 | A kind of seamless stopend for Tunnel Second Lining |
CN106979023A (en) * | 2017-05-22 | 2017-07-25 | 中铁二局集团有限公司 | The adjustable concrete end mould of Tunnel Second Lining width and its adjusting method |
CN206707734U (en) * | 2017-05-19 | 2017-12-05 | 四川皓德斯新材料科技有限公司 | A kind of tunnel double-lining compounded rubber lifts locking plug template |
CN206707735U (en) * | 2017-05-19 | 2017-12-05 | 四川皓德斯新材料科技有限公司 | A kind of compounded rubber vertical rod is stretched bulkhead |
CN209354164U (en) * | 2018-09-30 | 2019-09-06 | 广东省长大公路工程有限公司 | A kind of combination tunnel lining trolley end mould |
-
2018
- 2018-09-30 CN CN201811162958.5A patent/CN109184746A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106150527A (en) * | 2015-03-24 | 2016-11-23 | 中铁隆工程集团有限公司 | Containing middle buried water stop tunnel double-lining chassis air bag mould end blocking method |
CN205370601U (en) * | 2016-02-05 | 2016-07-06 | 中铁八局集团第一工程有限公司 | Two lining construction waterstop positioner in tunnel |
CN106285725A (en) * | 2016-10-27 | 2017-01-04 | 四川皓德斯新材料科技有限公司 | A kind of stopper structure being arranged between formwork jumbo and country rock and installation method thereof |
CN106837385A (en) * | 2017-04-07 | 2017-06-13 | 中国水利水电第五工程局有限公司 | A kind of seamless stopend for Tunnel Second Lining |
CN206707734U (en) * | 2017-05-19 | 2017-12-05 | 四川皓德斯新材料科技有限公司 | A kind of tunnel double-lining compounded rubber lifts locking plug template |
CN206707735U (en) * | 2017-05-19 | 2017-12-05 | 四川皓德斯新材料科技有限公司 | A kind of compounded rubber vertical rod is stretched bulkhead |
CN106979023A (en) * | 2017-05-22 | 2017-07-25 | 中铁二局集团有限公司 | The adjustable concrete end mould of Tunnel Second Lining width and its adjusting method |
CN209354164U (en) * | 2018-09-30 | 2019-09-06 | 广东省长大公路工程有限公司 | A kind of combination tunnel lining trolley end mould |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110985068A (en) * | 2019-11-27 | 2020-04-10 | 中铁隧道局集团建设有限公司 | Novel tunnel secondary lining end water-stopping sealing dual-purpose water-stopping belt |
CN112695801A (en) * | 2020-12-29 | 2021-04-23 | 中信建设有限责任公司 | Municipal administration utility tunnel hydraulic pressure platform truck |
CN112695801B (en) * | 2020-12-29 | 2021-08-17 | 中信建设有限责任公司 | Municipal administration utility tunnel hydraulic pressure platform truck |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209354164U (en) | A kind of combination tunnel lining trolley end mould | |
CN109184746A (en) | A kind of method for embedding combining tunnel lining trolley end mould and waterstop | |
US8500429B2 (en) | Method and means of lining a manhole | |
CN113153213B (en) | Gas collection hole plugging device and plugging method thereof | |
CN108222089A (en) | A kind of underwater wet method prosthetic device of concrete-pile defect and restorative procedure | |
CN107035388A (en) | A kind of tunnel double-lining compounded rubber lifting locking plug template and its application method | |
CN109339089A (en) | A kind of rim of a cup isolated footing cup core forming method | |
CN206487148U (en) | A kind of wall bolt hole slip casting capping tools | |
CN207959302U (en) | A kind of underwater wet method prosthetic device of concrete-pile defect | |
CN209115120U (en) | A kind of lining of hidden digging structure two concrete vault anticreep sky device | |
CN204826427U (en) | Two accuse precast concrete cushions of floor cover to reinforcement | |
KR200477980Y1 (en) | Supply Device of Concrete Mortar | |
CN209040133U (en) | Well-covering device for dewatering well suitable for rich groundwater region | |
CN204199694U (en) | Concrete preformed hole shaping device | |
CN204435928U (en) | It is a kind of that building masonry wall crack is convenient fills up device | |
CN217601490U (en) | Open caisson structure based on gasbag is rectified | |
CN207688061U (en) | A kind of prefabricated streetlamp lamp socket | |
CN207582934U (en) | A kind of pre-buried hook for being used to fix builder's jack I-steel | |
CN202053370U (en) | Device for manufacturing tubular pile in aspirating manner | |
CN212406108U (en) | Structure for pouring concrete column by adopting inflatable template fixed with floor slab | |
CN1325829C (en) | Method for continuous casting delivery pipeline with soft gas-pocket and soft gas-pocket thereof | |
CN209011845U (en) | A kind of tunnel grouting structure | |
CN211472615U (en) | Foundation reinforcing device | |
CN219888019U (en) | Plugging structure for oil field oil testing | |
CN110777795B (en) | Quick concrete pipeline encapsulating and pouring device and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |