CN109129841A - A kind of construction of ceramsite concrete wall panel is with pouring mold and its construction method - Google Patents
A kind of construction of ceramsite concrete wall panel is with pouring mold and its construction method Download PDFInfo
- Publication number
- CN109129841A CN109129841A CN201810860713.3A CN201810860713A CN109129841A CN 109129841 A CN109129841 A CN 109129841A CN 201810860713 A CN201810860713 A CN 201810860713A CN 109129841 A CN109129841 A CN 109129841A
- Authority
- CN
- China
- Prior art keywords
- mold
- steel wire
- mold shell
- welded
- shell
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/0029—Moulds or moulding surfaces not covered by B28B7/0058 - B28B7/36 and B28B7/40 - B28B7/465, e.g. moulds assembled from several parts
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B23/00—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
- B28B23/02—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
- B28B23/022—Means for inserting reinforcing members into the mould or for supporting them in the mould
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B23/00—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
- B28B23/02—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
- B28B23/022—Means for inserting reinforcing members into the mould or for supporting them in the mould
- B28B23/024—Supporting means
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/0002—Auxiliary parts or elements of the mould
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/0029—Moulds or moulding surfaces not covered by B28B7/0058 - B28B7/36 and B28B7/40 - B28B7/465, e.g. moulds assembled from several parts
- B28B7/0032—Moulding tables or similar mainly horizontal moulding surfaces
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/0029—Moulds or moulding surfaces not covered by B28B7/0058 - B28B7/36 and B28B7/40 - B28B7/465, e.g. moulds assembled from several parts
- B28B7/0055—Mould pallets; Mould panels
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a kind of constructions of ceramsite concrete wall panel with pouring mold and its construction method, including mold shell, mold base and the second positioning plate, supporting square tube is provided with below the mold shell, support frame is provided with below the supporting square tube, traveling wheel is provided with below support frame as described above, the two sides of the mold shell are provided with assembly ear, transversely strengthening bar is provided among the assembly ear, the transversely strengthening bar is internally provided with vertical structure reinforcing rod, assembly bolt is provided with above the transversely strengthening bar, the side of the mold shell is provided with vertical structure reinforcing rod, mast-up is provided with above the mold shell, the mast-up side is provided with limited block.Beneficial effect is: steel wire can be first put into device by the present invention, by the way that manually the steel wire of entire row is put into mold, is being poured, improving production efficiency, improving product quality, while avoiding steel wire bending, improving the quality of steel wire.
Description
Technical field
The present invention relates to concrete panel construction equipment fields, relate in particular to a kind of ceramsite concrete wall panel construction use
Pour mold and its construction method.
Background technique
Concrete panel is a kind of common prefabricated component during constructions work, and the effect of construction operation can be improved
Rate, in concrete panel work progress, common construction method is that the concrete that will be prepared pours into mold, then passes through artificial
Steel wire insertion has been filled in the mold of concrete.
But this production method for being inserted directly into steel wire, will cause biggish trueness error, and be easy to cause steel wire curved
Folding, reduces its service life and structural strength, therefore concrete panel mould product production efficiency used at present is low, it is difficult to suitable
Answer growing building demand, thus propose it is a kind of first steel wire is put into device, by manually by the steel wire of entire row
Net is put into mold, in the concrete walls operation mode poured, is improved production efficiency, is improved product quality.
Summary of the invention
The object of the invention is that providing a kind of construction of ceramsite concrete wall panel with pouring to solve the above-mentioned problems
Mold and its construction method.
The present invention through the following technical solutions to achieve the above objectives:
A kind of construction of ceramsite concrete wall panel is with pouring mold, including mold shell, mold base and the second positioning plate, institute
It states and is provided with supporting square tube below mold shell, support frame, setting below support frame as described above are provided with below the supporting square tube
There is traveling wheel, the two sides of the mold shell are provided with assembly ear, are provided with transversely strengthening bar, the cross among the assembly ear
It is internally provided with vertical structure reinforcing rod to reinforcing bar, is provided with assembly bolt, the mold above the transversely strengthening bar
The side of shell is provided with vertical structure reinforcing rod, is provided with mast-up above the mold shell, the mast-up side is set
It is equipped with limited block, is provided among the limited block and pours positioning groove, the both ends of the mold base are provided with the first positioning
Plate is provided with mold crossbeam among the mold base, is provided with locating slot on the mold base, on second positioning plate
Side is provided with steel wire partition rod, and steel wire limited block, the setting of steel wire partition rod side are provided among the steel wire partition rod
There is steel wire Lift hook.
Further, support frame as described above is fixedly connected with the traveling wheel by column, support frame as described above and the support
Square tube passes through groove nested encryptions.
Further, the supporting square tube and the mold shell are welded to connect, the mold shell and the vertical knot
Structure reinforcing rod is welded to connect, and the mold shell and the assembly ear are welded to connect, the assembly ear and the transversely strengthening bar
Plug connection.
Further, the mold shell and the mast-up are welded to connect, and the mold shell and the limited block weld
It connects in succession, the limited block pours positioning groove and snapped connection by engaging with described.
Further, the mold shell and the vertical structure reinforcing rod are welded to connect, the mold shell with it is described
Bolt is assembled to connect by snap-fitted.
Further, the mold base and the first positioning plate of support frame as described above are welded to connect, the mold base and institute
Locating slot welded connecting is stated, the mold base is connect with the mold beam welding.
Further, second positioning plate and the steel wire partition rod are welded to connect, the steel wire partition rod with it is described
Steel wire limited block is welded to connect, and second positioning plate and the steel wire Lift hook are welded to connect.
Further, surface of the present invention carries out spray painting processing.
Further, the size of the mold base and the size of the mold shell are consistent, described to pour positioning
The size of groove and the size of second positioning plate are consistent.
The present invention also provides a kind of ceramsite concrete wall panel construction construction methods for pouring mold, pour applied to above-mentioned
In die apparatus, specific construction method are as follows:
A, staff pushes the mold shell, drives the present invention by the traveling wheel and arrives designated position, and leads to
Cross the transversely strengthening bar, the mold shell is fixed the positioning groove that pours, keep the knot of the mold shell
Structure is stablized.
B, the mold base is nested into inside the mold shell by staff, by the mold base and the mould
Fastening is fixed in the bottom of tool shell.
C, steel wire is suspended on the steel wire Lift hook by staff, and staff lifts second positioning plate,
Under the positioning of first positioning plate, steel wire is inserted into inside the mold shell, second positioning plate is made to nest into institute
It states and pours inside positioning groove.
D, haydite concrete is poured from the upper end of the mold shell into inside the mold shell, makes haydite concrete
Coagulation forming later extracts second positioning plate out, completes haydite concrete wall and pours operation.
The beneficial effects of the present invention are: steel wire can be first put into device by the present invention, by manually by entire row
Steel wire be put into mold, poured, improving production efficiency, improving product quality, while it is curved to avoid steel wire
Folding, improves the quality of steel wire.
Detailed description of the invention
Fig. 1 is a kind of ceramsite concrete wall panel construction front view structure schematic diagram for pouring mold of the present invention;
Fig. 2 is a kind of ceramsite concrete wall panel construction right view structure diagram for pouring mold of the present invention;
Fig. 3 is a kind of ceramsite concrete wall panel construction mould structure schematic diagram for pouring mold of the present invention;
Fig. 4 is a kind of structure letter of ceramsite concrete wall panel construction steel wire hanging apparatus for pouring mold of the present invention
Figure;
Fig. 5 is a kind of plan structure of the ceramsite concrete wall panel construction under the assembled state for pouring mold of the present invention
Schematic diagram.
The reference numerals are as follows:
1, support frame;2, traveling wheel;3, supporting square tube;4, mold shell;5, ear is assembled;6, transversely strengthening bar;7, vertical
Structural strengthening bar;8, mast-up;9, limited block;10, positioning groove is poured;11, vertical structure reinforcing rod;12, bolt is assembled;
13, mold base;14, locating slot;15, mold crossbeam;16, the first positioning plate;17, the second positioning plate;18, steel wire partition rod;
19, steel wire Lift hook;20, steel wire limited block.
Specific embodiment
The present invention will be further explained below with reference to the attached drawings:
As Figure 1-Figure 5, a kind of construction of ceramsite concrete wall panel is with pouring mold, including mold shell 4, mold base
13 and second positioning plate 17, supporting square tube 3 is provided with below the mold shell 4, is provided with support below the supporting square tube 3
Frame 1, traveling wheel 2 is provided with below support frame as described above 1, and the two sides of the mold shell 4 are provided with assembly ear 5, the assembly ear 5
Centre is provided with transversely strengthening bar 6, and the transversely strengthening bar 6 is internally provided with vertical structure reinforcing rod 117, and the transverse direction adds
Assembly bolt 12 is provided with above solid rod 6, the side of the mold shell 4 is provided with vertical structure reinforcing rod 117, the mold
Mast-up 8 is provided with above shell 4,8 side of mast-up is provided with limited block 9, is provided with and pours among the limited block 9
Positioning groove 10, the both ends of the mold base 13 are provided with the first positioning plate 16, are provided with mould among the mold base 13
Have crossbeam 15, is provided with locating slot 14 on the mold base 13, is provided with steel wire partition rod above second positioning plate 17
18, steel wire limited block 209 is provided among the steel wire partition rod 18,18 side of steel wire partition rod is provided with steel wire lifting
Hook 19.
In the present embodiment, support frame as described above 1 is fixedly connected with the traveling wheel 2 by column, support frame as described above 1 with it is described
Supporting square tube 3 passes through groove nested encryptions.
In the present embodiment, the supporting square tube 3 is welded to connect with the mold shell 4, and the mold shell 4 is erected with described
Be welded to connect to structural strengthening bar 117, the mold shell 4 and the assembly ear 5 welded connecting, the assembly ear 5 with it is described
6 plug of transversely strengthening bar connection.
In the present embodiment, the mold shell 4 is welded to connect with the mast-up 8, the mold shell 4 and the limit
Block 9 is welded to connect, the limited block 9 with it is described pour positioning groove 10 and pass through engage and snap connection.
In the present embodiment, the mold shell 4 is welded to connect with the vertical structure reinforcing rod 117, the mold shell 4
It is connect with the assembly bolt 12 by snap-fitted.
In the present embodiment, the mold base 13 is welded to connect with 1 first positioning plate 16 of support frame as described above, the mold bottom
Seat 13 is welded to connect with the locating slot 14, and the mold base 13 is welded to connect with the mold crossbeam 15.
In the present embodiment, second positioning plate 17 is welded to connect with the steel wire partition rod 18, the steel wire partition rod
18 are welded to connect with the steel wire limited block 209, and second positioning plate 17 is welded to connect with the steel wire Lift hook 19.
In the present embodiment, surface of the present invention carries out spray painting processing.
In the present embodiment, the size of the mold base 13 and the size of the mold shell 4 are consistent, described to pour
The size of positioning groove 10 and the size of second positioning plate 17 are consistent.
The present invention also provides a kind of ceramsite concrete wall panel construction construction methods for pouring mold, pour applied to above-mentioned
In die apparatus, specific construction method are as follows:
A, staff pushes the mold shell 4, drives the present invention by the traveling wheel 2 and arrives designated position, and
By the transversely strengthening bar 6, it is described pour positioning groove 10 mold shell 4 be fixed, keep outside the mold
The stable structure of shell 4.
B, the mold base 13 is nested into inside the mold shell 4 by staff, by the mold base 13 with
Fastening is fixed in the bottom of the mold shell 4.
C, steel wire is suspended on the steel wire Lift hook 19 by staff, and staff lifts second positioning plate
17, under the positioning of first positioning plate 16, steel wire is inserted into inside the mold shell 4, makes second positioning plate
17 nest into described pour inside positioning groove 10.
D, haydite concrete is poured from the upper end of the mold shell 4 into inside the mold shell 4, makes haydite coagulation
Native coagulation forming later extracts second positioning plate 17 out, completes haydite concrete wall and pours operation.
The basic principles, main features and advantages of the invention have been shown and described above.The technical staff of the industry should
Understand, the present invention is not limited to the above embodiments, and the above embodiments and description only describe originals of the invention
Reason, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes and improvements
It all fall within the protetion scope of the claimed invention.
Claims (10)
1. a kind of construction of ceramsite concrete wall panel is with pouring mold, it is characterised in that: including mold shell (4), mold base
(13) it is provided with supporting square tube (3) with the second positioning plate (17), mold shell (4) lower section, supporting square tube (3) lower section
It is provided with support frame (1), is provided with traveling wheel (2) below support frame as described above (1), the two sides of the mold shell (4) are provided with
It assembles ear (5), is provided with transversely strengthening bar (6) among the assembly ear (5), transversely strengthening bar (6) are internally provided with
Vertical structure reinforcing rod (117), transversely strengthening bar (6) top are provided with assembly bolt (12), the mold shell (4)
Side is provided with vertical structure reinforcing rod (117), is provided with mast-up (8), the mast-up above the mold shell (4)
(8) side is provided with limited block (9), is provided among the limited block (9) and is poured positioning groove (10), the mold base
(13) both ends are provided with the first positioning plate (16), are provided with mold crossbeam (15), the mould among the mold base (13)
It is provided with locating slot (14) on tool pedestal (13), is provided with steel wire partition rod (18) above second positioning plate (17), it is described
It is provided with steel wire limited block (209) among steel wire partition rod (18), steel wire partition rod (18) side is provided with steel wire lifting
Hook (19).
2. a kind of ceramsite concrete wall panel construction according to claim 1 is with pouring mold, it is characterised in that: the support
Frame (1) is fixedly connected with the traveling wheel (2) by column, and support frame as described above (1) is embedding by groove with the supporting square tube (3)
Set connection.
3. a kind of ceramsite concrete wall panel construction according to claim 1 is with pouring mold, it is characterised in that: the support
Square tube (3) and the mold shell (4) are welded to connect, and the mold shell (4) and the vertical structure reinforcing rod (117) are welded
Connection, the mold shell (4) and the assembly ear (5) are welded to connect, the assembly ear (5) and the transversely strengthening bar (6)
Plug connection.
4. a kind of ceramsite concrete wall panel construction according to claim 1 is with pouring mold, it is characterised in that: the mold
Shell (4) and the mast-up (8) are welded to connect, and the mold shell (4) and the limited block (9) are welded to connect, the limit
Position block (9) with it is described pour positioning groove (10) and pass through engage and snap connection.
5. a kind of ceramsite concrete wall panel construction according to claim 1 is with pouring mold, it is characterised in that: the mold
Shell (4) and the vertical structure reinforcing rod (117) are welded to connect, and the mold shell (4) and the assembly bolt (12) are logical
Cross snap-fitted connection.
6. a kind of ceramsite concrete wall panel construction according to claim 1 is with pouring mold, it is characterised in that: the mold
Pedestal (13) and (1) first positioning plate (16) of support frame as described above are welded to connect, the mold base (13) and the locating slot
(14) it is welded to connect, the mold base (13) and the mold crossbeam (15) are welded to connect.
7. a kind of ceramsite concrete wall panel construction according to claim 1 is with pouring mold, it is characterised in that: described second
Positioning plate (17) and the steel wire partition rod (18) are welded to connect, the steel wire partition rod (18) and the steel wire limited block
(209) it is welded to connect, second positioning plate (17) and the steel wire Lift hook (19) are welded to connect.
8. a kind of ceramsite concrete wall panel construction according to claim 1 is with pouring mold, it is characterised in that: table of the present invention
Face carries out spray painting processing.
9. a kind of ceramsite concrete wall panel construction according to claim 1 is with pouring mold, it is characterised in that: the mold
The size of pedestal (13) and the size of the mold shell (4) are consistent, the size for pouring positioning groove (10) and institute
The size for stating the second positioning plate (17) is consistent.
10. a kind of ceramsite concrete wall panel construction construction method for pouring mold, is applied to claim 1 to 9 any one
Described pours in die apparatus, it is characterised in that: specific construction method including the following steps:
A, staff pushes the mold shell (4), drives the present invention by the traveling wheel (2) and arrives designated position, and
By the transversely strengthening bar (6), it is described pour positioning groove (10) mold shell (4) be fixed, described in holding
The stable structure of mold shell (4).
B, the mold base (13) is nested into the mold shell (4) inside by staff, by the mold base (13)
Fastening is fixed with the bottom of the mold shell (4).
C, steel wire is suspended on the steel wire Lift hook (19) by staff, and staff lifts second positioning plate
(17), under the positioning of first positioning plate (16), steel wire is inserted into the mold shell (4) inside, makes described second
Positioning plate (17) pours positioning groove (10) inside described in nesting into.
D, haydite concrete is poured from the upper end of the mold shell (4) into the mold shell (4) inside, makes haydite coagulation
Native coagulation forming later extracts second positioning plate (17) out, completes haydite concrete wall and pours operation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810860713.3A CN109129841B (en) | 2018-08-01 | 2018-08-01 | Pouring mold for ceramsite concrete wall board construction and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810860713.3A CN109129841B (en) | 2018-08-01 | 2018-08-01 | Pouring mold for ceramsite concrete wall board construction and construction method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109129841A true CN109129841A (en) | 2019-01-04 |
CN109129841B CN109129841B (en) | 2020-11-17 |
Family
ID=64798534
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810860713.3A Active CN109129841B (en) | 2018-08-01 | 2018-08-01 | Pouring mold for ceramsite concrete wall board construction and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109129841B (en) |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2874349A1 (en) * | 2004-08-20 | 2006-02-24 | Jean Paul Martinez | Pre-fabricated mortar and concrete product e.g. reinforced concrete beam, fabricating device for e.g. building industry, has two beams, where each beam has three pairs of chisels to constitute lift table vertically moved by two jacks |
CN101439553A (en) * | 2008-12-30 | 2009-05-27 | 朱春生 | Method for pouring and molding large scale disposal wallboard and mould carriage thereof |
CN103317594A (en) * | 2013-05-28 | 2013-09-25 | 池州市新科建材有限公司 | Gypsum block pouring die |
CN104612282A (en) * | 2015-02-02 | 2015-05-13 | 西安建筑科技大学 | Prefabricated steel fiber sludge-made ceramisite concrete wall based on T-shaped groove connection and construction method of prefabricated steel fiber sludge-made ceramisite concrete wall |
CN204322273U (en) * | 2014-11-25 | 2015-05-13 | 中国联合装备集团安阳机械有限公司 | A kind of former of rebar cylinder mould combined wall board |
CN204382478U (en) * | 2015-01-07 | 2015-06-10 | 四川国正环保科技有限公司 | A kind of wall board forming mould |
CN105538501A (en) * | 2015-12-28 | 2016-05-04 | 中民筑友有限公司 | Construction method restraining floating of ceramsite concrete and prefabricated part |
CN205325963U (en) * | 2015-12-11 | 2016-06-22 | 福建安吉屋新型建材有限公司 | Haydite composite wall panel production facility |
CN106630780A (en) * | 2015-10-29 | 2017-05-10 | 顾杨子 | Preparation for concrete ceramsite wallboard |
CN206289958U (en) * | 2016-10-27 | 2017-06-30 | 中国航天建设集团有限公司 | A kind of inside wall formwork erecting device and inside wall formwork formwork erecting structure |
CN206967706U (en) * | 2017-07-11 | 2018-02-06 | 合肥国瑞集成建筑科技有限公司 | Mould car is used in a kind of assembled wallboard production |
-
2018
- 2018-08-01 CN CN201810860713.3A patent/CN109129841B/en active Active
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2874349A1 (en) * | 2004-08-20 | 2006-02-24 | Jean Paul Martinez | Pre-fabricated mortar and concrete product e.g. reinforced concrete beam, fabricating device for e.g. building industry, has two beams, where each beam has three pairs of chisels to constitute lift table vertically moved by two jacks |
CN101439553A (en) * | 2008-12-30 | 2009-05-27 | 朱春生 | Method for pouring and molding large scale disposal wallboard and mould carriage thereof |
CN103317594A (en) * | 2013-05-28 | 2013-09-25 | 池州市新科建材有限公司 | Gypsum block pouring die |
CN204322273U (en) * | 2014-11-25 | 2015-05-13 | 中国联合装备集团安阳机械有限公司 | A kind of former of rebar cylinder mould combined wall board |
CN204382478U (en) * | 2015-01-07 | 2015-06-10 | 四川国正环保科技有限公司 | A kind of wall board forming mould |
CN104612282A (en) * | 2015-02-02 | 2015-05-13 | 西安建筑科技大学 | Prefabricated steel fiber sludge-made ceramisite concrete wall based on T-shaped groove connection and construction method of prefabricated steel fiber sludge-made ceramisite concrete wall |
CN106630780A (en) * | 2015-10-29 | 2017-05-10 | 顾杨子 | Preparation for concrete ceramsite wallboard |
CN205325963U (en) * | 2015-12-11 | 2016-06-22 | 福建安吉屋新型建材有限公司 | Haydite composite wall panel production facility |
CN105538501A (en) * | 2015-12-28 | 2016-05-04 | 中民筑友有限公司 | Construction method restraining floating of ceramsite concrete and prefabricated part |
CN206289958U (en) * | 2016-10-27 | 2017-06-30 | 中国航天建设集团有限公司 | A kind of inside wall formwork erecting device and inside wall formwork formwork erecting structure |
CN206967706U (en) * | 2017-07-11 | 2018-02-06 | 合肥国瑞集成建筑科技有限公司 | Mould car is used in a kind of assembled wallboard production |
Also Published As
Publication number | Publication date |
---|---|
CN109129841B (en) | 2020-11-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105220619B (en) | A kind of method of quick manufacture two-wire nose circle solid pier | |
CN208251132U (en) | Cup-shaped foundation internal mold supporting die and cup-shaped foundation building device | |
CN103276895B (en) | Die supporting method of reversed-cone-shaped column cap die | |
CN205907855U (en) | Steel pipe board combination steel sheet shear force wall | |
CN109129841A (en) | A kind of construction of ceramsite concrete wall panel is with pouring mold and its construction method | |
CN207888894U (en) | Dual-direction pre-tensioning system prestressed concrete track slab mold | |
CN109291235A (en) | A kind of steelframe, manufacturing method and application method improving T beam forms disassembly efficiency | |
CN106836255B (en) | The integral prefabricated structure of basement bottom board catch pit steel mesh and method of construction | |
CN206383280U (en) | Precast T-Beam wing plate framework of steel reinforcement molding bed rack | |
CN201809042U (en) | Lifting frame for lifting whole steel reinforcement framework of box beam | |
CN207293909U (en) | A kind of precast beam reinforced bar skeleton hanging apparatus | |
CN217326486U (en) | Hollow superstructure diaphragm capsule location structure of concrete | |
CN214942435U (en) | Vertical supporting device for upper formwork of reinforcing steel bar net rack | |
CN205206301U (en) | Integrally lift up formula shaft template | |
CN212024543U (en) | Vertical lifting appliance for side mold of prefabricated box girder | |
CN210025765U (en) | Hoisting system for integrally formed steel reinforcement cage of box girder | |
CN208310300U (en) | Hoisting structure and hanging device | |
CN209308417U (en) | A kind of quick production and for building half prefabricated system automatically docked | |
CN209053429U (en) | A kind of formwork system of assembled architecture | |
CN207032631U (en) | A kind of stable type hollow heat-insulation building block | |
CN111410117A (en) | Vertical lifting appliance for side mold of prefabricated box girder | |
CN111058561A (en) | Construction method for thin-wall square box rib-free accurate positioning hollow floor | |
CN219746187U (en) | Vertical pipe gallery mould steel reinforcement cage ligature support | |
CN207003737U (en) | A kind of assembling wall body structure with decorative plate of outer wall | |
CN111774803A (en) | Mail steamer sheet metal upset frock |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20201026 Address after: 364000 SHANGBAN Industrial Zone, Xinan town, Zhangping City, Longyan City, Fujian Province Applicant after: FUJIAN QISHENG ENVIRONMENTAL PROTECTION BUILDING MATERIALS TECHNOLOGY Co.,Ltd. Address before: 523000 3 Hubin South Road, iron furnace Village, Dongguan, Guangdong Applicant before: GUANGDONG YIANJU ENVIRONMENTAL PROTECTION BUILDING MATERIAL Co.,Ltd. |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |