[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN109083117A - A kind of piling standing method of jack-up unit - Google Patents

A kind of piling standing method of jack-up unit Download PDF

Info

Publication number
CN109083117A
CN109083117A CN201811136175.XA CN201811136175A CN109083117A CN 109083117 A CN109083117 A CN 109083117A CN 201811136175 A CN201811136175 A CN 201811136175A CN 109083117 A CN109083117 A CN 109083117A
Authority
CN
China
Prior art keywords
platform
spud leg
spud
piling
jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811136175.XA
Other languages
Chinese (zh)
Inventor
张磊
邓国辉
石保国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CSSC Huangpu Wenchong Shipbuilding Co Ltd
Original Assignee
CSSC Huangpu Wenchong Shipbuilding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSSC Huangpu Wenchong Shipbuilding Co Ltd filed Critical CSSC Huangpu Wenchong Shipbuilding Co Ltd
Priority to CN201811136175.XA priority Critical patent/CN109083117A/en
Publication of CN109083117A publication Critical patent/CN109083117A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/02Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention discloses a kind of piling standing methods of jack-up unit, it is characterised in that: include the following steps, at platform towage to predetermined operation, and decentralization spud leg to mud face;The posture that adjustment platform is acted using Single Pile, guarantees the trim and angle of heel of platform;Start lifting device, platform is slowly lifted, when the bottom surface of platform from the water surface suitably with a distance from when stop peaceful;It observes each spud leg for a period of time, determines and start pre- ballast after each spud leg is stablized.The present invention can pass through the pre- ballast basis operation of short period, so that during the foundation stress under platform leg shoe reaches lifting operation or spud leg shoe is born during severe storm maximum vertical load, to guarantee safety of the platform under normal operation or storm.Using effect of the present invention is good, use easy to spread.

Description

A kind of piling standing method of jack-up unit
Technical field
The present invention relates to jack-up unit technical field, the piling more specifically to a kind of jack-up unit is stood Method.
Background technique
Engineering platform with individual support leg is supported by the shoe of contact ocean bottom soil.Platform leg is in addition to being come from Outside the vertical load that weight, changing load and the lifting torque of platform itself generate, also subject to by wind, wave, stream environmental condition Caused horizontal load, these horizontal loads will lead to platform and generate tilting moment, this tilting moment can be to the spud leg of lower wind direction Shoe generates Additional vertical load, which can cause sinking for spud leg shoe during severe storm, so as to cause platform hair Raw inclination is toppled.
Summary of the invention
In order to overcome the deficiencies of the prior art, the present invention provides a kind of piling standing method of jack-up unit, so that platform During foundation stress under spud leg shoe reaches lifting operation or spud leg shoe is born during severe storm maximum is hung down To load, to guarantee safety of the platform under normal operation or storm.
The technical solution adopted by the present invention to solve the technical problems is:
A kind of piling standing method of jack-up unit, comprising the following steps:
Step 1, at platform towage to predetermined operation, decentralization spud leg to mud face;
Step 2 is acted the posture of adjustment platform using Single Pile, guarantees the trim and angle of heel of platform;
Step 3, start lifting device, platform is slowly lifted, when the bottom surface of platform from the water surface suitably with a distance from when stop Peaceful;
Step 4 observes each spud leg for a period of time, determines and starts pre- ballast after each spud leg is stablized.
Preferably, in the step 4, pre- ballast the following steps are included:
A, two spud legs on one diagonal line are loaded by lifting device simultaneously, and observes the situation of two spud legs, if two Spud leg occurs to sink then to sink to stablizing to it and continues to be depressed into no sinking in advance after a certain period of time;
B, the spud leg on another diagonal line is loaded by lifting device simultaneously, and observes the situation of two spud legs, if two Spud leg occurs to sink then to sink to stablizing to it and continues to be depressed into no sinking in advance after a certain period of time;
C, successively two cornerwise spud legs are gradually loaded by turns, until the load of spud leg reaches the precompressed being calculated Load;
D, after four pile leg precompressed reach requirement, platform is leveled, guarantees tilt angle, then keeps one section of this state Time allows pile foundation to stablize.
It preferably,, can be in the platform close in advance when at by the platform towage to predetermined operation in the step 1 Position of the spud leg from seabed 1-2 meters is first transferred when being set at industry.
Preferably, in the step 2, the trim and angle of heel of the platform are respectively less than 0.5 °.
Preferably, in the step 3, the bottom surface of the platform is 0.8-1.2 meters with a distance from the water surface.
Preferably, in step a, b, increase the sustained load of each spud leg by 100- to spud leg load 200 tons, the sinking of the spud leg stable time is 8-12 minutes.
Preferably, in the step d, the tilt angle of the platform is less than 0.5 °.
The beneficial effects of the present invention are: piling standing is carried out to platform by this method, it can be pre- by the short period Ballast basis operation, so that during the foundation stress under platform leg shoe reaches lifting operation or stake during severe storm The maximum vertical load that leg shoe is born, to guarantee safety of the platform under normal operation or storm.The present invention uses Effect is good, use easy to spread.
Detailed description of the invention
Fig. 1 is the flow diagram of the piling standing method of jack-up unit of the invention.
Fig. 2 is the flow diagram of the precompressed support method of the piling standing method of jack-up unit of the invention.
Specific embodiment
With reference to the accompanying drawings and examples, specific embodiments of the present invention will be described in further detail.Implement below Example is not intended to limit the scope of the invention for illustrating the present invention.Based on the embodiments of the present invention, ordinary skill Personnel's every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
Please refer to attached drawing 1-2, a kind of piling standing method of jack-up unit of the present embodiment, comprising the following steps:
Step 1, at platform towage to predetermined operation, decentralization spud leg to mud face.Wherein, by the platform towage extremely When at predetermined operation, position of the spud leg from seabed 1-2 meters can be first transferred when the platform is close at predetermined operation.
Step 2 is acted the posture of adjustment platform using Single Pile, guarantees the trim and angle of heel of platform.Wherein, institute The trim and angle of heel for stating platform are respectively less than 0.5 °.
Step 3, start lifting device, platform is slowly lifted, when the bottom surface of platform from the water surface suitably with a distance from when stop Peaceful.Wherein, the bottom surface of the platform is 0.8-1.2 meters with a distance from the water surface.Preferably, the bottom surface of the platform is from the water surface Distance be 1 meter.
Step 4 observes each spud leg for a period of time, preferably, observing each spud leg and dipmeter 15 minutes.It determines described each Spud leg starts pre- ballast after stablizing.Wherein, pre- ballast the following steps are included:
A, two spud legs on one diagonal line are loaded by lifting device simultaneously, and observes the situation of two spud legs, if two Spud leg occurs to sink then to sink to stablizing to it and continues to be depressed into no sinking in advance after a certain period of time.Wherein, should make to spud leg load The sustained load of each spud leg increases 100-200 tons, and the sinking of the spud leg stable time is 8-12 minutes.Under preferably, Sedate fix time is 10 minutes.
B, the spud leg on another diagonal line is loaded by lifting device simultaneously, and observes the situation of two spud legs, if two Spud leg occurs to sink then to sink to stablizing to it and continues to be depressed into no sinking in advance after a certain period of time.Wherein, should make to spud leg load The sustained load of each spud leg increases 100-200 tons, and the sinking of the spud leg stable time is 8-12 minutes.Under preferably, Sedate fix time is 10 minutes.
C, successively two cornerwise spud legs are gradually loaded by turns, until the load of spud leg reaches the precompressed being calculated Load;
D, after four pile leg precompressed reach requirement, platform is leveled, guarantees tilt angle, then keeps one section of this state Time allows pile foundation to stablize.Preferably, the tilt angle of the platform is less than 0.5 °.
The piling standing method of jack-up unit based on above-mentioned technical characteristic can pass through the pre- ballast base of short period Plinth operation, so that during the foundation stress under platform leg shoe reaches lifting operation or spud leg shoe during severe storm The maximum vertical load born, to guarantee safety of the platform under normal operation or storm.Using effect of the present invention is good, Use easy to spread.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, without departing from the technical principles of the invention, several improvement and replacement can also be made, these are improved and replacement Also it should be regarded as protection scope of the present invention.

Claims (7)

1. a kind of piling standing method of jack-up unit, it is characterised in that: the following steps are included:
Step 1, at platform towage to predetermined operation, decentralization spud leg to mud face;
Step 2 is acted the posture of adjustment platform using Single Pile, guarantees the trim and angle of heel of platform;
Step 3, start lifting device, platform is slowly lifted, when the bottom surface of platform from the water surface suitably with a distance from when stop it is peaceful Platform;
Step 4 observes each spud leg for a period of time, determines and starts pre- ballast after each spud leg is stablized.
2. the piling standing method of jack-up unit as described in claim 1, it is characterised in that: in the step 4, precompressed Carry the following steps are included:
A, two spud legs on one diagonal line are loaded by lifting device simultaneously, and observes the situation of two spud legs, if two spud legs Occur to sink then to sink to stablizing to it and continues to be depressed into no sinking in advance after a certain period of time;
B, the spud leg on another diagonal line is loaded by lifting device simultaneously, and observes the situation of two spud legs, if two spud legs Occur to sink then to sink to stablizing to it and continues to be depressed into no sinking in advance after a certain period of time;
C, successively two cornerwise spud legs are gradually loaded by turns, until the load of spud leg reaches the pre- ballast being calculated Lotus;
D, after four pile leg precompressed reach requirement, platform is leveled, guarantees tilt angle, when then keeping one section of this state Between, allow pile foundation to stablize.
3. the piling standing method of jack-up unit as described in claim 1, it is characterised in that: in the step 1, inciting somebody to action When at the platform towage to predetermined operation, the spud leg can be first transferred when the platform is close at predetermined operation from seabed 1- 2 meters of position.
4. the piling standing method of jack-up unit as described in claim 1, it is characterised in that: described in the step 2 The trim and angle of heel of platform are respectively less than 0.5 °.
5. the piling standing method of jack-up unit as described in claim 1, it is characterised in that: described in the step 3 The bottom surface of platform is 0.8-1.2 meters with a distance from the water surface.
6. the piling standing method of jack-up unit as claimed in claim 2, it is characterised in that: in step a, b, give institute Stating spud leg load increases the sustained load of each spud leg by 100-200 tons, and the sinking of the spud leg stable time is 8- 12 minutes.
7. the piling standing method of jack-up unit as claimed in claim 2, it is characterised in that: described flat in the step d The tilt angle of platform is less than 0.5 °.
CN201811136175.XA 2018-09-28 2018-09-28 A kind of piling standing method of jack-up unit Pending CN109083117A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811136175.XA CN109083117A (en) 2018-09-28 2018-09-28 A kind of piling standing method of jack-up unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811136175.XA CN109083117A (en) 2018-09-28 2018-09-28 A kind of piling standing method of jack-up unit

Publications (1)

Publication Number Publication Date
CN109083117A true CN109083117A (en) 2018-12-25

Family

ID=64842633

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811136175.XA Pending CN109083117A (en) 2018-09-28 2018-09-28 A kind of piling standing method of jack-up unit

Country Status (1)

Country Link
CN (1) CN109083117A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201010891Y (en) * 2006-12-18 2008-01-23 中国海洋石油总公司 Self-elevating producing and oil-storing platform
CN102071690A (en) * 2010-12-08 2011-05-25 中国石油大学(北京) Offshore self-elevating drilling platform pile pitching and pile pulling automatic control device and method
CN107142918A (en) * 2017-04-06 2017-09-08 华电重工股份有限公司 The marine floading condition operational method of self-elevating work platform half
CN107268558A (en) * 2016-04-08 2017-10-20 中国国际海运集装箱(集团)股份有限公司 The precompressed piling method of four spud leg jack-up units

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201010891Y (en) * 2006-12-18 2008-01-23 中国海洋石油总公司 Self-elevating producing and oil-storing platform
CN102071690A (en) * 2010-12-08 2011-05-25 中国石油大学(北京) Offshore self-elevating drilling platform pile pitching and pile pulling automatic control device and method
CN107268558A (en) * 2016-04-08 2017-10-20 中国国际海运集装箱(集团)股份有限公司 The precompressed piling method of four spud leg jack-up units
CN107142918A (en) * 2017-04-06 2017-09-08 华电重工股份有限公司 The marine floading condition operational method of self-elevating work platform half

Similar Documents

Publication Publication Date Title
CN107142918B (en) Semi-floating operation method of offshore jack-up work platform
KR101646493B1 (en) Offshore wind power substructure and installation method for jacket type substructure thereof
CN105133558A (en) Deep-water bare rock platform and construction method thereof
CN108166523A (en) A kind of resistance to plucking suction barrel base and its installation method
CN205024689U (en) Waist rail and bored concrete pile connected node structure
CN101539118B (en) Passive antiscour base of basic structure of gravity-type offshore wind turbine
CN106021753A (en) Calculation method for anti-overturning stability of double-row piles supporting structure
CN204825949U (en) Marine fan basis connection structure of pipe posture of driving piles in advance
CN107386453B (en) High-rise House on stilts construction method
CN105804111B (en) A kind of Length discrepancy leg offshore wind farm jacket basis and its construction method
CN206365354U (en) A kind of single piling bar and single clump assembly type net cage anchor foundation
CN102912811B (en) Multi-base gravity type base structure
CN109083117A (en) A kind of piling standing method of jack-up unit
DK1848861T3 (en) System for stabilizing gravity-based offshore structures
CN204370429U (en) A kind of foundation pit earth pressure-controlled structure
Yang Application of comprehensive rectification method in rectification of buildings
CN202767102U (en) Combined type balance weight retaining wall
CN205046537U (en) Naked rock platform of deep water
CN106351226B (en) The anti-puncture precompressed support method of leveling ship
CN210459232U (en) Soil nailing wall supporting structure for pure sand area
CN109057295A (en) The manufacturing method of steel construction jacking system
CN208733657U (en) Underground open caisson
CN217439000U (en) Shear wall head structure
CN105401564B (en) Construction method for fixing tidal current energy power generation device to water bottom and tidal current energy power generation device
CN103015459A (en) Construction method for underwater baring platform steel cover box on storm surge river mouth

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181225