CN109004747A - Responsible consumer power failure Warning System and method based on power grid real-time status - Google Patents
Responsible consumer power failure Warning System and method based on power grid real-time status Download PDFInfo
- Publication number
- CN109004747A CN109004747A CN201810742988.7A CN201810742988A CN109004747A CN 109004747 A CN109004747 A CN 109004747A CN 201810742988 A CN201810742988 A CN 201810742988A CN 109004747 A CN109004747 A CN 109004747A
- Authority
- CN
- China
- Prior art keywords
- power
- responsible consumer
- information
- server
- warning
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 12
- 238000012544 monitoring process Methods 0.000 claims abstract description 44
- 238000004891 communication Methods 0.000 claims abstract description 11
- 230000005611 electricity Effects 0.000 claims description 11
- 230000009466 transformation Effects 0.000 claims description 4
- 230000010354 integration Effects 0.000 claims description 3
- 230000003993 interaction Effects 0.000 claims description 3
- 238000011156 evaluation Methods 0.000 claims description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000010276 construction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
Classifications
-
- H02J13/0006—
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00001—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the display of information or by user interaction, e.g. supervisory control and data acquisition systems [SCADA] or graphical user interfaces [GUI]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S40/00—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
- Y04S40/12—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
- Y04S40/128—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment involving the use of Internet protocol
Landscapes
- Engineering & Computer Science (AREA)
- Human Computer Interaction (AREA)
- Power Engineering (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The present invention provides a kind of responsible consumer power failure Warning System based on power grid real-time status, the power distribution network running state monitoring server communicated including distribution line monitor terminal, by communicating Intranet with distribution line monitor terminal;First interchanger, by the responsible consumer Risk-warning server group of the first interchanger and power distribution network running state monitoring server communication, second switch, and the background monitoring terminal communicated by second switch with responsible consumer Risk-warning server group;Responsible consumer Risk-warning server group includes Web Application Server and database server.Method for early warning includes route outlet switch status monitoring, judges whether route have a power failure, responsible consumer power failure risk graduation early warning on dead line.The present invention is able to achieve to the timely and effective early warning of responsible consumer power failure risk, solves the problems, such as easily to bring unnecessary loss to important power consumers because power grid enterprises lack effective means for responsible consumer power failure Risk-warning at present.
Description
Technical field
The present invention relates to electric power network monitoring technology fields, and in particular to a kind of responsible consumer based on power grid real-time status
Power failure Warning System and method for early warning.
Background technique
Responsible consumer is one of power grid enterprises emphasis service object, and the power-off event of responsible consumer once occurs, it will makes
At biggish economic loss and social influence.All kinds of construction of power grid enterprises, maintenance and distribution network failure can all bring important
The power failure hidden danger of user.
Currently, power grid enterprises lack effective means for responsible consumer power failure Risk-warning, responsible consumer is depended on
The mode for reporting or contacting power utility check person for repairment to Customer Service Center of power grid enterprises is passively handled, since power failure risk is pre-
Alert and discovery not in time, easily brings unnecessary loss to important power consumers because having a power failure.
Summary of the invention
The purpose of the present invention is: in view of the deficiencies of the prior art, provide a kind of responsible consumer based on power grid real-time status
Power failure Warning System and method are realized to the timely and effective early warning of important power consumers power failure risk, are solved at present because of power grid
Enterprise is aiming at the problem that responsible consumer power failure Risk-warning lacks effective means and easily brings unnecessary loss to important power consumers.
The technical scheme is that the responsible consumer power failure Risk-warning system of the invention based on power grid real-time status
System, matches including distribution line monitor terminal, by the communication Intranet of power grid enterprises with what above-mentioned distribution line monitor terminal communicated
Grid operation state server;It is structurally characterized in that: further include the first interchanger, by above-mentioned first interchanger with it is above-mentioned
The responsible consumer Risk-warning server group of power distribution network running state monitoring server communication, second switch, and by upper
State the background monitoring terminal that second switch is communicated with above-mentioned responsible consumer Risk-warning server group;Above-mentioned responsible consumer risk
Warning Service device group includes Web Application Server and database server, in which:
Distribution line monitor terminal, for monitor outlet switch on distribution line point/"on" position and electric current, voltage data with
And protection act information;
Power distribution network running state analysis server, the monitoring information of the outlet switch for receiving the upload of distribution line monitor terminal
Analyze and determine whether corresponding distribution line occurs power-off event;
Database server is built-in with power information database, responsible consumer information database, scheduled outage information database
And electric power safeguard manages database;Web Application Server is used for responsible consumer power failure Risk-warning;
Background monitoring terminal, for realizing human-computer interaction.
Further embodiment is: above-mentioned to be used to store equipment account information and files on each of customers number with power information database
Substation-route-distribution transforming-user the associated data constructed according to unified integration;Responsible consumer information database is for storing weight
Want User Profile information, the active/standby power information of responsible consumer and responsible consumer power supply change resume information, responsible consumer shelves
Case information includes the information such as Customs Assigned Number, user's name, electricity consumption address;Scheduled outage information database is for storing power grid enterprises
Scheduled outage information;Electric power safeguard management database is for storing power grid enterprises' electric power safeguard action message.
A kind of responsible consumer power failure Warning System by above-mentioned based on power grid real-time status implement based on power grid
The responsible consumer power failure method for prewarning risk of real-time status, comprising the following steps:
1. distribution line monitor terminal monitor corresponding outlet switch on distribution line point/"on" position and electric current, voltage data
And protection act information;And monitoring information is uploaded to distribution Running State prison by the communication Intranet of power grid enterprises in real time
Control server;
2. power distribution network running state monitoring server receives the monitoring information that distribution line monitor terminal uploads, corresponding supply is judged
Whether circuit occurs power-off event, if power-off event occurs, power distribution network running state monitoring server will include having a power failure to supply
Power-off event information including electric line is answered by the Web that the first interchanger is sent in responsible consumer Risk-warning server group
Use server;
3. Web Application Server receives the power-off event information that power distribution network running state monitoring server is sent, database is called
Scheduled outage information database in server inquires whether the affiliated route of current power-off event is to stop with the plan of period on the same day
Power information route, if so, determining current power-off event for scheduled outage;If it is not, then determining that current power-off event stops for failure
Electricity;
4. Web Application Server, which calls in database server, matches power information database, analyzes and record current power failure thing
All users that part influences;
5. Web Application Server calls the responsible consumer information database in database server, influenced in current power-off event
All users in filter out impacted responsible consumer;
6. Web Application Server calls the data of database server storage, it is divided into from high to low according to Risk-warning grade red
Color, yellow, orange and blue four grades, the Risk-warning grade currently having a power failure according to following rule evaluation responsible consumer:
It is when having a power failure there are any one power circuit state of the movable responsible consumer of electric power safeguard, Risk-warning grade is red
Color;Any power circuit of the responsible consumer of unregulated power Support activity is there are when scheduled outage or fault outage, Risk-warning grade
It is orange;There are any power circuits of the movable responsible consumer of electric power safeguard to stop with the route same day any under substation in the presence of plan
When electricity or fault outage, Risk-warning grade is yellow;The same power transformation of any power circuit of the responsible consumer of unregulated power Support activity
Any route stand down there are when scheduled outage or fault outage, Risk-warning grade is yellow;
7. Web Application Server monitors the page to backstage monitor terminal push responsible consumer power failure Risk-warning, monitor on the page
Display responsible consumer list is distinguished according to red, orange, yellow, blue background color;Responsible consumer list display information includes warning grade, user
Number, user's name, electricity consumption address, electric power safeguard activity name, power information.
The present invention has the effect of positive: (1) using the responsible consumer power failure wind of the invention based on power grid real-time status
Dangerous early warning system and method can effectively realize the timely monitoring to power network line power-off event and to being affected by power failure in range
Responsible consumer timely had a power failure automatically Risk-warning, can preferably solve power grid enterprises and have a power failure master for responsible consumer
Relying on artificial reporting schemes leads to responsible consumer Risk-warning low efficiency, brings asking for unnecessary loss to important power consumers
Topic.(2) the responsible consumer power failure Warning System of the invention based on power grid real-time status mainly relies on power grid enterprises existing
Some hardware device components form, and cost of implementation is lower, and implementation method for early warning is simple and reliable, strong applicability.
Detailed description of the invention
Fig. 1 is system structure schematic block diagram of the invention;
Fig. 2 is flow chart of the method for the present invention.
Specific embodiment
The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.
(embodiment 1)
See Fig. 1, the responsible consumer power failure Warning System based on power grid real-time status of the present embodiment, mainly by distribution wire
Road monitor terminal, the communication Intranet of power grid enterprises, power distribution network running state monitoring server, the first interchanger, responsible consumer wind
Dangerous Warning Service device group, second switch and background monitoring terminal composition;Responsible consumer Risk-warning server group includes Web
Application server and database server.
Distribution line monitor terminal is respectively set at each outlet switch of distribution line, for monitoring phase on distribution line
Answer outlet switch point/"on" position and electric current, voltage data and protection act information;Distribution line monitor terminal passes through logical
Believe Intranet and power distribution network running state monitoring server communication, and monitoring information is uploaded to power distribution network running state monitoring service
Device.
Power distribution network running state analysis server, the prison of each outlet switch for receiving the upload of distribution line monitor terminal
Information is controlled, and analyzes and determines whether corresponding distribution line occurs power-off event according to monitoring information, if judging a certain route hair
Raw power-off event, then power-off event information is sent to the monitoring of responsible consumer Risk-warning by power distribution network running state analysis server
Server group;Power distribution network running state analysis server is logical by the first interchanger and responsible consumer Risk-warning server group
Letter.
Aforementioned distribution line monitor terminal and power distribution network running state monitoring server are the prior art.
Database server in responsible consumer Risk-warning server group is built-in with power information database, important
User Information Database, scheduled outage information database and electric power safeguard manage database, wherein match power information database
Equipment account information is associated with substation-route-distribution transforming-user that subscriber profile data unified integration constructs for storing
Data;Responsible consumer information database is for storing responsible consumer archive information, the active/standby power information of responsible consumer and again
User's power supply is wanted to change resume information, responsible consumer archive information includes the information such as Customs Assigned Number, user's name, electricity consumption address;
Scheduled outage information database is for storing power grid enterprises' scheduled outage information;Electric power safeguard management database is for storing power grid
Enterprise's electric power safeguard action message.
Web Application Server in responsible consumer Risk-warning server group is used for responsible consumer power failure Risk-warning.
Web Application Server receives the power-off event information that power distribution network running state analysis server is sent, and influences on power-off event
Responsible consumer and its risk class carry out analysis and assessment, accordingly issue to there are the responsible consumers of risk according to risk class red
Color, yellow, orange and blue early warning.
Background monitoring terminal shows the responsible consumer Risk-warning of Web Application Server push for realizing human-computer interaction
Information;The relevant informations such as typing responsible consumer, electric power safeguard, scheduled outage into database server.Background monitoring terminal is logical
Second switch is crossed to communicate with responsible consumer Risk-warning server group.
The responsible consumer power failure method for prewarning risk based on power grid real-time status of the present embodiment, mainly by following steps reality
It applies:
1. on each distribution line monitor terminal monitoring distribution line corresponding outlet switch point/"on" position and electric current, voltage number
Accordingly and protection act information;And monitoring information is uploaded to distribution Running State by the communication Intranet of power grid enterprises in real time
Monitoring server;
2. power distribution network running state monitoring server receives the monitoring information that each distribution line monitor terminal uploads, judgement is corresponding
Whether power supply circuit occurs power-off event, if power-off event occurs, power distribution network running state monitoring server will include having a power failure
Power-off event information including power supply line is sent to the Web in responsible consumer Risk-warning server group by the first interchanger
Application server.In this step, power distribution network running state monitoring server mainly judges according to outlet switch gate-dividing state corresponding
Power supply line has a power failure;
3. Web Application Server receives the power-off event information that power distribution network running state monitoring server is sent, database is called
Scheduled outage information database in server inquires whether the affiliated route of current power-off event is to stop with the plan of period on the same day
Power information route, if so, determining current power-off event for scheduled outage;If it is not, then determining that current power-off event stops for failure
Electricity;
4. Web Application Server, which calls in database server, matches power information database, analyzes and record current power failure thing
All users that part influences;
5. Web Application Server calls the responsible consumer information database in database server, influenced in current power-off event
All users in filter out impacted responsible consumer;
6. Web Application Server calls the data of database server storage, the Risk-warning that assessment responsible consumer currently has a power failure
Grade, Risk-warning grade are divided into red, yellow, orange and blue four grades from high to low;Wherein, there are electric power safeguards
Any one power circuit state of movable responsible consumer is when having a power failure, and Risk-warning grade is red;Unregulated power Support activity
Any power circuit of responsible consumer there are when scheduled outage or fault outage, Risk-warning grade is orange;There are electric power guarantors
Hinder any power circuit of movable responsible consumer on the day of route any under substation there are when scheduled outage or fault outage, wind
Dangerous warning grade is yellow;Any power circuit of the responsible consumer of unregulated power Support activity exists with route any under substation to be counted
When drawing power failure or fault outage, Risk-warning grade is yellow;
7. Web Application Server monitors the page to backstage monitor terminal push responsible consumer power failure Risk-warning, monitor on the page
Display responsible consumer list is distinguished according to red, orange, yellow, blue background color;Responsible consumer list display information includes warning grade, user
Number, user's name, electricity consumption address, electric power safeguard activity name, power information.
Above embodiments are the explanations to a specific embodiment of the invention, rather than limitation of the present invention, related technology
The technical staff in field without departing from the spirit and scope of the present invention, can also make various transformation and variation and obtain
To corresponding equivalent technical solution, therefore all equivalent technical solutions should be included into patent protection model of the invention
It encloses.
Claims (3)
1. a kind of responsible consumer power failure Warning System based on power grid real-time status, including it is distribution line monitor terminal, logical
Cross the power distribution network running state monitoring server that the communication Intranet of power grid enterprises is communicated with the distribution line monitor terminal;It is special
Sign is: further including the first interchanger, passes through first interchanger and the power distribution network running state monitoring server communication
Responsible consumer Risk-warning server group, second switch, and pass through the second switch and the responsible consumer wind
The background monitoring terminal of dangerous Warning Service device group communication;The responsible consumer Risk-warning server group includes Web application service
Device and database server, in which:
Distribution line monitor terminal, for monitor outlet switch on distribution line point/"on" position and electric current, voltage data with
And protection act information;
Power distribution network running state analysis server, the monitoring information of the outlet switch for receiving the upload of distribution line monitor terminal
Analyze and determine whether corresponding distribution line occurs power-off event;
Database server is built-in with power information database, responsible consumer information database, scheduled outage information database
And electric power safeguard manages database;Web Application Server is used for responsible consumer power failure Risk-warning;
Background monitoring terminal, for realizing human-computer interaction.
2. the responsible consumer power failure Warning System according to claim 1 based on power grid real-time status, feature exist
In: it is described to be used to store by the power transformation of equipment account information and subscriber profile data unified integration building with power information database
It stands-route-distribution transforming-user associated data;Responsible consumer information database is for storing responsible consumer archive information, important use
The active/standby power information and responsible consumer power supply at family change resume information, and responsible consumer archive information includes Customs Assigned Number, uses
The information such as name in an account book claims, electricity consumption address;Scheduled outage information database is for storing power grid enterprises' scheduled outage information;Electric power safeguard
Management database is for storing power grid enterprises' electric power safeguard action message.
3. a kind of responsible consumer power failure Warning System by of any of claims 1 or 2 based on power grid real-time status is implemented
The responsible consumer power failure method for prewarning risk based on power grid real-time status, it is characterised in that: the following steps are included:
1. distribution line monitor terminal monitor corresponding outlet switch on distribution line point/"on" position and electric current, voltage data
And protection act information;And monitoring information is uploaded to distribution Running State prison by the communication Intranet of power grid enterprises in real time
Control server;
2. power distribution network running state monitoring server receives the monitoring information that distribution line monitor terminal uploads, corresponding supply is judged
Whether circuit occurs power-off event, if power-off event occurs, power distribution network running state monitoring server will include having a power failure to supply
Power-off event information including electric line is answered by the Web that the first interchanger is sent in responsible consumer Risk-warning server group
Use server;
3. Web Application Server receives the power-off event information that power distribution network running state monitoring server is sent, database is called
Scheduled outage information database in server inquires whether the affiliated route of current power-off event is to stop with the plan of period on the same day
Power information route, if so, determining current power-off event for scheduled outage;If it is not, then determining that current power-off event stops for failure
Electricity;
4. Web Application Server, which calls in database server, matches power information database, analyzes and record current power failure thing
All users that part influences;
5. Web Application Server calls the responsible consumer information database in database server, influenced in current power-off event
All users in filter out impacted responsible consumer;
6. Web Application Server calls the data of database server storage, it is divided into from high to low according to Risk-warning grade red
Color, yellow, orange and blue four grades, the Risk-warning grade currently having a power failure according to following rule evaluation responsible consumer:
It is when having a power failure there are any one power circuit state of the movable responsible consumer of electric power safeguard, Risk-warning grade is red
Color;Any power circuit of the responsible consumer of unregulated power Support activity is there are when scheduled outage or fault outage, Risk-warning grade
It is orange;There are any power circuits of the movable responsible consumer of electric power safeguard to stop with the route same day any under substation in the presence of plan
When electricity or fault outage, Risk-warning grade is yellow;The same power transformation of any power circuit of the responsible consumer of unregulated power Support activity
Any route stand down there are when scheduled outage or fault outage, Risk-warning grade is yellow;
7. Web Application Server monitors the page to backstage monitor terminal push responsible consumer power failure Risk-warning, monitor on the page
Display responsible consumer list is distinguished according to red, orange, yellow, blue background color;Responsible consumer list display information includes warning grade, user
Number, user's name, electricity consumption address, electric power safeguard activity name, power information.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810742988.7A CN109004747A (en) | 2018-07-09 | 2018-07-09 | Responsible consumer power failure Warning System and method based on power grid real-time status |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810742988.7A CN109004747A (en) | 2018-07-09 | 2018-07-09 | Responsible consumer power failure Warning System and method based on power grid real-time status |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109004747A true CN109004747A (en) | 2018-12-14 |
Family
ID=64599066
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810742988.7A Pending CN109004747A (en) | 2018-07-09 | 2018-07-09 | Responsible consumer power failure Warning System and method based on power grid real-time status |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109004747A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110400207A (en) * | 2019-07-31 | 2019-11-01 | 华北电力大学(保定) | A kind of financial On-line monitor system and method based on big data |
CN112308246A (en) * | 2020-10-27 | 2021-02-02 | 广东电网有限责任公司 | Power failure notification method and system |
CN115589070A (en) * | 2022-11-11 | 2023-01-10 | 贵州电网有限责任公司 | Power grid risk early warning method and system based on cloud computing processing |
CN116011827A (en) * | 2023-03-23 | 2023-04-25 | 北京科东电力控制系统有限责任公司 | Power failure monitoring analysis and early warning system and method for key cells |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103065270A (en) * | 2013-01-05 | 2013-04-24 | 深圳供电局有限公司 | Visual monitored control system is salvageed to electric wire netting trouble |
CN103093395A (en) * | 2013-01-21 | 2013-05-08 | 广东电网公司东莞供电局 | Method and equipment of blackout monitoring service dispatching |
CN105868940A (en) * | 2016-06-01 | 2016-08-17 | 黄绍华 | Grid fault information issuing and processing system |
JP2017103967A (en) * | 2015-12-04 | 2017-06-08 | 中国電力株式会社 | Power system operation system and power system operation method |
CN107171438A (en) * | 2017-05-18 | 2017-09-15 | 中国南方电网有限责任公司 | A kind of net level matches somebody with somebody electricity consumption monitoring and management system |
-
2018
- 2018-07-09 CN CN201810742988.7A patent/CN109004747A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103065270A (en) * | 2013-01-05 | 2013-04-24 | 深圳供电局有限公司 | Visual monitored control system is salvageed to electric wire netting trouble |
CN103093395A (en) * | 2013-01-21 | 2013-05-08 | 广东电网公司东莞供电局 | Method and equipment of blackout monitoring service dispatching |
JP2017103967A (en) * | 2015-12-04 | 2017-06-08 | 中国電力株式会社 | Power system operation system and power system operation method |
CN105868940A (en) * | 2016-06-01 | 2016-08-17 | 黄绍华 | Grid fault information issuing and processing system |
CN107171438A (en) * | 2017-05-18 | 2017-09-15 | 中国南方电网有限责任公司 | A kind of net level matches somebody with somebody electricity consumption monitoring and management system |
Non-Patent Citations (1)
Title |
---|
陈艺云等: "停电风险预警服务在供电服务中的应用", 《大众用电》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110400207A (en) * | 2019-07-31 | 2019-11-01 | 华北电力大学(保定) | A kind of financial On-line monitor system and method based on big data |
CN112308246A (en) * | 2020-10-27 | 2021-02-02 | 广东电网有限责任公司 | Power failure notification method and system |
CN115589070A (en) * | 2022-11-11 | 2023-01-10 | 贵州电网有限责任公司 | Power grid risk early warning method and system based on cloud computing processing |
CN116011827A (en) * | 2023-03-23 | 2023-04-25 | 北京科东电力控制系统有限责任公司 | Power failure monitoring analysis and early warning system and method for key cells |
CN116011827B (en) * | 2023-03-23 | 2023-12-22 | 北京科东电力控制系统有限责任公司 | Power failure monitoring analysis and early warning system and method for key cells |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107909295B (en) | Power failure information monitoring and analyzing system | |
CN109004747A (en) | Responsible consumer power failure Warning System and method based on power grid real-time status | |
CN103065270B (en) | Visual monitored control system is salvageed to electric wire netting trouble | |
CN103944265B (en) | A kind of interactive intelligent adapted electric energy monitoring device and method | |
CN106357414B (en) | Information interacting method and system for base station electric generation management | |
CN104810923A (en) | Intelligent power distribution and use integrated terminal based on IEC61850 stipulation | |
CN111478972B (en) | Integrated remote monitoring background management system and monitoring method | |
CN109345786A (en) | A kind of non-resident user power utilization abnormal conditions automatic alarm system of low pressure | |
CN109255554A (en) | A kind of low pressure matches electricity consumption monitoring and management system | |
CN202083724U (en) | Intelligent meter box | |
CN109613363A (en) | A kind of power distribution network grid side and user side electric energy quality monitoring and management method | |
CN107272532A (en) | A kind of electric self-service terminal method for visually monitoring and platform | |
CN111967658A (en) | Comprehensive power failure analysis method based on marketing and distribution information integration platform | |
CN112016813A (en) | Method for monitoring power supply and utilization service state of directional important power customer | |
CN112165398A (en) | System based on 5G wisdom lamp pole is measurement along separate routes | |
CN103607425B (en) | Intelligent electricity consumption service method based on UC technology | |
CN105932770A (en) | Intelligent electric meter box | |
CN207764802U (en) | A kind of power distribution network synthesis data buffering system hardware platform | |
CN112598257A (en) | Power failure analysis method and system based on big data feature mining | |
Mak | A synergistic approach to implement demand response, asset management and service reliability using smart metering, AMI and MDM systems | |
CN103296756A (en) | Managing and monitoring system for transformer substation | |
CN111489072A (en) | Big data management and analysis system based on city management | |
CN110634083A (en) | High-efficient safe distribution network electric energy operation system | |
CN113256178B (en) | Distribution network operation mode rationality evaluation method and system | |
CN205583848U (en) | Intelligent ammeter cabinet |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181214 |
|
RJ01 | Rejection of invention patent application after publication |