CN108952242A - A kind of construction method of indoor coal storage yard arch-shaped space truss - Google Patents

A kind of construction method of indoor coal storage yard arch-shaped space truss Download PDF

Info

Publication number
CN108952242A
CN108952242A CN201810912336.3A CN201810912336A CN108952242A CN 108952242 A CN108952242 A CN 108952242A CN 201810912336 A CN201810912336 A CN 201810912336A CN 108952242 A CN108952242 A CN 108952242A
Authority
CN
China
Prior art keywords
rack
installation
net
construction
starting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810912336.3A
Other languages
Chinese (zh)
Inventor
鲁廷和
李钟�
罗婕莹
朱律键
章浙黔
谢祁峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guizhou Electric Power Engineering Co Ltd
Original Assignee
PowerChina Guizhou Electric Power Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guizhou Electric Power Engineering Co Ltd filed Critical PowerChina Guizhou Electric Power Engineering Co Ltd
Priority to CN201810912336.3A priority Critical patent/CN108952242A/en
Publication of CN108952242A publication Critical patent/CN108952242A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H5/00Buildings or groups of buildings for industrial or agricultural purposes
    • E04H5/02Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of construction method of indoor coal storage yard arch-shaped space truss, the step of construction are as follows: one, preparation of construction;Two, unwrapping wire positioning and inspection;Three, installation starting rack;Four, net-shell net-rack is installed;Five, it checks and accepts;In the step 3 and step 4, alternately size adjusting and the bolt fastening work of rack, in the step 3, the erection sequence for rack of starting to walk are as follows: lower edge ball positions → assembling lower boom →, and ball positioning → web member is installed → of winding up assembles top boom → fastening → correction → examination.By using the construction method of starting rack and net-shell net-rack segmentation installation, construction efficiency can be greatly improved, reduce crane uses machine-team amount and cost of labor, while also assuring the installation quality of rack, construction cost is saved for enterprise, achieves good using effect.

Description

A kind of construction method of indoor coal storage yard arch-shaped space truss
Technical field
The present invention relates to a kind of indoor coal storage yard of boiler more particularly to a kind of construction method of boiler indoor coal storage yard arch-shaped space truss, Belong to boiler plant technical field.
Background technique
Boiler is widely used in thermo-power station engineering, plays coal combustion generating high steam, then pass through steam drive vapour Turbine power generation, be one of the energy of weight in national product, existing boiler, which is all matched, is arranged with indoor coal storage yard, due to coal consumption compared with Greatly, indoor coal storage yard roof generally uses grid structure, when carrying out rack installation, especially for large-scale arch-shaped space truss, if It is using traditional process in bulk, the problem is that crane is big using machine-team amount, installation period is longer, it is not easy to guarantee installation Quality, this is live problem to be solved.
Summary of the invention
The technical problem to be solved by the present invention is a kind of construction method of indoor coal storage yard arch-shaped space truss is provided, using this method It constructs, construction and installation efficiency can be greatly improved, reduce the machine-team usage amount of crane, while ensure that the matter of installation Amount, the above-mentioned problem of effective solution.
The technical solution of the present invention is as follows: a kind of construction method of indoor coal storage yard arch-shaped space truss, the step of construction are as follows: one, construction Prepare;Two, unwrapping wire positioning and inspection;Three, installation starting rack;Four, net-shell net-rack is installed;Five, it checks and accepts;The step 3 and step In rapid four, alternately the size adjusting and bolt fastening of rack work, in the step 3, the erection sequence for rack of starting to walk Are as follows: lower edge ball positions → assembling lower boom →, and ball positioning → web member is installed → of winding up assembles top boom → fastening → and corrects → test It receives.
In the step 2, the relative elevation of rack embedded board on civil engineering bearing surface is all measured and is marked by application level instrument Show at corresponding position, checks whether absolute altitude, the in-plane displancement of checking axial dimension and built-in fitting meet design and exhale wanting for paper It asks.
In the step 3, the installation method for rack of starting to walk are as follows: starting rack is pacified using truck crane Assembly in pieces at height Dress carries out, installation 3 to 4 when installation since a grid close to rack end ground installation barrel shell is at the support After the rack of a lower boom, one end of rack is at this moment sling using truck crane, lower edge grid is installed, lower edge grid is after the installation is completed Loose suspension hook, then install the grid that winds up, and so on until installation completely across rack, it is in place then to carry out support.
In the step 4, the installation method of net-shell net-rack are as follows: Method for Installation is overhang using smallest assembled rigid unit, i.e., is passed from bottom to top The erection sequence closed up into, ecto-entad, erection sequence are as follows: one, latticed shell structure first lap is installed the first Pin rack and is installed Afterwards, then the absolute altitude of corresponding rack is cooperated to be determined the radian of rack, ingredient, then spells tripod on the ground, pushes away triangle Frame carries out rack junior unit assembly with crane;Two, an overall model is formed after first lap rack installs, and crane is moved to down A installation site installed corresponding ball button bar part until support position is installed to centre by last mounted rack, is formed Certain rigidity, other installation methods are same and so on, subsequent installation, it is necessary to rely on the rack of closure, two survey grid framves carry out It is symmetrically installed, closes up in centre.
The beneficial effects of the present invention are: compared with prior art, using technical solution of the present invention, by using starting net The construction method of frame and net-shell net-rack segmentation installation, can greatly improve construction efficiency, and reduce crane uses machine-team Amount and cost of labor, while also assuring the installation quality of rack, construction cost is saved for enterprise, achieves good use Effect.
Detailed description of the invention
Fig. 1 is present invention starting network frame hoisting schematic diagram one;
Fig. 2 is present invention starting network frame hoisting schematic diagram two;
Fig. 3 is present invention starting network frame hoisting schematic diagram three.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, below with reference to this specification attached drawing to this hair It is bright to be described in further detail.
Embodiment 1: as shown in attached drawing 1~3, the step of a kind of construction method of indoor coal storage yard arch-shaped space truss, construction are as follows: one, Preparation of construction;Two, unwrapping wire positioning and inspection;Three, installation starting rack;Four, net-shell net-rack is installed;Five, it checks and accepts;The step 3 In step 4, alternately the size adjusting and bolt fastening of rack work, and in the step 3, the installation for rack of starting to walk is suitable Sequence are as follows: lower edge ball positions → assembling lower boom →, and ball positioning → web member is installed → of winding up assembles top boom → fastening → and corrects → test It receives.
In the step 2, the relative elevation of rack embedded board on civil engineering bearing surface is all measured and is marked by application level instrument Show at corresponding position, checks whether absolute altitude, the in-plane displancement of checking axial dimension and built-in fitting meet design and exhale wanting for paper It asks.
In the step 3, the installation method for rack of starting to walk are as follows: starting rack is pacified using truck crane Assembly in pieces at height Dress carries out, installation 3 to 4 when installation since a grid close to rack end ground installation barrel shell is at the support After the rack of a lower boom, one end of rack is at this moment sling using truck crane, lower edge grid is installed, lower edge grid is after the installation is completed Loose suspension hook, then install the grid that winds up, and so on until installation completely across rack, it is in place then to carry out support.
In the step 4, the installation method of net-shell net-rack are as follows: Method for Installation is overhang using smallest assembled rigid unit, i.e., is passed from bottom to top The erection sequence closed up into, ecto-entad, erection sequence are as follows: one, latticed shell structure first lap is installed the first Pin rack and is installed Afterwards, then the absolute altitude of corresponding rack is cooperated to be determined the radian of rack, ingredient, then spells tripod on the ground, pushes away triangle Frame carries out rack junior unit assembly with crane;Two, an overall model is formed after first lap rack installs, and crane is moved to down A installation site installed corresponding ball button bar part until support position is installed to centre by last mounted rack, is formed Certain rigidity, other installation methods are same and so on, subsequent installation, it is necessary to rely on the rack of closure, two survey grid framves carry out It is symmetrically installed, closes up in centre.
In the present embodiment, this engineering is situation are as follows: indoor coal storage yard arch-shaped space truss project subject is just putting quadrangular pyramid bolt ball-joint Point rack, structural shape use three-core cylinder frame.Roofing uses the zinc-plated profiled sheet of colored monolayer.Rack span is 70 meters, long 60 meters of degree.Wind up supporting form, is connected by winding up ball and rest with the built-in fitting in concrete column cushion cap.Building enclosure is by purlin Item and the zinc-plated profiled sheet composition of colored monolayer.The project installation time is short, the duration is tight, on-site consolidation amount is big, installation accuracy is wanted It asks height, installation exercise radius big, therefore specially formulates the design of this construction operation, need carefully to organize in construction, careful arrangement, with Guarantee to complete installation task by matter on time.
Since this engineering construction figure is camber rack.The characteristics of belonging to special-shaped reticulated shell for this engineering, my company project Portion personnel are conscientious, meticulously study drawing after, in conjunction with previous installation similar engineering successful experience abundant, propose " span side It installs to rack method in bulk is unidirectionally carried out from B axle to A axis up to one stable structural unit of formation, then big portion are matched using crane Ball node is in the best construction of hinged state at B axle support in conjunction Assembly in pieces at height installation " starting Construction of The Grids operation process Technical solution.This scheme rack installation fast speed, for starting Construction of The Grids personnel all in Ground Operation, safety coefficient is high, It is widely used in multiple engineerings.
In the present embodiment, the preparation of step 1 has:
1. grid structure with bolt-sphere joints installation is using unidirectional in bulk to whole across rock-steady structure system is formed from B axle to A axis on ground, so Crane cooperation carries out the construction method of high altitude bulk afterwards, it is desirable that and place is neat, smooth solid, guarantees that large-scale crane lifts by crane demand, To guarantee that, in rainy season normal construction, place should have reliable drainage measure.
It is indicated in 2. civil engineering unit application level instrument all measures the relative elevation of rack embedded board on civil engineering bearing surface At the corresponding position of plane drawing, and this datagram is supplied to project supervision and rack installation engineer, as installation and it is right The foundation that each supporting-point repetition measurement is checked and accepted.
3. go into operation Qian Xu establishment officer prospecting scene, whether absolute altitude, the in-plane displancement for checking axial dimension and built-in fitting are accorded with Close design requirement.
In the present embodiment, the installation method of net-shell net-rack are as follows: the determining arrangement and method for construction of latticed shell structure installation is that small spelling is single Member overhanging Method for Installation, i.e., the erection sequence that progressive, ecto-entad closes up from bottom to top belong to interior expansion method construction, and erection sequence is such as Under: step 1: after latticed shell structure first lap the first Pin rack of installation installs, then the absolute altitude of corresponding rack is cooperated to be determined The radian of rack, ingredient, then spells tripod on the ground, pushes away tripod with crane and carries out rack junior unit assembly.
The net rack support for first putting moulding bed position well, the corresponding chord member of connection and web member after measurement is accurate.
Rack starting installation, is assumed unified command of by team leader, and team member finds support accurately, installs corresponding ball and rod piece, unit of starting to walk Net is at rear, and tissue will be tightened in place from self-test, bolt-connection position is surveyed in time, the stringent adjustment for carrying out rack position, it is desirable that net The offset of frame support is strict controlled in allowable error.
During Construction of The Grids, the working method of tripod is spelled are as follows:
The ball and rod piece at this are first prepared, a team member finds ball position accurately, docks two web members respectively, is twisted with spanner or pipe wrench Sleeve bolt, then has a team member to embrace a top boom (towards the thick end of the scroll) again, and bolt is directed at corresponding ball rapidly by another team member Hole is tightened this top boom in place with spanner or pipe wrench, and in rundown process, web member team member shakes rod piece, so that rod piece and ball It tightens completely in place.This refills another top boom (wing), finds ball accurately, tighten bolt in place after hours.
Spell the working method of tripod:
For two team members at the node that winds up, two team members find ball corresponding with rod piece accurately, by rod piece at lower edge node respectively Bolt between ball is tightened rapidly in place, and four team members work at the same time, and should skillfully be cooperated between each other, finally by two team members Load chord member and lower edge ball.
Step 2: forming an overall model after first lap rack installs, crane is moved into next installation site, is relied on Last mounted rack, until support position is installed to centre., corresponding ball button bar part is installed, certain rigidity is formed, is constructed Tissue will be tightened in place from self-test, bolt-connection position is surveyed in time in the process, the stringent adjustment for carrying out rack position, it is desirable that rack Support offset is strict controlled in allowable error.Other installation methods are same and so on.
In the present embodiment, big portion is had using the main points that crane is coupled construction method:
After first lap rack closes up, rack partially forms entirety, force request is able to satisfy, after related personnel inspects for acceptance Support is fixed temporarily, and is started subsequent rack and is successively closed up installation;Subsequent installation, it is necessary to the rack of closure is relied on, because closure Rack size and absolute altitude and stress reach design requirement, and two survey grid framves are symmetrically installed, are closed up in centre, peace subsequent in this way The rack size closed up and absolute altitude are filled on the basis of foundation ring, ensure that the quality of rack.Steel is hung on mounted rack to climb Ladder, in order to which operating personnel facilitates arrival work surface;Junior unit is sling by crane (or small suspender), is slowly promoted to, when docking Bolt is directed at corresponding ball rapidly, is tightened this rod piece in place with spanner or pipe wrench, in rundown process, web member team member shakes Lever part, so that rod piece and ball are tightened in place completely;Erection sequence are as follows: after the completion of starting region rack installation is closed up, rack peace Zhuan Liangge group hoists installation from both ends lower, closes up on top, and erection sequence is to promote to one end, returns again after installation to the end Back towards other end installation.
In the present embodiment, adjustment and firm work have:
(1) measurement checks the quality of rack at any time when rack is installed.It checks lower edge size of mesh opening and diagonal line, checks the grid that winds up Size and with linea angulata, checks rack longitudinal length, lateral length, grid rise.It can also be adjusted before each interim fulcrum is not removed.
(2) rack entirety amount of deflection is adjusted, deflection value can be controlled by winding up with the adjustment of lower chord size.
(3) rack during the installation process should each interim fulcrum check at any time sinking situation, if any decline situation, in time plus Gu preventing falling phenomenon.
(4) after rack inspection, adjustment, rack high-strength bolt is re-secured.
(5) after the fastening of rack high-strength bolt, the positioning stove bolt on sleeve is tightened into locking.
(6) rest is installed: according to drawing requirement, in-site installation being carried out to rest after measurement, the gradient is found out, to install room Panel material.
In the present embodiment, due to using above-mentioned construction method, compared with traditional method in bulk, (specification is crane 20 tons) drop to 17 machine-teams from 25 original machine-teams using machine-team amount, general work drops to 156 from original 252, And installation period then dropped to 8 days from original 12 days, substantially increased installation effectiveness, while the installation quality also guaranteed, took Obtained significant effect.
Place is not described in detail by the present invention, is the well-known technique of those skilled in the art of the present technique.Finally, it is stated that the above reality It applies example to be only used to illustrate the technical scheme of the present invention and not to limit it, although having carried out specifically the present invention referring to preferred embodiment It is bright, those skilled in the art should understand that, can with modification or equivalent replacement of the technical solution of the present invention are made, and The objective and range for not departing from technical solution of the present invention, are intended to be within the scope of the claims of the invention.

Claims (4)

1. a kind of construction method of indoor coal storage yard arch-shaped space truss, it is characterised in that: the step of construction are as follows: one, preparation of construction;Two, it puts Line positioning and inspection;Three, installation starting rack;Four, net-shell net-rack is installed;Five, it checks and accepts;In the step 3 and step 4, hand over It works for the size adjusting and bolt fastening for carrying out rack, in the step 3, the erection sequence for rack of starting to walk are as follows: lower edge ball is fixed Position → assembling lower boom → ball positioning → web member is installed → of winding up assembles top boom → fastening → correction → examination.
2. a kind of construction method of indoor coal storage yard arch-shaped space truss according to claim 1, it is characterised in that: the step 2 In, the relative elevation of rack embedded board on civil engineering bearing surface is all measured and is indicated at corresponding position by application level instrument, Check whether absolute altitude, the in-plane displancement of review axial dimension and built-in fitting meet the requirement that paper is exhaled in design.
3. a kind of construction method of indoor coal storage yard arch-shaped space truss according to claim 1, it is characterised in that: the step 3 In, the installation method for rack of starting to walk are as follows: starting rack is installed using truck crane Assembly in pieces at height, from close to rack when installation One grid of end starts, and carries out ground installation barrel shell is at the support, after the rack for installing 3 to 4 lower booms, this When one end of rack is sling using truck crane, lower edge grid is installed, lower edge grid loose suspension hook after the installation is completed, then install the net that winds up Lattice, and so on until installation completely across rack, then carry out support it is in place.
4. a kind of construction method of indoor coal storage yard arch-shaped space truss according to claim 1, it is characterised in that: the step 4 In, the installation method of net-shell net-rack are as follows: Method for Installation is overhang using smallest assembled rigid unit, i.e., progressive, ecto-entad closes up from bottom to top Erection sequence, erection sequence are as follows: one, after the first Pin rack of latticed shell structure first lap installation installs, then cooperating corresponding net The absolute altitude of frame is determined the radian of rack, on the ground ingredient, then spells tripod, and pushing away tripod, with crane to carry out rack small Unit splicing;Two, overall model is formed after first lap rack installs, and crane is moved into next installation site, in dependence A mounted rack installs corresponding ball button bar part, forms certain rigidity until support position is installed to centre, other peaces Dress method is same and so on, subsequent installation, it is necessary to rely on the rack of closure, two survey grid framves are symmetrically installed, and are closed in centre Hold together.
CN201810912336.3A 2018-08-11 2018-08-11 A kind of construction method of indoor coal storage yard arch-shaped space truss Pending CN108952242A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810912336.3A CN108952242A (en) 2018-08-11 2018-08-11 A kind of construction method of indoor coal storage yard arch-shaped space truss

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810912336.3A CN108952242A (en) 2018-08-11 2018-08-11 A kind of construction method of indoor coal storage yard arch-shaped space truss

Publications (1)

Publication Number Publication Date
CN108952242A true CN108952242A (en) 2018-12-07

Family

ID=64469409

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810912336.3A Pending CN108952242A (en) 2018-08-11 2018-08-11 A kind of construction method of indoor coal storage yard arch-shaped space truss

Country Status (1)

Country Link
CN (1) CN108952242A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110185188A (en) * 2019-06-04 2019-08-30 中国十九冶集团有限公司 Large-span reticulated shell installation method
CN112359975A (en) * 2020-11-05 2021-02-12 中国十九冶集团有限公司 Installation method for preventing latticed shell from laterally moving
CN112431422A (en) * 2020-10-29 2021-03-02 上海宝冶冶金工程有限公司 Large-span net rack installation method
CN112627356A (en) * 2020-12-22 2021-04-09 中国二十冶集团有限公司 Installation method of arched net rack
CN113321146A (en) * 2021-06-09 2021-08-31 中国二十冶集团有限公司 Single-side jacking safety protection device and safety jacking method for large-span reticulated shell structure
CN113833118A (en) * 2021-10-11 2021-12-24 煤炭工业太原设计研究院集团有限公司 Upright quadrangular pyramid net rack and profile steel stand column combined structure

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101988308A (en) * 2010-09-30 2011-03-23 中国华西企业有限公司 Non-support installation method of long-span spatial bolt ball steel reticulated shell dome
CN103982045A (en) * 2014-04-08 2014-08-13 浙江国盛钢结构有限公司 Installation construction method of roof lattice shell structure without supports and cantilevers
CN105178609A (en) * 2015-09-06 2015-12-23 中建二局第三建筑工程有限公司 High-altitude bulk construction method for steel-structure grid

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101988308A (en) * 2010-09-30 2011-03-23 中国华西企业有限公司 Non-support installation method of long-span spatial bolt ball steel reticulated shell dome
CN103982045A (en) * 2014-04-08 2014-08-13 浙江国盛钢结构有限公司 Installation construction method of roof lattice shell structure without supports and cantilevers
CN105178609A (en) * 2015-09-06 2015-12-23 中建二局第三建筑工程有限公司 High-altitude bulk construction method for steel-structure grid

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
董石麟: "《空间结构》", 31 December 2003, 中国计划出版社 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110185188A (en) * 2019-06-04 2019-08-30 中国十九冶集团有限公司 Large-span reticulated shell installation method
CN112431422A (en) * 2020-10-29 2021-03-02 上海宝冶冶金工程有限公司 Large-span net rack installation method
CN112359975A (en) * 2020-11-05 2021-02-12 中国十九冶集团有限公司 Installation method for preventing latticed shell from laterally moving
CN112359975B (en) * 2020-11-05 2022-04-15 中国十九冶集团有限公司 Installation method for preventing latticed shell from laterally moving
CN112627356A (en) * 2020-12-22 2021-04-09 中国二十冶集团有限公司 Installation method of arched net rack
CN113321146A (en) * 2021-06-09 2021-08-31 中国二十冶集团有限公司 Single-side jacking safety protection device and safety jacking method for large-span reticulated shell structure
CN113833118A (en) * 2021-10-11 2021-12-24 煤炭工业太原设计研究院集团有限公司 Upright quadrangular pyramid net rack and profile steel stand column combined structure

Similar Documents

Publication Publication Date Title
CN108952242A (en) A kind of construction method of indoor coal storage yard arch-shaped space truss
CN107012949B (en) Lifting method of large-span steel corridor
CN101988308B (en) Non-support installation method of long-span spatial bolt ball steel reticulated shell dome
CN101200916B (en) Construction method of prestressed suspension type building structure
CN110886423B (en) BIM technology-based steel structure tension beam roof construction method
CN105178609B (en) Steel structure net rack high altitude bulk construction method
CN102337785B (en) Construction process of ultra-large-span net-frame arch-shaped shed type storage silo
CN103628570B (en) A kind of mounting method of weld ball-node grid structure
WO2014117480A1 (en) Method of constructing cylindrical shell grid structure with ultra-large span
CN207211775U (en) Hydraulic jacking device and grid structure
CN101839068A (en) Prestressing method for installing large-span double-layer latticed shell structure
CN109235902A (en) Positive quadrangular pyramid bolt-ball net frame multi-point support high-altitude dissipates splicing method
CN110387965A (en) A kind of coal yard wide-span cylindrical reticulated shell structure gable starting construction method
CN107386460A (en) A kind of large-span shell bolted spherical node installation method
WO2022253310A1 (en) High-altitude rotating construction method for large venue steel canopy
CN104846747A (en) Self-anchored suspension bridge boom tensioning technology based on self-equilibrium system
CN207017435U (en) Large span bolt-ball net frame
CN109680619A (en) A kind of steel truss beam sling Arch Bridge Construction method big suitable for environmental restrictions
CN111561175B (en) Prestress underpinning static force cutting and column pulling construction process
CN110820950B (en) Integral synchronous jacking construction method for large-span combined type overweight eccentric slope angle steel structure
CN108842954A (en) Installation and construction method of huge different-section honeycomb beam structure system of wing-shaped roof
CN204898744U (en) Pile foundation resistance to plucking resistance to compression testing system
CN114922435A (en) Construction method of bolt-sphere joint net rack of garbage power station
CN207419704U (en) A kind of self-balancing cable net structure that can mitigate wind load
CN109440942B (en) Installation structure and construction process of factory building roof grid

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181207