A kind of job scheduling monitoring method, device, terminal and readable medium
Technical field
The present embodiments relate to intelligent terminal technology more particularly to a kind of job scheduling monitoring method, device, terminal and
Readable medium.
Background technology
Child often will appear job scheduling and arrange unreasonable situation during completing homework at present.Such as
It wastes on the topic that will not be done and does not rest suitably in more time or operation complete process, child's sitting is caused to be unfavorable for
Health etc..Parent needs to arrange for professional supervision child and fulfils assignment, and can not determine when to remind child in monitor procedure
Son abandons the topic that will not be done, and child can not be reminded to rest when child is inscribing.Therefore for child to mastery of knowledge
It is very necessary that situation carries out job scheduling monitoring.
Invention content
In view of this, an embodiment of the present invention provides a kind of job scheduling monitoring method, device, terminal and readable medium,
Job scheduling monitoring is carried out to mastery of knowledge situation for child, child's operating efficiency is improved, realizes more rational
Sitting prompts.
In a first aspect, an embodiment of the present invention provides a kind of job scheduling monitoring methods, including:
At least one job task is received, determines that at least one operation is appointed by cloud database and private database access
The Estimated Time Of Completion of each job task in business;
According to the Estimated Time Of Completion of each job task and sitting reminder time, each sessions and rest are set
Stage, and generate initial program according to each sessions and rest period;
By the completion sequence of job task in each sessions, the performance of each job task is monitored, according to institute
It states performance and updates initial program, and job scheduling monitoring is carried out according to updated initial program.
Optionally, described that each operation at least one job task is determined by cloud database and private database access
The Estimated Time Of Completion of task, including:
The average completion time of each job task at least one job task is determined by cloud database;
Judge to whether there is in private database access and be gone through with what each job task at least one job task matched
History job task;
If so, determine the personal deadline according to the Historical Jobs task that matches, and according to it is described averagely complete when
Between and the personal deadline determine the Estimated Time Of Completion of each job task;
If it is not, then using the average completion time as Estimated Time Of Completion.
Optionally, described according to the average completion time and the personal deadline determines the estimated of each job task
Deadline, including:
Judge whether the personal deadline is all longer or shorter than average completion time;
If so, using the average value of personal deadline as Estimated Time Of Completion;
If it is not, then using the average value of personal deadline and average completion time as Estimated Time Of Completion.
Optionally, described that each operation is formulated according to the Estimated Time Of Completion of each job task and sitting reminder time
Stage and rest period, and initial program is generated according to each sessions and rest period, including:
Sessions are divided according to sitting reminder time, the rest period is set between each sessions;
According to the Estimated Time Of Completion of each job task, the job task of each sessions and each job task are determined
Completion sequence;
It is generated according to the job task of each sessions, the completion sequence of each job task and the rest period initial
Program.
Optionally, the completion sequence by job task in each sessions, monitors the completion of each job task
Situation updates initial program according to the performance, including:
By the completion sequence of job task in each sessions, the careful topic time of each job task is monitored;
Prompt time is skipped according to what the Estimated Time Of Completion of each job task determined each job task;
When the careful topic time, which is equal to, skips prompt time, carry out skipping prompt, and prompt time is skipped according to described
Update initial program;
When the careful topic time, which is less than, skips prompt time, the actual finish time of monitoring results task, by the reality
The border deadline is added to private database access, and updates initial program according to the actual finish time.
Optionally, prompt time is skipped described in the basis updates initial program, including:
Deadline and the difference for skipping prompt time on the estimation, choose job task from next sessions, and
The job task of the selection is added to the current work stage.
Optionally, described that initial program is updated according to the actual finish time, including:
When the actual finish time is shorter than Estimated Time Of Completion, according to the actual finish time and it is expected that when completing
Between difference, job task is chosen from next sessions, and the job task of selection is added to the current work stage;
When the actual finish time is longer than Estimated Time Of Completion, according to the actual finish time and it is expected that when completing
Between difference, job task is chosen from the current work stage, and the job task of selection is transferred to next sessions.
Second aspect, an embodiment of the present invention provides a kind of job scheduling monitoring devices, including:
Job task receiving module passes through cloud database and private database access for receiving at least one job task
Determine the Estimated Time Of Completion of each job task at least one job task;
Initial program generation module, when for being reminded according to the Estimated Time Of Completion of each job task and sitting
Between each sessions and rest period be set, and generate initial program according to each sessions and rest period;
Monitoring module monitors the complete of each job task for the completion sequence by job task in each sessions
At situation, initial program is updated according to the performance, and job scheduling prison is carried out according to updated initial program
Control.
The third aspect, an embodiment of the present invention provides a kind of terminals, including:
One or more processors;
Memory, for storing one or more programs;
When one or more of programs are executed by one or more of processors so that one or more of processing
Device realizes the job scheduling monitoring method as described in any embodiment of the present invention.
Fourth aspect, an embodiment of the present invention provides a kind of readable mediums, are stored thereon with computer program, the program quilt
The job scheduling monitoring method as described in any embodiment of the present invention is realized when processor executes.
A kind of job scheduling monitoring method, device, terminal and readable medium provided in an embodiment of the present invention, according to cloud data
Library and private database access determine the Estimated Time Of Completion of each job task;According to the Estimated Time Of Completion of each job task and long
Each sessions of reminder time setting and rest period are sat, and initial program is generated according to each sessions and rest period;
By the completion sequence of job task in each sessions, the performance of each job task is monitored, is updated just according to performance
Beginning program, and job scheduling monitoring is carried out according to updated initial program.Child is directed to knowledge to realize
It grasps situation and carries out job scheduling monitoring, improve child's operating efficiency, realize more rational sitting prompt.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technology description to do one simply to introduce, it should be apparent that, the accompanying drawings in the following description is this hair
Some bright embodiments for those of ordinary skill in the art without creative efforts, can be with root
Other attached drawings are obtained according to these attached drawings.
Fig. 1 is a kind of job scheduling monitoring method flow chart that the embodiment of the present invention one provides;
Fig. 2 is a kind of job scheduling monitoring device structural schematic diagram provided by Embodiment 2 of the present invention;
Fig. 3 is a kind of structural schematic diagram for terminal that the embodiment of the present invention three provides.
Specific implementation mode
To make the object, technical solutions and advantages of the present invention clearer, hereinafter with reference to attached in the embodiment of the present invention
Figure, technical scheme of the present invention is clearly and completely described by embodiment, it is clear that described embodiment is the present invention one
Section Example, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not doing
Go out the every other embodiment obtained under the premise of creative work, shall fall within the protection scope of the present invention.
Embodiment one
Fig. 1 is a kind of job scheduling monitoring method flow chart that the embodiment of the present invention one provides, and the present embodiment is applicable to
The case where job scheduling monitors, this method can be realized by terminal, such as can be intelligent desk lamp, computer learning machine etc., specifically
It can be implemented by software in terminal and/or hardware.Referring to Fig. 1, which includes the following steps:
S110, at least one job task is received, at least one operation is determined by cloud database and private database access
The Estimated Time Of Completion of each job task in task.
Wherein, at least one job task is received, can be that terminal is acquired using image collecting device (such as camera)
The operation topic of child;It can also be that terminal receives the job task of prescribed form, by parsing prescribed form, determine at least one
A job task.Wherein prescribed form for example can be that people teaches version primary school Chinese second grade first unit next time word to write from memory, and lead to
It crosses and parses the prescribed form, it may be determined that job task is to write from memory people to teach version primary school Chinese second grade first unit next time word,
And then the corresponding work data of the job task can be searched by server or local data.
Wherein, terminal can be by connecting operation topic similar with job task in network inquiry cloud database, and leads to
The job task deadline for crossing the great amount of terminals upload recorded in cloud database determines average completion time, wherein can be with root
The complexity of job task is judged according to average completion time length.Wherein, terminal can be by inquiring local private database access
Or the private database access uploaded onto the server, determine whether child did similar job task, when in the presence of similar job task
When, the personal deadline that child completes task needs can be inquired from private database access.When averagely being completed by synthesis
Between and the personal deadline formulate more rational estimated completion so as to the grasp situation for child to job task
Time, and according to the Estimated Time Of Completion carry out job scheduling monitoring, so as to be directed to child to mastery of knowledge situation into
Row job scheduling monitors, and improves child's operating efficiency.
Optionally, the pre- of each job task at least one job task is determined by cloud database and private database access
It counts the deadline, including:
The average completion time of each job task at least one job task is determined by cloud database;Judge private number
According in library with the presence or absence of the Historical Jobs task that matches with each job task at least one job task;If so, according to
The Historical Jobs task to match determines the personal deadline, and determines each work according to average completion time and personal deadline
The Estimated Time Of Completion of industry task;If it is not, then using average completion time as Estimated Time Of Completion.
Wherein, the average completion time of each job task at least one job task is determined by cloud database, specifically
Can be the job task deadline uploaded by the great amount of terminals that is recorded in cloud database determine average completion time, such as
Seek the average value of the job task deadline of great amount of terminals upload.Wherein, when in private database access exist with it is at least one
When the Historical Jobs task that each job task matches in job task, it was demonstrated that child did similar or identical operation and appoints before
Business determines the personal deadline according to Historical Jobs task at this time, and is determined according to average completion time and personal deadline
The Estimated Time Of Completion of each job task.Wherein, when in private database access be not present and each operation at least one job task
When the Historical Jobs task that task matches, it was demonstrated that child did not do similar or identical job task before, at this time not yet
In the presence of the personal deadline of the Historical Jobs to match.It is determined at this point, only largely uploading data according to terminal in cloud database
Average completion time, and using the average completion time as the Estimated Time Of Completion of the job task.So as to be directed to child
To Historical Jobs task, more rational Estimated Time Of Completion is determined.
Optionally, the Estimated Time Of Completion of each job task, packet are determined according to average completion time and personal deadline
It includes:
Judge whether the personal deadline is all longer or shorter than average completion time;If so, by the personal deadline
Average value as Estimated Time Of Completion;If it is not, then using the average value of personal deadline and average completion time as estimated
Deadline.
Wherein, if the personal deadline is all longer or shorter than average completion time, prove child to job task pair
The knowledge point grasp answered is preferable or poor, at this time then without reference to average completion time, and appoints to operation directly against child
Situation is grasped in be engaged in corresponding knowledge point, determines Estimated Time Of Completion, may thereby determine that more rational Estimated Time Of Completion;Its
In, if personal deadline part is longer or shorter than average completion time, prove that child is good to knowledge point Grasping level, this
When can seek personal deadline and average completion time average value as Estimated Time Of Completion, may thereby determine that more
Rational Estimated Time Of Completion.On the estimation the deadline carry out job scheduling monitoring, so as to for child to knowledge
It grasps situation and carries out job scheduling monitoring, improve child's operating efficiency.
S120, each sessions and rest are arranged according to the Estimated Time Of Completion of each job task and sitting reminder time
Stage, and generate initial program according to each sessions and rest period.
Wherein it is possible to according to the length of sitting reminder time, rest period and each sitting reminder period pair are arranged
Illustratively when sitting reminder time is 40 minutes, one section of rest period can be arranged every 40 minutes in the sessions answered
(such as can be 10 minutes), wherein according to the Estimated Time Of Completion for completing each operation, select matched with 40 minutes it is more
A job task can be specifically that the Estimated Time Of Completion summation of multiple job tasks is default centered on by 40 minutes
Value in range.Wherein, sessions can be at least one, and the rest period is set between each two sessions.According to
Each sessions and rest period is arranged in the Estimated Time Of Completion of each job task and sitting reminder time, ensure that child exists
It completes to be rested according to sitting prompting between two job tasks, child can be made not beaten by sitting prompting during doing one's assignment
It disturbs, does topic thinking and be not interrupted, to realize more rational sitting prompt.
Optionally, each sessions are formulated according to the Estimated Time Of Completion of each job task and sitting reminder time and stopped
The breath stage, and initial program is generated according to each sessions and rest period, including:
Sessions are divided according to sitting reminder time, the rest period is set between each sessions;According to each operation
The Estimated Time Of Completion of task determines the job task of each sessions and the completion sequence of each job task;According to each operation
The job task in stage, the completion sequence of each job task and rest period generate initial program.
Wherein, according to the Estimated Time Of Completion of each job task, the job task of each sessions is determined, it specifically can be with
It is that the Estimated Time Of Completion summation of the multiple job tasks determined is in preset range centered on sitting reminder time
Value;According to the Estimated Time Of Completion of each job task determine each job task completion sequence, can be specifically, according to each operation
The Estimated Time Of Completion length of task, can tentatively judge the complexity of each job task, when can be specifically estimated complete
Between longer job task difficulty it is higher, can by each job task according to by letter to hardly possible sequence arrangement job task it is complete
At sequence, to guide child to do topic thinking, improves child and do topic efficiency.According to the job task of each sessions, each operation
The completion sequence of task and rest period generate initial program, and monitor child's job scheduling according to the initial program,
Child can be directed to, job scheduling monitoring is carried out to mastery of knowledge situation, improved child's operating efficiency, realize and more close
The sitting of reason prompts.
S130, by each sessions job task completion sequence, the performance of each job task is monitored, according to complete
Initial program is updated at situation, and job scheduling monitoring is carried out according to updated initial program.
It wherein, can be according to the completion of job task in each sessions in initial program after generating initial program
Sequence prompt child's does topic sequence, during child inscribes, the time that child handles job task can be monitored, according to place
The time length of reason job task can carry out child to skip prompt etc., so as to complete the monitoring of job task.By right
The job task progress of child is monitored and prompts, and then child can be reminded to do topic progress in time, to improve child
Operating efficiency.
Optionally, by the completion sequence of job task in each sessions, the performance of each job task is monitored, according to
Performance updates initial program, including:
By the completion sequence of job task in each sessions, the careful topic time of each job task is monitored;According to each operation
What the Estimated Time Of Completion of task determined each job task skips prompt time;When examining the topic time equal to prompt time is skipped,
It carries out skipping prompt, and initial program is updated according to prompt time is skipped;When examining the topic time less than prompt time is skipped, prison
The actual finish time for surveying job task, is added to private database access, and more according to actual finish time by actual finish time
New initial program.
Wherein, the topic time is examined it is to be understood that child inscribes the time to starting writing from reading, the monitoring careful topic time can lead to
The body shape of image collecting device (such as camera) acquisition child is crossed to realize, can be specifically by tracking child's eyes
Focal position judges whether child inscribes in reading, by identifying that child's hand motion judges whether child starts writing, so that it is determined that child
The time to starting writing is inscribed from reading.Wherein, the default ratio that prompt time can be each job task Estimated Time Of Completion is skipped
The example time, such as can be 40%, 50% or the 60% of Estimated Time Of Completion, it is not specifically limited herein.Wherein, when child examines
The topic time is bad to the knowledge point grasp of the job task equal to child when skipping prompt time, is then proved, can remind at this time
Child first completes the next item down job task, and the excessive time is wasted on the job task so as to avoid child.Wherein, work as child
The topic time is examined less than when skipping prompt time, then proving that child has roadmap to the job task, child can be monitored at this time
The actual finish time of son, and actual finish time can be added to private database access, to match historic task for after
Corresponding individual's deadline lays the first stone, and can also remove upper cloud database after personal information, to improve the job task
The accuracy rate of corresponding average completion time.Wherein, initial program is updated according to skipping time and actual finish time, it can be with
Realize according to child fulfil assignment progress the case where adjusted initial program in real time, so as to child raising operation effect
Rate.
Optionally, initial program is updated according to skipping prompt time, including:
Deadline and the difference for skipping prompt time on the estimation, choose job task from next sessions, and
The job task of selection is added to the current work stage.
Wherein, the preset ratio time that prompt time can be each job task Estimated Time Of Completion is skipped, when child examines
The topic time is equal to when skipping prompt time, carries out skipping prompt, then when the sessions will occur a length of Estimated Time Of Completion with
The free time for skipping the difference of prompt time can be chosen and free time phase according to the free time from next sessions
Matched job task, and the job task is added to the current work stage, to not only ensure that child can be by sitting
Reminder time enters the rest period, can also improve the speed that child fulfils assignment.
Optionally, initial program is updated according to actual finish time, including:
When actual finish time is shorter than Estimated Time Of Completion, according to actual finish time and Estimated Time Of Completion difference,
Job task is chosen from next sessions, and the job task of selection is added to the current work stage;When actually accomplishing
When time is longer than Estimated Time Of Completion, according to actual finish time and Estimated Time Of Completion difference, selected from the current work stage
Job task is taken, and the job task of selection is transferred to next sessions.
Wherein, when actual finish time is shorter than Estimated Time Of Completion, then a length of when the sessions will occur to be expected
At the free time of time and the difference of actual finish time, can be chosen from next sessions and sky according to the free time
The job task that the remaining time matches, and the job task is added to the current work stage;When actual finish time be longer than it is pre-
When counting the deadline, then appearance cannot be completed all job tasks by the sessions, can deadline and reality on the estimation
The difference of border deadline chooses the job task to match with time difference from the current work stage, and the operation is appointed
Business is transferred to next sessions.To not only realize the allotment of job task, child can not also be delayed and rested, not only
It can ensure the operating efficiency of child, can also realize more rational sitting prompt.
Optionally, after carrying out skipping prompt, further include:
Record skips the corresponding job task of prompt, and generates tutorial message according to the corresponding job task of prompt is skipped.
Wherein, the corresponding job task of prompt will be skipped to record, it can be realized that there are which unresolved topics by child
Mesh generates tutorial message for these unsolved topics.Wherein, tutorial message may include that child does not solve the detailed of topic
Parsing is used to help child and learns the knowledge point that do not grasp;Tutorial message can also include the similar topic type of unresolved topic, use
Consolidate the knowledge point that do not grasp in helping child.To more shoot the arrow at the target to carry out knowledge point guidance to child, be conducive to improve
Child to be grasp situation.
Wherein, after generating tutorial message, it can also will skip the corresponding job task of prompt and feed back to default terminal.Its
In, default terminal can be the intelligent terminals such as mobile phone, computer, notebook or the pad of parent or teacher, be conducive to teacher parent and
When understand child knowledge point and grasp situation, can teach students in accordance with their aptitude child, improve efficiency of teaching.
Job scheduling monitoring method provided in this embodiment determines each job task according to cloud database and private database access
Estimated Time Of Completion;Each sessions are set according to the Estimated Time Of Completion of each job task and sitting reminder time and are stopped
The breath stage, and generate initial program according to each sessions and rest period;By the completion of job task in each sessions
Sequentially, the performance for monitoring each job task updates initial program according to performance, and according to it is updated initially into
It spends table and carries out job scheduling monitoring.Child is directed to the progress job scheduling monitoring of mastery of knowledge situation to realize, and is improved
Child operating efficiency realizes more rational sitting prompt.
Embodiment two
Fig. 2 is a kind of job scheduling monitoring device structural schematic diagram provided by Embodiment 2 of the present invention, and the present embodiment can fit
It is monitored for job scheduling.
Referring to Fig. 2, job scheduling monitoring device in the present embodiment, including:
Job task receiving module 210 passes through cloud database and private data for receiving at least one job task
Library determines the Estimated Time Of Completion of each job task at least one job task;
Initial program generation module 220, when for being reminded according to the Estimated Time Of Completion of each job task and sitting
Between each sessions and rest period be set, and generate initial program according to each sessions and rest period;
Monitoring module 230 monitors the completion of each job task for the completion sequence by job task in each sessions
Situation updates initial program according to performance, and carries out job scheduling monitoring according to updated initial program.
Optionally, job task receiving module 210, is specifically used for:
The average completion time of each job task at least one job task is determined by cloud database;Judge private number
According in library with the presence or absence of the Historical Jobs task that matches with each job task at least one job task;If so, according to
The Historical Jobs task to match determines the personal deadline, and determines each work according to average completion time and personal deadline
The Estimated Time Of Completion of industry task;If it is not, then using average completion time as Estimated Time Of Completion.
Optionally, job task receiving module 210, also particularly useful for:
Judge whether the personal deadline is all longer or shorter than average completion time;If so, by the personal deadline
Average value as Estimated Time Of Completion;If it is not, then using the average value of personal deadline and average completion time as estimated
Deadline.
Optionally, initial program generation module 220, is specifically used for:
Sessions are divided according to sitting reminder time, the rest period is set between each sessions;According to each operation
The Estimated Time Of Completion of task determines the job task of each sessions and the completion sequence of each job task;According to each operation
The job task in stage, the completion sequence of each job task and rest period generate initial program.
Optionally, monitoring module 230 are specifically used for:
By the completion sequence of job task in each sessions, the careful topic time of each job task is monitored;According to each operation
What the Estimated Time Of Completion of task determined each job task skips prompt time;When examining the topic time equal to prompt time is skipped,
It carries out skipping prompt, and initial program is updated according to prompt time is skipped;When examining the topic time less than prompt time is skipped, prison
The actual finish time for surveying job task, is added to private database access, and more according to actual finish time by actual finish time
New initial program.
Optionally, monitoring module 230, also particularly useful for:
Deadline and the difference for skipping prompt time on the estimation, choose job task from next sessions, and
The job task of selection is added to the current work stage.
Optionally, monitoring module 230, also particularly useful for:
When actual finish time is shorter than Estimated Time Of Completion, according to actual finish time and Estimated Time Of Completion difference,
Job task is chosen from next sessions, and the job task of selection is added to the current work stage;When actually accomplishing
When time is longer than Estimated Time Of Completion, according to actual finish time and Estimated Time Of Completion difference, selected from the current work stage
Job task is taken, and the job task of selection is transferred to next sessions.
Optionally, monitoring module 230 further include:
Record sub module is skipped the corresponding job task of prompt for recording, and is appointed according to the corresponding operation of prompt is skipped
Business generates tutorial message.
Job scheduling monitoring device provided in this embodiment, the job scheduling monitoring method proposed with embodiment one belong to same
One inventive concept, the technical detail of detailed description not can be found in embodiment one, and the present embodiment and implementation in the present embodiment
One advantageous effect having the same of example.
Embodiment three
A kind of terminal is present embodiments provided, job scheduling monitoring is can be used for.Fig. 3 is that the embodiment of the present invention three provides
A kind of structural schematic diagram of terminal.Referring to Fig. 3, which includes:
One or more processors 310;
Memory 320, for storing one or more programs;
When one or more of programs are executed by one or more of processors 310 so that one or more of
Processor 310 realizes the job scheduling monitoring method proposed such as embodiment one.
In Fig. 3 by taking a processor 310 as an example;Processor 310 and memory 320 can be connected by bus or other modes
It connects, in Fig. 3 for being connected by bus.
Memory 320 is used as a kind of computer readable storage medium, can be used for storing software program, computer can perform journey
Sequence and module, such as the corresponding program instruction/module of job scheduling monitoring method in the embodiment of the present invention.Processor 310 is logical
Cross operation and be stored in software program, instruction and module in memory 320, to execute terminal various function application and
Above-mentioned job scheduling monitoring method is realized in data processing.
Memory 320 can include mainly storing program area and storage data field, wherein storing program area can store operation system
Application program needed for system, at least one function;Storage data field can be stored uses created data etc. according to terminal.This
Outside, memory 320 may include high-speed random access memory, can also include nonvolatile memory, for example, at least one
Disk memory, flush memory device or other non-volatile solid state memory parts.In some instances, memory 320 can be into one
Step includes the memory remotely located relative to processor 310, these remote memories can pass through network connection to terminal.On
The example for stating network includes but not limited to internet, intranet, LAN, mobile radio communication and combinations thereof.
The job scheduling monitoring method that the terminal that the present embodiment proposes is proposed with embodiment one belongs to same inventive concept, not
The technical detail of detailed description can be found in embodiment one in the present embodiment, and the present embodiment and embodiment one are having the same
Advantageous effect.
Example IV
The present embodiment provides a kind of readable mediums, are stored thereon with computer program, real when which is executed by processor
Now such as the job scheduling monitoring method of the proposition of embodiment one.
The job scheduling monitoring method that the readable medium that the present embodiment proposes is proposed with embodiment one belongs to same invention structure
Think, the technical detail of detailed description not can be found in embodiment one in the present embodiment, and the present embodiment has with embodiment one
Identical advantageous effect.
By the description above with respect to embodiment, it is apparent to those skilled in the art that, the present invention
It can be realized by software and required common hardware, naturally it is also possible to which by hardware realization, but the former is more in many cases
Good embodiment.Based on this understanding, technical scheme of the present invention substantially in other words contributes to the prior art
Part can be expressed in the form of software products, which can be stored in computer readable storage medium
In, such as the floppy disk of computer, read-only memory (Read-Only Memory, ROM), random access memory (Random
Access Memory, RAM), flash memory (FLASH), hard disk or CD etc., including some instructions are with so that a computer is set
Standby (can be personal computer, server or the network equipment etc.) executes the method described in each embodiment of the present invention.
Note that above are only presently preferred embodiments of the present invention and institute's application technology principle.It will be appreciated by those skilled in the art that
The present invention is not limited to specific embodiments described here, can carry out for a person skilled in the art it is various it is apparent variation,
It readjusts and substitutes without departing from protection scope of the present invention.Therefore, although being carried out to the present invention by above example
It is described in further detail, but the present invention is not limited only to above example, without departing from the inventive concept, also
May include other more equivalent embodiments, and the scope of the present invention is determined by scope of the appended claims.