CN108805764A - A kind of job scheduling monitoring method, device, terminal and readable medium - Google Patents

A kind of job scheduling monitoring method, device, terminal and readable medium Download PDF

Info

Publication number
CN108805764A
CN108805764A CN201810547214.9A CN201810547214A CN108805764A CN 108805764 A CN108805764 A CN 108805764A CN 201810547214 A CN201810547214 A CN 201810547214A CN 108805764 A CN108805764 A CN 108805764A
Authority
CN
China
Prior art keywords
time
job task
completion
job
sessions
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810547214.9A
Other languages
Chinese (zh)
Other versions
CN108805764B (en
Inventor
徐之峰
孙安国
李强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Huiye Communication Technology Co.,Ltd.
Original Assignee
Shanghai Yude Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Yude Technology Co Ltd filed Critical Shanghai Yude Technology Co Ltd
Priority to CN201810547214.9A priority Critical patent/CN108805764B/en
Publication of CN108805764A publication Critical patent/CN108805764A/en
Application granted granted Critical
Publication of CN108805764B publication Critical patent/CN108805764B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/20Education
    • G06Q50/205Education administration or guidance

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Educational Administration (AREA)
  • Educational Technology (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The embodiment of the invention discloses a kind of job scheduling monitoring method, device, terminal and readable medium, wherein this method includes:At least one job task is received, the Estimated Time Of Completion of each job task at least one job task is determined by cloud database and private database access;Each sessions and rest period are set according to the Estimated Time Of Completion of each job task and sitting reminder time, and initial program is generated according to each sessions and rest period;By the completion sequence of job task in each sessions, the performance of each job task is monitored, initial program is updated according to performance, and job scheduling monitoring is carried out according to updated initial program.A kind of job scheduling monitoring method, device, terminal and readable medium provided in an embodiment of the present invention carry out job scheduling monitoring to mastery of knowledge situation for child, improve child's operating efficiency, realize more rational sitting prompt.

Description

A kind of job scheduling monitoring method, device, terminal and readable medium
Technical field
The present embodiments relate to intelligent terminal technology more particularly to a kind of job scheduling monitoring method, device, terminal and Readable medium.
Background technology
Child often will appear job scheduling and arrange unreasonable situation during completing homework at present.Such as It wastes on the topic that will not be done and does not rest suitably in more time or operation complete process, child's sitting is caused to be unfavorable for Health etc..Parent needs to arrange for professional supervision child and fulfils assignment, and can not determine when to remind child in monitor procedure Son abandons the topic that will not be done, and child can not be reminded to rest when child is inscribing.Therefore for child to mastery of knowledge It is very necessary that situation carries out job scheduling monitoring.
Invention content
In view of this, an embodiment of the present invention provides a kind of job scheduling monitoring method, device, terminal and readable medium, Job scheduling monitoring is carried out to mastery of knowledge situation for child, child's operating efficiency is improved, realizes more rational Sitting prompts.
In a first aspect, an embodiment of the present invention provides a kind of job scheduling monitoring methods, including:
At least one job task is received, determines that at least one operation is appointed by cloud database and private database access The Estimated Time Of Completion of each job task in business;
According to the Estimated Time Of Completion of each job task and sitting reminder time, each sessions and rest are set Stage, and generate initial program according to each sessions and rest period;
By the completion sequence of job task in each sessions, the performance of each job task is monitored, according to institute It states performance and updates initial program, and job scheduling monitoring is carried out according to updated initial program.
Optionally, described that each operation at least one job task is determined by cloud database and private database access The Estimated Time Of Completion of task, including:
The average completion time of each job task at least one job task is determined by cloud database;
Judge to whether there is in private database access and be gone through with what each job task at least one job task matched History job task;
If so, determine the personal deadline according to the Historical Jobs task that matches, and according to it is described averagely complete when Between and the personal deadline determine the Estimated Time Of Completion of each job task;
If it is not, then using the average completion time as Estimated Time Of Completion.
Optionally, described according to the average completion time and the personal deadline determines the estimated of each job task Deadline, including:
Judge whether the personal deadline is all longer or shorter than average completion time;
If so, using the average value of personal deadline as Estimated Time Of Completion;
If it is not, then using the average value of personal deadline and average completion time as Estimated Time Of Completion.
Optionally, described that each operation is formulated according to the Estimated Time Of Completion of each job task and sitting reminder time Stage and rest period, and initial program is generated according to each sessions and rest period, including:
Sessions are divided according to sitting reminder time, the rest period is set between each sessions;
According to the Estimated Time Of Completion of each job task, the job task of each sessions and each job task are determined Completion sequence;
It is generated according to the job task of each sessions, the completion sequence of each job task and the rest period initial Program.
Optionally, the completion sequence by job task in each sessions, monitors the completion of each job task Situation updates initial program according to the performance, including:
By the completion sequence of job task in each sessions, the careful topic time of each job task is monitored;
Prompt time is skipped according to what the Estimated Time Of Completion of each job task determined each job task;
When the careful topic time, which is equal to, skips prompt time, carry out skipping prompt, and prompt time is skipped according to described Update initial program;
When the careful topic time, which is less than, skips prompt time, the actual finish time of monitoring results task, by the reality The border deadline is added to private database access, and updates initial program according to the actual finish time.
Optionally, prompt time is skipped described in the basis updates initial program, including:
Deadline and the difference for skipping prompt time on the estimation, choose job task from next sessions, and The job task of the selection is added to the current work stage.
Optionally, described that initial program is updated according to the actual finish time, including:
When the actual finish time is shorter than Estimated Time Of Completion, according to the actual finish time and it is expected that when completing Between difference, job task is chosen from next sessions, and the job task of selection is added to the current work stage;
When the actual finish time is longer than Estimated Time Of Completion, according to the actual finish time and it is expected that when completing Between difference, job task is chosen from the current work stage, and the job task of selection is transferred to next sessions.
Second aspect, an embodiment of the present invention provides a kind of job scheduling monitoring devices, including:
Job task receiving module passes through cloud database and private database access for receiving at least one job task Determine the Estimated Time Of Completion of each job task at least one job task;
Initial program generation module, when for being reminded according to the Estimated Time Of Completion of each job task and sitting Between each sessions and rest period be set, and generate initial program according to each sessions and rest period;
Monitoring module monitors the complete of each job task for the completion sequence by job task in each sessions At situation, initial program is updated according to the performance, and job scheduling prison is carried out according to updated initial program Control.
The third aspect, an embodiment of the present invention provides a kind of terminals, including:
One or more processors;
Memory, for storing one or more programs;
When one or more of programs are executed by one or more of processors so that one or more of processing Device realizes the job scheduling monitoring method as described in any embodiment of the present invention.
Fourth aspect, an embodiment of the present invention provides a kind of readable mediums, are stored thereon with computer program, the program quilt The job scheduling monitoring method as described in any embodiment of the present invention is realized when processor executes.
A kind of job scheduling monitoring method, device, terminal and readable medium provided in an embodiment of the present invention, according to cloud data Library and private database access determine the Estimated Time Of Completion of each job task;According to the Estimated Time Of Completion of each job task and long Each sessions of reminder time setting and rest period are sat, and initial program is generated according to each sessions and rest period; By the completion sequence of job task in each sessions, the performance of each job task is monitored, is updated just according to performance Beginning program, and job scheduling monitoring is carried out according to updated initial program.Child is directed to knowledge to realize It grasps situation and carries out job scheduling monitoring, improve child's operating efficiency, realize more rational sitting prompt.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technology description to do one simply to introduce, it should be apparent that, the accompanying drawings in the following description is this hair Some bright embodiments for those of ordinary skill in the art without creative efforts, can be with root Other attached drawings are obtained according to these attached drawings.
Fig. 1 is a kind of job scheduling monitoring method flow chart that the embodiment of the present invention one provides;
Fig. 2 is a kind of job scheduling monitoring device structural schematic diagram provided by Embodiment 2 of the present invention;
Fig. 3 is a kind of structural schematic diagram for terminal that the embodiment of the present invention three provides.
Specific implementation mode
To make the object, technical solutions and advantages of the present invention clearer, hereinafter with reference to attached in the embodiment of the present invention Figure, technical scheme of the present invention is clearly and completely described by embodiment, it is clear that described embodiment is the present invention one Section Example, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not doing Go out the every other embodiment obtained under the premise of creative work, shall fall within the protection scope of the present invention.
Embodiment one
Fig. 1 is a kind of job scheduling monitoring method flow chart that the embodiment of the present invention one provides, and the present embodiment is applicable to The case where job scheduling monitors, this method can be realized by terminal, such as can be intelligent desk lamp, computer learning machine etc., specifically It can be implemented by software in terminal and/or hardware.Referring to Fig. 1, which includes the following steps:
S110, at least one job task is received, at least one operation is determined by cloud database and private database access The Estimated Time Of Completion of each job task in task.
Wherein, at least one job task is received, can be that terminal is acquired using image collecting device (such as camera) The operation topic of child;It can also be that terminal receives the job task of prescribed form, by parsing prescribed form, determine at least one A job task.Wherein prescribed form for example can be that people teaches version primary school Chinese second grade first unit next time word to write from memory, and lead to It crosses and parses the prescribed form, it may be determined that job task is to write from memory people to teach version primary school Chinese second grade first unit next time word, And then the corresponding work data of the job task can be searched by server or local data.
Wherein, terminal can be by connecting operation topic similar with job task in network inquiry cloud database, and leads to The job task deadline for crossing the great amount of terminals upload recorded in cloud database determines average completion time, wherein can be with root The complexity of job task is judged according to average completion time length.Wherein, terminal can be by inquiring local private database access Or the private database access uploaded onto the server, determine whether child did similar job task, when in the presence of similar job task When, the personal deadline that child completes task needs can be inquired from private database access.When averagely being completed by synthesis Between and the personal deadline formulate more rational estimated completion so as to the grasp situation for child to job task Time, and according to the Estimated Time Of Completion carry out job scheduling monitoring, so as to be directed to child to mastery of knowledge situation into Row job scheduling monitors, and improves child's operating efficiency.
Optionally, the pre- of each job task at least one job task is determined by cloud database and private database access It counts the deadline, including:
The average completion time of each job task at least one job task is determined by cloud database;Judge private number According in library with the presence or absence of the Historical Jobs task that matches with each job task at least one job task;If so, according to The Historical Jobs task to match determines the personal deadline, and determines each work according to average completion time and personal deadline The Estimated Time Of Completion of industry task;If it is not, then using average completion time as Estimated Time Of Completion.
Wherein, the average completion time of each job task at least one job task is determined by cloud database, specifically Can be the job task deadline uploaded by the great amount of terminals that is recorded in cloud database determine average completion time, such as Seek the average value of the job task deadline of great amount of terminals upload.Wherein, when in private database access exist with it is at least one When the Historical Jobs task that each job task matches in job task, it was demonstrated that child did similar or identical operation and appoints before Business determines the personal deadline according to Historical Jobs task at this time, and is determined according to average completion time and personal deadline The Estimated Time Of Completion of each job task.Wherein, when in private database access be not present and each operation at least one job task When the Historical Jobs task that task matches, it was demonstrated that child did not do similar or identical job task before, at this time not yet In the presence of the personal deadline of the Historical Jobs to match.It is determined at this point, only largely uploading data according to terminal in cloud database Average completion time, and using the average completion time as the Estimated Time Of Completion of the job task.So as to be directed to child To Historical Jobs task, more rational Estimated Time Of Completion is determined.
Optionally, the Estimated Time Of Completion of each job task, packet are determined according to average completion time and personal deadline It includes:
Judge whether the personal deadline is all longer or shorter than average completion time;If so, by the personal deadline Average value as Estimated Time Of Completion;If it is not, then using the average value of personal deadline and average completion time as estimated Deadline.
Wherein, if the personal deadline is all longer or shorter than average completion time, prove child to job task pair The knowledge point grasp answered is preferable or poor, at this time then without reference to average completion time, and appoints to operation directly against child Situation is grasped in be engaged in corresponding knowledge point, determines Estimated Time Of Completion, may thereby determine that more rational Estimated Time Of Completion;Its In, if personal deadline part is longer or shorter than average completion time, prove that child is good to knowledge point Grasping level, this When can seek personal deadline and average completion time average value as Estimated Time Of Completion, may thereby determine that more Rational Estimated Time Of Completion.On the estimation the deadline carry out job scheduling monitoring, so as to for child to knowledge It grasps situation and carries out job scheduling monitoring, improve child's operating efficiency.
S120, each sessions and rest are arranged according to the Estimated Time Of Completion of each job task and sitting reminder time Stage, and generate initial program according to each sessions and rest period.
Wherein it is possible to according to the length of sitting reminder time, rest period and each sitting reminder period pair are arranged Illustratively when sitting reminder time is 40 minutes, one section of rest period can be arranged every 40 minutes in the sessions answered (such as can be 10 minutes), wherein according to the Estimated Time Of Completion for completing each operation, select matched with 40 minutes it is more A job task can be specifically that the Estimated Time Of Completion summation of multiple job tasks is default centered on by 40 minutes Value in range.Wherein, sessions can be at least one, and the rest period is set between each two sessions.According to Each sessions and rest period is arranged in the Estimated Time Of Completion of each job task and sitting reminder time, ensure that child exists It completes to be rested according to sitting prompting between two job tasks, child can be made not beaten by sitting prompting during doing one's assignment It disturbs, does topic thinking and be not interrupted, to realize more rational sitting prompt.
Optionally, each sessions are formulated according to the Estimated Time Of Completion of each job task and sitting reminder time and stopped The breath stage, and initial program is generated according to each sessions and rest period, including:
Sessions are divided according to sitting reminder time, the rest period is set between each sessions;According to each operation The Estimated Time Of Completion of task determines the job task of each sessions and the completion sequence of each job task;According to each operation The job task in stage, the completion sequence of each job task and rest period generate initial program.
Wherein, according to the Estimated Time Of Completion of each job task, the job task of each sessions is determined, it specifically can be with It is that the Estimated Time Of Completion summation of the multiple job tasks determined is in preset range centered on sitting reminder time Value;According to the Estimated Time Of Completion of each job task determine each job task completion sequence, can be specifically, according to each operation The Estimated Time Of Completion length of task, can tentatively judge the complexity of each job task, when can be specifically estimated complete Between longer job task difficulty it is higher, can by each job task according to by letter to hardly possible sequence arrangement job task it is complete At sequence, to guide child to do topic thinking, improves child and do topic efficiency.According to the job task of each sessions, each operation The completion sequence of task and rest period generate initial program, and monitor child's job scheduling according to the initial program, Child can be directed to, job scheduling monitoring is carried out to mastery of knowledge situation, improved child's operating efficiency, realize and more close The sitting of reason prompts.
S130, by each sessions job task completion sequence, the performance of each job task is monitored, according to complete Initial program is updated at situation, and job scheduling monitoring is carried out according to updated initial program.
It wherein, can be according to the completion of job task in each sessions in initial program after generating initial program Sequence prompt child's does topic sequence, during child inscribes, the time that child handles job task can be monitored, according to place The time length of reason job task can carry out child to skip prompt etc., so as to complete the monitoring of job task.By right The job task progress of child is monitored and prompts, and then child can be reminded to do topic progress in time, to improve child Operating efficiency.
Optionally, by the completion sequence of job task in each sessions, the performance of each job task is monitored, according to Performance updates initial program, including:
By the completion sequence of job task in each sessions, the careful topic time of each job task is monitored;According to each operation What the Estimated Time Of Completion of task determined each job task skips prompt time;When examining the topic time equal to prompt time is skipped, It carries out skipping prompt, and initial program is updated according to prompt time is skipped;When examining the topic time less than prompt time is skipped, prison The actual finish time for surveying job task, is added to private database access, and more according to actual finish time by actual finish time New initial program.
Wherein, the topic time is examined it is to be understood that child inscribes the time to starting writing from reading, the monitoring careful topic time can lead to The body shape of image collecting device (such as camera) acquisition child is crossed to realize, can be specifically by tracking child's eyes Focal position judges whether child inscribes in reading, by identifying that child's hand motion judges whether child starts writing, so that it is determined that child The time to starting writing is inscribed from reading.Wherein, the default ratio that prompt time can be each job task Estimated Time Of Completion is skipped The example time, such as can be 40%, 50% or the 60% of Estimated Time Of Completion, it is not specifically limited herein.Wherein, when child examines The topic time is bad to the knowledge point grasp of the job task equal to child when skipping prompt time, is then proved, can remind at this time Child first completes the next item down job task, and the excessive time is wasted on the job task so as to avoid child.Wherein, work as child The topic time is examined less than when skipping prompt time, then proving that child has roadmap to the job task, child can be monitored at this time The actual finish time of son, and actual finish time can be added to private database access, to match historic task for after Corresponding individual's deadline lays the first stone, and can also remove upper cloud database after personal information, to improve the job task The accuracy rate of corresponding average completion time.Wherein, initial program is updated according to skipping time and actual finish time, it can be with Realize according to child fulfil assignment progress the case where adjusted initial program in real time, so as to child raising operation effect Rate.
Optionally, initial program is updated according to skipping prompt time, including:
Deadline and the difference for skipping prompt time on the estimation, choose job task from next sessions, and The job task of selection is added to the current work stage.
Wherein, the preset ratio time that prompt time can be each job task Estimated Time Of Completion is skipped, when child examines The topic time is equal to when skipping prompt time, carries out skipping prompt, then when the sessions will occur a length of Estimated Time Of Completion with The free time for skipping the difference of prompt time can be chosen and free time phase according to the free time from next sessions Matched job task, and the job task is added to the current work stage, to not only ensure that child can be by sitting Reminder time enters the rest period, can also improve the speed that child fulfils assignment.
Optionally, initial program is updated according to actual finish time, including:
When actual finish time is shorter than Estimated Time Of Completion, according to actual finish time and Estimated Time Of Completion difference, Job task is chosen from next sessions, and the job task of selection is added to the current work stage;When actually accomplishing When time is longer than Estimated Time Of Completion, according to actual finish time and Estimated Time Of Completion difference, selected from the current work stage Job task is taken, and the job task of selection is transferred to next sessions.
Wherein, when actual finish time is shorter than Estimated Time Of Completion, then a length of when the sessions will occur to be expected At the free time of time and the difference of actual finish time, can be chosen from next sessions and sky according to the free time The job task that the remaining time matches, and the job task is added to the current work stage;When actual finish time be longer than it is pre- When counting the deadline, then appearance cannot be completed all job tasks by the sessions, can deadline and reality on the estimation The difference of border deadline chooses the job task to match with time difference from the current work stage, and the operation is appointed Business is transferred to next sessions.To not only realize the allotment of job task, child can not also be delayed and rested, not only It can ensure the operating efficiency of child, can also realize more rational sitting prompt.
Optionally, after carrying out skipping prompt, further include:
Record skips the corresponding job task of prompt, and generates tutorial message according to the corresponding job task of prompt is skipped.
Wherein, the corresponding job task of prompt will be skipped to record, it can be realized that there are which unresolved topics by child Mesh generates tutorial message for these unsolved topics.Wherein, tutorial message may include that child does not solve the detailed of topic Parsing is used to help child and learns the knowledge point that do not grasp;Tutorial message can also include the similar topic type of unresolved topic, use Consolidate the knowledge point that do not grasp in helping child.To more shoot the arrow at the target to carry out knowledge point guidance to child, be conducive to improve Child to be grasp situation.
Wherein, after generating tutorial message, it can also will skip the corresponding job task of prompt and feed back to default terminal.Its In, default terminal can be the intelligent terminals such as mobile phone, computer, notebook or the pad of parent or teacher, be conducive to teacher parent and When understand child knowledge point and grasp situation, can teach students in accordance with their aptitude child, improve efficiency of teaching.
Job scheduling monitoring method provided in this embodiment determines each job task according to cloud database and private database access Estimated Time Of Completion;Each sessions are set according to the Estimated Time Of Completion of each job task and sitting reminder time and are stopped The breath stage, and generate initial program according to each sessions and rest period;By the completion of job task in each sessions Sequentially, the performance for monitoring each job task updates initial program according to performance, and according to it is updated initially into It spends table and carries out job scheduling monitoring.Child is directed to the progress job scheduling monitoring of mastery of knowledge situation to realize, and is improved Child operating efficiency realizes more rational sitting prompt.
Embodiment two
Fig. 2 is a kind of job scheduling monitoring device structural schematic diagram provided by Embodiment 2 of the present invention, and the present embodiment can fit It is monitored for job scheduling.
Referring to Fig. 2, job scheduling monitoring device in the present embodiment, including:
Job task receiving module 210 passes through cloud database and private data for receiving at least one job task Library determines the Estimated Time Of Completion of each job task at least one job task;
Initial program generation module 220, when for being reminded according to the Estimated Time Of Completion of each job task and sitting Between each sessions and rest period be set, and generate initial program according to each sessions and rest period;
Monitoring module 230 monitors the completion of each job task for the completion sequence by job task in each sessions Situation updates initial program according to performance, and carries out job scheduling monitoring according to updated initial program.
Optionally, job task receiving module 210, is specifically used for:
The average completion time of each job task at least one job task is determined by cloud database;Judge private number According in library with the presence or absence of the Historical Jobs task that matches with each job task at least one job task;If so, according to The Historical Jobs task to match determines the personal deadline, and determines each work according to average completion time and personal deadline The Estimated Time Of Completion of industry task;If it is not, then using average completion time as Estimated Time Of Completion.
Optionally, job task receiving module 210, also particularly useful for:
Judge whether the personal deadline is all longer or shorter than average completion time;If so, by the personal deadline Average value as Estimated Time Of Completion;If it is not, then using the average value of personal deadline and average completion time as estimated Deadline.
Optionally, initial program generation module 220, is specifically used for:
Sessions are divided according to sitting reminder time, the rest period is set between each sessions;According to each operation The Estimated Time Of Completion of task determines the job task of each sessions and the completion sequence of each job task;According to each operation The job task in stage, the completion sequence of each job task and rest period generate initial program.
Optionally, monitoring module 230 are specifically used for:
By the completion sequence of job task in each sessions, the careful topic time of each job task is monitored;According to each operation What the Estimated Time Of Completion of task determined each job task skips prompt time;When examining the topic time equal to prompt time is skipped, It carries out skipping prompt, and initial program is updated according to prompt time is skipped;When examining the topic time less than prompt time is skipped, prison The actual finish time for surveying job task, is added to private database access, and more according to actual finish time by actual finish time New initial program.
Optionally, monitoring module 230, also particularly useful for:
Deadline and the difference for skipping prompt time on the estimation, choose job task from next sessions, and The job task of selection is added to the current work stage.
Optionally, monitoring module 230, also particularly useful for:
When actual finish time is shorter than Estimated Time Of Completion, according to actual finish time and Estimated Time Of Completion difference, Job task is chosen from next sessions, and the job task of selection is added to the current work stage;When actually accomplishing When time is longer than Estimated Time Of Completion, according to actual finish time and Estimated Time Of Completion difference, selected from the current work stage Job task is taken, and the job task of selection is transferred to next sessions.
Optionally, monitoring module 230 further include:
Record sub module is skipped the corresponding job task of prompt for recording, and is appointed according to the corresponding operation of prompt is skipped Business generates tutorial message.
Job scheduling monitoring device provided in this embodiment, the job scheduling monitoring method proposed with embodiment one belong to same One inventive concept, the technical detail of detailed description not can be found in embodiment one, and the present embodiment and implementation in the present embodiment One advantageous effect having the same of example.
Embodiment three
A kind of terminal is present embodiments provided, job scheduling monitoring is can be used for.Fig. 3 is that the embodiment of the present invention three provides A kind of structural schematic diagram of terminal.Referring to Fig. 3, which includes:
One or more processors 310;
Memory 320, for storing one or more programs;
When one or more of programs are executed by one or more of processors 310 so that one or more of Processor 310 realizes the job scheduling monitoring method proposed such as embodiment one.
In Fig. 3 by taking a processor 310 as an example;Processor 310 and memory 320 can be connected by bus or other modes It connects, in Fig. 3 for being connected by bus.
Memory 320 is used as a kind of computer readable storage medium, can be used for storing software program, computer can perform journey Sequence and module, such as the corresponding program instruction/module of job scheduling monitoring method in the embodiment of the present invention.Processor 310 is logical Cross operation and be stored in software program, instruction and module in memory 320, to execute terminal various function application and Above-mentioned job scheduling monitoring method is realized in data processing.
Memory 320 can include mainly storing program area and storage data field, wherein storing program area can store operation system Application program needed for system, at least one function;Storage data field can be stored uses created data etc. according to terminal.This Outside, memory 320 may include high-speed random access memory, can also include nonvolatile memory, for example, at least one Disk memory, flush memory device or other non-volatile solid state memory parts.In some instances, memory 320 can be into one Step includes the memory remotely located relative to processor 310, these remote memories can pass through network connection to terminal.On The example for stating network includes but not limited to internet, intranet, LAN, mobile radio communication and combinations thereof.
The job scheduling monitoring method that the terminal that the present embodiment proposes is proposed with embodiment one belongs to same inventive concept, not The technical detail of detailed description can be found in embodiment one in the present embodiment, and the present embodiment and embodiment one are having the same Advantageous effect.
Example IV
The present embodiment provides a kind of readable mediums, are stored thereon with computer program, real when which is executed by processor Now such as the job scheduling monitoring method of the proposition of embodiment one.
The job scheduling monitoring method that the readable medium that the present embodiment proposes is proposed with embodiment one belongs to same invention structure Think, the technical detail of detailed description not can be found in embodiment one in the present embodiment, and the present embodiment has with embodiment one Identical advantageous effect.
By the description above with respect to embodiment, it is apparent to those skilled in the art that, the present invention It can be realized by software and required common hardware, naturally it is also possible to which by hardware realization, but the former is more in many cases Good embodiment.Based on this understanding, technical scheme of the present invention substantially in other words contributes to the prior art Part can be expressed in the form of software products, which can be stored in computer readable storage medium In, such as the floppy disk of computer, read-only memory (Read-Only Memory, ROM), random access memory (Random Access Memory, RAM), flash memory (FLASH), hard disk or CD etc., including some instructions are with so that a computer is set Standby (can be personal computer, server or the network equipment etc.) executes the method described in each embodiment of the present invention.
Note that above are only presently preferred embodiments of the present invention and institute's application technology principle.It will be appreciated by those skilled in the art that The present invention is not limited to specific embodiments described here, can carry out for a person skilled in the art it is various it is apparent variation, It readjusts and substitutes without departing from protection scope of the present invention.Therefore, although being carried out to the present invention by above example It is described in further detail, but the present invention is not limited only to above example, without departing from the inventive concept, also May include other more equivalent embodiments, and the scope of the present invention is determined by scope of the appended claims.

Claims (10)

1. a kind of job scheduling monitoring method, which is characterized in that including:
At least one job task is received, is determined at least one job task by cloud database and private database access The Estimated Time Of Completion of each job task;
According to the Estimated Time Of Completion of each job task and sitting reminder time, each sessions and rest period are set, And generate initial program according to each sessions and rest period;
By the completion sequence of job task in each sessions, the performance of each job task is monitored, according to described complete Initial program is updated at situation, and job scheduling monitoring is carried out according to updated initial program.
2. according to the method described in claim 1, it is characterized in that, described determine institute by cloud database and private database access The Estimated Time Of Completion of each job task at least one job task is stated, including:
The average completion time of each job task at least one job task is determined by cloud database;
Judge that the history that whether there is in private database access with each job task matches at least one job task is made Industry task;
If so, determine the personal deadline according to the Historical Jobs task that matches, and according to the average completion time and Individual's deadline determines the Estimated Time Of Completion of each job task;
If it is not, then using the average completion time as Estimated Time Of Completion.
3. according to the method described in claim 2, it is characterized in that, described complete according to the average completion time and the individual The Estimated Time Of Completion of each job task is determined at the time, including:
Judge whether the personal deadline is all longer or shorter than average completion time;
If so, using the average value of personal deadline as Estimated Time Of Completion;
If it is not, then using the average value of personal deadline and average completion time as Estimated Time Of Completion.
4. according to the method described in claim 1, it is characterized in that, the Estimated Time Of Completion according to each job task And sitting reminder time formulates each sessions and rest period, and generated just according to each sessions and rest period Beginning program, including:
Sessions are divided according to sitting reminder time, the rest period is set between each sessions;
According to the Estimated Time Of Completion of each job task, determine each sessions job task and each job task it is complete At sequence;
Initial progress is generated according to the job task of each sessions, the completion sequence of each job task and the rest period Table.
5. according to the method described in claim 1, it is characterized in that, the completion by job task in each sessions Sequentially, the performance for monitoring each job task updates initial program according to the performance, including:
By the completion sequence of job task in each sessions, the careful topic time of each job task is monitored;
Prompt time is skipped according to what the Estimated Time Of Completion of each job task determined each job task;
When the careful topic time, which is equal to, skips prompt time, carry out skipping prompt, and prompt time update is skipped according to described Initial program;
When the careful topic time, which is less than, skips prompt time, the actual finish time of monitoring results task is complete by the reality It is added to private database access at the time, and initial program is updated according to the actual finish time.
6. according to the method described in claim 5, it is characterized in that, skipping prompt time described in the basis updates initial progress Table, including:
The deadline and the difference of prompt time is skipped on the estimation, choose job task from next sessions, and by institute The job task for stating selection is added to the current work stage.
7. according to the method described in claim 5, it is characterized in that, described update initial progress according to the actual finish time Table, including:
It is poor according to the actual finish time and Estimated Time Of Completion when the actual finish time is shorter than Estimated Time Of Completion Value, chooses job task, and the job task of selection is added to the current work stage from next sessions;
It is poor according to the actual finish time and Estimated Time Of Completion when the actual finish time is longer than Estimated Time Of Completion Value, chooses job task, and the job task of selection is transferred to next sessions from the current work stage.
8. a kind of job scheduling monitoring device, which is characterized in that including:
Job task receiving module is determined for receiving at least one job task by cloud database and private database access The Estimated Time Of Completion of each job task at least one job task;
Initial program generation module, for being set according to the Estimated Time Of Completion and sitting reminder time of each job task It sets each sessions and rest period, and initial program is generated according to each sessions and rest period;
Monitoring module monitors the completion feelings of each job task for the completion sequence by job task in each sessions Condition updates initial program according to the performance, and carries out job scheduling monitoring according to updated initial program.
9. a kind of terminal, which is characterized in that the terminal includes:
One or more processors;
Memory, for storing one or more programs;
When one or more of programs are executed by one or more of processors so that one or more of processors are real The now job scheduling monitoring method as described in any in claim 1-7.
10. a kind of readable medium, is stored thereon with computer program, which is characterized in that the program is realized when being executed by processor Job scheduling monitoring method as described in any in claim 1-7.
CN201810547214.9A 2018-05-31 2018-05-31 Operation progress monitoring method and device, terminal and readable medium Active CN108805764B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810547214.9A CN108805764B (en) 2018-05-31 2018-05-31 Operation progress monitoring method and device, terminal and readable medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810547214.9A CN108805764B (en) 2018-05-31 2018-05-31 Operation progress monitoring method and device, terminal and readable medium

Publications (2)

Publication Number Publication Date
CN108805764A true CN108805764A (en) 2018-11-13
CN108805764B CN108805764B (en) 2022-02-18

Family

ID=64089596

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810547214.9A Active CN108805764B (en) 2018-05-31 2018-05-31 Operation progress monitoring method and device, terminal and readable medium

Country Status (1)

Country Link
CN (1) CN108805764B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109598441A (en) * 2018-11-28 2019-04-09 深圳市元创时代科技有限公司 Method for allocating tasks and system
CN109619838A (en) * 2019-01-29 2019-04-16 曹桂硕 The application method and intelligent school table system of intelligent school table
CN112083628A (en) * 2019-06-13 2020-12-15 广东小天才科技有限公司 Intelligent projection device and projection interaction method
CN112148396A (en) * 2019-06-26 2020-12-29 广东小天才科技有限公司 Method and device for reminding job progress, terminal equipment and storage medium
CN112150090A (en) * 2019-06-26 2020-12-29 广东小天才科技有限公司 Operation planning reminding terminal and method
CN112150777A (en) * 2019-06-26 2020-12-29 广东小天才科技有限公司 Intelligent operation reminding device and method
CN112235465A (en) * 2020-10-27 2021-01-15 四川金沐志德科技有限公司 Learning task and financing management system based on intelligent terminal
CN112308511A (en) * 2020-10-27 2021-02-02 北京字节跳动网络技术有限公司 Task plan generation method and device, electronic equipment and storage medium
CN113313377A (en) * 2021-05-26 2021-08-27 广汽丰田汽车有限公司 Production preparation process management method, system and computer readable storage medium
CN115086363A (en) * 2022-05-23 2022-09-20 北京声智科技有限公司 Learning task early warning method and device, electronic equipment and storage medium
CN115577997A (en) * 2022-12-12 2023-01-06 上海奔曜科技有限公司 Scheduling control method, device, equipment and computer readable storage medium

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150142491A1 (en) * 2013-11-15 2015-05-21 Cognito Limited Management of field-based workers
CN104966424A (en) * 2015-07-03 2015-10-07 广东小天才科技有限公司 Learning method and device based on point reading machine
CN105225179A (en) * 2015-08-28 2016-01-06 广东小天才科技有限公司 Learning process monitoring method and learning process monitoring device
CN106022628A (en) * 2016-05-27 2016-10-12 内蒙古自治区民航机场集团有限责任公司 Airport work distributing, monitoring and scheduling system based on mobile terminals, and method thereof
CN106804113A (en) * 2015-06-26 2017-06-06 华为技术有限公司 A kind of control method of intelligent terminal pattern, device and intelligent terminal
CN107944839A (en) * 2017-12-19 2018-04-20 李丹 Student's holiday time automatic curriculum scheduling system for prompting

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150142491A1 (en) * 2013-11-15 2015-05-21 Cognito Limited Management of field-based workers
CN106804113A (en) * 2015-06-26 2017-06-06 华为技术有限公司 A kind of control method of intelligent terminal pattern, device and intelligent terminal
CN104966424A (en) * 2015-07-03 2015-10-07 广东小天才科技有限公司 Learning method and device based on point reading machine
CN105225179A (en) * 2015-08-28 2016-01-06 广东小天才科技有限公司 Learning process monitoring method and learning process monitoring device
CN106022628A (en) * 2016-05-27 2016-10-12 内蒙古自治区民航机场集团有限责任公司 Airport work distributing, monitoring and scheduling system based on mobile terminals, and method thereof
CN107944839A (en) * 2017-12-19 2018-04-20 李丹 Student's holiday time automatic curriculum scheduling system for prompting

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109598441A (en) * 2018-11-28 2019-04-09 深圳市元创时代科技有限公司 Method for allocating tasks and system
CN109619838B (en) * 2019-01-29 2022-01-07 曹桂硕 Application method of intelligent desk and intelligent desk system
CN109619838A (en) * 2019-01-29 2019-04-16 曹桂硕 The application method and intelligent school table system of intelligent school table
CN112083628A (en) * 2019-06-13 2020-12-15 广东小天才科技有限公司 Intelligent projection device and projection interaction method
CN112148396A (en) * 2019-06-26 2020-12-29 广东小天才科技有限公司 Method and device for reminding job progress, terminal equipment and storage medium
CN112150777A (en) * 2019-06-26 2020-12-29 广东小天才科技有限公司 Intelligent operation reminding device and method
CN112150090A (en) * 2019-06-26 2020-12-29 广东小天才科技有限公司 Operation planning reminding terminal and method
CN112235465A (en) * 2020-10-27 2021-01-15 四川金沐志德科技有限公司 Learning task and financing management system based on intelligent terminal
CN112308511A (en) * 2020-10-27 2021-02-02 北京字节跳动网络技术有限公司 Task plan generation method and device, electronic equipment and storage medium
CN113313377A (en) * 2021-05-26 2021-08-27 广汽丰田汽车有限公司 Production preparation process management method, system and computer readable storage medium
CN115086363A (en) * 2022-05-23 2022-09-20 北京声智科技有限公司 Learning task early warning method and device, electronic equipment and storage medium
CN115086363B (en) * 2022-05-23 2024-02-13 北京声智科技有限公司 Early warning method and device for learning task, electronic equipment and storage medium
CN115577997A (en) * 2022-12-12 2023-01-06 上海奔曜科技有限公司 Scheduling control method, device, equipment and computer readable storage medium
CN115577997B (en) * 2022-12-12 2023-06-09 上海奔曜科技有限公司 Scheduling control method, device, equipment and computer readable storage medium

Also Published As

Publication number Publication date
CN108805764B (en) 2022-02-18

Similar Documents

Publication Publication Date Title
CN108805764A (en) A kind of job scheduling monitoring method, device, terminal and readable medium
Yinger Routines in teacher planning
Nunamaker et al. Electronic meeting systems
Vennix et al. Model-building for group decision support: issues and alternatives in knowledge elicitation
Stefik et al. Beyond the chalkboard: Computer support for collaboration and problem solving in meetings
Zafeiriou et al. Using students' perceptions of participation in collaborative learning activities in the design of online learning environments
CN110091335B (en) Method, system, device and storage medium for controlling learning partner robot
Franklin Deliberation and voluntary action in “conscious” software agents
CN113504965B (en) Service processing system and method
CN109635259A (en) A kind of electronic test paper generation method, device, equipment and storage medium
Harnad Interactive cognition: Exploring the potential of electronic quote/commenting
CN108230797A (en) A kind of interactive assisted learning method and system
Alario-Hoyos et al. Adaptive planner for facilitating the management of tasks in MOOCs
CN107480894A (en) Scoring reminding method, device, server and the storage medium of on-line teaching system
Chandler The science education advisor: Applying a user centered design approach to the development of an interactive case-based advising system
KR20110082445A (en) Device and method for providing studying information adjusted by studying achievement
JP2003280505A (en) Learning support method and learning support program
Lowe Postmodernity and historians of education: A view from Britain
CN107527306A (en) Briefing method, apparatus, server and the storage medium of on-line teaching system
KR20140046430A (en) Repetitive learning system and providing method thereof
CN105118341B (en) A kind of network-based classroom instruction method and system
Jbara A new visual tool to improve the effectiveness of teaching and learning CPU scheduling algorithms
Abdelfattah et al. Automated academic schedule builder for University’s faculties
Cheng et al. Brief, Just-in-Time Teaching Tips to Support Computer Science Tutors
CN110297916A (en) A kind of interaction control method of net work teaching system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20200417

Address after: Room 706, Room 1699, South Zuchong Road, Yushan Town, Kunshan City, Suzhou City, Jiangsu Province

Applicant after: Kunshan Pinyuan Intellectual Property Operating Technology Co., Ltd.

Address before: 200233, Shanghai, Jinshan District Jinshan Industrial Zone, Ting Wei highway 65584, room 1309

Applicant before: SHANGHAI WIND TECHNOLOGIES Co.,Ltd.

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200624

Address after: 400030 Chongqing City, Shapingba District, No. 6, Paul Road, No. 4

Applicant after: Chongqing Huiye Communication Technology Co.,Ltd.

Address before: Room 706, Room 1699, South Zuchong Road, Yushan Town, Kunshan City, Suzhou City, Jiangsu Province

Applicant before: Kunshan Pinyuan Intellectual Property Operating Technology Co.,Ltd.

TA01 Transfer of patent application right
CB02 Change of applicant information

Address after: 400030 No. 6, No. 4, comprehensive security road, Shapingba District, Chongqing.

Applicant after: Chongqing Huiye IOT Technology Co.,Ltd.

Address before: 400030 No. 6, No. 4, comprehensive security road, Shapingba District, Chongqing.

Applicant before: Chongqing Huiye Communication Technology Co.,Ltd.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant