CN108681848A - 一种“三位一体”小型水库或淤地坝汛期预警方法 - Google Patents

一种“三位一体”小型水库或淤地坝汛期预警方法 Download PDF

Info

Publication number
CN108681848A
CN108681848A CN201810976326.6A CN201810976326A CN108681848A CN 108681848 A CN108681848 A CN 108681848A CN 201810976326 A CN201810976326 A CN 201810976326A CN 108681848 A CN108681848 A CN 108681848A
Authority
CN
China
Prior art keywords
rainfall
water level
early warning
forecast
formula
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810976326.6A
Other languages
English (en)
Inventor
张宝森
李春江
史学建
时芳欣
汪自力
田治宗
李书霞
于国卿
谢志刚
岳瑜素
曾贺
邓宇
郭晓明
张晓华
徐璐凯
赵苏磊
马子普
兰华林
顾利亚
周文君
何丽娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yellow River Institute of Hydraulic Research
Original Assignee
Yellow River Institute of Hydraulic Research
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yellow River Institute of Hydraulic Research filed Critical Yellow River Institute of Hydraulic Research
Priority to CN201810976326.6A priority Critical patent/CN108681848A/zh
Publication of CN108681848A publication Critical patent/CN108681848A/zh
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/40Controlling or monitoring, e.g. of flood or hurricane; Forecasting, e.g. risk assessment or mapping

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Alarm Systems (AREA)

Abstract

本发明公开了一种“三位一体”小型水库或淤地坝汛期预警方法,其中三位包含气象预报层、水位预警层及防洪抢险层。具体实施包括:气象预报层中,可据水库周边历史降雨资料,提前预测不同降雨重现期下降雨量p,可据中央或地方气象站大尺度预测降雨量p,也可基于选定雨量站获取实时降雨量p;水位预警层中,根据降雨量p及降雨径流公式,预测坝前水位h,或实时监测坝前水位h,再进行三级水位预警;防洪抢险层中,根据三级预警信息,发布相应防洪抢险措施,将预警和抢险信息同时自动推送至相关单位或个人。本发明考虑三种降雨量预报,三种水位预警,三种防洪抢险措施,构建了一整套多角度、多级别、多措施的一体化预警方法,可以解决小流域内小水库或淤地坝内安全度汛问题。

Description

一种“三位一体”小型水库或淤地坝汛期预警方法
技术领域
本发明涉及水利领域,主要是关于小型水库与淤地坝防洪预警方面。
背景技术
小型水库是指库容在10万立方米~1000万立方米之间的水库,其中,库容在100万立方米~1000万立方米的为小(1)型水库,库容在10万立方米~100万立方米的为小(2)型水库。
淤地坝是指在水土流失地区各级沟道中,以拦泥淤地为目的而修建的坝工建筑物,主要目的是滞洪、拦泥,淤地、蓄水、建设农田、发展农业生产、减轻黄河泥沙。
据《第一次全国水利普查公报》数据,全国建成的各类水库98002座,其中小型水库93308座,占水库总数95.2%,小型水库中小(1)型和小(2)型比例为1:4.2。其中1954~2006年度期间全国各类溃坝水库中,小型水库占96.4%,其溃坝原因主要有洪水漫顶(占51.1%),工程质量差(占32.0%),运行管理不当(占10.6%)等。
亟待提高小型水库与淤地坝的防洪预警作用,增长预见期,提前采取相应的防洪措施,减少下游人员及经济的损失。
传统的防洪措施,包括工程措施和非工程措施,但小型水库和淤地坝数量多、分布广,地处偏僻,难以形成完善的防洪工程体系,这样洪水预报、预警等非工程措施对小型水库与淤地坝防洪就显得尤为重要。洪水预报模型有很多,如新安江模型,分布式水文模型、其他经验模型等,这些多应用于水文资料丰富的大中型流域预报,预报较复杂。而小型水库由于库容小、汇流时间短,水位上涨快,暴雨来临时,极易发生漫顶而溃坝,特别是由淤地坝改建的小型水库,淤积量较大,防洪库容更小,因此必须最大限度增长洪水预见期,提前采取措施减少或延缓溃坝对下游人员及财产的损失。
专利“中小水库智能四象限调洪方法”(申请号 201610021720.5)公开了一种水库入库流量预报与调洪演算的简易方法,能够缩短调洪方案的制定时间,有效提高中小型水库预报的时效性,起到防洪预警作用。但是需要较丰富的历史降雨资料,用来提前绘制该水库不同工况条件下降雨径流关系曲线、洪峰关系曲线、调洪关系曲线、一次洪量及起涨库容和水库最大蓄水量关系曲线,而一般小型水库,特别是淤地坝历史资料极端匮乏,同时该专利未提出多种预警方式,且缺乏不同预警级别下的防洪抢险措施。
发明内容
本发明的目的是提供一整套针对小型水库或淤地坝的防洪预警技术方法,从而减少溃坝风险或延缓溃坝时间,最大限度的增长预见期,为实施防洪抢险措施和撤离下游人员争取更长时间。
本发明介绍的是一种“三位一体”(气象预报-水位预警-防洪抢险)的小型水库或淤地坝汛期预警方法,见图1,主要技术方案如下。
1.先选取离水库15km范围内气象站或雨量站,该气象站或雨量站尽量位于大坝上游汇水面积内,且能有三站构建的三角形将水库包含其中,但对于气象站或雨量站较少的地区,可选1~2气象站或雨量站。
2.获取所选气象站或雨量站的历史降雨资料,分析各站实测年均汛期(6月-9月)最大降雨量与历年最大24小时降雨量,以做好水库汛期长时预警和短时预警。
3.选取坝前水位h为预警指标,同时选取水库的汛限水位高程、溢洪道底板高程、坝顶高程为预警阈值,建立三级水位预警。对于一部分无溢洪道设施的淤地坝,可选取坝顶高程以下4.5m处为溢洪道底板高程。对于无任何水位监测设备的小型水库或淤地坝,可在坝前设立简易水尺或在迎水斜坡上用防水颜料或彩条布标注高程。
4.在步骤A或步骤B或步骤C中,将利用降雨量p预测预报坝前水位h,具体操作如下:利用公式(1)计算出入库径流量w ,再利用公式(2)计算初始库容 ,最后利用公式(3)计算坝前水位h。
公式(1):,式中: w为径流量(m3);P为降雨量(mm);A为流域控制面积(m2),为某类型地径流系数;为流域内该类型地所占面积比例。
公式(2):,式中: h0为初始坝前水位(m),为初始库容(m3)。
公式(3);),式中: h为预报坝前水位(m)。
其中公式(2)和公式(3)通过库容散点图拟合而得,拟合公式建议采用多项式,且相关系数R2≥0.95。
5.在步骤A中,若要提前预测不同降雨强度下的坝前水位,可以基于历史降雨资料中历年最大24小时降雨量,绘制显著性水平α=0.05降水频率曲线,从而求出不同降雨重现期的降雨量p,作为该水库设计暴雨量,提前绘制不同降雨强度下的坝前水位h。
6.在步骤A中,若要超前(汛期来临之前)预测该水库坝前水位,可以基于灰色-周期外延预测模型(参考论文:吕萍,基于灰色—周期外延模型的年降水量预测,吉林水利2013.01)以及历史年均汛期(6月-9月)最大降雨量,预测该年度汛期内降雨量p,作为该水库汛期小尺度预报暴雨量,从而超前预测坝前水位h。
7.在步骤B中,基于中央或地方气象站发布的该水库所在地区1-7天(甚至更长时间)降雨量p或降雨等级,作为该水库大尺度预报降雨,从而预测坝前水位h。
8.在步骤B中,可根据气象部门划分的24小时降雨量七个等级:微量(<0.1mm)、小雨(0.1~9.9mm)、中雨(10.0~24.9mm)、大雨(25.0~49.9mm)、暴雨(50.0~99.9mm)、大暴雨(100.0~249.9mm)、特大暴雨(>250.0mm),再结合步骤A中绘制的降雨频率曲线,查询不同等级下降雨量所对应的降雨重现期范围,从而可大尺度的预测坝前水位h。
9.在步骤C中,基于选好的雨量站的实时降雨量p,实时预测坝前水位h。
10.当坝前水位h等于或超过汛限水位高程(步骤F),发布Ⅲ级蓝色预警;当坝前水位h等于或超过溢洪道底板高程(步骤H),发布Ⅱ级黄色预警;当坝前水位h等于或超过坝顶高程(步骤G),发布Ⅰ级红色预警。其中坝前水位h包括利用降雨量预测的坝前水位h(步骤M)或坝前自动水位计监测的水位h(步骤D)或利用虚拟电子水尺监测水位h(步骤E)。
11.当发布Ⅲ级蓝色预警信号时,打开水库排水卧管(底孔)排水,对于无排水卧管(底孔)或排水卧管(底孔)排水量较小时,可跨越坝顶或在溢洪道内搭建一组或多组内径为300mm的无动力虹吸排水管道,该管材可选用橡胶伸缩软管,重量轻,价格便宜,携带和安装方便快捷,利于紧急防洪抢险,抢险过后还可回收再利用。
12.当发布Ⅱ级黄色预警信号时,利用溢洪道溢流排洪,对于有闸门的溢洪道,及时开启闸门,对于一部分无溢洪道的淤地坝,增加坝前水位观测频次至15分钟/次,并开始准备铺设坝面临时泄洪槽的相关材料。
13.当发布Ⅰ级红色预警信号时,在坝体背水坡搭建坝面临时泄洪槽,该泄洪槽铺设宽5m,泄洪漕两侧采用沙袋围堰,底部采用防冲材料。
14.在步骤J和步骤K中,将不同等级的预警信息和相应的抢险应对措施通过电台或微信或QQ或短信,自动同时推送至相关单位或个人。
附图说明
图1为“三位一体”的小型水库或淤地坝汛期预警技术方案图。
图1中A、B、C、D、E、F、G、H、J、K、L、M为该技术方案的关键步骤。
图1中(1)、(2)、(3)为关键计算公式。
具体实施方式
本发明的总体实施思路是:先获取气象预报层降雨量p,再推求水位预警层中坝前水位h进行水位预警,最后在防洪抢险层,根据相应预警信息发布不同级别预警并实施防洪抢险措施,具体实施过程如下。
在气象预报层,利用步骤A或步骤B或步骤C可获得降雨量p。其中步骤A是基于历史降雨资料,计算不同暴雨重现期下的降雨量,或利用灰色-周期外延预测模型计算该水库地区小尺度条件下降雨量。步骤B是基于中央或地方气象站的大尺度预报降雨量或降雨等级。步骤C是实时降雨量。
在水位预警层,基于不同工况条件下预测的降雨量p,经过公式(1)(2)(3)计算在步骤M处可以预测坝前水位h,同时对于有水位监测设备的水库,也可以采用步骤D和步骤E实时监测坝前水位,在步骤L处进行三级水位预警。
在防洪抢险层,根据上一层的三级水位预警情况,分别进行步骤F或步骤G或步骤H,以及对应的防洪抢险措施,再进过步骤J和步骤K将预警信息和防洪抢险信息发送给相关单位或个人。

Claims (10)

1.一种“三位一体”小型水库或淤地坝汛期预警方法,其特征在于,该方法包含气象预报层、水位预警层、防洪抢险层等三个层面,且汛期实施步骤为从气象预报层到水位预警层再到防洪抢险层。
2.根据权利要求1所述的气象预报层,其特征在于,先选取离水库15km范围内气象站或雨量站,该气象站或雨量站位于大坝上游汇水面积内,能有三站构建的三角形将水库流域包含其中,而对于气象站或雨量站较少的地区,可选1~2气象站或雨量站。
3.根据权利要求1所述的气象预报层,其特征在于,包含三种降雨量,一种是基于历史降雨资料的不同频率降雨量预报,一种是基于中央或地方气象站1-7天降雨量预报或降雨等级预报,一种是基于所选雨量站的实时降雨量监测。
4.根据权利要求3所述的基于历史降雨资料不同频率降雨预报,其特征在于,基于历年最大24小时降雨量绘制显著性水平α=0.05降水频率曲线,从而查询不同降雨重现期的降雨量,以及利用灰色-周期外延预测模型开展该水库或淤地坝小尺度短期预报降雨量。
5.根据权利要求3所述的基于中央或地方气象站降雨等级预报,其特征在于,根据气象部门划分的24小时降雨量七个等级:微量(<0.1mm)、小雨(0.1~9.9mm)、中雨(10.0~24.9mm)、大雨(25.0~49.9mm)、暴雨(50.0~99.9mm)、大暴雨(100.0~249.9mm)、特大暴雨(>250.0mm),再结合权利4中提到的降雨频率曲线,查询不同等级下降雨量所对应的降雨重现期范围,从而可大尺度的预测坝前水位。
6.根据权利要求1所述的水位预警层,其特征在于,利用降雨量p预测坝前水位,其具体步骤包括:利用公式(1)计算出入库径流量w,再利用公式(2)计算初始库容,最后利用公式(3)计算坝前水位h;
公式(1):,式中:w为径流量(m3);P为降雨量(mm);A为流域控制面积(m2),为某类型地径流系数;为流域内该类型地所占面积比例;
公式(2):,式中:h0为初始坝前水位(m),为初始库容(m3);
公式(3);),式中:h为预报坝前水位(m);
其中公式(2)和公式(3)通过库容散点图拟合而得,拟合公式建议采用多项式,且相关系数R2≥0.95。
7.根据权利要求1所述的水位预警层,其特征在于,三种坝前水位实时监测方法,一种在坝前设立简易水尺或在坝体迎水斜坡上用防水颜料或彩条布标注高程,现场人员读取,一种是利用坝前自动水位计自动监测水位,一种是基于视频构建电子水尺监测水位。
8.根据权利要求1所述的水位预警层,其特征在于,构建以汛限水位高程、溢洪道底板高程、坝顶高程为预警阈值的三级水位预警模式。
9.根据权利要求1所述的防洪抢险层,其特征在于,当预测水位或实时监测水位等于或大于汛限水位高程时,发布Ⅲ级蓝色预警,同时采取开启排水卧管(底孔)或安装一组或多组无动力虹吸排水管,当预测水位或实时监测水位等于或大于溢洪道底板高程时,发布Ⅱ级黄色预警,同时采取溢洪道溢流排洪,当预测水位或实时监测水位等于或大于坝顶高程时,发布Ⅰ级红色预警,同时搭建临时坝面泄洪槽。
10.根据权利要求1所述的防洪抢险层,其特征在于,将三级水位预警信息和相应抢险措施信息自动通过电台、微信、QQ、短信同时发送给相关单位或个人。
CN201810976326.6A 2018-08-25 2018-08-25 一种“三位一体”小型水库或淤地坝汛期预警方法 Pending CN108681848A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810976326.6A CN108681848A (zh) 2018-08-25 2018-08-25 一种“三位一体”小型水库或淤地坝汛期预警方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810976326.6A CN108681848A (zh) 2018-08-25 2018-08-25 一种“三位一体”小型水库或淤地坝汛期预警方法

Publications (1)

Publication Number Publication Date
CN108681848A true CN108681848A (zh) 2018-10-19

Family

ID=63816478

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810976326.6A Pending CN108681848A (zh) 2018-08-25 2018-08-25 一种“三位一体”小型水库或淤地坝汛期预警方法

Country Status (1)

Country Link
CN (1) CN108681848A (zh)

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109685312A (zh) * 2018-11-19 2019-04-26 西安理工大学 一种流域次降雨事件下淤地坝系失效风险评价方法
CN109767027A (zh) * 2018-11-30 2019-05-17 深圳春沐源控股有限公司 水库渗水量预测方法及装置
CN109978263A (zh) * 2019-03-27 2019-07-05 上海市园林设计研究总院有限公司 一种园林水系水位预警方法
CN110852525A (zh) * 2019-11-19 2020-02-28 长安大学 基于预报误差越级设防的水库防洪限制水位动态调节方法
CN110991688A (zh) * 2019-10-15 2020-04-10 国网浙江省电力有限公司紧水滩水力发电厂 基于气象数值预报的水库调度预警方法
CN111091690A (zh) * 2019-12-28 2020-05-01 天地伟业技术有限公司 一种智能水利球机自动预测水位触发警报方法
CN111476976A (zh) * 2020-04-28 2020-07-31 广西壮族自治区水利科学研究院 一种水库暴雨预警阈值动态分析系统
CN112967476A (zh) * 2021-04-09 2021-06-15 黑龙江文图测绘地理信息有限责任公司 一种基于双曲分流模型的洪水预报系统
CN113011673A (zh) * 2021-03-31 2021-06-22 新奥数能科技有限公司 一种冷却塔水位的监测预警方法及装置
CN113034853A (zh) * 2021-03-02 2021-06-25 成都正和德能风险管理咨询有限公司 一种洪水预报预警分析方法及系统
CN113435631A (zh) * 2021-06-04 2021-09-24 南京河海南自水电自动化有限公司 一种洪水预报方法、系统、可读存储介质及计算设备
CN113916318A (zh) * 2021-08-31 2022-01-11 福建枋洋水利投资发展有限公司 一种基于水情监测的大坝安全监测方法
CN114495430A (zh) * 2021-12-23 2022-05-13 北京中关村智连安全科学研究院有限公司 一种土石坝安全状态预警方法及系统
CN114737515A (zh) * 2022-04-25 2022-07-12 北京中瀚环球真空流体科技有限责任公司 一种虹吸应急排洪智能响应系统及方法
CN115115236A (zh) * 2022-06-30 2022-09-27 青岛海信网络科技股份有限公司 一种水库溃坝的预警方法和设备
CN115419022A (zh) * 2022-08-29 2022-12-02 内蒙古大学 一种优化的流域型防蚀控砂淤地坝系统及其施工方法
CN115661438A (zh) * 2022-10-21 2023-01-31 广州地铁集团有限公司 一种基于机器视觉的站外水位监测及防汛预警方法
CN115909662A (zh) * 2022-10-08 2023-04-04 内蒙古工业大学 一种淤地坝防洪预警方法与系统
CN116258278A (zh) * 2023-05-10 2023-06-13 青岛研博数据信息技术有限公司 构建的水位库容推演方法、系统及其设备
CN116720651A (zh) * 2023-05-18 2023-09-08 浙江河海中控信息科技有限公司 汛期闸口排水超前预测方法和系统
CN117236791A (zh) * 2023-11-10 2023-12-15 山东汇颐信息技术有限公司 基于gis和bim三维技术的水利实时监测方法和系统

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009300311A (ja) * 2008-06-16 2009-12-24 Toshiba Corp 洪水予測支援装置および洪水予測支援方法
CN104851051A (zh) * 2014-12-08 2015-08-19 国家电网公司 一种结合动态修正的电网区域暴雨量精细化预警方法
CN105678984A (zh) * 2015-12-30 2016-06-15 四川大学 无资料地区堰塞湖溃决灾害预警体系建立方法
CN107578134A (zh) * 2017-09-12 2018-01-12 西安理工大学 一种考虑预警的黄河上游梯级水库防洪调度方法
CN108320462A (zh) * 2018-03-02 2018-07-24 中山市爱科应用科技有限公司 城市防汛预警预报系统

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009300311A (ja) * 2008-06-16 2009-12-24 Toshiba Corp 洪水予測支援装置および洪水予測支援方法
CN104851051A (zh) * 2014-12-08 2015-08-19 国家电网公司 一种结合动态修正的电网区域暴雨量精细化预警方法
CN105678984A (zh) * 2015-12-30 2016-06-15 四川大学 无资料地区堰塞湖溃决灾害预警体系建立方法
CN107578134A (zh) * 2017-09-12 2018-01-12 西安理工大学 一种考虑预警的黄河上游梯级水库防洪调度方法
CN108320462A (zh) * 2018-03-02 2018-07-24 中山市爱科应用科技有限公司 城市防汛预警预报系统

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
冯文杰 等: "半城子水库简易洪水预报方法在防洪调度中的应用", 《北京水务》 *
陆桂明 等: "郑州防洪减灾水文信息预警系统设计", 《华北水利水电学院学报》 *

Cited By (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109685312B (zh) * 2018-11-19 2023-09-29 西安理工大学 一种流域次降雨事件下淤地坝系失效风险评价方法
CN109685312A (zh) * 2018-11-19 2019-04-26 西安理工大学 一种流域次降雨事件下淤地坝系失效风险评价方法
CN109767027A (zh) * 2018-11-30 2019-05-17 深圳春沐源控股有限公司 水库渗水量预测方法及装置
CN109978263A (zh) * 2019-03-27 2019-07-05 上海市园林设计研究总院有限公司 一种园林水系水位预警方法
CN109978263B (zh) * 2019-03-27 2023-06-09 上海市园林设计研究总院有限公司 一种园林水系水位预警方法
CN110991688B (zh) * 2019-10-15 2022-06-07 国网浙江省电力有限公司紧水滩水力发电厂 基于气象数值预报的水库调度预警方法
CN110991688A (zh) * 2019-10-15 2020-04-10 国网浙江省电力有限公司紧水滩水力发电厂 基于气象数值预报的水库调度预警方法
CN110852525A (zh) * 2019-11-19 2020-02-28 长安大学 基于预报误差越级设防的水库防洪限制水位动态调节方法
CN111091690A (zh) * 2019-12-28 2020-05-01 天地伟业技术有限公司 一种智能水利球机自动预测水位触发警报方法
CN111476976A (zh) * 2020-04-28 2020-07-31 广西壮族自治区水利科学研究院 一种水库暴雨预警阈值动态分析系统
CN113034853A (zh) * 2021-03-02 2021-06-25 成都正和德能风险管理咨询有限公司 一种洪水预报预警分析方法及系统
CN113034853B (zh) * 2021-03-02 2023-10-17 成都正和德能风险管理咨询有限公司 一种洪水预报预警分析方法及系统
CN113011673A (zh) * 2021-03-31 2021-06-22 新奥数能科技有限公司 一种冷却塔水位的监测预警方法及装置
CN112967476A (zh) * 2021-04-09 2021-06-15 黑龙江文图测绘地理信息有限责任公司 一种基于双曲分流模型的洪水预报系统
CN113435631B (zh) * 2021-06-04 2024-02-02 南京河海南自水电自动化有限公司 一种洪水预报方法、系统、可读存储介质及计算设备
CN113435631A (zh) * 2021-06-04 2021-09-24 南京河海南自水电自动化有限公司 一种洪水预报方法、系统、可读存储介质及计算设备
CN113916318A (zh) * 2021-08-31 2022-01-11 福建枋洋水利投资发展有限公司 一种基于水情监测的大坝安全监测方法
CN114495430A (zh) * 2021-12-23 2022-05-13 北京中关村智连安全科学研究院有限公司 一种土石坝安全状态预警方法及系统
CN114737515A (zh) * 2022-04-25 2022-07-12 北京中瀚环球真空流体科技有限责任公司 一种虹吸应急排洪智能响应系统及方法
CN115115236A (zh) * 2022-06-30 2022-09-27 青岛海信网络科技股份有限公司 一种水库溃坝的预警方法和设备
CN115419022A (zh) * 2022-08-29 2022-12-02 内蒙古大学 一种优化的流域型防蚀控砂淤地坝系统及其施工方法
CN115419022B (zh) * 2022-08-29 2023-12-15 内蒙古大学 一种优化的流域型防蚀控砂淤地坝系统及其施工方法
CN115909662A (zh) * 2022-10-08 2023-04-04 内蒙古工业大学 一种淤地坝防洪预警方法与系统
CN115661438A (zh) * 2022-10-21 2023-01-31 广州地铁集团有限公司 一种基于机器视觉的站外水位监测及防汛预警方法
CN115661438B (zh) * 2022-10-21 2024-03-08 广州地铁集团有限公司 一种基于机器视觉的站外水位监测及防汛预警方法
CN116258278A (zh) * 2023-05-10 2023-06-13 青岛研博数据信息技术有限公司 构建的水位库容推演方法、系统及其设备
CN116720651A (zh) * 2023-05-18 2023-09-08 浙江河海中控信息科技有限公司 汛期闸口排水超前预测方法和系统
CN117236791A (zh) * 2023-11-10 2023-12-15 山东汇颐信息技术有限公司 基于gis和bim三维技术的水利实时监测方法和系统
CN117236791B (zh) * 2023-11-10 2024-03-08 山东汇颐信息技术有限公司 基于gis和bim三维技术的水利实时监测方法和系统

Similar Documents

Publication Publication Date Title
CN108681848A (zh) 一种“三位一体”小型水库或淤地坝汛期预警方法
CN106529739A (zh) 基于网格化的洪水预测方法
KR102663700B1 (ko) 기상정보를 이용한 지역 침수분석 시스템
CN106326656B (zh) 一种工程设施极端暴雨洪水位的模拟预测方法
CN101929140A (zh) 非平原城市排洪规划设计方法
Arvand et al. Evaluating the impact of LID-BMPs on urban runoff reduction in an urban sub-catchment
Chui et al. The development of a comprehensive flood prevention strategy for Hong Kong
Aziz et al. Flood Disaster in Erbil City: Problems and Solutions
Juliastuti et al. The assessment of drainage performance in the residential area using SWMM
Douglas et al. Characterisation of urban streams and urban flooding
CN110889185A (zh) 一种小流域的洪峰流量分析方法及其应用
KR101181304B1 (ko) 유비쿼터스 도시의 물순환 건전성 시뮬레이션 방법
Suryanti et al. Study of Characteristics and Management of Drainage Problems in Ubud District
Sari Performance of retarding basin in flood disaster risk mitigation in Welang River, East Java Province, Indonesia
Yang et al. Return period for urban rainwater drainage networks based on the lowest total social investment method: a case study in Tianjin, China
Le et al. Assessing the impacts of urbanization and climate change on urban drainage system
Hussain et al. Modifying the spillway of Adhaim Dam, reducing flood impact, and saving water
Velychko et al. Evaluation of the green flood mitigation measures in urban area in the frame of the sustainable city concept
Aufa et al. Water Infiltration Policy for Urban Flood Management
KR20240020378A (ko) 고해상도 dem을 활용한 농경지 침수분석 시스템
Seo et al. A Study on the Stormwater Drainage Method of Overflow Type for the Prevention of Urban Flood due to Abnormal Precipitation
Shamkhi et al. Evaluation of the rain water network in wasit governorate/Kut city and the commercial center of the region as a dual network (rain and sewage)
Husain Flood Routing in Reservoir using Modified Puls Method
Yen Urban flood hazard and its mitigation
Sarala et al. Improvement of storm water drainage system in Greater Hyderabad Municipal Corporation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181019

WD01 Invention patent application deemed withdrawn after publication