CN108590700A - One kind secretly checking room equipment opening/manhole and its construction method - Google Patents
One kind secretly checking room equipment opening/manhole and its construction method Download PDFInfo
- Publication number
- CN108590700A CN108590700A CN201810151639.8A CN201810151639A CN108590700A CN 108590700 A CN108590700 A CN 108590700A CN 201810151639 A CN201810151639 A CN 201810151639A CN 108590700 A CN108590700 A CN 108590700A
- Authority
- CN
- China
- Prior art keywords
- interconnection
- secretly
- construction
- lining structure
- vertical passageway
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 58
- 239000011150 reinforced concrete Substances 0.000 claims abstract description 21
- 238000000034 method Methods 0.000 claims abstract description 14
- 230000003014 reinforcing effect Effects 0.000 claims description 35
- 230000002787 reinforcement Effects 0.000 claims description 26
- 229910000831 Steel Inorganic materials 0.000 claims description 20
- 239000010959 steel Substances 0.000 claims description 20
- 239000004567 concrete Substances 0.000 claims description 11
- 210000003205 muscle Anatomy 0.000 claims description 10
- 238000009412 basement excavation Methods 0.000 claims description 9
- 210000000481 breast Anatomy 0.000 claims description 6
- 238000003466 welding Methods 0.000 claims description 4
- 230000005855 radiation Effects 0.000 claims description 2
- 230000008901 benefit Effects 0.000 abstract description 8
- 238000005520 cutting process Methods 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 4
- 230000008878 coupling Effects 0.000 description 3
- 238000010168 coupling process Methods 0.000 description 3
- 238000005859 coupling reaction Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 230000008859 change Effects 0.000 description 2
- 238000010438 heat treatment Methods 0.000 description 2
- 239000011148 porous material Substances 0.000 description 2
- 238000007569 slipcasting Methods 0.000 description 2
- 239000011449 brick Substances 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000003475 lamination Methods 0.000 description 1
- 239000003550 marker Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000035800 maturation Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000004745 nonwoven fabric Substances 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000005507 spraying Methods 0.000 description 1
- 239000003351 stiffener Substances 0.000 description 1
- 238000003756 stirring Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- -1 tunnel arch wall Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/107—Reinforcing elements therefor; Holders for the reinforcing elements
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/38—Waterproofing; Heat insulating; Soundproofing; Electric insulating
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The invention discloses one kind secretly checking room equipment opening/manhole and its construction method comprising interconnection and vertical passageway, the interconnection are arranged in the side for secretly checking room, are vertically arranged with the secretly room of checking;The vertical passageway is vertically arranged with interconnection, vertically leads to ground;The vertical passageway includes first lining structure and two lining structures, is overlapped by manually digging hole method and interconnection;The just lining structure is recycled by several reinforced concrete core-tubes to be overlapped, and the tunnel to connect horizontal pipeline just serves as a contrast and ground, two lining structure are arranged in the inside of first lining structure.Technical solution provided by the invention secretly rolls over construction using subterranean tunnel, is not take up earth's surface place, adaptable advantage strong, construction is convenient;It is constructed using manually digging hole method, constructing, it is small to be influenced by underground utilities, and the construction time is short, and backfill compactness is easy to control, and cutting depth is adjustable, and emergency processing is convenient, has the advantages that low engineering cost, construction safety degree are high.
Description
Technical field
The invention belongs to construction engineering technical fields, are related to one kind and secretly checking room equipment opening/manhole and its construction method.
Background technology
The country mainly passes through in solving downtown area shallow buried covered excavation and secretly checking room equipment opening/manhole construction at present
Steel suspension bridge, night open caisson construction are set up daytime to secretly checking room vault or side wall.
Open caisson construction equipment opening/manhole has the disadvantage that:
(1)It is stringent to construction progress control, once night can not construct open caisson tube coupling to below ground, road will be influenced daytime
It is current;
(2)Open caisson tube coupling and tunnel structure contact surface difficulty of construction are big, waterproof is bonded difficulty, later stage underground water easily from contact surface into
Enter inspection chamber;
(3)The backfill of open caisson tube coupling back is difficult, and the later stage easily settles;
(4)Construction is influenced by present situation underground utilities, and underground utilities are met in construction to be avoided, and large area excavation is needed to change shifting pipeline
Or backfill changes shifting design position, again the shortcomings of excavation construction.
Secretly folding is chiefly used in shallow-depth-excavation tunnel construction in tunnel, and manually digging hole fado is constructed for bridge pier, and technology maturation is applied
Work process flexible, application cost are low, construction efficiency is high, are widely used to shallow-depth-excavation tunnel construction and bridge pier is constructed, but
It secretly checks in room equipment opening, artificial construction and there is no application.
With the close scheme of the present invention be Beijing blueprint Engineering Co., Ltd " heating pipeline secretly do the structure design of cell with
Construction " technical solution.The program mainly elaborate downtown area heating power cell do not have it is bright open execution conditions, it is disconnected by tunnel
Face gradual change to meet the device space requirement the construction method for secretly checking room.It is not directed to and secretly checks room equipment opening/manhole
Specific practice.
Invention content
The purpose of the present invention is the one kind in view of the above technical problems, provided secretly checks room equipment opening/manhole and its applies
Work method secretly rolls over construction using subterranean tunnel, is not take up earth's surface place, adaptable advantage strong, construction is convenient;Using people
Work borehole method is constructed, and constructing, it is small to be influenced by underground utilities, and the construction time is short, and backfill compactness is easy to control, and cutting depth is adjustable
Section, emergency processing is convenient, has the advantages that low engineering cost, construction safety degree are high.
Technical scheme of the present invention
In order to solve the above technical problems, one kind provided by the invention secretly checks room equipment opening/manhole, specifically include laterally logical
Road and vertical passageway, the interconnection are arranged in the side for secretly checking room, are vertically arranged with the secretly room of checking;It is described perpendicular
It is vertically arranged to channel and interconnection, vertically leads to construction ground;The vertical passageway includes first lining structure and two lining knots
Structure is overlapped by manually digging hole method and interconnection;The just lining structure is recycled by several reinforced concrete core-tubes to be overlapped, with
The tunnel for connecting horizontal pipeline just serves as a contrast and construction ground, two lining structure are arranged in the inside of first lining structure.
Further, the reinforced concrete core-tube of the just lining structure uses steel form, adjacent segments overlap joint to be not less than 50mm,
To ensure the integral strength of just lining structure, it is ensured that engineering construction quality.
Further, the reinforcing bar in the reinforced concrete core-tube includes circumferential reinforcement and longitudinal reinforcement, the circumferential direction steel
Muscle welds to form steel reinforcement cage with longitudinal reinforcement, and the longitudinal reinforcement stretches into adjacent reinforced concrete core-tube.
Further, the reinforcing bar of the reinforced concrete core-tube is connected by the arch reinforcing bar on L-type steel muscle and interconnection
It connects.
Further, two lining structure reinforcing bar of the interconnection and the reinforcing bar of vertical passageway bind pour simultaneously, and reinforcing bar connects
It meets place and arc reinforcing beam is set along tunnel lateral direction, along the longitudinally disposed crossbeam in tunnel, be arranged along hole and radiate reinforcing rib, above and below hole
Modal circumferential stiffening rib is set.
Meanwhile it present invention also provides a kind of construction method secretly checking room equipment opening/manhole, specifically including following
Step:
S1 is arranged ingate secretly checking the following stalk end in room side wall arch, excavates interconnection to designated position;
S2, hand excavation vertical passageway simultaneously pour breast wall concrete with template, and cycle construction to tunnel just serves as a contrast vault;
S3 abolishes concrete and connects reinforcing bar, integrally performs the waterproof of vertical passageway and interconnection;
S4 binds two lined steel muscle of vertical passageway and interconnection and pours.
Advantageous effect of the present invention:
One kind provided by the invention secretly checks room equipment opening/manhole and its construction method, reasonable for structure, has following technology
Effect:
(1)By laterally opening interconnection to both sides of the road suitable position in the secretly room of checking, it is not limited to secretly check on room
Side, can avoid the underground utilities of construction site, have the advantages that construction is flexible;
(2)The application uses manually digging hole, and supporting is deep-controlled flexibly, does not influence walk on daytime, avoids site operation
Influence to road;
(3)Just lining panelling construction technique is similar with tunnel for manually digging hole method panelling construction technique, and construction to contact surface can pass through chisel
Go out the connection of tunnel structure reinforcement welding, bolt-spary supports is same entirety, and construction technology is simple, good integrity;
(4)Since contact surface is same entirety, waterproof can be performed simultaneously with tunnel, ensure waterproof construction globality, pour simultaneously
Leakage scenarios will not occur for two layers of liner structure, contact surface;
(5)For manually digging hole method retaining wall by anchor spraying concrete supporting, back is not likely to produce hole region, and can reserve back slip casting
Pipe, timely slip casting backfill is closely knit, is not susceptible to road settlement.
Description of the drawings
By being described in detail made by conjunction with the following drawings, above-mentioned advantage of the invention will be apparent and be easier reason
Solution, these attached drawings are only schematical, are not intended to limit the present invention, wherein:
Fig. 1 is a kind of layout secretly checking room equipment opening/manhole of the present invention;
The schematic diagram of lining structure at the beginning of Fig. 2 is the present invention;
Fig. 3 is the schematic diagram of the reinforced concrete core-tube of the present invention;
Fig. 4 serves as a contrast dome portions hole reinforcement figure at the beginning of being the present invention;
Fig. 5 is the A-A views in Fig. 4;
Fig. 6 is the partial enlarged view in Fig. 5;
Fig. 7 is the two lining vault hole reinforcement figures of the present invention;
Fig. 8 is the B-B views in Fig. 7.
In attached drawing, the component representated by each label is as follows:
1. interconnection;2. vertical passageway;3. secretly checking room;4. just lining structure;4-1. reinforced concrete core-tube;1-4-1. ring
To reinforcing bar;1-4-2. longitudinal reinforcement;5. two lining structures;6.L steel bars;7. arc reinforcing beam;8. crossbeam;9. radiating reinforcing rib;
10. modal circumferential stiffening rib.
Specific implementation mode
With reference to specific embodiments and the drawings, room equipment opening/manhole and its construction party are secretly checked to one kind of the invention
Method is described in detail.
The embodiment recorded herein is the specific specific implementation mode of the present invention, for illustrating design of the invention,
It is explanatory and illustrative, should not be construed as the limitation to embodiment of the present invention and the scope of the invention.Except what is recorded herein
Outside embodiment, those skilled in the art can also based on the application claims and specification disclosure of that using aobvious and
The other technical solutions being clear to, these technical solutions include any obvious using making for the embodiment to recording herein
The technical solution of substitutions and modifications.
The attached drawing of this specification is schematic diagram, aids in illustrating the design of the present invention, it is schematically indicated the shape of each section
And its correlation.The structure of each component for the ease of clearly showing the embodiment of the present invention is note that, between each attached drawing
Do not drawn according to identical ratio.Identical reference marker is for indicating identical part.
Fig. 1 to Fig. 8 is the herein described accompanying drawings for secretly checking room equipment opening/manhole and its construction method.
A kind of structural schematic diagram secretly checking room equipment opening/manhole, as shown in Figure 1, its specifically include interconnection 1 and
Vertical passageway 2, the interconnection 1 are arranged in the side for secretly checking room 3, are vertically arranged with room 3 is secretly checked;It is described perpendicular
It is vertically arranged to channel 2 and interconnection 1, vertically leads to construction ground;The vertical passageway 2 includes first lining structure 4 and two
Lining structure 5 is overlapped by manually digging hole method and interconnection 1;The just lining structure 4 is by several reinforced concrete core-tube 4-1
Cycle overlap joint, the tunnel to connect horizontal pipeline 1 just serves as a contrast and construction ground, two lining structure 5 are arranged in first lining structure 4
Portion.
The reinforced concrete core-tube 4-1 of the just lining structure 4 uses steel form, adjacent segments overlap joint to be not less than 50mm, such as Fig. 2
It is shown.Adjacent reinforced concrete retaining wall 4-1 is mutually overlapped, and effectively increases the integral strength of first lining structure 4.In the application, steel
The thickness range of reinforced concrete retaining wall 4-1 is 50-150mm, and the altitude range of each sections of reinforced concrete core-tube 4-1 is 500-
1000mm。
Reinforcing bar in the reinforced concrete core-tube 4-1 includes circumferential reinforcement 4-1-1 and longitudinal reinforcement 4-1-2, such as Fig. 3 institutes
Show, the circumferential reinforcement 4-1-1 and longitudinal reinforcement 4-1-2 welds to form steel reinforcement cage, and the longitudinal reinforcement 4-1-2 stretches into adjacent
In reinforced concrete core-tube 4-1, the steel reinforcement cage in longitudinal reinforcement 4-1-2 and adjacent reinforced concrete core-tube 4-1 welds, and improves
The integral strength of first lining structure.Fig. 4 serves as a contrast dome portions hole reinforcement figure at the beginning of being the present invention, the reinforced concrete core-tube 4-1's
Reinforcing bar is by the arch bar connecting on L-type steel muscle 6 and interconnection 1, as shown in Figures 5 and 6.L-type steel muscle 6 is vertical by retaining wall
Reinforcing bar just serves as a contrast arch reinforcing bar with tunnel or vertical dowel is welded to connect, and after the completion of welding, the exposed reinforcing bar in excision hole mixes and stirs
Pea gravel concreten manually smoothes out hole, waterproof fitting construction is carried out convenient for whole, to ensure waterproof construction effect.
Fig. 7 is the two lining vault hole reinforcement figures of the present invention, two lining structure reinforcing bar of the interconnection and vertical passageway 2
Reinforcing bar binds pour simultaneously, and rebar junction is along tunnel lateral direction setting arc reinforcing beam 7, along the longitudinally disposed crossbeam 8 in tunnel, along hole
Mouth setting radiation reinforcing rib 9, hole modal circumferential stiffening rib 10 setting up and down.
In Fig. 7 and embodiment shown in Fig. 8, the same equipment opening of tunnel double-lining reinforcing bar, manhole reinforcing bar bind pour simultaneously, steel
Muscle junction is along four φ of tunnel lateral direction setting twice, 25 arc reinforcing beams 7;Along four 25 crossbeams of φ of the longitudinally disposed twice in tunnel
8;Along hole, 12 × 150mm of setting φ radiate reinforcing rib 9;Hole 14 ring stiffeners 10 of twice φ setting up and down, for reinforcing
Hole.
Meanwhile it disclosed herein as well is a kind of construction method secretly checking room equipment opening/manhole, specifically including following
Step:
S1 is arranged ingate secretly checking the following stalk end in 3 side wall arch of room, excavates interconnection 1 to designated position;
Specifically, in the side wall arch that secretly checks room 3, ingate is arranged in following stalk section, excavates interconnection 1, at the beginning of tunnel
It serves as a contrast to suitable position, such as both sides of the road square brick pavement lower section, the influence with reduction to road traffic.
S2, hand excavation vertical passageway 2 simultaneously pour breast wall concrete with template, and cycle construction to tunnel just serves as a contrast vault;
Specifically, hand excavation is a cycle per 1m, and hole sets up tripod and promotes the earthwork.Depth 1m is often dug, retaining wall steel is bound
Muscle, and the lower section soil body is inserted into vertical reinforcement lower end, it is welded to connect with the reinforced concrete core-tube 4-1 of subsequent cycle, welding length
Degree is not less than 10d.Breast wall concrete is poured with template in time, daily drilling depth is 1 section, ensures that breast wall concrete intensity, cycle are applied
Work just serves as a contrast vault to tunnel.Wind turbine is taken to blow when constructing in hole, it is ensured that keep with fresh air in hole when operation, avoid anoxic.
S3 abolishes concrete and connects reinforcing bar, integrally performs the waterproof of vertical passageway 2 and interconnection 1;
Specifically, equipment opening, manhole waterproof construction use thickness 1.5mmECB/EVA coextru-lamination waterproof materials, tunnel arch wall, hole
Non-woven fabrics is arranged in the interior borehole wall, performs simultaneously, hole drop-over, ensures waterproof layer globality.
S4 binds two lined steel muscle of vertical passageway 2 and interconnection 1 and pours.
In this application, the depth of the vertical passageway on ground should be not more than 20m, secretly check room equipment opening, manhole two
Lining structure pore diameter range is 700-1500mm, and the pore diameter range of first lining structure is 1000-2000mm, and manually digging hole casing will be higher by
Ground 150-200mm.
Compared with the prior art the shortcomings that and deficiency, one kind provided by the invention secretly check room equipment opening/manhole and its
Construction method secretly rolls over construction using subterranean tunnel, is not take up earth's surface place, adaptable advantage strong, construction is convenient;Using
Manually digging hole method is constructed, and constructing, it is small to be influenced by underground utilities, and the construction time is short, and backfill compactness is easy to control, and cutting depth can
It adjusts, emergency processing is convenient, has the advantages that low engineering cost, construction safety degree are high.
The present invention is not limited to the above-described embodiments, anyone can obtain other various forms under the inspiration of the present invention
Product, it is every that there is technical side identical or similar to the present application however, make any variation in its shape or structure
Case is within the scope of the present invention.
Claims (6)
1. one kind secretly checking room equipment opening/manhole, which is characterized in that including interconnection(1)And vertical passageway(2), described
Interconnection(1)Setting is secretly checking room(3)Side, and secretly check room(3)It is vertically arranged;The vertical passageway
(2)With interconnection(1)It is vertically arranged, vertically leads to construction ground;The vertical passageway(2)Including first lining structure(4)And
Two lining structures(5), pass through manually digging hole method and interconnection(1)Overlap joint;The just lining structure(4)By several armored concrete
Retaining wall(4-1)Cycle overlap joint, to connect horizontal pipeline(1)Tunnel just serve as a contrast and construction ground, two lining structure(5)Setting exists
First lining structure(4)Inside.
2. secretly checking room equipment opening/manhole according to claim 1, which is characterized in that the just lining structure(4)Reinforcing bar
Concrete guard wall(4-1)Using steel form, adjacent segments overlap joint is not less than 50mm.
3. secretly checking room equipment opening/manhole according to claim 1, which is characterized in that the reinforced concrete core-tube(4-
1)Reinforcing bar pass through L-type steel muscle(6)With interconnection(1)On arch bar connecting.
4. secretly checking room equipment opening/manhole according to claim 1, which is characterized in that two lining structure of the interconnection
Reinforcing bar and vertical passageway(2)Reinforcing bar simultaneously bind pour, rebar junction along tunnel lateral direction be arranged arc reinforcing beam(7), edge
The longitudinally disposed crossbeam in tunnel(8), along hole, radiation reinforcing rib is set(9), hole modal circumferential stiffening rib setting up and down(10).
5. secretly checking room equipment opening/manhole according to claim 2, which is characterized in that the reinforced concrete core-tube(4-
1)In reinforcing bar include circumferential reinforcement(4-1-1)And longitudinal reinforcement(4-1-2), the circumferential reinforcement(4-1-1)With longitudinal reinforcement
(4-1-2)Welding forms steel reinforcement cage, the longitudinal reinforcement(4-1-2)Stretch into adjacent reinforced concrete core-tube(4-1)It is interior.
6. a kind of construction method secretly checking room equipment opening/manhole, which is characterized in that include the following steps:
S1 is secretly checking room(3)Ingate is arranged in the following stalk end in side wall arch, excavates interconnection(1)To designated position;
S2, hand excavation vertical passageway(2)It is used in combination template to pour breast wall concrete, cycle construction to tunnel just serves as a contrast vault;
S3 abolishes concrete and connects reinforcing bar, integrally performs vertical passageway(2)And interconnection(1)Waterproof;
S4 binds vertical passageway(2)And interconnection(1)Two lined steel muscle and pour.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810151639.8A CN108590700A (en) | 2018-02-14 | 2018-02-14 | One kind secretly checking room equipment opening/manhole and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810151639.8A CN108590700A (en) | 2018-02-14 | 2018-02-14 | One kind secretly checking room equipment opening/manhole and its construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108590700A true CN108590700A (en) | 2018-09-28 |
Family
ID=63608824
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810151639.8A Pending CN108590700A (en) | 2018-02-14 | 2018-02-14 | One kind secretly checking room equipment opening/manhole and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108590700A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111877321A (en) * | 2020-07-21 | 2020-11-03 | 成都市建筑设计研究院 | Cast-in-place pile applied to underground reinforced concrete structure and construction method thereof |
Citations (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002155695A (en) * | 2000-11-22 | 2002-05-31 | Kajima Corp | Method for executing shield-tunnel connecting section |
CN201588636U (en) * | 2009-08-10 | 2010-09-22 | 招商局重庆交通科研设计院有限公司 | Tunnel inner wall structure |
CN102953739A (en) * | 2012-10-26 | 2013-03-06 | 中铁二十二局集团第六工程有限公司 | Bidirectional punching method for underground excavation of subway station |
CN202768000U (en) * | 2012-09-20 | 2013-03-06 | 四汇建设集团有限公司 | Large aperture manual hole digging pile retaining wall steel bar cover |
CN103572764A (en) * | 2013-10-15 | 2014-02-12 | 中国建筑第二工程局有限公司 | Ultra-deep manual hole digging pile dado water stop structure and construction method thereof |
CN104060997A (en) * | 2014-07-11 | 2014-09-24 | 北京建筑大学 | Method for conducting construction by enabling shield tunneling machine to penetrate through inspection well |
CN203961994U (en) * | 2014-07-17 | 2014-11-26 | 中铁十一局集团城市轨道工程有限公司 | Under balancing earth-pressure shielding machine, wear the concealed tunneling structure of having runed shield tunnel |
CN104251140A (en) * | 2014-09-03 | 2014-12-31 | 大禹伟业(北京)国际科技有限公司 | Composite waterproof layer for underground construction and manufacturing and construction method thereof |
CN204312095U (en) * | 2014-12-15 | 2015-05-06 | 中铁二十局集团有限公司 | A kind of soft rock tunnel hole anti-collapse process spreading cover arch |
CN204851266U (en) * | 2015-07-28 | 2015-12-09 | 中铁十八局集团有限公司 | Secretly dig shaft structure directly over station |
CN105545342A (en) * | 2016-03-02 | 2016-05-04 | 中铁第一勘察设计院集团有限公司 | Smoke shaft of existing lining tunnel inner arch and constructing method of smoke shaft |
CN105888703A (en) * | 2016-06-03 | 2016-08-24 | 北京城建设计发展集团股份有限公司 | Method for constructing super-shallow-burial subway station under transverse canopy erected inside micro pilot tunnel |
WO2017071111A1 (en) * | 2015-10-29 | 2017-05-04 | 周兆弟 | Underground pipe gallery protection structure |
CN106703814A (en) * | 2015-07-30 | 2017-05-24 | 宏润建设集团股份有限公司 | Mined metro station hole pile construction method |
CN106930777A (en) * | 2017-04-14 | 2017-07-07 | 中铁六局集团有限公司 | The construction method of the lining of Bored Section of Metro main track assembled two |
CN107218046A (en) * | 2017-07-31 | 2017-09-29 | 北京市市政工程设计研究总院有限公司 | Mechanical assistance sealing Station structure and construction method in a kind of pilot tunnel |
CN107435340A (en) * | 2017-07-10 | 2017-12-05 | 广州地铁设计研究院有限公司 | The pipeline outlet structure and its method of a kind of non-excavation type pipe gallery |
CN107503755A (en) * | 2017-09-08 | 2017-12-22 | 中铁十六局集团地铁工程有限公司 | A kind of construction method for exempting from button arch flat-top cavern-pile method construction subway station |
CN207989047U (en) * | 2018-02-14 | 2018-10-19 | 北京城建道桥建设集团有限公司 | One kind secretly checking room equipment opening |
-
2018
- 2018-02-14 CN CN201810151639.8A patent/CN108590700A/en active Pending
Patent Citations (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002155695A (en) * | 2000-11-22 | 2002-05-31 | Kajima Corp | Method for executing shield-tunnel connecting section |
CN201588636U (en) * | 2009-08-10 | 2010-09-22 | 招商局重庆交通科研设计院有限公司 | Tunnel inner wall structure |
CN202768000U (en) * | 2012-09-20 | 2013-03-06 | 四汇建设集团有限公司 | Large aperture manual hole digging pile retaining wall steel bar cover |
CN102953739A (en) * | 2012-10-26 | 2013-03-06 | 中铁二十二局集团第六工程有限公司 | Bidirectional punching method for underground excavation of subway station |
CN103572764A (en) * | 2013-10-15 | 2014-02-12 | 中国建筑第二工程局有限公司 | Ultra-deep manual hole digging pile dado water stop structure and construction method thereof |
CN104060997A (en) * | 2014-07-11 | 2014-09-24 | 北京建筑大学 | Method for conducting construction by enabling shield tunneling machine to penetrate through inspection well |
CN203961994U (en) * | 2014-07-17 | 2014-11-26 | 中铁十一局集团城市轨道工程有限公司 | Under balancing earth-pressure shielding machine, wear the concealed tunneling structure of having runed shield tunnel |
CN104251140A (en) * | 2014-09-03 | 2014-12-31 | 大禹伟业(北京)国际科技有限公司 | Composite waterproof layer for underground construction and manufacturing and construction method thereof |
CN204312095U (en) * | 2014-12-15 | 2015-05-06 | 中铁二十局集团有限公司 | A kind of soft rock tunnel hole anti-collapse process spreading cover arch |
CN204851266U (en) * | 2015-07-28 | 2015-12-09 | 中铁十八局集团有限公司 | Secretly dig shaft structure directly over station |
CN106703814A (en) * | 2015-07-30 | 2017-05-24 | 宏润建设集团股份有限公司 | Mined metro station hole pile construction method |
WO2017071111A1 (en) * | 2015-10-29 | 2017-05-04 | 周兆弟 | Underground pipe gallery protection structure |
CN105545342A (en) * | 2016-03-02 | 2016-05-04 | 中铁第一勘察设计院集团有限公司 | Smoke shaft of existing lining tunnel inner arch and constructing method of smoke shaft |
CN105888703A (en) * | 2016-06-03 | 2016-08-24 | 北京城建设计发展集团股份有限公司 | Method for constructing super-shallow-burial subway station under transverse canopy erected inside micro pilot tunnel |
CN106930777A (en) * | 2017-04-14 | 2017-07-07 | 中铁六局集团有限公司 | The construction method of the lining of Bored Section of Metro main track assembled two |
CN107435340A (en) * | 2017-07-10 | 2017-12-05 | 广州地铁设计研究院有限公司 | The pipeline outlet structure and its method of a kind of non-excavation type pipe gallery |
CN107218046A (en) * | 2017-07-31 | 2017-09-29 | 北京市市政工程设计研究总院有限公司 | Mechanical assistance sealing Station structure and construction method in a kind of pilot tunnel |
CN107503755A (en) * | 2017-09-08 | 2017-12-22 | 中铁十六局集团地铁工程有限公司 | A kind of construction method for exempting from button arch flat-top cavern-pile method construction subway station |
CN207989047U (en) * | 2018-02-14 | 2018-10-19 | 北京城建道桥建设集团有限公司 | One kind secretly checking room equipment opening |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111877321A (en) * | 2020-07-21 | 2020-11-03 | 成都市建筑设计研究院 | Cast-in-place pile applied to underground reinforced concrete structure and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106050266B (en) | The construction method of shield section service channel tunneling in rich water sand-pebble layer tunnel | |
CN104612160B (en) | A kind of next-door neighbour's existing building pit maintenance soil structure and construction method | |
CN109723065A (en) | Deep basal pit freezing partly reinforced construction method in bracing means and rich water sandy pear variety | |
CN102322064A (en) | Construction method for underground diaphragm wall of deep foundation pit for subway station in collapsible loess areas | |
CN109026064B (en) | Construction method for large-span multi-arch tunnel with semi-bright and semi-dark | |
CN103590425A (en) | Peaty soft soil stratum subway station construction technology | |
CN106703814A (en) | Mined metro station hole pile construction method | |
CN109630127A (en) | A kind of construction method of rich water soft stratum ultra-deep shield vertical shaft | |
CN108842819A (en) | A kind of urban track traffic cable run method for tunnel construction | |
CN105649653B (en) | Circle special cross section Tunneling by mining method structure and its construction method are not waited up and down | |
CN103046557A (en) | Foundation pit water-sealing supporting method by using long spiral cement soil mixing structural steel pile | |
CN104895111B (en) | The construction method of integrated pipe canal in weak soil ground | |
CN110424460A (en) | A kind of tunnel open excavation construction technology | |
KR100656194B1 (en) | Open cut and cover method applying tunnel cut method | |
CN108343035A (en) | River construction method is worn under shallow tunnel | |
CN105256810A (en) | Construction method for round underground continuous wall two-in-one structure | |
CN109296371A (en) | MJS method and horizontal freezing joint reinforcement pressure-bearing rich water arenaceous stratum overlap the system and its construction method that section is worn under station | |
CN110528578A (en) | Under wear existing railway double track tunnel cover and cut construction method | |
CN113202173B (en) | Construction method for temporarily replacing cross-foundation-pit concrete pipe with steel pipe in deep foundation pit construction | |
CN101575859B (en) | Anti-seepage joint of underground continuous walls and construction method thereof | |
CN211500658U (en) | Shallow tunnel supporting construction that nearly connects that buries suitable for sand ground | |
CN108149682A (en) | A kind of slip casting casing device and the pile foundation drilling construction method using the casing device | |
CN113235613B (en) | Method for excavating and supporting newly-built foundation pit by utilizing adjacent existing guard piles | |
CN109915150A (en) | A kind of pile foundation pre-reinforcement supporting construction and its construction method controlling tunnel subsidence | |
CN207989047U (en) | One kind secretly checking room equipment opening |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180928 |
|
RJ01 | Rejection of invention patent application after publication |