CN108505645B - CL composite concrete shear wall cast-in-place construction method - Google Patents
CL composite concrete shear wall cast-in-place construction method Download PDFInfo
- Publication number
- CN108505645B CN108505645B CN201810260251.1A CN201810260251A CN108505645B CN 108505645 B CN108505645 B CN 108505645B CN 201810260251 A CN201810260251 A CN 201810260251A CN 108505645 B CN108505645 B CN 108505645B
- Authority
- CN
- China
- Prior art keywords
- concrete
- wall
- plate
- self
- sealing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
- E04G11/08—Forms, which are completely dismantled after setting of the concrete and re-built for next pouring
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
Claims (8)
- The field pouring construction method of the CL composite concrete shear wall is characterized by comprising the following steps: comprises the following steps of (a) carrying out,(1) lifting the CL net rack plate: the CL rack plate is a nonstandard block, the CL composite shear wall is decomposed according to the arrangement condition of the CL composite shear wall in the construction drawing and according to a node detail drawing in the construction drawing and a related technical specification and a construction joint reservation condition, the specification, the size, the peripheral node characteristics, the number and the position of the CL rack plate are expressed in detail, and the CL rack plate is communicated with a professional manufacturer in advance through an order form to produce and supply a goods plan;(2) placing the purchased CL net rack plate in a temporary field adjacent to a construction site;(3) uniformly arranging a plurality of positioning and adjusting components on two side surfaces of the CL net rack plate in the leveled construction site; meanwhile, ejecting a wall form in-place control line and a CL grid plate installation control line on a construction site;(4) the CL net rack plates provided with the positioning and adjusting assemblies are conveyed to a wall construction site by using a trolley, the CL net rack plates are sequentially hoisted into CL net rack plate installation control lines by using a tower crane and are butted, a temporary protection frame is erected by using steel pipes to temporarily position the CL net rack plates, and the temporary protection frame is fixed on a steel bar prefabricated from the foundation to the top in the shear wall;(5) wall formworks are respectively installed on the inner side and the outer side of the CL net frame plate according to a formwork in-place control line, a formwork leveling device is arranged on the lower side edge of the wall formwork, and the leveling device is operated to level the upper edge of the wall formwork so as to ensure the levelness of the top edge of the wall surface; an operation platform is erected above the wall formwork by adopting a scaffold, the operation platform consists of a platform plate, a guardrail and a ladder, the temporary protective frame is gradually removed in the process of installing the wall formwork, so that the positioning adjusting components arranged on the inner side and the outer side of the CL net frame plate are respectively contacted with the wall formwork, and a wall penetrating bolt and a plastic sleeve are arranged at a preset position;the template leveling device comprises a horizontally arranged channel steel, the open side of the channel steel is downwards arranged, the lower surface of the channel steel is fixedly connected with at least two fixing nuts, the fixing nuts are uniformly arranged at intervals along the length direction of the channel steel, round holes corresponding to the screw holes of the fixing nuts are formed in the channel steel up and down, the inner diameter of each round hole is larger than or equal to the inner diameter of each screw hole of each fixing nut, a leveling bolt is connected to the screw hole of each fixing nut in a threaded manner, the head of each leveling bolt is positioned above the channel steel, and the lower end of each leveling bolt is; the lower end edge of the wall template is supported outside the upper surface of the channel steel;the hinged support comprises a ball head and a supporting block, the width of the supporting block is smaller than the width of an opening at the bottom of the channel steel, the bottom of the supporting block is a plane, a ball head socket is arranged on the upper surface of the supporting block, the lower end of the leveling bolt is fixedly connected with the top of the ball head, and the ball head is rotatably connected in the ball head socket; a reinforcing rib is arranged between the side part of the fixed nut and the inside of the channel steel; the upper bolt of the leveling nut is connected with a fastening nut, and the lower end surface of the fastening nut is in top pressure contact with the upper surface of the channel steel;the process of operating the template leveling device to adjust the levelness of the wall template comprises the following steps: firstly, loosening the fastening nut by using a wrench, then clamping the head of the leveling bolt by using the wrench, screwing the leveling bolt, driving the channel steel to move up and down by using the fixing nut in threaded connection with the leveling bolt, driving the wall body template to realize height adjustment by using the channel steel, and screwing the fastening nut to be in jacking contact with the channel steel after the top edge of the wall body template is kept horizontal, wherein the wall body template is in seamless connection with a horizontal template arranged at the bottom of a roof;(6) pouring self-sealing concrete into the cavity between the CL net frame plate and the wall formwork at the inner side and the cavity between the CL net frame plate and the wall formwork at the outer side from the top of the wall formwork;the CL rack plate comprises a polystyrene board with a rectangular structure, an inner steel wire mesh and an outer steel wire mesh are respectively arranged on the inner side and the outer side of the polystyrene board and are connected through oblique inserted steel bars penetrating through the polystyrene board, a convex rib is arranged on one side edge of the polystyrene board in the vertical direction, and a sealing positioning groove is formed in the other side edge of the polystyrene board in the vertical direction; the cross sections of the convex edge strips and the sealing positioning grooves are the same in shape and size;the positioning and adjusting component in the step (3) comprises an inner concrete block and an outer concrete block, the outer side of the inner concrete block is in contact with the inner side face of the polyphenyl plate, the inner side of the outer concrete block is in contact with the outer side face of the polyphenyl plate, the positioning sleeve penetrates through the polyphenyl plate along the inner horizontal direction and the outer horizontal direction, the inner end portion of the positioning sleeve is embedded in the inner concrete block, the outer end portion of the positioning sleeve is embedded in the outer concrete block, the portion, in contact with the inner concrete block, of an inner steel wire mesh is embedded in the inner concrete block, the portion, in contact with the outer concrete block, of the outer steel wire mesh is embedded in the outer concrete block, the outer end portion of the inner adjusting rod extends into and is in threaded connection with the inner port of the positioning sleeve, the inner end portion of the outer adjusting rod extends into and is in threaded connection with the outer port of the positioning sleeve, an inner limiting plate is fixedly arranged at the inner end of the inner adjusting rod; the outer concrete block is in a circular truncated cone-shaped structure with thick inside and thin outside, and the inner concrete block is in a circular truncated cone-shaped structure with thick outside and thin inside;the specific manufacturing and installation process for setting the positioning and adjusting assembly in the step (3) is as follows: firstly, horizontally placing a CL net rack plate in a field, enabling the inner side of a polyphenyl plate to face upwards, uniformly forming a plurality of through holes in the polyphenyl plate, enabling a positioning sleeve to penetrate through the through holes, enabling the length of the positioning sleeve to be slightly larger than the distance between an inner steel wire mesh and an outer steel wire mesh, enabling the lower end of the positioning sleeve to be in contact with the ground, coaxially sleeving a mould which is in a circular truncated cone shape and is provided with two through ends, outside the positioning sleeve, enabling the edge of the upper end of the mould to be flush with the positioning sleeve, enabling the edge of the lower end of the mould to be in contact with the polyphenyl plate, forming a through seam for penetrating through the steel wire mesh on the mould, adding concrete into the mould, tamping, scraping off redundant concrete, leveling the top surface of; inserting positioning sleeves into other through holes on the polystyrene board in sequence according to the operation process and manufacturing an inner concrete block; after the inner concrete blocks are completely manufactured, watering and curing the inner concrete blocks, turning up the polystyrene board after at least two days, and manufacturing the outer concrete module according to the manufacturing process of the inner concrete module; after the outer concrete module is watered and maintained, the outer end part of the inner adjusting rod extends into and is in threaded connection with the inner port of the positioning sleeve, and the inner end part of the outer adjusting rod extends into and is in threaded connection with the outer port of the positioning sleeve.
- 2. The CL composite concrete shear wall cast-in-place construction method according to claim 1, characterized in that: the cart in the step (4) comprises a bottom plate, universal wheels with locking mechanisms are arranged on the bottom surface of the bottom plate, a vertical frame is fixedly arranged on the rear side of the upper surface of the bottom plate, the front side of the vertical frame is arranged in a manner that the front side is low in front and high in back, handrails are arranged on the left side and the right side of the middle part of the rear side of the vertical frame, a support frame is arranged on the upper part of the rear side of the vertical frame, a small hydraulic station is arranged on the support frame, a pushing oil cylinder is fixedly arranged at the top of the small hydraulic station along the front-back horizontal direction, a hooking oil cylinder is fixedly arranged at the front end of a piston rod of the pushing oil cylinder along the vertical direction, a positioning nail is arranged at the lower end of the piston rod of the hooking oil cylinder, the pushing oil cylinder and the hooking oil cylinder are both connected with the small hydraulic station;the process that the cart in the step (4) conveys the CL net rack plate provided with the positioning and adjusting assembly to a wall construction site comprises the following steps: placing a plurality of CL net frame plates on a bottom plate side by side, enabling a CL net frame plate on the last side to lean against a vertical frame in an inclined mode, enabling other CL net frame plates to lean against adjacent CL net frame plates on the back side in sequence, operating an operation panel, pushing a piston rod of an oil cylinder to extend forwards to a position right above the CL net frame plate on the foremost side to stop, enabling a piston rod of a hook oil cylinder to extend downwards, positioning and pinning the piston rod inside the upper end face of a polystyrene board, and enabling a worker to hold an armrest to push a cart to convey the CL net frame plates to a wall construction site; two annular steel wire ropes are connected to a lifting hook of the tower crane, a piston rod of a pushing oil cylinder is controlled to extend firstly, the upper part of a CL net frame plate at the foremost side is pushed to move forwards to a vertical state through a hooking oil cylinder and a positioning nail, one annular steel wire rope is hung on two inner concrete blocks or outer concrete blocks at the same height at the front side of the CL net frame plate, a worker holds the CL net frame plate in the vertical state firstly, then the piston rod of the hooking oil cylinder is controlled to retract upwards, a positioning needle is separated from the polystyrene plate, the piston rod of the pushing oil cylinder is controlled to move backwards to the upper side of the next polystyrene plate, the piston rod of the hooking oil cylinder extends downwards, the positioning nail is fixed into the polystyrene plate, then the other annular steel wire rope is hung on the two outer concrete blocks or inner concrete blocks at the rear side of the CL net frame plate, the outer concrete blocks and the inner concrete blocks hung by the two annular steel wire, hoisting the CL rack plate to the specified position of the CL rack plate installation control line; sequentially hoisting all CL net rack plates on the cart in place according to the process; in the tower crane operation process, the other cart is provided with the CL net frame plate and pushed to a construction site, the two carts transport the CL net frame plate in turn, and the tower crane does not stop hoisting the CL net frame plate in place; in the process of hoisting the CL rack plate in place, the two adjacent polystyrene boards are matched with the sealing positioning groove through the convex ribs to achieve the effect of positioning and sealing, and meanwhile, the two adjacent and connected inner steel wire meshes and the two adjacent and connected outer steel wire meshes are connected into a whole by using the lapping net sheets and the iron wires, and the inner steel wire meshes are also connected with the steel bars prefabricated in the shear wall body.
- 3. The CL composite concrete shear wall cast-in-place construction method according to claim 1, characterized in that: before the wall body formwork is installed in the step (5), a release agent is coated on the inner wall of the wall body formwork, the inner limiting plate and the outer limiting plate are rotated in advance according to the thickness of the wall body, the inner adjusting rod moves inwards while rotating in the positioning sleeve, the outer adjusting rod moves outwards while rotating in the positioning sleeve until the distance between the inner limiting plate and the outer limiting plate is equal to the thickness of the wall body, and then the wall body formwork on the inner side is in contact with the inner limiting plate and the wall body formwork on the outer side is in contact with the outer limiting plate.
- 4. The CL composite concrete shear wall cast-in-place construction method according to claim 1, characterized in that: in the step (6), because the inner steel wire mesh and the outer steel wire mesh are dense, the distance between the outer side of the polystyrene board and the wall body template is small, and the self-compacting concrete with the designed strength grade is adopted, and the self-compacting concrete can reach the following working performance: within 5 seconds, the slump is 260-280 mm, the expansion degree is 600-750 mm, the workability is good, and no visual bleeding or segregation phenomenon exists;the material of the self-compacting concrete should meet the following requirements:cementing materials: cement; the cement adopts 42.5 silicate, ordinary silicate cement and slag silicate cement;coarse aggregate: stones; the stones are continuous graded pebbles or gravels with the grain diameter of 5-10 mm;fine aggregate: sand; the sand is medium sand with a larger fineness modulus which is more than or equal to 2.6;water: clean drinking water is adopted;blending materials: fly ash I and fly ash II or ground slag and a small amount of expanding agent are added into self-sealing concrete, the admixture is well prepared before use, and the fly ash with small water ratio is used as much as possible;additive: the common water reducing agent can not reach the water reducing degree and the improved workability required by high-performance concrete, and a superplasticizer or a high-efficiency water reducing agent is generally required to be added; the naphthalene-based superplasticizers of different manufacturers are compounded and used according to a proportion, the interaction among the components of the blended product is mutually adjusted, the respective advantages are exerted, and the super-superposition effect is obtained; besides the water reducing agent, an air entraining agent, an early strength agent or a retarder and a pumping aid are added in a proper amount according to the actual engineering situation.
- 5. The CL composite concrete shear wall cast-in-place construction method according to claim 4, characterized in that: the concrete process of pouring the self-sealing concrete in the step (6) is as follows: when the self-sealing concrete is pumped, a funnel or a baffle is arranged at the upper opening of the wall body template after the self-sealing concrete falls from the opening of the delivery pipe, so that the concrete enters a mold at a slow speed, the height difference h of the liquid level of the self-sealing concrete generated by different resistance and flow rates of the self-sealing concrete at any section in the wall body template at two sides of the polystyrene board is not more than 400 mm, namely the size of the self-sealing concrete slurry level at the outer side higher than the self-sealing concrete slurry level at the inner side is controlled within 400 mm; in the process of pouring the self-sealing concrete, a specially-assigned person is arranged to observe the liquid level height of the concrete of each section, the liquid level height can be measured through flashlight irradiation and inserted rod during observation, and when the liquid level height difference of the self-sealing concrete at a certain section is close to 400 mm, the self-sealing concrete is poured at the point immediately.
- 6. The CL composite concrete shear wall cast-in-place construction method according to claim 5, characterized in that: in order to control the flow rate of self-sealing concrete on the inner side and the outer side of the CL net frame plate, a steel pipe for a scaffold is vertically inserted into the thicker side to control the section in the pouring process of the self-sealing concrete, a hook is welded on the steel pipe so as to be conveniently drawn out, and the inner limiting plate and the outer limiting plate play a role of limiting the polystyrene board to keep a vertical state when the polystyrene board is subjected to the pressure of the self-sealing concrete; the mold-entering temperature of the self-sealing concrete is controlled to be 5-35 ℃, and the self-sealing concrete pouring point is arranged at the intersection part of the cross-shaped, T-shaped or L-shaped wall body so as to facilitate the uniform flow of the self-sealing concrete; the same pouring point is preferably used for the push type continuous pouring, and when the pouring points are switched, the next layer of self-sealing concrete is poured before the initial setting of the self-sealing concrete of the front layer.
- 7. The CL composite concrete shear wall cast-in-place construction method according to claim 5, characterized in that: in the step (6), in order to achieve the purpose of smooth surface when the self-sealing concrete is poured, auxiliary vibration is carried out outside the wall formwork, and a leather hammer, a small flat vibrator or a vibrating rod vibrates from bottom to top along with the pouring of the self-sealing concrete in an auxiliary vibration mode; when the hidden column with a complex steel bar structure or the middle part of the composite shear wall is poured, a small vibrating rod is adopted for proper inserting and tamping, and the obliquely inserted steel bars of the CL net rack plate cannot be touched during inserting and tamping.
- 8. The CL composite concrete shear wall cast-in-place construction method according to claim 7, characterized in that: when the wall body formwork is in place in the step (5), mortar is paved on the lower part of the wall body formwork or mortar joints are hooked after the wall body formwork is in place, so that mortar return on the lower part of the wall body formwork is prevented;the wall template frame of the door and window opening is fixedly provided with steel plate corner protectors by wood screws, and the overall rigidity of the door and window frame is ensured and the corners are prevented from deforming and leaking slurry by adopting thickened frames and increased diagonal supports;sealing the splicing seams of all the wall formworks by adopting a sponge sealing strip pressing measure; auxiliary measures of sticking plastic adhesive tapes or applying sealant can be adopted at local parts as necessary, so that the leakage of cement mortar is practically avoided;air vents are reserved at internal corners or other dead corners of the opening, the self-sealing concrete is timely observed during pouring, and the self-sealing concrete is immediately plugged after being filled to prevent mortar from losing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810260251.1A CN108505645B (en) | 2018-03-27 | 2018-03-27 | CL composite concrete shear wall cast-in-place construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810260251.1A CN108505645B (en) | 2018-03-27 | 2018-03-27 | CL composite concrete shear wall cast-in-place construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108505645A CN108505645A (en) | 2018-09-07 |
CN108505645B true CN108505645B (en) | 2020-04-17 |
Family
ID=63378790
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810260251.1A Expired - Fee Related CN108505645B (en) | 2018-03-27 | 2018-03-27 | CL composite concrete shear wall cast-in-place construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108505645B (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110067389A (en) * | 2019-05-22 | 2019-07-30 | 河南西艾尔墙体科技有限公司 | A kind of dedicated cast-in-place concrete separator of CL |
CN112502325A (en) * | 2020-12-11 | 2021-03-16 | 天长市飞龙金属制品有限公司 | Concrete shear wall construction process based on steel grating |
CN114892851A (en) * | 2022-05-12 | 2022-08-12 | 中国二十二冶集团有限公司 | CL shear wall template whole piece construction assembling method |
CN115012645B (en) * | 2022-06-29 | 2023-03-24 | 涿州天保建筑体系有限公司 | Wall formwork, building wall and construction method of building wall |
CN116446566B (en) * | 2023-04-06 | 2024-01-23 | 中铁广州工程局集团有限公司 | CL wall structure |
CN116517273B (en) * | 2023-07-04 | 2023-08-25 | 江苏新益建筑材料有限公司 | Corner type constructional column cement template group |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101240570A (en) * | 2007-12-28 | 2008-08-13 | 中铁十二局集团有限公司 | Double-side in-situ placing construction method for CL structure system composite wall board concrete |
CN204325609U (en) * | 2014-12-04 | 2015-05-13 | 福建南纺有限责任公司 | The motor handling instrument of rotor spinning machine |
CN105386538A (en) * | 2015-09-18 | 2016-03-09 | 河南西艾尔建筑科技有限公司 | CL composite concrete shear wall construction process |
CN205444590U (en) * | 2015-10-28 | 2016-08-10 | 江苏中南建筑产业集团有限责任公司 | Cast -in -place compound incubation concrete shear force wall |
CN105507462B (en) * | 2015-11-27 | 2018-08-14 | 中国建筑第七工程局有限公司 | Have both the combined wall and its construction method of load-bearing and heat insulation function |
CN206941636U (en) * | 2017-07-17 | 2018-01-30 | 江苏鹏程钢结构有限公司 | A kind of steel column fixing device |
-
2018
- 2018-03-27 CN CN201810260251.1A patent/CN108505645B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN108505645A (en) | 2018-09-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108505645B (en) | CL composite concrete shear wall cast-in-place construction method | |
CN108505644B (en) | CL composite concrete shear wall construction method | |
CN104533456B (en) | Super-large section chamber reinforced concrete modelling construction method | |
CN104564104B (en) | A kind of table system for tunnel-liner | |
CN110439137A (en) | Prefabricated panel, wall and prefabricated panel production method, precast wall body construction method | |
CN107059920B (en) | Loess formation piping lane construction technology | |
WO2013185277A1 (en) | Constructing method for concrete cylinder of construction steel bar of high-rise steel structure | |
CN104631512A (en) | Post-cast strip beam and slab construction method adopting formwork hanging method | |
CN212176540U (en) | Hydraulic climbing formwork system formwork | |
CN108277908B (en) | Energy-saving environment-friendly CL wall engineering construction method | |
CN110552440A (en) | safe and environment-friendly construction process for high-strength assembled integral type sandwich heat-insulation shear wall | |
CN209942029U (en) | Light prefabricated assembled external wall panel | |
CN111058631B (en) | Concrete construction method for large-gradient inclined roof | |
CN111113628B (en) | Construction method for spraying prefabricated T-shaped beam | |
CN110578338A (en) | System capable of moving aluminum alloy template integrally and operation method | |
CN205224332U (en) | Prefabricated wall body and prefabricated wallboard | |
CN110952995A (en) | Construction method for external tunnel door post-cast ring beam | |
CN107386246A (en) | A kind of lock chamber wall Construction Through Form on Traveler method | |
CN109853803A (en) | Assembled integral floor and fabrication and installation method | |
CN211340850U (en) | Aluminum alloy template system capable of moving integrally | |
CN112227817A (en) | Construction method for casting circular herringbone column of cooling tower in sections | |
CN111663770A (en) | Quick and easy combination and shaping mold for post-cast strip of cast-in-place slab and construction method of quick and easy combination and shaping mold | |
CN111648256A (en) | Pier body reinforcing construction method | |
CN217353538U (en) | Disposable integral molding construction structure for sunken well and reversed ridge | |
CN204781467U (en) | Give sound insulation structure of pouring of infilled wall of cast -in -place light insulation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Song Meng Inventor after: Liu Baolin Inventor after: Yu En Inventor after: Wang Qiang Inventor after: Pan Junbo Inventor after: Lu Dongwei Inventor after: Liu Yuncai Inventor before: Song Meng Inventor before: Liu Baolin Inventor before: Yu En Inventor before: Wang Qiang Inventor before: Liu Yuncai |
|
CB03 | Change of inventor or designer information | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200417 Termination date: 20210327 |
|
CF01 | Termination of patent right due to non-payment of annual fee |