CN108412453A - A kind of coal mining water controls system and construction method altogether with gas - Google Patents

A kind of coal mining water controls system and construction method altogether with gas Download PDF

Info

Publication number
CN108412453A
CN108412453A CN201810382814.4A CN201810382814A CN108412453A CN 108412453 A CN108412453 A CN 108412453A CN 201810382814 A CN201810382814 A CN 201810382814A CN 108412453 A CN108412453 A CN 108412453A
Authority
CN
China
Prior art keywords
coal seam
water
mining
gas
drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810382814.4A
Other languages
Chinese (zh)
Inventor
唐永志
程桦
赵伟
唐彬
汪敏华
姚直书
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui University of Science and Technology
Huainan Mining Group Co Ltd
Original Assignee
Anhui University of Science and Technology
Huainan Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui University of Science and Technology, Huainan Mining Group Co Ltd filed Critical Anhui University of Science and Technology
Priority to CN201810382814.4A priority Critical patent/CN108412453A/en
Publication of CN108412453A publication Critical patent/CN108412453A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/04Directional drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/04Directional drilling
    • E21B7/046Directional drilling horizontal drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F7/00Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Mechanical Engineering (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

A kind of coal mining water of present invention offer controls system altogether with gas, the vertical drilling of water-bearing layer construction closed on from ground to first mining coal seam including an at least hole, and the horizontal grouting water blockoff in water-bearing layer being connected to vertical drilling drills, the horizontal grouting water blockoff drilling is at least a hole;And the first level extraction borehole in first mining coal seam being connected to vertical drilling;And the second horizontal extraction borehole in first mining coal seam overlying rock being connected to vertical drilling.The advantage of the invention is that:It is comprehensive to complete control of coalmine gas and water hazard prediction work by vertical ground drilling construction horizontal drilling, compared to construction gas control drilling respectively and underwater prevention drilling, more efficient, economy higher.

Description

A kind of coal mining water controls system and construction method altogether with gas
Technical field
The present invention relates to exploitation of mineral resources field, more specifically a kind of coal mining water and gas control altogether system and Construction method.
Background technology
During underground coal resource exploitation, it can usually be threatened by underground water and gas.Before coal mining, adopt more It carries out underground water closure and gas pumping work respectively with the method for drilling, drills generally by constructing in ground or underworkings. It is vertically drilled using ground and carries out water blockoff and gas pumping safety is good, but borehole engineering amount is big, and construction cost is high.And from underground Roadway construction drills, and borehole engineering amount is small, but easily causes spray orifice accident, and underground water or gas is caused to pour in tunnel, in some instances it may even be possible to Coal and gas prominent accident is induced, causes casualties and economic loss, danger is higher.In addition, current mash gas pumping drilling Larger by influence on groundwater, underground water, which pours in mash gas pumping drilling, can reduce the effective air-flow section of extraction borehole, and it is negative to increase extraction Crushing consumes, and reduces or fails so as to cause mash gas pumping drilling working efficiency.Therefore, existing coal mine underground water and gas control The control that technology is difficult to safety, economically and efficiently completes water and gas in coal mining.
Invention content
Under the conditions of water and Gas Disaster, the dangerous height of coal mining, quantities are big With construction cost height, a kind of coal mining water is provided and controls system and construction method altogether with gas.
The present invention solves above-mentioned technical problem by the following technical programs:
A kind of coal mining water controls system altogether with gas, including the water-bearing layer that at least a hole is closed on from ground to first mining coal seam The vertical drilling of construction, and the horizontal grouting water blockoff in water-bearing layer being connected to vertical drilling drill, the horizontal grouting Water blockoff drilling is at least a hole;
And the first level extraction borehole in first mining coal seam being connected to vertical drilling;
And the second horizontal extraction borehole in first mining coal seam overlying rock being connected to vertical drilling.
Preferably, further include:The overlying rock in the coal seam and the coal seam that are opened in successively above first mining coal seam respectively with The horizontal extraction borehole of third and the 4th horizontal extraction borehole of vertical drilling connection.
Preferably, further include the vertical extraction borehole of auxiliary;The vertical extraction borehole bottom end of auxiliary is in coal seam.
A kind of coal mining water controls the construction method of system with gas altogether:Include the following steps:
Grouting for water blocking construction procedure:The vertical drilling of water-bearing layer construction closed on from ground to first mining coal seam, then by fixed To the horizontal grouting for water blocking drilling in water-bearing layer of constructing is drilled in water-bearing layer, water blockoff material is injected into the horizontal grouting for water blocking drilling in water-bearing layer Expect, the underground water in plugging water-bearing stratum;
Mash gas pumping drilling construction step:From vertically drilling to first mining coal seam construction first level extraction borehole, by vertical It drills to first mining coal seam overlying rock the second horizontal extraction borehole of construction;
First mining coal seam gas pre-drainage adopts extinction construction procedure:By the horizontal extraction borehole of first mining coal seam to first mining coal seam preservation Gas carries out pre- extraction, eliminates the protrusion hidden danger of first mining coal seam;
First mining coal seam gas pumping and its top pre- extraction construction procedure of coal-bed gas:While exploitation first mining coal seam, By the gas being precipitated in the be arranged in first mining coal seam overlying rock second horizontal extraction borehole extraction head mining coal seam recovery process, The gas that its top coal seam caused by pressure release pours in first mining coal seam overlying rock is exploited in extraction simultaneously due to first mining coal seam, i.e., to upper Square coal seam carries out pre- extraction.
Preferably, it according to the second horizontal extraction borehole to the extracting result in top coal seam, may be selected to apply in coal seam above The horizontal extraction borehole of work third or the 4th horizontal extraction borehole of top Strata Overlying The Seam carry out further gas pumping work.
Preferably, as gas permeability of coal seam is poor, can drill injection high pressure water to drainage from coal seam, and hydrofracturing is carried out to coal seam After increasing gas permeability, then carries out gas pre-drainage and adopt work.
The advantage of the invention is that:
1. comprehensive to complete control of coalmine gas and water hazard prediction work, phase by vertical ground drilling construction horizontal drilling Than gas control drilling and the underwater prevention drilling of constructing respectively, more efficient, economy higher;
2. being controlled altogether with gas by water, safety guarantee and execution conditions are provided for coal and gas power phenomenon work;
3., it can be achieved that the gas pre-drainage of adjacent coal bed is adopted while carrying out coal mining to a coal seam, eliminate adjacent The protrusion hidden danger in coal seam, to realize gas control to whole coal seams successively, coal is more efficient with gas production, and economy is more It is good;
4. by blocking underground water, influence of the underground water to mash gas pumping drilling is eliminated, improves gas pumping work Efficiency;
5. being worked by gas pumping, pressure release is carried out to coal seam, the gas pressure in coal seam is reduced, to reduce ground Stressor layer eliminates the hidden danger of underground water intrusion coal mine underground working region in conjunction with grouting for water blocking measure;
6. by drilling from the drilling of ground construction gas control and water hazard prediction, ground construction place floor space is small, applies It arranges conveniently, flexibly to workshop, ground neighboring buildings and environment is influenced smaller with equipment;
7. the present invention has wide applicability.
Description of the drawings
Fig. 1 is the cross-sectional view of the present invention.
Specific implementation mode
The effect of to make to structure feature of the invention and being reached, has a better understanding and awareness, to preferable Embodiment and attached drawing cooperation detailed description, are described as follows:
As shown in Figure 1, a kind of coal mining water controls system, including an at least hole from ground 1 to first mining coal seam 5 altogether with gas The water-bearing layer 3 closed on is constructed vertical drilling 2, and the horizontal grouting water blockoff brills in water-bearing layer 3 be connected to vertical drilling 2 Hole 4, the horizontal grouting water blockoff drilling 4 are at least a hole;And first in first mining coal seam 5 being connected to vertical drilling 2 Horizontal extraction borehole 6;And the second horizontal extraction borehole 7 in 5 overlying rock of first mining coal seam being connected to vertical drilling 2.
In order to ensure safety, it can open up and erect respectively in the overlying rock in the top coal seam 8 of first mining coal seam 5 and the coal seam To horizontal 9 and the 4th horizontal extraction borehole 10 of extraction borehole of third of 2 connection of drilling.
And also vertical extraction borehole 11 can be assisted to ensure extracting result by opening up;The vertical extraction of auxiliary is bored 11 bottom end of hole is in coal seam.
A kind of coal mining water controls the construction method of system with gas altogether:Include the following steps:
Grouting for water blocking construction procedure:The water-bearing layer 3 closed on from ground 1 to first mining coal seam 5 is constructed vertical drilling 2, is then led to It crosses Directional Drilling to construct in water-bearing layer 3 water-bearing layer horizontal grouting for water blocking drilling 4, be noted into the horizontal grouting for water blocking drilling in water-bearing layer 4 Enter water shutoff material, the underground water in plugging water-bearing stratum;
Mash gas pumping drilling construction step:From vertically drilling 2 to the construction first level of first mining coal seam 5 extraction borehole 6, by erecting To drilling 2 to 5 overlying rock of first mining coal seam construct the second horizontal extraction borehole 7;
5 gas pre-drainage of first mining coal seam adopts extinction construction procedure:First mining coal seam 5 is assigned by 5 horizontal extraction borehole 6 of first mining coal seam The gas deposited carries out pre- extraction, eliminates the protrusion hidden danger of first mining coal seam 5;
5 gas pumping of first mining coal seam and its top pre- extraction construction procedure of coal-bed gas:In the same of exploitation head mining coal seams 5 When, by being precipitated in 7 extraction head mining coal seams of the second horizontal extraction borehole, 5 recovery process that is arranged in 5 overlying rock of first mining coal seam Gas, while extraction exploits its top coal seam caused by pressure release due to first mining coal seam 5 and pours in watt of 5 overlying rock of first mining coal seam This, i.e., carry out pre- extraction to top coal seam.
According to the second horizontal extraction borehole 7 to the extracting result in top coal seam, third of constructing in coal seam 8 above may be selected Horizontal extraction borehole 9 or the 4th horizontal extraction borehole 10 of top Strata Overlying The Seam carry out further gas pumping work.
If gas permeability of coal seam is poor, can drill injection high pressure water to drainage from coal seam, carry out hydrofracturing to coal seam and increase thoroughly After gas, then carries out gas pre-drainage and adopt work.
Water blockoff and gas pumping region area size can be determined as needed, may be selected a vertical drilling and and its Several horizontal extraction boreholes of unicom individually complete water blockoff and gas pumping work, or by it is multiple it is vertical drilling and with its unicom Several horizontal drillings cooperation complete water blockoff and gas pumping work;
According to the gas pumping effect of horizontal drilling, may be selected from the vertical extraction borehole 11 of ground construction auxiliary to coal seam, Draining coal seam gas further increases coal seam extinction and gas pumping effect;
The sequence of construction of grouting for water blocking and coal and gas power phenomenon can be according to the formation condition flexible arrangement of construction site, complete After working at water blockoff, can gas pumping work be carried out to each coal seam successively.
The basic principles, main features and advantages of the present invention have been shown and described above.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and what is described in the above embodiment and the description is only the present invention Principle, various changes and improvements may be made to the invention without departing from the spirit and scope of the present invention, these variation and Improvement is both fallen in the range of claimed invention.The present invention claims protection domain by appended claims and its Equivalent defines.

Claims (6)

1. a kind of coal mining water controls system altogether with gas, it is characterised in that:Including an at least hole from ground (1) to first mining coal seam (5) the vertical drilling (2) of water-bearing layer (3) construction closed on, and be in water-bearing layer (3) with what vertical drilling (2) was connected to Horizontal grouting water blockoff drills (4), and the horizontal grouting water blockoff drilling (4) is at least a hole;
And the first level extraction borehole (6) in first mining coal seam (5) being connected to vertical drilling (2);
And the second horizontal extraction borehole (7) in first mining coal seam (5) overlying rock being connected to vertical drilling (2).
2. a kind of coal mining water according to claim 1 controls system altogether with gas, it is characterised in that:Further include:Successively It is opened in the third water that the overlying rock in the coal seam and the coal seam above first mining coal seam (5) is connected to vertical drilling (2) respectively Flat extraction borehole (9) and the 4th horizontal extraction borehole (10).
3. a kind of coal mining water according to claim 1 or 2 controls system altogether with gas, it is characterised in that:Further include auxiliary Help vertical extraction borehole (11);Vertical extraction borehole (11) bottom end of auxiliary is in coal seam.
4. a kind of coal mining water controls construction method altogether with gas, it is characterised in that:It is any applied to the claims 1 to 3 Described controls system altogether, it is characterised in that:Include the following steps:
Grouting for water blocking construction procedure:The vertical drilling (2) of water-bearing layer (3) construction closed on from ground (1) to first mining coal seam (5), so By Directional Drilling, the horizontal grouting for water blocking in construction water-bearing layer drills (4) in water-bearing layer (3) afterwards, is bored to the horizontal grouting for water blocking in water-bearing layer Water shutoff material, the underground water in plugging water-bearing stratum are injected in hole (4);
Mash gas pumping drilling construction step:From vertically drill (2) to first mining coal seam (5) construction first level extraction borehole (6), by Vertical drilling (2) is constructed the second horizontal extraction borehole (7) to first mining coal seam (5) overlying rock;
First mining coal seam (5) gas pre-drainage adopts extinction construction procedure:By the horizontal extraction borehole of first mining coal seam (5) 6 to first mining coal seam (5) The gas of preservation carries out pre- extraction, eliminates the protrusion hidden danger of first mining coal seam (5);
First mining coal seam (5) gas pumping and its top pre- extraction construction procedure of coal-bed gas:In the same of the first mining coal seam (5) of exploitation When, by the be arranged in first mining coal seam (5) overlying rock second horizontal extraction borehole (7) extraction head mining coal seams (5) recovery process The gas of middle precipitation, while extraction is since coal seam pours on first mining coal seam (5) above it caused by first mining coal seam (5) exploitation pressure release The gas of rock stratum carries out pre- extraction to top coal seam.
5. a kind of coal mining water according to claim 4 controls construction method altogether with gas, it is characterised in that:According to second The construction horizontal extraction borehole of third (9) in coal seam above may be selected to the extracting result in top coal seam in horizontal extraction borehole (7) Or Strata Overlying The Seam the 4th horizontal extraction borehole (10) in top carries out further gas pumping work.
6. a kind of coal mining water according to claim 4 controls construction method altogether with gas, it is characterised in that:As coal seam is saturating Gas is poor, drills injection high pressure water using to drainage from coal seam, is carried out after hydrofracturing increases gas permeability to coal seam, then carry out watt This pre- extraction work.
CN201810382814.4A 2018-04-24 2018-04-24 A kind of coal mining water controls system and construction method altogether with gas Pending CN108412453A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810382814.4A CN108412453A (en) 2018-04-24 2018-04-24 A kind of coal mining water controls system and construction method altogether with gas

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810382814.4A CN108412453A (en) 2018-04-24 2018-04-24 A kind of coal mining water controls system and construction method altogether with gas

Publications (1)

Publication Number Publication Date
CN108412453A true CN108412453A (en) 2018-08-17

Family

ID=63136752

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810382814.4A Pending CN108412453A (en) 2018-04-24 2018-04-24 A kind of coal mining water controls system and construction method altogether with gas

Country Status (1)

Country Link
CN (1) CN108412453A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109898992A (en) * 2019-03-14 2019-06-18 安徽建筑大学 It is a kind of that disaster-ridden source ore bed safe working method is administered using surface orientation drilling in advance
CN111075502A (en) * 2020-02-18 2020-04-28 太原理工大学 Method for preventing coal mine water and gas spray holes
CN111894671A (en) * 2020-08-14 2020-11-06 山东科技大学 Ground water pumping hole pumping and draining method aiming at working face top plate separation layer water damage
CN112012785A (en) * 2020-09-11 2020-12-01 中国矿业大学 Method for extracting pressure-relief gas by utilizing L-shaped drilling in overburden rock isolation grouting filling process
CN112360345A (en) * 2020-10-27 2021-02-12 山东科技大学 Method and system for reinforcing grouting of gas extraction hole under extremely soft coal seam and application
CN112879077A (en) * 2021-01-13 2021-06-01 中煤科工开采研究院有限公司 Coal and coalbed methane continuous development method based on ground directional horizontal hole
CN113107583A (en) * 2021-05-21 2021-07-13 中国矿业大学 Thick and hard roof high-gas coal seam gas extraction system and extraction method
CN113123720A (en) * 2021-03-22 2021-07-16 中国煤炭地质总局水文地质局 Construction process for treating grouting holes and simultaneously using grouting holes as gas extraction holes in water damage area of coal seam floor

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102392677A (en) * 2011-10-21 2012-03-28 河南煤业化工集团研究院有限责任公司 Permeability improvement technology for coal bed gas reservoir cap by using three-dimensional fracture network modification
US20170044887A1 (en) * 2014-04-14 2017-02-16 Peabody Energy Australia Multi purpose drilling system and method
CN106545296A (en) * 2016-12-02 2017-03-29 淮北矿业股份有限公司 A kind of surface drilling grouting treatment method of deep mining coal seam base plate limestone water damage
CN106703692A (en) * 2016-12-02 2017-05-24 淮北矿业股份有限公司 Method using surface orientation bedding drilling grouting to reinforce laminar limestone
CN107044289A (en) * 2017-06-22 2017-08-15 中国矿业大学 A kind of water damage prevention and controls of bored grouting closure overlying strata water producing fractures main channel
CN208220720U (en) * 2018-04-24 2018-12-11 淮南矿业(集团)有限责任公司 A kind of coal mining water and gas control system altogether

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102392677A (en) * 2011-10-21 2012-03-28 河南煤业化工集团研究院有限责任公司 Permeability improvement technology for coal bed gas reservoir cap by using three-dimensional fracture network modification
US20170044887A1 (en) * 2014-04-14 2017-02-16 Peabody Energy Australia Multi purpose drilling system and method
CN106545296A (en) * 2016-12-02 2017-03-29 淮北矿业股份有限公司 A kind of surface drilling grouting treatment method of deep mining coal seam base plate limestone water damage
CN106703692A (en) * 2016-12-02 2017-05-24 淮北矿业股份有限公司 Method using surface orientation bedding drilling grouting to reinforce laminar limestone
CN107044289A (en) * 2017-06-22 2017-08-15 中国矿业大学 A kind of water damage prevention and controls of bored grouting closure overlying strata water producing fractures main channel
CN208220720U (en) * 2018-04-24 2018-12-11 淮南矿业(集团)有限责任公司 A kind of coal mining water and gas control system altogether

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
邢文平;李长青;郭纯;: "千米钻机在煤层底板注浆加固防水工程的应用", 煤矿安全, vol. 2016, no. 01, pages 115 - 116 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109898992A (en) * 2019-03-14 2019-06-18 安徽建筑大学 It is a kind of that disaster-ridden source ore bed safe working method is administered using surface orientation drilling in advance
CN111075502A (en) * 2020-02-18 2020-04-28 太原理工大学 Method for preventing coal mine water and gas spray holes
CN111894671A (en) * 2020-08-14 2020-11-06 山东科技大学 Ground water pumping hole pumping and draining method aiming at working face top plate separation layer water damage
CN112012785A (en) * 2020-09-11 2020-12-01 中国矿业大学 Method for extracting pressure-relief gas by utilizing L-shaped drilling in overburden rock isolation grouting filling process
CN112012785B (en) * 2020-09-11 2022-02-08 中国矿业大学 Method for extracting pressure-relief gas by utilizing L-shaped drilling in overburden rock isolation grouting filling process
CN112360345A (en) * 2020-10-27 2021-02-12 山东科技大学 Method and system for reinforcing grouting of gas extraction hole under extremely soft coal seam and application
CN112879077A (en) * 2021-01-13 2021-06-01 中煤科工开采研究院有限公司 Coal and coalbed methane continuous development method based on ground directional horizontal hole
CN113123720A (en) * 2021-03-22 2021-07-16 中国煤炭地质总局水文地质局 Construction process for treating grouting holes and simultaneously using grouting holes as gas extraction holes in water damage area of coal seam floor
CN113107583A (en) * 2021-05-21 2021-07-13 中国矿业大学 Thick and hard roof high-gas coal seam gas extraction system and extraction method

Similar Documents

Publication Publication Date Title
CN108412453A (en) A kind of coal mining water controls system and construction method altogether with gas
CN104863629B (en) A kind of method taking out absciss layer gas and draining slip casting under overlying strata using combined drilling and counterboring
CN110242301A (en) A kind of modified water-protection coal-mining method of two step slip casting of top plate water-bearing layer
CN103867229B (en) A kind of coal mine large-mining is dark prevents and treats comprehensive treatment method for water with lower group of coal mining
CN107044289A (en) A kind of water damage prevention and controls of bored grouting closure overlying strata water producing fractures main channel
CN106089291B (en) A kind of method for cooperateing with extraction to be caving the old dead zone of formula and lower coal seam coal bed gas
CN104314610A (en) Outburst eliminating method for coal roadway stripe region
CN104929567A (en) Low-cost construction process for passing through goaf
WO2017198109A1 (en) Pitshaft coal uncovering method for coal mines whose coal seam lies in main aquifer
CN107044280A (en) A kind of bored grouting detection method of mining overburden absciss layer distribution characteristics
CN103953386A (en) Upstream-blocking and downstream-seepage method for extracting gas in mining area
CN107387082A (en) A kind of method for weakening coal seam tight roof
CN107740707A (en) Thick coal-layer mining water damage prevention and controls under a kind of deep high artesian
CN109611146B (en) Separation layer water drainage grouting method
CN105804786B (en) A kind of weak seam bottom plate layer-through drilling pressure rushes anti-reflection method
CN104975868A (en) Top plate high-position boring large-diameter long-drill-hole gas extraction method based on directional drilling
CN107120137A (en) A kind of coal roadway tunneling is along seat earth Deephole pre-splitting blasting pumping method
US3814480A (en) Method of controlling gas accumulation in underground mines
CN106014345B (en) A kind of lower part caving method exploits the pumping method for the compound old dead zone coal bed gas to be formed
CN115749776A (en) Coal pillar recovery method based on fault grouting transformation
CN107313743A (en) One kind is using coal bed gas well to seat earth water barrier weak area band method for repairing and mending
CN107152309A (en) A kind of coal seam is the high water level and high-speed drainage water damage prevention and controls of Main aquifer
CN115199269A (en) Multi-disaster integrated prevention and control method for island outburst coal seam strong and weak coupling structure
CN107227959B (en) A kind of in-place blasting out boundary coal column/body promotes the water damage control method of closing of fracture
CN208220720U (en) A kind of coal mining water and gas control system altogether

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination