CN108411752A - The restorative procedure of asphalt pavement pit - Google Patents

The restorative procedure of asphalt pavement pit Download PDF

Info

Publication number
CN108411752A
CN108411752A CN201810133036.5A CN201810133036A CN108411752A CN 108411752 A CN108411752 A CN 108411752A CN 201810133036 A CN201810133036 A CN 201810133036A CN 108411752 A CN108411752 A CN 108411752A
Authority
CN
China
Prior art keywords
parts
restorative procedure
compound layer
asphalt pavement
asphalt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810133036.5A
Other languages
Chinese (zh)
Inventor
翁恩策
陈吉昌
董耀淼
潘友余
潘晓宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wenzhou City South Municipal Construction And Maintenance Co Ltd
Original Assignee
Wenzhou City South Municipal Construction And Maintenance Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou City South Municipal Construction And Maintenance Co Ltd filed Critical Wenzhou City South Municipal Construction And Maintenance Co Ltd
Priority to CN201810133036.5A priority Critical patent/CN108411752A/en
Publication of CN108411752A publication Critical patent/CN108411752A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/06Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
    • E01C23/09Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges
    • E01C23/096Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges for forming, opening-out, cleaning, drying or heating and filling
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B26/00Compositions of mortars, concrete or artificial stone, containing only organic binders, e.g. polymer or resin concrete
    • C04B26/02Macromolecular compounds
    • C04B26/26Bituminous materials, e.g. tar, pitch
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/00474Uses not provided for elsewhere in C04B2111/00
    • C04B2111/0075Uses not provided for elsewhere in C04B2111/00 for road construction

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Structural Engineering (AREA)
  • Ceramic Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention provides a kind of restorative procedure of asphalt pavement pit, includes the following steps:1)Clear up pit slot;2)Cutting pit slot side wall forms an inclined-plane and clears up cutting clout, is rinsed with water, to be dried, which slopes inwardly from the top of bituminous paving;3)A layer sizing is coated on inclined-plane, the thickness of compound layer is 10~15mm, wait for that compound layer cures, sizing material includes 3~4 parts of matrix pitch in parts by weight, 10~12 parts of fine sand, 8~10 parts of ceramic powder, 5 parts of aluminium powder, 23~25 parts of aqueous epoxy resins, 7 parts of mineral clay, 3 parts of diluent, 8 parts of grading building stones, 5~7 parts of acrylic emulsion;4)Asphalt cold repairing is inserted, is compacted.This programme is reinforced and is adjusted the flatness of cut surface to one layer sizing of roadway applications after cutting, while connecting pitch old pavement and new oil dressing by compound layer, and the bonding strength of new-old pavement is promoted by the transition of compound layer;The service life of bituminous paving after repairing is promoted through the above scheme.

Description

The restorative procedure of asphalt pavement pit
Technical field
The present invention relates to road rehabilitations, the more particularly to restorative procedure of asphalt pavement pit.
Background technology
Bituminous paving refers to various types of road surfaces that bitumen for road use material making is mixed in mineral material.Pitch combines Material, which improves to pave the way, resists the ability of driving and the damage of natural cause road pavement with pellet, and evenness of road surface is made to lack dirt, waterproof, warp It is durable long.Therefore, bituminous paving is a kind of high class pavement being the most widely used in road construction.
Road surface pit slot is generated due to road surface aggregate local shedding, and the principal element for generating asphalt pavement pit includes Water Damage, road surface aging.
Existing repair mode general process is as follows:The first step, the road surface cracked to pit slot periphery are cut;The Two steps clear up the rubble etc. in pit slot;Third walks, and fills into virgin material and is compacted.Combination of this mode due to the old and new road surface Degree is not high, easy tos produce crack, service life is not high.
Invention content
The object of the present invention is to provide a kind of restorative procedures of asphalt pavement pit, promote the bond strength on the old and new road surface, Prolong the service life.
The present invention above-mentioned technical purpose technical scheme is that:A kind of asphalt pavement pit is repaiied Compound method, includes the following steps:
1) pit slot is cleared up;
2) cutting pit slot side wall, which is formed, an inclined-plane and clears up cutting clout, is rinsed with water, to be dried, and the inclined-plane is from bituminous paving top Portion slopes inwardly;
3) layer sizing is coated on inclined-plane, the thickness of compound layer is 10~15mm, waits for that compound layer cures, sizing material is in parts by weight Including 3~4 parts of matrix pitch, 10~12 parts of fine sand, 8~10 parts of ceramic powder, 5 parts of aluminium powder, 23~25 parts of aqueous epoxy resins, mine 7 parts of matter clay, 3 parts of diluent, 8 parts of grading building stones, 5~7 parts of acrylic emulsion;
4) asphalt cold repairing is inserted, is compacted.
Pavement roughness after cutting exists simultaneously certain crackle etc., and this programme is to one layer of roadway applications after cutting The flatness of cut surface is reinforced and adjusted to sizing material, while connecting pitch old pavement and new oil dressing by compound layer, is passed through The transition of compound layer promotes the bonding strength of new-old pavement, and the setting on inclined-plane increases connection area, and it is strong further to promote connection Degree;The service life of bituminous paving after repairing is promoted through the above scheme.Wherein aqueous epoxy resins are as major ingredient, fine sand, pottery Porcelain powder diameter small flow can increase connectivity into the gap in road surface after cutting well.Aluminium powder is for promoting intensity, acrylic acid Lotion is for enhancing viscosity.
Further, first compound layer is preheated after 3), preheating temperature is 40~46 DEG C.
After being preheated to compound layer, the molecular motion velocities of asphalt mixture can be accelerated, repairing efficiency is promoted, subtract simultaneously Rejection caused by the few and temperature difference of asphalt mixture.
Further, compacting includes first pressing:Vibrator carries out vibration-extrusion, is rolled 2~3 times by road roller again later, Pavement temperature is maintained at 55~60 DEG C;Multiple pressure:It is rolled 6 times or more by road roller, pavement temperature is maintained at 47~52 DEG C;Eventually Pressure:It is rolled 2~3 times by road roller, pavement temperature is kept for 40 DEG C or more.
By the way of cold-patch (being repaired at a lower temperature), technique is simpler, and season oneself to cold weather operation, improves Accommodation.
Further, mineral clay is calcium bentonite.
Mineral clay has preferable compatibility with pitch, can uniformly be dispersed in pitch, enhances pitch intensity.
Further, diluent is by mass ratio 1:1 heavy oil and diesel oil composition.
The low temperature workability of asphalt cold repairing mixture depends primarily on the type of diluent, and heavy oil molecules amount is big, cold-patch drip The interior frictional resistance and cohesion value of green mixture are larger, therefore heavy oil cannot reduce the viscosity of pitch well, with heavy oil Low temperature workability grade for the cold repairing asphalt mixture of diluent is low, and the average molecular weight of vegetable oil is minimum, and vegetable oil is added Certain lubricating action can be played, but the initial stage viscosity of pitch can be reduced, makes the interior frictional resistance of cold repairing asphalt mixture Reduce with cohesion value.Therefore, this programme selects diesel oil-heavy oil according to special ratios as diluent.
Further, the grading building stones are made of the basalt that grain size is 0.2-9.5mm, and building stones pass through 12mm diameters It is 100% when sieve pore, by being 96.8% when 9.5mm diameter sieve pores, by being 78.4% when 6.3mm diameter sieve pores, passes through It is 45.7% when 2.4mm diameter sieve pores, by being 19.3% when 0.9mm diameter sieve pores, by being when 0.2mm diameter sieve pores 9.8%.
The pairs of intensity of group of grading building stones will produce certain influence, and this programme uses the grading building stones of aforementioned proportion.
Further, the preparation method of sizing material is as follows:1) matrix pitch is heated to 130 DEG C;
2) aqueous epoxy resins heating is allowed to be in molten condition, fine sand, ceramic powder, aluminium powder is added and is stirred 1h, is stirring Retentivity epoxy resin is in molten condition during mixing;
3) mixture after stirring is poured into the matrix pitch in 1) step, adds acrylic emulsion, antifoaming agent stirring, stirring When keep 115 DEG C of temperature or more, it is cooling.
In conclusion the invention has the advantages that:This programme promotes new-old pavement by the transition of compound layer Bonding strength.
Description of the drawings
Fig. 1 is the structural schematic diagram of the pit slot in embodiment 1.
Reference numeral:1, bituminous paving;2, pit slot;3, inclined-plane;4, compound layer.
Specific implementation mode
Below in conjunction with attached drawing, invention is further described in detail.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, people in the art Member can as needed make the present embodiment the modification of not creative contribution after reading this specification, but as long as at this It is all protected by Patent Law in the right of invention.
Embodiment 1:Referring to Fig.1, a kind of restorative procedure of asphalt pavement pit, includes the following steps:1) pit slot 2 is cleared up;
2) cutting 2 side wall of pit slot, which is formed, an inclined-plane 3 and clears up cutting clout, is rinsed with water, to be dried, and the inclined-plane 3 is from asphalt road 1 top of face slopes inwardly;
3) layer sizing is coated on inclined-plane 3, the thickness of compound layer 4 is 12mm, waits for that compound layer 4 cures, sizing material is in parts by weight Including 4 parts of matrix pitch, 12 parts of fine sand, 9 parts of ceramic powder, 5 parts of aluminium powder, 24 parts of aqueous epoxy resins, 7 parts of mineral clay, dilution 3 parts of agent, 8 parts of grading building stones, 7 parts of acrylic emulsion.Matrix pitch is that the 70# that Jiangshu Baoli Pitch Co., Ltd. provides is general Logical pitch.
4) asphalt cold repairing is inserted, is compacted.Asphalt cold repairing is produced by Tai'an Zheng Bo earth working materials Co., Ltd 70#, 50 DEG C, ductility 150cm, needle penetration 70-90mm of softening point.Compacting includes first pressing:Vibrator carries out vibration-extrusion, Zhi Houzai It is rolled 3 times by road roller, pavement temperature is maintained at 58 DEG C;
Multiple pressure:It is rolled 6 times or more by road roller, pavement temperature is maintained at 48 DEG C;
Final pressure:It is rolled 2 times by road roller, pavement temperature is kept for 40 DEG C or more.
Grading building stones are made of the basalt that grain size is 0.2-9.5mm, and building stones by being when 12mm diameter sieve pores 100%, by being 96.8% when 9.5mm diameter sieve pores, by being 78.4% when 6.3mm diameter sieve pores, sieved by 2.4mm diameters Kong Shiwei 45.7%, by being 19.3% when 0.9mm diameter sieve pores, by being 9.8% when 0.2mm diameter sieve pores.
Diluent is by mass ratio 1:1 heavy oil and diesel oil composition, mineral clay are calcium bentonite.
The preparation method of sizing material is as follows:1) matrix pitch is heated to 130 DEG C;
2) aqueous epoxy resins heating is allowed to be in molten condition, fine sand, ceramic powder, aluminium powder is added and is stirred 1h, is stirring Retentivity epoxy resin is in molten condition during mixing;
3) mixture after stirring is poured into the matrix pitch in 1) step, adds acrylic emulsion, antifoaming agent stirring, stirring When keep 115 DEG C of temperature or more, it is cooling.
Embodiment 2:A kind of restorative procedure of asphalt pavement pit, unlike embodiment 1:The thickness of compound layer 4 is 15mm, sizing material include 4 parts of matrix pitch, 10 parts of fine sand, 8 parts of ceramic powder, 5 parts of aluminium powder, aqueous epoxy resins 23 in parts by weight Part, 7 parts of mineral clay, 3 parts of diluent, 8 parts of grading building stones, 5 parts of acrylic emulsion.
Embodiment 3:A kind of restorative procedure of asphalt pavement pit, unlike embodiment 1:The thickness of compound layer 4 is 10mm, sizing material include 3 parts of matrix pitch, 11 parts of fine sand, 10 parts of ceramic powder, 5 parts of aluminium powder, aqueous epoxy resins 25 in parts by weight Part, 7 parts of mineral clay, 3 parts of diluent, 8 parts of grading building stones, 6 parts of acrylic emulsion.
Embodiment 4:A kind of restorative procedure of asphalt pavement pit, unlike embodiment 1:First to compound layer 4 after 3) It is preheated, preheating temperature is 42 DEG C.
Embodiment 5:A kind of restorative procedure of asphalt pavement pit, unlike embodiment 1:First to compound layer 4 after 3) It is preheated, preheating temperature is 46 DEG C.
Embodiment 6:A kind of restorative procedure of asphalt pavement pit, unlike embodiment 1:First to compound layer 4 after 3) It is preheated, preheating temperature is 40 DEG C.
Comparative example:A kind of restorative procedure of asphalt pavement pit, difference lies in omit 2) with embodiment 1.
Carry out the asphalt roads construction of height 50cm, to be onstructed finish can manually be opened after normal pass on asphalt roads Dig diameter length 100, the pit slot 27 of width 50cm, depth 10cm.
Pressure test, the wheel footpath 75cm of road roller are carried out using embodiment 1-6 and comparative example, pressure is 5 tons and carries out back and forth It rolls, measures the settling amount of pit slot 2.

Claims (7)

1. a kind of restorative procedure of asphalt pavement pit, which is characterized in that include the following steps:
1)Clear up pit slot;
2)Cutting pit slot side wall forms an inclined-plane and simultaneously clears up cutting clout, is rinsed with water, to be dried, and the inclined-plane is from bituminous paving top Portion slopes inwardly;
3)A layer sizing is coated on inclined-plane, the thickness of compound layer is 10~15mm, waits for that compound layer cures, sizing material is in parts by weight Including 3~4 parts of matrix pitch, 10~12 parts of fine sand, 8~10 parts of ceramic powder, 5 parts of aluminium powder, 23~25 parts of aqueous epoxy resins, mine 7 parts of matter clay, 3 parts of diluent, 8 parts of grading building stones, 5~7 parts of acrylic emulsion;
4)Asphalt cold repairing is inserted, is compacted.
2. the restorative procedure of asphalt pavement pit according to claim 1, it is characterized in that:3)First compound layer is carried out afterwards Preheating, preheating temperature are 40~46 DEG C.
3. the restorative procedure of asphalt pavement pit according to claim 1, it is characterized in that:Compacting includes first pressing:Vibrator Vibration-extrusion is carried out, is rolled 2~3 times by road roller again later, pavement temperature is maintained at 55~60 DEG C;
Multiple pressure:It is rolled 6 times or more by road roller, pavement temperature is maintained at 47~52 DEG C;
Final pressure:It is rolled 2~3 times by road roller, pavement temperature is kept for 40 DEG C or more.
4. the restorative procedure of asphalt pavement pit according to claim 1, it is characterized in that:Mineral clay is calcium bentonite.
5. the restorative procedure of asphalt pavement pit according to claim 1, it is characterized in that:Diluent is by mass ratio 1:1 Heavy oil and diesel oil composition.
6. the restorative procedure of asphalt pavement pit according to claim 1, it is characterized in that:The grading building stones are by grain size The basalt of 0.2-9.5mm forms, and grading building stones are by being 100% when 12mm diameter sieve pores, when by 9.5mm diameter sieve pores It is 96.8%, by being 78.4% when 6.3mm diameter sieve pores, by being 45.7% when 2.4mm diameter sieve pores, is sieved by 0.9mm diameters Kong Shiwei 19.3%, by being 9.8% when 0.2mm diameter sieve pores.
7. the restorative procedure of asphalt pavement pit according to claim 1, it is characterized in that:The preparation method of sizing material is as follows: 1)Matrix pitch is heated to 130 DEG C;
2)Aqueous epoxy resins heating is allowed to be in molten condition, fine sand, ceramic powder, aluminium powder is added and is stirred 1h, is stirring Retentivity epoxy resin is in molten condition during mixing;
3)Mixture after stirring is poured into 1)Matrix pitch in step adds acrylic emulsion, antifoaming agent stirring, stirring When keep 115 DEG C of temperature or more, it is cooling.
CN201810133036.5A 2018-02-09 2018-02-09 The restorative procedure of asphalt pavement pit Pending CN108411752A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810133036.5A CN108411752A (en) 2018-02-09 2018-02-09 The restorative procedure of asphalt pavement pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810133036.5A CN108411752A (en) 2018-02-09 2018-02-09 The restorative procedure of asphalt pavement pit

Publications (1)

Publication Number Publication Date
CN108411752A true CN108411752A (en) 2018-08-17

Family

ID=63128204

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810133036.5A Pending CN108411752A (en) 2018-02-09 2018-02-09 The restorative procedure of asphalt pavement pit

Country Status (1)

Country Link
CN (1) CN108411752A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109401519A (en) * 2018-12-14 2019-03-01 大连理工大学 A kind of bituminous pavement repair materials
CN109403175A (en) * 2018-12-07 2019-03-01 湖南鑫长胜材料科技有限公司 A kind of asphalt pavement pit repairing method
CN109468930A (en) * 2018-11-08 2019-03-15 宁波市建筑设计研究院有限公司 A kind of crack repairing method of bituminous pavement after snow
CN110241701A (en) * 2019-05-27 2019-09-17 内蒙古路桥工程技术检测有限责任公司 Repair outfit after pit slot detection
CN110565472A (en) * 2019-09-09 2019-12-13 浙江宁波甬台温高速公路有限公司 Side surface sticker for new and old road surface sealing of pit and construction method
CN110629648A (en) * 2019-09-21 2019-12-31 西安永夷建设工程有限责任公司 Asphalt cold material pit slot repairing structure and construction process
CN110777594A (en) * 2019-11-07 2020-02-11 江苏路耐德公路养护技术有限公司 Net-crack repairing and self-healing process and equipment for highway maintenance
CN113529551A (en) * 2021-05-22 2021-10-22 浙江中桓建设有限公司 Construction method for repairing road by using polyester glass fiber cloth

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1816606A (en) * 2003-07-07 2006-08-09 陶氏环球技术公司 Adhesive epoxy composition and process for applying it
CN101896530A (en) * 2007-12-13 2010-11-24 昭和电工株式会社 Epoxy resin curing agent, method for producing the same, and epoxy resin composition
CN102924018A (en) * 2012-11-26 2013-02-13 长安大学 Repair material for bituminous pavement pot holes and method for preparing same
CN103043962A (en) * 2011-10-17 2013-04-17 中国石油化工股份有限公司 Mixture for normal-temperature repairing of asphalt pavement pits, and preparation method and application thereof
CN105801010A (en) * 2016-03-28 2016-07-27 东南大学 Cold patch asphalt mixture prepared from clay minerals and preparation method of cold patch asphalt mixture
CN106746928A (en) * 2016-12-30 2017-05-31 周益铭 A kind of preparation method of asphalt pavement pit cold-repairing material
US20170166481A1 (en) * 2015-10-22 2017-06-15 United States Gypsum Company Freeze-thaw durable geopolymer compositions and methods for making same

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1816606A (en) * 2003-07-07 2006-08-09 陶氏环球技术公司 Adhesive epoxy composition and process for applying it
CN101896530A (en) * 2007-12-13 2010-11-24 昭和电工株式会社 Epoxy resin curing agent, method for producing the same, and epoxy resin composition
CN103043962A (en) * 2011-10-17 2013-04-17 中国石油化工股份有限公司 Mixture for normal-temperature repairing of asphalt pavement pits, and preparation method and application thereof
CN102924018A (en) * 2012-11-26 2013-02-13 长安大学 Repair material for bituminous pavement pot holes and method for preparing same
US20170166481A1 (en) * 2015-10-22 2017-06-15 United States Gypsum Company Freeze-thaw durable geopolymer compositions and methods for making same
CN105801010A (en) * 2016-03-28 2016-07-27 东南大学 Cold patch asphalt mixture prepared from clay minerals and preparation method of cold patch asphalt mixture
CN106746928A (en) * 2016-12-30 2017-05-31 周益铭 A kind of preparation method of asphalt pavement pit cold-repairing material

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
化学工业出版社组织编写: "《化工产品手册 第三版 新领域精细化学品》", 31 March 2001, 化学工业出版社 *
张争奇: "《高速公路沥青路面维修养护技术》", 30 September 2010, 北京:人民交通出版社 *
李乡状等: "《"未来的科技建筑》", 30 September 2011, 长春:东北师范大学出版社 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109468930A (en) * 2018-11-08 2019-03-15 宁波市建筑设计研究院有限公司 A kind of crack repairing method of bituminous pavement after snow
CN109468930B (en) * 2018-11-08 2020-11-17 宁波市建筑设计研究院有限公司 Crack repairing method for asphalt pavement after snow
CN109403175A (en) * 2018-12-07 2019-03-01 湖南鑫长胜材料科技有限公司 A kind of asphalt pavement pit repairing method
CN109401519A (en) * 2018-12-14 2019-03-01 大连理工大学 A kind of bituminous pavement repair materials
CN110241701A (en) * 2019-05-27 2019-09-17 内蒙古路桥工程技术检测有限责任公司 Repair outfit after pit slot detection
CN110565472A (en) * 2019-09-09 2019-12-13 浙江宁波甬台温高速公路有限公司 Side surface sticker for new and old road surface sealing of pit and construction method
CN110629648A (en) * 2019-09-21 2019-12-31 西安永夷建设工程有限责任公司 Asphalt cold material pit slot repairing structure and construction process
CN110777594A (en) * 2019-11-07 2020-02-11 江苏路耐德公路养护技术有限公司 Net-crack repairing and self-healing process and equipment for highway maintenance
CN110777594B (en) * 2019-11-07 2021-06-11 江苏路耐德交通科技有限公司 Net-crack repairing and self-healing process and equipment for highway maintenance
CN113529551A (en) * 2021-05-22 2021-10-22 浙江中桓建设有限公司 Construction method for repairing road by using polyester glass fiber cloth

Similar Documents

Publication Publication Date Title
CN108411752A (en) The restorative procedure of asphalt pavement pit
DE69627642T2 (en) METHOD FOR PRODUCING PAVING
US20100047015A1 (en) Composition and process of using an asphalt emulsion to convert an unpaved surface into a paved surface
CN103114526B (en) Steel bridge deck pavement cold mixing maintenance material and manufacturing method thereof
CN105645850A (en) Pavement quick-repair asphalt mixture, and preparation method and application method thereof
CN106149500B (en) A kind of construction method of cement emulsified asphalt mortar penetration type half-flexible pavement
CN104446156B (en) A kind of emulsified bitumen slurry mixture penetration type bituminous paving
CN110593046A (en) High-strength durable steel slag permeable asphalt pavement structure
CN109054409A (en) A kind of viscous micro- cover construction method of formula special asphalt of interlayer height
CN109455980A (en) Concrete road surface material for quickly repairing and its restorative procedure
CN106638294A (en) Steel bridge deck pavement structure
JP6875033B2 (en) Penetration type asphalt concrete and its manufacturing method and application
CN111304994B (en) Semi-flexible functional combined structure recovery layer applied to asphalt pavement maintenance
US7312262B2 (en) Methods and compositions for microsurfacing
CN202323706U (en) Repair structure for epoxy asphalt pavement pit slot
CN107840600B (en) Durable self-flowing asphalt mixture and construction method in hardening of rail transit pavement
CN106758647B (en) A kind of method of asphalt pavement pit repairing
CN112962380B (en) Construction method of asphalt pavement
CN105777000A (en) Epoxy resin-based high-performance cement mortar for pavement ultrathin anti-skid wearing layer and preparation and application method thereof
CN213448074U (en) Composite construction suitable for steel bridge deck drainage is mated formation
CN212742055U (en) Pavement paving structure
CN112411373A (en) Thin-layer composite concrete pavement structure suitable for steel box girder bridge floor and pavement method
JP5440832B2 (en) Earth-based paving material
JPH06329918A (en) Pavement composition
CN102433836A (en) Composite material for repairing epoxy asphalt pavement pit and preparation method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180817