CN108331205A - High ductility assembled filling wall and construction method - Google Patents

High ductility assembled filling wall and construction method Download PDF

Info

Publication number
CN108331205A
CN108331205A CN201810102582.2A CN201810102582A CN108331205A CN 108331205 A CN108331205 A CN 108331205A CN 201810102582 A CN201810102582 A CN 201810102582A CN 108331205 A CN108331205 A CN 108331205A
Authority
CN
China
Prior art keywords
building block
entrained concrete
air
high ductility
rectangular channel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810102582.2A
Other languages
Chinese (zh)
Inventor
熊立红
阳超
罗明康
高连玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Institute of Engineering Mechanics China Earthquake Administration
Original Assignee
Institute of Engineering Mechanics China Earthquake Administration
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Institute of Engineering Mechanics China Earthquake Administration filed Critical Institute of Engineering Mechanics China Earthquake Administration
Priority to CN201810102582.2A priority Critical patent/CN108331205A/en
Publication of CN108331205A publication Critical patent/CN108331205A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/02Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
    • E04B2/28Walls having cavities between, but not in, the elements; Walls of elements each consisting of two or more parts kept in distance by means of spacers, all parts being solid
    • E04B2/40Walls having cavities between, but not in, the elements; Walls of elements each consisting of two or more parts kept in distance by means of spacers, all parts being solid the walls being characterised by fillings in all cavities in order to form a wall construction

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

High ductility assembled filling wall and construction method.Tradition filling wall ductility is poor, low bearing capacity, under geological process, is easy to happen brittle break even total Collapse, causes a large amount of economic losses and casualties.The present invention forms:One group of air-entrained concrete building block(1), the air-entrained concrete building block described in one group is distributed vertically, is connected by special masonry mortar between the two neighboring air-entrained concrete building block, the air-entrained concrete building block surface has vertically symmetrical open rectangular channel(2), the one group of anchor hole arranged from top to bottom is provided in the open rectangular channel(3), lateral anchor bar is provided in the anchor hole(4), the transverse steel and the Reinforcement being arranged in the open rectangular channel(5)It is fixedly connected.The present invention is for the filling wall construction of high ductility assembled.

Description

High ductility assembled filling wall and construction method
Technical field:
The invention belongs to Construction Anti-earthquake technologies, and in particular to a kind of high ductility assembled filling wall and construction method.
Background technology:
It is a kind of non-structural element to fill wall, and usually as the enclosure wall and partition wall of frame structure, the earthquake of a large amount of earthquakes shows: Wall is filled since anti-side rigidity is larger, often bears larger geological process, and tradition filling wall ductility is poor, bearing capacity It is low, under geological process, it is easy to happen brittle break even total Collapse, causes a large amount of economic losses and casualties.
Tradition filling wall is could to start to build by laying bricks or stones after main structure construction completion.So can extend the duration, scene is built Build construction quality it is difficult to ensure that, and need to expend a large amount of manual works.
Invention content:
The purpose of the present invention is overcoming existing filling wall ductility poor, low bearing capacity, quality is difficult to ensure, expends a large amount of manual works The problem of, providing one kind can shorten the construction period in factory lines machinery production, progress synchronous with main structure construction, reduce work The pollution at ground scene, the easily controlled high ductility assembled filling wall of quality and construction method.
Above-mentioned purpose is realized by following technical scheme:
A kind of high ductility assembled filling wall, composition include:One group of air-entrained concrete building block, the air entrained concrete described in one group Building block is distributed vertically, is connected by masonry mortar between the two neighboring air-entrained concrete building block, the aerating coagulation Earth building blocks surface has vertically symmetrical open rectangular channel, is provided in the open rectangular channel and arranges from top to bottom One group of anchor hole, be provided with lateral anchor bar in the anchor hole, the transverse steel is opened in described with being arranged Reinforcement in mouth rectangular channel is fixedly connected.
The high ductility assembled fills wall, and asphalt mixtures modified by epoxy resin is filled between the anchor hole and the transverse steel Fat.
The high ductility assembled fills wall, and matcoveredn mortar is filled in the open rectangular channel.
The high ductility assembled fills wall, a diameter of 8-10mm of the anchor hole, the two neighboring anchor The distance between solid hole is 200-300mm.
The high ductility assembled fills wall, a diameter of 6mm ~ 12mm of the Reinforcement.
The high ductility assembled fills wall, a diameter of 6mm ~ 8mm of the lateral anchor bar.
A kind of construction method of high ductility assembled filling wall, this method comprises the following steps:
(1)Preparation of construction works:
It inspects for acceptance to the air-entrained concrete building block and reinforcing bar marched into the arena, dimensional discrepancy≤3mm, and without unfilled corner, using hairbrush Block surfaces are cleared up, using the position line of ink fountain pop-up building block fluting;
(2)Building block is processed;
According to the slotting position line of pop-up, building block is cut using groover, processes open rectangular channel, then in opening square The position of anchor hole is marked in shape slot with marking pen, finally impact drill is used to drill by labeling position, and anchor hole is required to answer It is penetrated through along block thickness direction;
(3)Build building block by laying bricks or stones;
Machined block surfaces are cleared up, then mixing air-entrained concrete building block builds dedicated mortar by laying bricks or stones, finally puts in the horizontal plane First piece of machined building block is set, spreads masonry mortar, then places second piece of machined building block in the above, until building by laying bricks or stones to wanting The height asked;
(4)Reinforcing bar is installed;
Inject epoxy resin into anchor hole with syringe, be inserted into lateral anchor bar, finally by Reinforcement with Lateral anchor bar welding;
(5)Fill protective layer mortar;
Mixing air-entrained concrete building block special mortar for plastering, is then filled open rectangular channel with mortar full, and is checked It checks and accepts.
Advantageous effect:
1. the present invention constrains the deformation of wall using the Reinforcement that deformation performance is good and intensity is high, limitation wall is split The development of seam, prevent filling wall occur brittle break, improve filling wall bearing capacity ability, convenient for be factory produced with And transport installation.
The present invention processes open rectangular channel on air-entrained concrete building block surface and drills inside open rectangular channel, builds by laying bricks or stones Wall wallboard is filled at standard, facilitates embedment Reinforcement, improves the globality and bearing capacity of filling wall.
Lateral anchor bar is passed through building block aperture by the present invention, and connection is welded or bound with Reinforcement, is ensured vertical To steel bar stress and filling wall wallboard energy cooperative transformation, common stress.
The present invention uses air-entrained concrete building block, environmental protection and energy saving, light weight, and the panel width for filling wall is 600mm, Convenient for factorial praluction and scene transport installation, construction efficiency is improved.
The high ductility assembled filling wall that the present invention uses has preferable durability and economy, and can greatly improve and fill out The bearing capacity and anti-seismic performance of wall are filled, casualties and economic loss after shake are reduced.
Assembled filling wall of the present invention can be in factory lines machinery production, can be with the same stepping of main structure construction Row, greatly shortens the duration, reduces the pollution of building-site, wallboard quality is easy to control.
The masonry mortar joint plumpness > 95% of the present invention, degree of gravity vertical forwall surface and flatness ensure that filling within 2mm The quality of wall.
Description of the drawings:
Attached drawing 1 is the structural schematic diagram of unprocessed air-entrained concrete building block.
Attached drawing 2 is the structural schematic diagram of the air-entrained concrete building block after processing.
Attached drawing 3 is the exploded view of the present invention.
Attached drawing 4 is the structural schematic diagram after present invention filling protective layer mortar.
Attached drawing 5 is the structural schematic diagram that the present invention is not filled by protective layer mortar.
In figure:1, air-entrained concrete building block;2, open rectangular channel;3, anchor hole;4, lateral anchor bar;5, longitudinal stress Reinforcing bar;6, protective layer mortar.
Specific implementation mode:
Embodiment 1:
A kind of high ductility assembled filling wall, composition include:One group of air-entrained concrete building block 1, the width of air-entrained concrete building block Degree is 600mm, and the air-entrained concrete building block described in one group is distributed vertically, is led between the two neighboring air-entrained concrete building block Masonry mortar connection is crossed, the air-entrained concrete building block surface has vertically symmetrical open rectangular channel 2, and be open square The width of shape slot is 40mm, and depth 25mm, length is identical as air-entrained concrete building block height, and open rectangular channel is mixed in aerating Solidifying earth building blocks both sides are arranged symmetrically, and two are respectively arranged per side, one arranged from top to bottom is provided in the open rectangular channel Group anchor hole 3, is provided with lateral anchor bar 4 in the anchor hole, the transverse steel and is arranged in the opening Reinforcement 5 in rectangular channel is fixedly connected.
Embodiment 2:
Wall is filled according to high ductility assembled described in embodiment 1, is filled between the anchor hole and the transverse steel There is epoxy resin.
Embodiment 3:
High ductility assembled according to embodiment 1 or 2 fills wall, and matcoveredn mortar is filled in the open rectangular channel 6。
Embodiment 4:
High ductility assembled according to embodiment 1 or 2 or 3 fills wall, and a diameter of 8-10mm of the anchor hole is adjacent The distance between anchor hole described in two is 200-300mm.
Embodiment 5:
High ductility assembled according to embodiment 1 or 2 or 3 or 4 fills wall, and the Reinforcement is HRB400 heat Steel rolling muscle, a diameter of 6mm ~ 12mm of the Reinforcement.
Embodiment 6:
High ductility assembled according to embodiment 1 or 2 or 3 or 4 or 5 fills wall, and the lateral anchor bar is HRB400 hot-rolled reinforced bars, a diameter of 6mm ~ 8mm of the lateral anchor bar.
Embodiment 7:
The construction method of above high ductility assembled filling wall, this method comprises the following steps:
(1)Preparation of construction works:
It inspects for acceptance to the air-entrained concrete building block and reinforcing bar marched into the arena, dimensional discrepancy≤3mm, and without unfilled corner, using hairbrush Block surfaces are cleared up, using the position line of ink fountain pop-up building block fluting;
(2)Building block is processed;
According to the slotting position line of pop-up, building block is cut using groover, processes open rectangular channel, then in opening square The position of anchor hole is marked in shape slot with marking pen, finally impact drill is used to drill by labeling position, and anchor hole is required to answer It is penetrated through along block thickness direction;
(3)Build building block by laying bricks or stones;
Machined block surfaces are cleared up, then mixing air-entrained concrete building block special masonry mortar, finally puts in the horizontal plane First piece of machined building block is set, spreads masonry mortar, then places second piece of machined building block in the above, until building by laying bricks or stones to wanting The height asked;
(4)Reinforcing bar is installed;
Inject epoxy resin into anchor hole with syringe, be inserted into lateral anchor bar, finally by Reinforcement with Lateral anchor bar welding;
(5)Fill protective layer mortar;
Mixing air-entrained concrete building block special mortar for plastering, is then filled open rectangular channel with mortar full, and is checked It checks and accepts, masonry mortar joint plumpness > 95%, degree of gravity vertical forwall surface and flatness are within 2mm;
A diameter of 8-10mm of the anchor hole, the distance between two neighboring described anchor hole are 200-300mm.In this way Enable lateral anchor bar to constrain the deformation of Reinforcement, ensures Reinforcement and wall of aerated concrete block Cooperative transformation;
Depth+the 30mm of anchor bar length=thickness of wall body-wall both sides open rectangular channel, can meet anchor in this way Gu reinforcing bar and space needed for Reinforcement welding, and can guarantee the protective layer thickness of anchor bar.

Claims (7)

1. a kind of high ductility assembled fills wall, composition includes:One group of air-entrained concrete building block, it is characterized in that:Described in one group Air-entrained concrete building block be distributed vertically, connected by special masonry mortar between the two neighboring air-entrained concrete building block It connects, the air-entrained concrete building block surface has a vertically symmetrical open rectangular channel, in the open rectangular channel It is provided with the one group of anchor hole arranged from top to bottom, lateral anchor bar, the lateral anchor are provided in the anchor hole Gu reinforcing bar is fixedly connected with the Reinforcement being arranged in the open rectangular channel.
2. high ductility assembled according to claim 1 fills wall, it is characterized in that:The anchor hole and the transverse direction Epoxy resin is filled between anchor bar.
3. high ductility assembled according to claim 1 or 2 fills wall, it is characterized in that:It is filled out in the open rectangular channel Filled with protective layer mortar.
4. high ductility assembled according to claim 1 or 2 or 3 fills wall, it is characterized in that:The diameter of the anchor hole For 8-10mm, the distance between the two neighboring anchor hole is 200-300mm.
5. high ductility assembled according to claim 1 or 2 or 3 or 4 fills wall, it is characterized in that:The longitudinal stress A diameter of 6mm ~ 12mm of reinforcing bar.
6. the high ductility assembled according to claims 1 or 2 or 3 or 4 or 5 fills wall, it is characterized in that:The lateral anchor Gu a diameter of 6mm ~ 8mm of reinforcing bar.
7. the construction method of the high ductility assembled filling wall described in a kind of one of claim 1-6, it is characterized in that:This method packet Include following steps:
(1)Preparation of construction works:
It inspects for acceptance to the air-entrained concrete building block and reinforcing bar marched into the arena, dimensional discrepancy≤3mm, and without unfilled corner, using hairbrush Block surfaces are cleared up, using the position line of ink fountain pop-up building block fluting;
(2)Building block is processed;
According to the slotting position line of pop-up, building block is cut using groover, processes open rectangular channel, then in opening square The position of anchor hole is marked in shape slot with marking pen, finally impact drill is used to drill by labeling position, and anchor hole is required to answer It is penetrated through along block thickness direction;
(3)Build building block by laying bricks or stones;
Machined block surfaces are cleared up, then mixing air-entrained concrete building block special masonry mortar, finally puts in the horizontal plane First piece of machined building block is set, special masonry mortar is spread, then place second piece of machined building block in the above, until building by laying bricks or stones To the height of requirement;
(4)Reinforcing bar is installed;
Inject epoxy resin into anchor hole with syringe, be inserted into lateral anchor bar, finally by Reinforcement with Lateral anchor bar welding;
(5)Fill protective layer mortar;
Mixing air-entrained concrete building block special mortar for plastering, is then filled open rectangular channel with mortar full, and is checked It checks and accepts.
CN201810102582.2A 2018-02-01 2018-02-01 High ductility assembled filling wall and construction method Withdrawn CN108331205A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810102582.2A CN108331205A (en) 2018-02-01 2018-02-01 High ductility assembled filling wall and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810102582.2A CN108331205A (en) 2018-02-01 2018-02-01 High ductility assembled filling wall and construction method

Publications (1)

Publication Number Publication Date
CN108331205A true CN108331205A (en) 2018-07-27

Family

ID=62928022

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810102582.2A Withdrawn CN108331205A (en) 2018-02-01 2018-02-01 High ductility assembled filling wall and construction method

Country Status (1)

Country Link
CN (1) CN108331205A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112900639A (en) * 2021-01-22 2021-06-04 中国建筑第八工程局有限公司 Glass brick and aerated concrete block staggered installation connecting component and construction method thereof
CN113136983A (en) * 2021-03-12 2021-07-20 九易庄宸科技(集团)股份有限公司 Assembled slip casting wall piece

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105155725A (en) * 2015-06-25 2015-12-16 李彦斌 Construction method of novel structural column for frame-structured T-shaped filled walls
KR20160050939A (en) * 2014-10-31 2016-05-11 씨티에스엔지니어링 주식회사 Masonry Wall Reinforcement Structure and Method using Anchor and Mesh
CN205776884U (en) * 2016-06-17 2016-12-07 天津博凯机电科技有限公司 A kind of assembled Novel light wall body
CN106948600A (en) * 2017-03-03 2017-07-14 重庆大学 Core column type is without the slurry accurate block masonry of air entrained concrete and its construction method
CN208072703U (en) * 2018-02-01 2018-11-09 中国地震局工程力学研究所 High ductility assembled fills wall

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160050939A (en) * 2014-10-31 2016-05-11 씨티에스엔지니어링 주식회사 Masonry Wall Reinforcement Structure and Method using Anchor and Mesh
CN105155725A (en) * 2015-06-25 2015-12-16 李彦斌 Construction method of novel structural column for frame-structured T-shaped filled walls
CN205776884U (en) * 2016-06-17 2016-12-07 天津博凯机电科技有限公司 A kind of assembled Novel light wall body
CN106948600A (en) * 2017-03-03 2017-07-14 重庆大学 Core column type is without the slurry accurate block masonry of air entrained concrete and its construction method
CN208072703U (en) * 2018-02-01 2018-11-09 中国地震局工程力学研究所 High ductility assembled fills wall

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112900639A (en) * 2021-01-22 2021-06-04 中国建筑第八工程局有限公司 Glass brick and aerated concrete block staggered installation connecting component and construction method thereof
CN113136983A (en) * 2021-03-12 2021-07-20 九易庄宸科技(集团)股份有限公司 Assembled slip casting wall piece

Similar Documents

Publication Publication Date Title
CN101769008B (en) Method for constructing quake-proof masonry house by utilizing prefabricated constructional column ring beams
CN101831970A (en) Integrally assembled wallboard wall and construction method thereof
CN1090362A (en) Improved building wall board and its manufacture method
CN113775081B (en) Construction method of inner and outer leaf composite wall body of archaize building
CN110552461A (en) Prefabricated constructional column of masonry infilled wall and construction method thereof
CN104831811B (en) A kind of hollow armored concrete precast wall body module
CN208072703U (en) High ductility assembled fills wall
CN108331205A (en) High ductility assembled filling wall and construction method
CN108071169A (en) Assemble prefabricated components formula house
CN206015953U (en) Honeycomb structure blockwork
CN107363986B (en) Integrated mobile locking device and wall body module process equipment
CN105019593B (en) Building heat preservation prefabricated section and modular arrangement of reinforcement cast-in-place method construction method thereof
CN110424370A (en) The linear type connecting node and L shape connecting node of prefabricated post and prefabricated panel
TWM616467U (en) Partition wall structure without dismantling grouting formwork
JP2010150894A (en) Reinforcing structure of concrete made bridge and reinforcing method thereof
CN106401276A (en) Construction method for wall column binding bars of frame type building block enclosing wall
CN106703015A (en) Steel plate concrete prefabricated part, permanent-temporary combined underground enclosure system and construction methods
CN103147525B (en) Earthenware brick stone wall assembly and earthenware brick stone wall construction method
CN104763158A (en) Joggle joint type lightweight aggregate interlocking block construction method
CN203782872U (en) Hollow reinforced concrete prefabricated wall body module and building utilizing module
CN209975560U (en) Prefabricated waterproof retaining wall plate structure
CN2584693Y (en) Building wall
CN212427718U (en) Raw soil-wood-jute cloth composite floor
CN103255872A (en) Hollow building block
CN1493755A (en) Building wall body board and building wall body

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20180727