A kind of non-wastewater discharge equipment
Technical field
The present invention relates to technical field of utilization of waste water, specifically a kind of non-wastewater discharge equipment.
Background technique
More industrial wastewater is often generated in the industrial production, these waste water are by being often direct emission after purification
Fall, and these waste water kinds have the overwhelming majority that can rationally utilize, hydrogen and oxygen can be made in waste water after electrolysis, therefore is badly in need of
Hydrogen and oxygen waste drain can be quickly made to realize utilization of wastewater resource, to indirectly realize nothing in one kind
Discharge of wastewater.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of non-wastewater discharge equipment, are able to solve above-mentioned present skill
The problems in art.
The present invention is achieved through the following technical solutions: a kind of non-wastewater discharge equipment of the invention, including cabinet,
It is set to the intracorporal electrolysis unit of the case, the photovoltaic devices for being set to the cabinet upper surface, is set on the left of the cabinet
The first collection the second collection for taking device and being set on the right side of the cabinet take device, on four corners of the bottom of box simultaneously
Equipped with fixed plate, fixation hole is equipped in the fixed plate, the electrolysis unit includes being set to the intracorporal cavity of the case, described
Partition, left-hand end of the partition close to lower end surface are fixedly installed between the inner wall of at the center of cavity upper inside walls and front and back side
It is fixedly installed lower sensing device on face, on the upside of the lower sensing device and is located on the partition left side and is fixedly installed
Ion block, the partition are fixedly installed between inner wall center on the downside of sensing device, the partition lower end surface and the cavity
The first mounting base, first mounting base upper end are fixedly installed on downside inner wall between left side and the cavity inner left wall
It is fixedly installed the first mounting blocks, first mounting blocks upper surface is equipped with multiple groups positive electrode needle, on the right side of the partition and described
The cavity lower end surface on the right side of cavity between inner wall is fixedly installed the second mounting base, and the fixation of second mounting base upper end is set
It is equipped with the second mounting blocks, second mounting blocks upper surface is equipped with multiple groups negative electrode needle, and the cavity is close to the upper of inner left wall
It is provided with intake chamber on the inner wall of side, end cap is provided with outside the intake chamber, matches before and after the end cap upper surface and is provided with handle,
The photovoltaic devices include the fulcrum bearing being fixedly installed at the center of the cabinet upper surface, and the fulcrum bearing upper surface is fixed to be connected
It is connected to lower successive chunk, is provided with the first mounting rack on the upside of the cabinet, first mounting rack upper surface is fixedly installed first
Photovoltaic panel, first mounting rack lower end surface are fixedly installed successive chunk, and the upper successive chunk is rotatably assorted by articulated shaft
It is connected to the lower successive chunk, the first mounting rack left end face is rotatably assorted by articulated shaft is connected with the second mounting rack,
Second mounting rack upper surface is fixedly installed the second photovoltaic panel, and first mounting rack is solid close to the lower end surface of left end face
Surely it is provided with tension spring, the tension spring lower end is fixedly connected on the upper surface of the cabinet, and the cabinet is close to the upper of left end face
End face is fixedly installed fixing seat, and the upward turn trough in port is provided in the fixing seat, fixed in inner wall on the right side of the turn trough
Be provided with first electricity favourable turn, it is described first electricity favourable turn left side and be located at the turn trough in be provided with reel, the reel right side
It is rotatably assorted by Coupling Shaft and is connected to the first electricity favourable turn, the reel left side is rotatably assorted by Coupling Shaft to be connected to
The inner left wall of the turn trough, coiling has drawstring on the reel, and the drawstring other end is fixedly connected on first installation
On the lower end surface of the nearly right end face of bridge joint.
Described first collects that take device include being set to left-hand cylinder body on the left of the cabinet as a preferred technical solution, described
It is provided with the first collection in left-hand cylinder body and takes chamber, first collection, which takes to be provided between chamber and the cavity, to be led to first collection and take chamber
And a left side for the cavity is managed in succession, and the first draw-out device is provided on the left pipe in succession, first collection takes chamber close to downside
It is provided with the first rhone in the inner left wall of inner wall, the first closing cap, institute are provided at the port of first rhone left end
Stating on the upside of the first rhone and being located at first collection takes chamber to be provided with the first aqueduct close in the inner left wall of front inner wall,
First collection takes the first condensate pipe that is intracavitary being provided with coiling and interlinking with first aqueduct, first collection
Chamber is taken to be provided with the first drainpipe to interlink with first condensate pipe close in the inner left wall of rear side inner wall, described
One collection takes chamber to be fixedly installed air gauge close in the inner left wall of upper inside walls, and first collection takes chamber upper inside walls to be provided with
First scarf is fixedly installed oxygen hose at the center of first scarf upper surface, is provided with first on the oxygen hose
Valve, is provided with the first port for taking chamber to interlink with first collection in the oxygen hose, first port and described the
One collection takes chamber joint to be fixedly installed the first strainer block.
It includes being set to right cylinder on the right side of the cabinet that second collection, which takes device, as a preferred technical solution, described
It is provided with the second collection in right cylinder and takes chamber, second collection, which takes to be provided between chamber and the cavity, to be led to second collection and take chamber
And the right side of the cavity is managed in succession, is provided with identical with the first draw-out device structure second on the right pipe in succession and is extracted
Device, second collection take chamber to be provided with the second rhone close on the right side inner wall of downside inner wall, and second rhone is right
It holds and is provided with the second closing cap at port, take chamber close to front inner wall on the upside of second rhone and positioned at second collection
It is provided with the second aqueduct on the inner wall of right side, second collection takes intracavitary being provided with coiling and communicates with second aqueduct
The second condensate pipe even, the right side inner wall that second collection takes chamber close to rear side inner wall are provided with and second condensate pipe
The second drainpipe to interlink, the right side inner wall that second collection takes chamber close to upper inside walls is fixedly installed air gauge, described
Second collection takes chamber upper inside walls to be provided with the second scarf, and second scarf upper surface is fixedly installed hydrogen at center
Pipe, the hydrogen tube outer surface are provided with the second valve, are provided in the hydrogen pipe and take chamber to interlink with second collection
Second port, second port and second collection take chamber joint to be fixedly installed the second strainer block.
First draw-out device includes being fixedly connected on the left pipe secure fit in succession as a preferred technical solution,
The ring in succession of connection is provided with the fixed pedestal of fixed link in the ring in succession, is fixedly installed second in the pedestal
Electricity favourable turn, the second electricity favourable turn right end power are connected with fan blades.
Storage bottle, the storage bottle and the negative electricity are fixedly installed in the fulcrum bearing as a preferred technical solution,
Pole needle and negative electrode needle are electrically connected, and the storage bottle and first photovoltaic panel and the second photovoltaic panel are electrically connected.
The beneficial effects of the present invention are: the configuration of the present invention is simple, easy to operate, user of service is first before using the present apparatus
The first draw-out device and the second draw-out device are closed, the first rhone, the first valve, the second rhone and the second valve are simultaneously closed off
Door is ready to complete rear user of service and opens end cap and inject industrial wastewater in cavity by intake chamber, when Industry Waste in cavity
Stop water filling when water level is more than upper sensing device, close end cap at this time and gives positive electrode needle logical upper positive electricity, it is logical to negative electrode needle
Upper negative electricity, positive electrode needle generates oxygen by the intracorporal water electrolysis of chamber, and on positive electrode needle with negative electrode needle at this time, in negative electrode
Hydrogen is generated on needle, at this time the first draw-out device and the starting of the second draw-out device, at this time the second electricity favourable turn rotation, and then by turning
Spindle drives fan blades rotation, and then the oxygen generated on the left of cavity is pumped into the first collection and takes intracavitary, will to generate in cavity hydrogen
It is pumped into the second collection and takes intracavitary, be passed through the condensed water and then vapor brought into is cold in the first aqueduct and the second aqueduct at this time
But it liquefies, when the first collection takes chamber or the second collection takes intracavitary gas pressure to reach preset value, staff opens first respectively
First collection is taken chamber and second collects intracavitary oxygen and hydrogen is taken to extract out respectively by valve and the second valve, period the first strainer block and
Second strainer block can further remove the vapor brought into, and the liquid water for cooling down generation can be by the first rhone and second
Rhone releases, the first electricity favourable turn starting being set in fixing seat during electrolysis, and then is driven and rolled up by Coupling Shaft
Cylinder rotation, and then tense or unclamp drawstring, and then overcomes the elastic force of tension spring, so drive the first mounting rack around upper successive chunk and under
Successive chunk, which rotates and is directed at sunlight, makes the second mounting rack and the first photovoltaic panel convert sunlight to greatest extent, and when using in cavity
When liquid level reaches lower sensing device or less, the second photovoltaic panel can be folded and pass through intake chamber by staff is added Industry Waste again
Water.
Detailed description of the invention
The present invention is described in detail by following specific embodiments and drawings for ease of explanation,.
Fig. 1 is a kind of schematic diagram of internal structure of non-wastewater discharge equipment of the invention;
Fig. 2 is the enlarged diagram of " A " in Fig. 1;
Fig. 3 is the structural schematic diagram of the first draw-out device of the invention;
Fig. 4 is the structural schematic diagram of the second condensate pipe of the invention;
Fig. 5 is the bottom view of cabinet in the present invention.
Specific embodiment
As Figure 1-Figure 5, a kind of non-wastewater discharge equipment of the invention, including cabinet 11, it is set to the cabinet 11
Interior electrolysis unit, the photovoltaic devices for being set to 11 upper surface of cabinet, the first collection for being set to 11 left side of cabinet take
Device and the second collection for being set to 11 right side of cabinet take device, are equipped with simultaneously on the corner of cabinet 11 bottom four solid
Fixed board 110, is equipped with fixation hole 111 in the fixed plate 110, the fixation hole 111 for engage with fastening bolt and will described in
Cabinet 11 is fixed on ground, and the electrolysis unit includes the cavity 13 being set in the cabinet 11,13 upside of cavity
Partition 21 is fixedly installed between the inner wall of at the center of inner wall and front and back side, the partition 21 is close in the left end face of lower end surface
It is fixedly installed lower sensing device 24, lower 24 upside of sensing device and being located on 21 left side of partition is fixedly installed
Upper sensing device 23,21 lower end surface of partition and the cavity are fixedly installed ion block between 13 downside inner wall center
22, the first mounting base 14 is fixedly installed on the downside inner wall between 21 left side of the partition and 13 inner left wall of the cavity,
First mounting base, 14 upper end is fixedly installed the first mounting blocks 17, and 17 upper surface of the first mounting blocks is equipped with multiple groups positive electricity
Pole needle 18,13 lower end surface of the cavity between 21 right side of partition and 13 right side inner wall of the cavity are fixedly installed second
Mounting base 12,12 upper end of the second mounting base are fixedly installed the second mounting blocks 15, and 15 upper surface of the second mounting blocks is set
There is multiple groups negative electrode needle 16, the cavity 13 is provided with intake chamber 31, the intake chamber close in the upper inside walls of inner left wall
It is provided with end cap 32 outside 31, matches before and after 32 upper surface of end cap and is provided with handle 33, the photovoltaic devices include that fixation is set
The fulcrum bearing 35 being placed at the 11 upper surface center of cabinet, 35 upper surface of fulcrum bearing are fixedly connected with lower successive chunk 37,
The first mounting rack 39 is provided on the upside of the cabinet 11,39 upper surface of the first mounting rack is fixedly installed the first photovoltaic panel
41,39 lower end surface of the first mounting rack is fixedly installed successive chunk 38, and the upper successive chunk 38 is matched by articulated shaft rotation
Conjunction is connected to the lower successive chunk 37, and 39 left end face of the first mounting rack is rotatably assorted by articulated shaft is connected with the second peace
Shelve 42,42 upper surface of the second mounting rack is fixedly installed the second photovoltaic panel 43, and first mounting rack 39 is close to left side
The lower end surface of end face is fixedly installed tension spring 34, and 34 lower end of tension spring is fixedly connected on the upper surface of the cabinet 11, described
The upper surface of cabinet 11 close to left end face is fixedly installed fixing seat 44, and upward turn in port is provided in the fixing seat 44
Slot 49, is fixedly installed the first electricity favourable turn 45 in the 49 right side inner wall of turn trough, 45 left side of the first electricity favourable turn and is located at institute
It states and is provided with reel 48 in turn trough 49,48 right side of reel is rotatably assorted by Coupling Shaft 47 is connected to first electricity turn
Machine 45,48 left side of reel are rotatably assorted by Coupling Shaft 47 and are connected to the inner left wall of the turn trough 49, the reel
Coiling has drawstring 51 on 48, and 51 other end of drawstring is fixedly connected on first mounting rack 39 close to the lower end of right end face
On face.
Valuably, described first collect take device include be set to the 11 left side left-hand cylinder body 63 of cabinet, the left-hand cylinder body 63
It is inside provided with the first collection and takes chamber 64, first collection, which takes to be provided between chamber 64 and the cavity 21, to be led to first collection and take chamber
64 and the cavity 21 left pipe 61 in succession, be provided with the first draw-out device 62 on the left pipe 61 in succession, first collection takes
Chamber 64 is provided with the first rhone 65 close in the inner left wall of downside inner wall, is arranged at the 65 left end port of the first rhone
There is the first closing cap 66,65 upside of the first rhone and is located at first collection and takes chamber 64 close in the left side of front inner wall
It is provided with the first aqueduct 67 on wall, first collection takes being provided with coiling in chamber 64 and communicates with first aqueduct 67
The first condensate pipe 69 even, first collection take chamber 64 be provided with close in the inner left wall of rear side inner wall with it is described first cold
The first drainpipe that condensate pipe 69 interlinks, first collection take chamber 64 to be fixedly installed close in the inner left wall of upper inside walls
Air gauge 72, first collection takes 64 upper inside walls of chamber to be provided with the first scarf 73, in 73 upper surface of the first scarf
Be fixedly installed oxygen hose 74 at the heart, the first valve 77 be provided on the oxygen hose 74, be provided in the oxygen hose 74 with
The first port 75 that first collection takes chamber 64 to interlink, first port 75 take 64 joint of chamber to fix with first collection
It is provided with the first strainer block 76.
Valuably, it includes being set to the 11 right cylinder 88 in right side of cabinet, the right cylinder 88 that second collection, which takes device,
It is inside provided with the second collection and takes chamber 83, second collection, which takes to be provided between chamber 83 and the cavity 21, to be led to second collection and take chamber
83 and the cavity 21 right pipe 82 in succession, be provided on the right pipe 82 in succession identical as 62 structure of the first draw-out device
The second draw-out device 81, it is described second collection take chamber 83 to be provided with the second rhone 84 close on the right side inner wall of downside inner wall,
It is provided with the second closing cap 85 at second rhone, the 84 right end port, 84 upside of the second rhone and is located at described the
Two collection take chamber 83 to be provided with the second aqueduct 85 close on the right side inner wall of front inner wall, and second collection, which takes in chamber 83, to be provided with
The second condensate pipe 86 that is coiling and interlinking with second aqueduct 85, second collection take chamber 83 close to rear side inner wall
Right side inner wall be provided with the second drainpipe 96 to interlink with second condensate pipe 86, second collection takes chamber 83 close
The right side inner wall of upper inside walls is fixedly installed air gauge 89, and second collection takes 83 upper inside walls of chamber to be provided with the second scarf
91, hydrogen pipe 92 is fixedly installed at the 91 upper surface center of the second scarf, and 92 outer surface of hydrogen pipe is provided with
Two valves 95 are provided with the second port 93 for taking chamber 83 to interlink with second collection in the hydrogen pipe 92, and described second is logical
Mouth 93 takes 83 joint of chamber to be fixedly installed the second strainer block 94 with second collection.
Valuably, first draw-out device 62 includes being fixedly connected on connecing for the left connection of 61 secure fit of pipe in succession
The chain of rings 621 is provided with the fixed pedestal 624 of fixed link 625, fixed setting in the pedestal 624 in the ring in succession 621
There is the second electricity favourable turn 623, the second electricity 623 right end power of favourable turn are connected with fan blades 622.
Valuably, storage bottle 36, the storage bottle 36 and the negative electrode needle 18 are fixedly installed in the fulcrum bearing 35
And negative electrode needle 16 is electrically connected, the storage bottle 36 is electrically connected with first photovoltaic panel 41 and the second photovoltaic panel 43.
User of service first closes the first draw-out device 62 and the second draw-out device 81 before using the present apparatus, simultaneously closes off
First rhone 65, the first valve 77, the second rhone 84 and the second valve 95 are ready to complete rear user of service and open end cap 32
And industrial wastewater is injected in cavity 13 by intake chamber 31, when industrial wastewater liquid level is more than upper sensing device 23 in cavity 13
Stop water filling, close end cap 32 at this time and give positive electrode needle 18 logical upper positive electricity, gives negative electrode needle 16 logical upper negative electricity, at this time positive electrode
Needle 18 generates oxygen by the water electrolysis in cavity 13, and on positive electrode needle 18 with negative electrode needle 16, raw on negative electrode needle 16
At hydrogen, at this time the first draw-out device 62 and the starting of the second draw-out device 81, at this time 623 rotation of the second electricity favourable turn, and then pass through
Coupling Shaft drives fan blades 622 to rotate, and then the oxygen generated on the left of cavity 21 is pumped into the first collection and is taken in chamber 64, will be in cavity 21
The hydrogen of generation is pumped into the second collection and takes in chamber 83, is passed through condensed water in turn in the first aqueduct 67 and the second aqueduct 85 at this time
The vapor cooling liquid that will be brought into, when the first collection takes chamber 64 or the second collection takes the gas pressure in chamber 83 to reach preset value,
Staff open respectively the first valve 77 and the second valve 95 by the first collection take chamber 64 and second collect take oxygen in chamber 83 and
Hydrogen is extracted out respectively, and period the first strainer block 76 and the second strainer block 94 can further remove the vapor brought into, and cool down
The liquid water of generation can be released by the first rhone 65 and the second rhone 84, and fixing seat 44 is set to during electrolysis
Interior 45 starting of the first electricity favourable turn, and then rotated by Coupling Shaft 47 with movable reel 48, and then tense or unclamp drawstring 51, in turn
Overcome the elastic force of tension spring 34, and then drive the first mounting rack 39 to rotate around upper successive chunk 38 and lower successive chunk 37 and be directed at sunlight to make
It obtains the second mounting rack 42 and the first photovoltaic panel 41 converts sunlight to greatest extent, and filled when reaching lower induction using liquid level in cavity 13
When setting 24 or less, the second photovoltaic panel 43 can be folded and industrial wastewater is added again by intake chamber 31 by staff.
The beneficial effects of the present invention are: the configuration of the present invention is simple, easy to operate, user of service is first before using the present apparatus
The first draw-out device and the second draw-out device are closed, the first rhone, the first valve, the second rhone and the second valve are simultaneously closed off
Door is ready to complete rear user of service and opens end cap and inject industrial wastewater in cavity by intake chamber, when Industry Waste in cavity
Stop water filling when water level is more than upper sensing device, close end cap at this time and gives positive electrode needle logical upper positive electricity, it is logical to negative electrode needle
Upper negative electricity, positive electrode needle generates oxygen by the intracorporal water electrolysis of chamber, and on positive electrode needle with negative electrode needle at this time, in negative electrode
Hydrogen is generated on needle, at this time the first draw-out device and the starting of the second draw-out device, at this time the second electricity favourable turn rotation, and then by turning
Spindle drives fan blades rotation, and then the oxygen generated on the left of cavity is pumped into the first collection and takes intracavitary, will to generate in cavity hydrogen
It is pumped into the second collection and takes intracavitary, be passed through the condensed water and then vapor brought into is cold in the first aqueduct and the second aqueduct at this time
But it liquefies, when the first collection takes chamber or the second collection takes intracavitary gas pressure to reach preset value, staff opens first respectively
First collection is taken chamber and second collects intracavitary oxygen and hydrogen is taken to extract out respectively by valve and the second valve, period the first strainer block and
Second strainer block can further remove the vapor brought into, and the liquid water for cooling down generation can be by the first rhone and second
Rhone releases, the first electricity favourable turn starting being set in fixing seat during electrolysis, and then is driven and rolled up by Coupling Shaft
Cylinder rotation, and then tense or unclamp drawstring, and then overcomes the elastic force of tension spring, so drive the first mounting rack around upper successive chunk and under
Successive chunk, which rotates and is directed at sunlight, makes the second mounting rack and the first photovoltaic panel convert sunlight to greatest extent, and when using in cavity
When liquid level reaches lower sensing device or less, the second photovoltaic panel can be folded and pass through intake chamber by staff is added Industry Waste again
Water.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any
The change or replacement expected without creative work, should be covered by the protection scope of the present invention.Therefore, of the invention
Protection scope should be determined by the scope of protection defined in the claims.