CN108179672A - A kind of sponge-type road structure and its method for paving - Google Patents

A kind of sponge-type road structure and its method for paving Download PDF

Info

Publication number
CN108179672A
CN108179672A CN201711201776.XA CN201711201776A CN108179672A CN 108179672 A CN108179672 A CN 108179672A CN 201711201776 A CN201711201776 A CN 201711201776A CN 108179672 A CN108179672 A CN 108179672A
Authority
CN
China
Prior art keywords
water
sand
sponge
concrete
permeable brick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711201776.XA
Other languages
Chinese (zh)
Inventor
马万荣
李志勇
何伟
杨伟远
贾高为
沈玉园
王兵
刘华祥
朱良侑
韩桥
王裕
孙朋丹
黄相全
王雷
杨凯捷
张书熠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daqian Ecological Environment Group Ltd By Share Ltd
Original Assignee
Daqian Ecological Environment Group Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daqian Ecological Environment Group Ltd By Share Ltd filed Critical Daqian Ecological Environment Group Ltd By Share Ltd
Priority to CN201711201776.XA priority Critical patent/CN108179672A/en
Publication of CN108179672A publication Critical patent/CN108179672A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/32Coherent pavings made in situ made of road-metal and binders of courses of different kind made in situ
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B3/00Producing shaped articles from the material by using presses; Presses specially adapted therefor
    • B28B3/02Producing shaped articles from the material by using presses; Presses specially adapted therefor wherein a ram exerts pressure on the material in a moulding space; Ram heads of special form
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • C04B28/02Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing hydraulic cements other than calcium sulfates
    • C04B28/04Portland cements
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/225Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
    • E01C11/226Coherent pavings
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/00241Physical properties of the materials not provided for elsewhere in C04B2111/00
    • C04B2111/00284Materials permeable to liquids

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Manufacturing & Machinery (AREA)
  • Mechanical Engineering (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Inorganic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a kind of sponge-type road structures, it is followed successively by roadbed, 40 60mm medium-sand seams bed courses, 180 220mm open gradations metallings, 160 200mm sand-free coarse porous concretes concrete layers and 70 90mm water-permeable bricks, the water-permeable brick from top to bottom, raw material is compared by following quality:Cement 350 450, coarse aggregate 1,200 1500, adhesive 20 30, polypropene staple 10 20, short steel fibre 10 20, admixture 50 150, additive 30 50 and water 150 200 form.The present invention provides a kind of water permeability is good, road structure of high mechanical strength and its method for paving.

Description

A kind of sponge-type road structure and its method for paving
Technical field
The present invention relates to a kind of sponge-type road structure and its method for paving, belong to road construction technical field.
Background technology
Pervious concrete be it is a kind of rainwater can be allowed to flow into underground, effective recharge of groundwater, the level of ground water for alleviating city is anxious Some Urban Environmental Problems of play decline etc.;And the danger of the environmental pollutions such as the oil compounds on ground can be effectively eliminated Evil;It is the excellent paving protected underground water, maintaining ecological balance, urban heat land effect can be alleviated, promote surface water cycle simultaneously Package material is conducive to the benign development of environment for human survival and urban rainwater management and water prevention and cure of pollution, improves urban development In the work such as secondary environment problem, there is special significance.
To the defects of designing of drainning off floodwaters when current each city is due to early stage planning, cause city that urban waterlogging often occurs, Main reason is exactly that road in city, square use hardening structure, prevents rainwater from on-site elimination.While in order to call state The spongeization of existing road is studied about the call for building sponginess city by family.The present invention is emphatically to urban road people Trade is transformed, and is mated formation with water-permeable brick instead of past hardening brick, while structure sheaf is transformed.
Invention content
The technical problem to be solved by the invention is to provide a kind of water permeability is good, road structure of high mechanical strength and Its method for paving.
In order to solve the above technical problems, the technical solution adopted by the present invention is:
A kind of sponge-type road structure is followed successively by roadbed, 40-60mm medium-sand seams bed course, 180-220mm open gradations from top to bottom Metalling, 160-200mm sand-free coarse porous concretes concrete layer and 70-90mm water-permeable bricks, the water-permeable brick compare raw material by following quality: Cement 350-450, coarse aggregate 1200-1500, adhesive 20-30, polypropene staple 10-20, short steel fibre 10-20, blending Expect 50-150, additive 30-50 and water 150-200 compositions.
The short length of steel fiber be 10-30mm, diameter 0.2-0.5mm, draw ratio 50-100, tensile strength >= 400MPa。
The polypropene staple length is 20-50mm.
The cement is portland cement, and label is not less than 42.5.
The coarse aggregate is matched using single-stage, grain size 5-10mm.
The water-permeable brick preparation method is as follows:Cement, coarse aggregate, admixture are taken by formula rate, is stirred in blender After 30s, under agitation, adhesive, polypropene staple, short steel fibre, additive, water are poured into blender respectively, Stir 3-5min;
By the mixed material after stirring, routinely technique carries out mechanical pressing with brick machine, and adobe is made, passes through the nature of 28 days After maintenance, water-permeable brick is made.
Sand-free coarse porous concrete concrete uses C20 sand-free coarse porous concrete concrete.
A kind of method for paving of sponge-type road structure, including step in detail below:
(1)Control Survey for Construction;
(2)Place flattens, and wherein Subgrade Compaction is more than 93%;
(3)Coarse sands layer cushion construction, including preparation of construction;Surveying setting-out;Place flattens and is laid with coarse sand, wherein empty paving 1cm Thickness, using plate vibrator to sand bedding course jolt ramming;
(4)Metalling is constructed, including surveying setting-out;Rubble and rolled broken stone are laid, wherein the thickness of 2~3cm of empty paving, uses 2.5t vibrated rollers roll, and before rolling, per square meter 3~4kg of water-sprinkling, with water-sprinkling again is rolled, per square meter water-sprinkling 1kg, press road After machine rolls 3 times, vibrate 2 times, then static pressure 1~2 time;
(5)Sand-free coarse porous concrete concrete construction, including preparation of construction;Surveying setting-out;Installation positioning floating screed steel pipe;Watering wetting rubble Layer;Pave sand-free coarse porous concrete concrete;Jolt ramming non-fine concrete and plastic covering membrane curing, wherein being spread out using storehouse method is jumped Paving construction, 1~2cm of virtual resurfacing thickness;Construction of vibrating is carried out using storehouse method is jumped, using the plate vibrator with plank, two end-rack exist It on the steel pipe in lattice storehouse, vibrates back and forth 2~3 times, stops vibrating in non-fine concrete pulp;Sand-free coarse porous concrete concrete pours into After work, conserved using covered rearing with plastic film;
(6)Water-permeable brick is constructed, including preparation of construction;Surveying setting-out;Water-permeable brick floating screed;Watering wetting base paves microlith coagulation Soil;Water-permeable brick dips in slurry and thin, middle sand sweeps seam;Water-permeable brick needs to soak before mating formation, but surface must not have moisture;Microlith coagulation 0.5~1cm of virtual resurfacing thickness that soil paves, slit width 5mm, after pea gravel concreten paves, water-permeable brick bottom dip in the ratio of mud for 0.4~ 0.5 cement mortar;Watering maintenance afterwards for 24 hours is survived, conserves 2~3 days, during which must not disturb the water-permeable brick mated formation;Spread thin, middle sand Seam is swept, it must be dry sand to sweep seam sand, and clay content hereinafter, need repeatedly to sweep seam, after having swept every time, is sprinkled water, it is ensured that make sand immediately 1% Gap can be filled, until sand no longer sinks after watering;
(7)Finished product protection.
The advantageous effect that the present invention is reached:Short steel fibre and polypropylene fibre are incorporated into concrete can be very big Ground enhances the mechanical strength of water-permeable brick;The sponge-type road pavement structure of the present invention uses permeability preferably and high mechanical strength Water-permeable brick as upper layer, ensure that enough water permeabilities and compression strength, surface gathered water, lower section can be effectively reduced It is smooth conducive to fast permeable speed and face layer to be laid with sand-free coarse porous concrete concrete layer, metalling and medium-sand seam bed course.
Specific embodiment
The invention will be further described below.Following embodiment is only used for the technical side for clearly illustrating the present invention Case, and be not intended to limit the protection scope of the present invention and limit the scope of the invention.
Embodiment 1
A kind of sponge-type road structure, be followed successively by from top to bottom roadbed, 50mm medium-sand seams bed course, 200mm open gradations metalling, 180mm sand-free coarse porous concretes concrete layer and 80mm water-permeable bricks.
Wherein water-permeable brick compares raw material by following quality:Po42.5 cement 350,5-10mm single-stages are with coarse aggregate 1200, gluing Agent 20,20mm polypropene staples 10, the short steel fibres 10 of 15mm, flyash 50, water-reducing agent 30 and water 150 form.
Water-permeable brick preparation method is as follows:Cement, coarse aggregate, admixture are taken by formula rate, 30s is stirred in blender Afterwards, under agitation, adhesive, polypropene staple, short steel fibre, additive, water are poured into blender respectively, stirred 3-5min;
By the mixed material after stirring, routinely technique carries out mechanical pressing with brick machine, and adobe is made, passes through the nature of 28 days After maintenance, water-permeable brick is made, the permeability rate of finished product water-permeable brick is 10-15mm/s, and compression strength is 25-30 Mpa.
Sand-free coarse porous concrete concrete uses C20 sand-free coarse porous concrete concrete.
A kind of method for paving of sponge-type road structure, including step in detail below:
(1)Control Survey for Construction;
(2)Place flattens, and wherein Subgrade Compaction is more than 93%;
(3)Coarse sands layer cushion construction, including preparation of construction;Surveying setting-out;Place flattens and is laid with coarse sand, wherein empty paving 1cm Thickness, using plate vibrator to sand bedding course jolt ramming;
(4)Metalling is constructed, including surveying setting-out;Rubble and rolled broken stone are laid, wherein the thickness of 2~3cm of empty paving, uses 2.5t vibrated rollers roll, and before rolling, per square meter 3~4kg of water-sprinkling, with water-sprinkling again is rolled, per square meter water-sprinkling 1kg, press road After machine rolls 3 times, vibrate 2 times, then static pressure 1~2 time;
(5)Sand-free coarse porous concrete concrete construction, including preparation of construction;Surveying setting-out;Installation positioning floating screed steel pipe;Watering wetting rubble Layer;Pave sand-free coarse porous concrete concrete;Jolt ramming non-fine concrete and plastic covering membrane curing, wherein being spread out using storehouse method is jumped Paving construction, 1~2cm of virtual resurfacing thickness;Construction of vibrating is carried out using storehouse method is jumped, using the plate vibrator with plank, two end-rack exist It on the steel pipe in lattice storehouse, vibrates back and forth 2~3 times, stops vibrating in non-fine concrete pulp;Sand-free coarse porous concrete concrete pours into After work, conserved using covered rearing with plastic film;
(6)Water-permeable brick is constructed, including preparation of construction;Surveying setting-out;Water-permeable brick floating screed;Watering wetting base paves microlith coagulation Soil;Water-permeable brick dips in slurry and thin, middle sand sweeps seam;Water-permeable brick needs to soak before mating formation, but surface must not have moisture;Microlith coagulation 0.5~1cm of virtual resurfacing thickness that soil paves, slit width 5mm, after pea gravel concreten paves, water-permeable brick bottom dip in the ratio of mud for 0.4~ 0.5 cement mortar;Watering maintenance afterwards for 24 hours is survived, conserves 2~3 days, during which must not disturb the water-permeable brick mated formation;Spread thin, middle sand Seam is swept, it must be dry sand to sweep seam sand, and clay content hereinafter, need repeatedly to sweep seam, after having swept every time, is sprinkled water, it is ensured that make sand immediately 1% Gap can be filled, until sand no longer sinks after watering;
(7)Finished product protection.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, without departing from the technical principles of the invention, several improvement and deformation can also be made, these are improved and deformation Also it should be regarded as protection scope of the present invention.

Claims (8)

1. a kind of sponge-type road structure, it is characterized in that, it is followed successively by roadbed, 40-60mm medium-sand seams bed course, 180- from top to bottom 220mm open gradations metalling, 160-200mm sand-free coarse porous concretes concrete layer and 70-90mm water-permeable bricks, the water-permeable brick is by following Quality compares raw material:Cement 350-450, coarse aggregate 1200-1500, adhesive 20-30, polypropene staple 10-20, short steel fibre 10-20, admixture 50-150, additive 30-50 and water 150-200 compositions.
2. a kind of sponge-type road structure according to claim 1, it is characterized in that, the short length of steel fiber is 10- 30mm, diameter 0.2-0.5mm, draw ratio 50-100, tensile strength >=400MPa.
3. according to a kind of sponge-type road structure of claim 1-2 any one of them, it is characterized in that, the polypropene staple Length is 20-50mm.
4. a kind of sponge-type road structure according to claim 3, it is characterized in that, the cement is portland cement, is marked Number be not less than 42.5.
5. a kind of sponge-type road structure according to claim 4, it is characterized in that, the coarse aggregate is matched using single-stage, grain Diameter is 5-10mm.
6. a kind of sponge-type road structure according to claim 5, it is characterized in that, the water-permeable brick preparation method is as follows: Take cement, coarse aggregate, admixture by formula rate, in blender stir 30s after, under agitation, respectively by adhesive, Polypropene staple, short steel fibre, additive, water are poured into blender, stir 3-5min;
By the mixed material after stirring, routinely technique carries out mechanical pressing with brick machine, and adobe is made, passes through the nature of 28 days After maintenance, water-permeable brick is made.
7. a kind of sponge-type road structure according to claim 6, it is characterized in that, sand-free coarse porous concrete concrete using C20 without Sand coarse porous concrete.
8. a kind of method for paving of sponge-type road structure according to claim 7, it is characterized in that, including walking in detail below Suddenly:
(1) Control Survey for Construction;
(2) place flattens, and wherein Subgrade Compaction is more than 93%;
(3) coarse sands layer cushion construction, including preparation of construction;Surveying setting-out;Place flattens and is laid with coarse sand, wherein empty paving 1cm Thickness, using plate vibrator to sand bedding course jolt ramming;
(4) metalling is constructed, including surveying setting-out;Rubble and rolled broken stone are laid, wherein the thickness of 2~3cm of empty paving, uses 2.5t vibrated rollers roll, and before rolling, per square meter 3~4kg of water-sprinkling, with water-sprinkling again is rolled, per square meter water-sprinkling 1kg, press road After machine rolls 3 times, vibrate 2 times, then static pressure 1~2 time;
(5) sand-free coarse porous concrete concrete construction, including preparation of construction;Surveying setting-out;Installation positioning floating screed steel pipe;Watering wetting rubble Layer;Pave sand-free coarse porous concrete concrete;Jolt ramming non-fine concrete and plastic covering membrane curing, wherein being spread out using storehouse method is jumped Paving construction, 1~2cm of virtual resurfacing thickness;Construction of vibrating is carried out using storehouse method is jumped, using the plate vibrator with plank, two end-rack exist It on the steel pipe in lattice storehouse, vibrates back and forth 2~3 times, stops vibrating in non-fine concrete pulp;Sand-free coarse porous concrete concrete pours into After work, conserved using covered rearing with plastic film;
(6) water-permeable brick is constructed, including preparation of construction;Surveying setting-out;Water-permeable brick floating screed;Watering wetting base paves microlith coagulation Soil;Water-permeable brick dips in slurry and thin, middle sand sweeps seam;Water-permeable brick needs to soak before mating formation, but surface must not have moisture;Microlith coagulation 0.5~1cm of virtual resurfacing thickness that soil paves, slit width 5mm, after pea gravel concreten paves, water-permeable brick bottom dip in the ratio of mud for 0.4~ 0.5 cement mortar;Watering maintenance afterwards for 24 hours is survived, conserves 2~3 days, during which must not disturb the water-permeable brick mated formation;Spread thin, middle sand Seam is swept, it must be dry sand to sweep seam sand, and clay content hereinafter, need repeatedly to sweep seam, after having swept every time, is sprinkled water, it is ensured that make sand immediately 1% Gap can be filled, until sand no longer sinks after watering;
(7) finished product protection.
CN201711201776.XA 2017-11-27 2017-11-27 A kind of sponge-type road structure and its method for paving Pending CN108179672A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711201776.XA CN108179672A (en) 2017-11-27 2017-11-27 A kind of sponge-type road structure and its method for paving

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711201776.XA CN108179672A (en) 2017-11-27 2017-11-27 A kind of sponge-type road structure and its method for paving

Publications (1)

Publication Number Publication Date
CN108179672A true CN108179672A (en) 2018-06-19

Family

ID=62545282

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711201776.XA Pending CN108179672A (en) 2017-11-27 2017-11-27 A kind of sponge-type road structure and its method for paving

Country Status (1)

Country Link
CN (1) CN108179672A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109183546A (en) * 2018-09-25 2019-01-11 天津市水利科学研究院 A kind of sponge urban road and its construction method using ventilation anti-seepage sand
CN109608222A (en) * 2018-11-27 2019-04-12 扬州市职业大学 A kind of preparation method of vegetation type regeneration concrete Roofing brick

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202187415U (en) * 2011-08-19 2012-04-11 机械工业第三设计研究院 Drainage structure for sidewalk
CN107151117A (en) * 2017-05-24 2017-09-12 广东信强混凝土有限公司 A kind of pervious concrete

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202187415U (en) * 2011-08-19 2012-04-11 机械工业第三设计研究院 Drainage structure for sidewalk
CN107151117A (en) * 2017-05-24 2017-09-12 广东信强混凝土有限公司 A kind of pervious concrete

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
许彦旭: "透水砖铺装施工工艺", 《百度文库》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109183546A (en) * 2018-09-25 2019-01-11 天津市水利科学研究院 A kind of sponge urban road and its construction method using ventilation anti-seepage sand
CN109608222A (en) * 2018-11-27 2019-04-12 扬州市职业大学 A kind of preparation method of vegetation type regeneration concrete Roofing brick

Similar Documents

Publication Publication Date Title
KR101173441B1 (en) Permeable paving manufacture method to use eco-friendly recycled aggregate coated
CN107226648B (en) Diamond dust tailing composite sand-based ecological water permeable brick and preparation method thereof
KR101192238B1 (en) Permeable paving manufacture method to use eco-friendly recycled aggregate double-coated
US10815624B2 (en) Concrete pavement structure comprising a concrete base layer and an elastomer improved concrete wearing layer
CN103882788B (en) Based on the method for constructing roadway of the modification roller compacted concrete surface layer of enzyme soil cured substrate layer
KR101219616B1 (en) Lightweight foamed concrete composition having antiwashout property underwater
KR20130008149A (en) The piling method of earth for road pavement
KR20190006233A (en) Construction method of water-permeable pavement with excellent properties of stability, economy and conduct ability for pavement and road
KR100203990B1 (en) Methods of paving road and of manufacturing sidewalk blocks using waste cement concrete
KR100625172B1 (en) Production method of soil concrete and soil block using expansive agent or hydro-depository agent
CN108179672A (en) A kind of sponge-type road structure and its method for paving
KR20130128980A (en) Composition for soil pavement and construction method of soil pavement using the same
CN107032660A (en) A kind of preparation method for the composite for laying porous pavement
JP2909929B2 (en) How to build a block pavement
JP2001181009A (en) Binder for water-permeable concrete pavement, and water-permeable concrete pavement concreted at site
JP6617043B2 (en) Construction method of drainage pavement
CN111041924A (en) On-site-made water permeable ground and preparation process thereof
KR960011337B1 (en) Process for the preparation of concrete panel
JP7191445B2 (en) interlocking block paving
KR100907751B1 (en) Packaging method using soybeans
KR100424453B1 (en) Paving method using stone powder for water permeable cement concrete road
JPH0136963Y2 (en)
CN112094082B (en) Preparation method of pervious concrete based on slurry-to-bone ratio and cementing material
KR100740262B1 (en) The construction method of the playground floor for children
KR102715456B1 (en) Wood chip mixture and its manufacturing method, and construction method using the wood chip mixture

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180619