[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN108014690A - One kind finishing uses wall finiss mixing device - Google Patents

One kind finishing uses wall finiss mixing device Download PDF

Info

Publication number
CN108014690A
CN108014690A CN201711276765.8A CN201711276765A CN108014690A CN 108014690 A CN108014690 A CN 108014690A CN 201711276765 A CN201711276765 A CN 201711276765A CN 108014690 A CN108014690 A CN 108014690A
Authority
CN
China
Prior art keywords
slide
agitator tank
cylinder
paint
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711276765.8A
Other languages
Chinese (zh)
Other versions
CN108014690B (en
Inventor
邓文雅
李芳�
刘世荣
其他发明人请求不公开姓名
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shang Guilin
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711276765.8A priority Critical patent/CN108014690B/en
Publication of CN108014690A publication Critical patent/CN108014690A/en
Application granted granted Critical
Publication of CN108014690B publication Critical patent/CN108014690B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01FMIXING, e.g. DISSOLVING, EMULSIFYING OR DISPERSING
    • B01F27/00Mixers with rotary stirring devices in fixed receptacles; Kneaders
    • B01F27/80Mixers with rotary stirring devices in fixed receptacles; Kneaders with stirrers rotating about a substantially vertical axis
    • B01F27/90Mixers with rotary stirring devices in fixed receptacles; Kneaders with stirrers rotating about a substantially vertical axis with paddles or arms 
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01FMIXING, e.g. DISSOLVING, EMULSIFYING OR DISPERSING
    • B01F27/00Mixers with rotary stirring devices in fixed receptacles; Kneaders
    • B01F27/05Stirrers
    • B01F27/11Stirrers characterised by the configuration of the stirrers
    • B01F27/19Stirrers with two or more mixing elements mounted in sequence on the same axis
    • B01F27/191Stirrers with two or more mixing elements mounted in sequence on the same axis with similar elements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01FMIXING, e.g. DISSOLVING, EMULSIFYING OR DISPERSING
    • B01F35/00Accessories for mixers; Auxiliary operations or auxiliary devices; Parts or details of general application
    • B01F35/10Maintenance of mixers
    • B01F35/145Washing or cleaning mixers not provided for in other groups in this subclass; Inhibiting build-up of material on machine parts using other means
    • B01F35/1452Washing or cleaning mixers not provided for in other groups in this subclass; Inhibiting build-up of material on machine parts using other means using fluids
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01FMIXING, e.g. DISSOLVING, EMULSIFYING OR DISPERSING
    • B01F35/00Accessories for mixers; Auxiliary operations or auxiliary devices; Parts or details of general application
    • B01F35/71Feed mechanisms
    • B01F35/712Feed mechanisms for feeding fluids
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01FMIXING, e.g. DISSOLVING, EMULSIFYING OR DISPERSING
    • B01F2101/00Mixing characterised by the nature of the mixed materials or by the application field
    • B01F2101/30Mixing paints or paint ingredients, e.g. pigments, dyes, colours, lacquers or enamel

Landscapes

  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Mixers Of The Rotary Stirring Type (AREA)

Abstract

The present invention relates to a kind of mixing device, more particularly to a kind of finishing to use wall finiss mixing device.The technical problem to be solved in the present invention is to provide it is a kind of it is time saving and energy saving, mixing speed is fast, paint will not be spilt in whipping process, without causing to waste, will not make the finishing wall finiss mixing device on ground dirty.In order to solve the above technical problem, the present invention provides such a finishing wall finiss mixing device, includes bottom plate, agitator tank, drainage conduit, the first valve, lower hopper, cross bar etc.;Bottom plate top right side is provided with agitator tank, and agitator tank lower right side is connected with drainage conduit, and for drainage conduit with being connected in agitator tank, drainage conduit is equipped with the first valve, and agitating device is equipped with agitator tank.The present invention can be rinsed the paint in paint kettle by flusher, and preventing that paint from remaining in paint kettle causes to waste, it is fast time saving and energy saving, mixing speed has been reached, paint will not be spilt in whipping process, without causing to waste, will not make the effect on ground dirty.

Description

One kind finishing uses wall finiss mixing device
Technical field
The present invention relates to a kind of mixing device, more particularly to a kind of finishing to use wall finiss mixing device.
Background technology
Finishing is also known as decorate or decoration.Refer to what is carried out in certain area and scope, including Hydroelectric Project Construction, wall, What plate, ceiling, landscape etc. were realized, a whole set of arrangement and method for construction and design formed according to certain design concept and beautiful rule Scheme.
In wall surfacing, it can all use to paint and mopping is carried out to metope, all can be and in order to make paint preferably use It is time-consuming and laborious, mixing speed is slow, whipping process when being stirred mixing to paint using preceding, and being manually stirred to painting Middle paint easily spills and causes to waste, while can also make ground dirty, thus there is an urgent need for research and development it is a kind of it is time saving and energy saving, mixing speed is fast, stir Paint will not be spilt during mixing, and without causing to waste, will not make the finishing wall finiss mixing device on ground dirty.
The content of the invention
(1)Technical problems to be solved
Time-consuming and laborious, mixing speed is slow when the present invention is manually stirred paint to overcome, paint easily splashes in whipping process Going out causes to waste, while the shortcomings that can also make ground dirty, the technical problem to be solved in the present invention is to provide it is a kind of it is time saving and energy saving, stir It is fast to mix speed, paint will not be spilt in whipping process, without causing to waste, will not make the finishing wall finiss batch mixing on ground dirty Device.
(2)Technical solution
In order to solve the above technical problem, the present invention provides such a finishing wall finiss mixing device, include bottom plate, Agitator tank, drainage conduit, the first valve, lower hopper, cross bar, pipeline, conical pipe, discharging device and agitating device, bottom plate top right Side is provided with agitator tank, and agitator tank lower right side is connected with drainage conduit, and drainage conduit in agitator tank with connect, and drainage conduit is equipped with the One valve, is equipped with agitating device in agitator tank, and agitator tank left upper portion is provided with lower hopper, lower hopper with agitator tank is interior connects, Cross bar is installed in lower hopper, is connected with pipeline on cross bar, pipeline top is connected with conical pipe, conical pipe with being connected in pipeline, Conical pipe top is located at outside lower hopper, and bottom plate top left side is equipped with discharging device.
Preferably, discharging device includes motion bar, driving device, hold-down devices and clamping device, bottom plate top left side Equipped with driving device, motion bar is connected with driving device, motion bar is located on front side of driving device, and motion bar is equipped with lower press fitting Put, hold-down devices are equipped with clamping device.
Preferably, driving device includes the first cylinder, rack, support base, first bearing seat, first rotating shaft and gear, Bottom plate top left side front and rear sides symmetrical expression is provided with support base, and support base crown center is provided with first bearing seat, front and rear First rotating shaft is connected between the first bearing seat of both sides, gear, first rotating shaft front end and motion bar are installed in the middle part of first rotating shaft Connection, bottom plate top left side are provided with the first cylinder, and in being vertically arranged, the first cylinder is located on the left of support base the first cylinder, the Rack is installed, rack is located on the left of gear, rack and pinion engagement on the telescopic rod of one cylinder.
Preferably, hold-down devices include the first fixed block, the second cylinder, the first slide, the first sliding block and fixed plate, living Lever lower part is provided with the first slide, and the first slide is equipped with the first sliding block, and the first sliding block is slidably matched with the first slide, and first Fixed plate is installed, fixed plate is connected with clamping device, and motion bar lower part is provided with the first fixed block, the first fixed block on sliding block Above the first slide, the second cylinder is installed on the first fixed block, the telescopic rod of the second cylinder is connected with the first sliding block.
Preferably, clamping device includes the second shaft, arc snap-gauge, kelly, the second fixed block and nut, in fixed plate Second shaft is installed, two arc snap-gauges are installed in the second shaft, one of arc snap-gauge tail end is provided with kelly, card Screw thread is carved with bar, another arc snap-gauge tail end is provided with the second fixed block, and through hole, kelly position are provided with the middle part of the second fixed block In in through hole, being provided with nut on kelly, nut coordinates with kelly.
Preferably, agitating device has been further included, agitating device includes second bearing seat, motor, bull stick and agitating vane, Agitator tank crown center is Embedded to be provided with second bearing seat, bull stick is provided with second bearing seat, between bull stick lower part is uniform Every agitating vane is installed, the outer crown center of agitator tank is provided with motor, and in being vertically arranged, the output shaft of motor passes through motor Shaft coupling is connected with bull stick top.
Preferably, flusher has been further included, flusher includes water tank, water pump, outlet pipe, check valve and the second valve Door, bottom plate top left side are provided with water tank, and water tank is between support base and agitator tank, and bottom right is provided with water in water tank Pump, the water outlet of water pump are connected with outlet pipe, and outlet pipe tail end is through tank top left side and lower hopper left upper portion and pipeline Top connects, and outlet pipe in pipeline with connecting, and outlet pipe is equipped with check valve, and pipeline is equipped with the second valve.
Preferably, the second slide and the second sliding block have been further included, the second slide, the second slide position are installed at the top of bottom plate On the left of the first cylinder, for the second slide in being vertically arranged, the second slide is equipped with the second sliding block coordinated with it, the second sliding block with Second slide is slidably matched, and the second sliding block right flank is connected with rack left surface.
Preferably, rubber slab has been further included, two arc snap-gauge medial surfaces are fitted with rubber slab.
Operation principle:Operating personnel pour into water in agitator tank first, you can are placed on the paint kettle equipped with paint and put Expect on device, you can start discharging device, paint kettle is moved to above conical pipe by discharging device, and then drives paint kettle downward Mobile, paint kettle is moved down to be contacted with conical pipe, in conical pipe insertion paint kettle, closes discharging device, and is painted and passed through cone In shape pipe flow ipe, the paint in pipeline flows out through lower hopper and flows into agitator tank, and paint is contacted with water.When in agitator tank When having suitable paint, you can start discharging device and drive paint kettle to recover to original position, restart agitating device, agitating device Mixing component, which rotates, is stirred paint and water, after paint is stirred evenly with water, you can close agitating device, operating personnel The paint being stirred can be taken out and used.
Because discharging device includes motion bar, driving device, hold-down devices and clamping device, bottom plate top left side is equipped with Driving device, motion bar is connected with driving device, and motion bar is located on front side of driving device, and motion bar is equipped with hold-down devices, Hold-down devices are equipped with clamping device, when water level is when in agitator tank, operating personnel can paint kettle pressed from both sides by clamping device Fasten, restart driving device, driving device drives motion bar to rotate forward, and motion bar is rotated forward drives paint kettle by hold-down devices Rotate forward, and then when paint kettle is just being gone to directly over conical pipe, you can driving device is closed, restarts hold-down devices, lower press fitting Put and drive paint kettle to move down, paint kettle is moved down to be contacted with conical pipe, and then is made in conical pipe insertion paint kettle, is closed Hold-down devices, and then paint and pass through in conical pipe flow ipe, and flow into agitator tank.Similarly, when the paint in paint kettle is complete When portion is flowed out, you can start hold-down devices and drive paint kettle to move up, close hold-down devices, you can start driving device and drive Paint kettle recovers to original position, then is unclamped paint kettle by clamping device, and operating personnel can remove paint kettle.
Because driving device includes the first cylinder, rack, support base, first bearing seat, first rotating shaft and gear, bottom plate Top left side front and rear sides symmetrical expression is provided with support base, and support base crown center is provided with first bearing seat, front and rear sides First rotating shaft is connected between first bearing seat, gear is installed in the middle part of first rotating shaft, first rotating shaft front end is connected with motion bar, Bottom plate top left side is provided with the first cylinder, and the first cylinder is in being vertically arranged, and the first cylinder is located on the left of support base, the first cylinder Telescopic rod on rack is installed, rack is located on the left of gear, rack and pinion engagement, after paint kettle is clamped, operator Member can start the telescopic rod elongation of the first cylinder, and the telescopic rod elongated carry-over bar of the first cylinder moves up, and rack is upward Mobile band moving gear rotates forward, and gear, which rotates forward, drives first rotating shaft to rotate forward, and first rotating shaft, which rotates forward, drives motion bar to rotate forward, and then drives Paint kettle rotates forward, when paint kettle is moved to directly over conical pipe, you can close the first cylinder.Similarly, when the oil in paint kettle After paint all flows out, you can the telescopic rod for starting the first cylinder shortens, and then gear reversion drives motion bar to invert, and paint kettle Inversion recovery closes the first cylinder to original position.
Because hold-down devices include the first fixed block, the second cylinder, the first slide, the first sliding block and fixed plate, activity Bar lower part is provided with the first slide, and the first slide is equipped with the first sliding block, and the first sliding block is slidably matched with the first slide, and first slides Fixed plate is installed, fixed plate is connected with clamping device, and motion bar lower part is provided with the first fixed block, the first fixed block position on block Above the first slide, the second cylinder is installed on the first fixed block, the telescopic rod of the second cylinder is connected with the first sliding block, works as oil When paint can is moved to directly over conical pipe, the telescopic rod that operating personnel can start the second cylinder shortens, and the second cylinder stretches Bar, which shortens, drives the first sliding block to move down, and the first sliding block, which moves down, drives fixed plate to move down, and then is filled by clamping Put and drive paint kettle to move down, paint kettle, which moves down, to be made in conical pipe insertion paint kettle, closes the second cylinder, and then paint Flowed out by conical pipe.After the paint in paint kettle all flows out, you can start the telescopic rod elongation of the second cylinder, and then band Dynamic paint kettle moves up recovery to original position, closes the second cylinder.
Because clamping device includes the second shaft, arc snap-gauge, kelly, the second fixed block and nut, pacify in fixed plate Equipped with the second shaft, two arc snap-gauges are installed in the second shaft, one of arc snap-gauge tail end is provided with kelly, kelly On be carved with screw thread, another arc snap-gauge tail end is provided with the second fixed block, is provided with through hole in the middle part of the second fixed block, kelly is located at In through hole, nut is installed on kelly, nut coordinates with kelly, and operating personnel twist nut first, and nut rotation takes off with kelly From, you can pull the separation of two arc snap-gauges, kelly departs from out of through hole, then by paint kettle be placed on two arc snap-gauges it Between, operating personnel can close two arc snap-gauges, and make in kelly insertion through hole, then nut is sleeved on kelly and is twisted, Nut rotation is contacted with the second fixed block, and then nut fixes two arc snap-gauges with the cooperation of the second fixed block, and will paint Bucket is fixed, you can starts the first cylinder and paint kettle is moved to directly over conical pipe.Similarly, when the paint in paint kettle all flows After going out, and when recovering to original position, you can twist nut again, and then two arc snap-gauges unclamp paint kettle, operating personnel are Paint kettle can be removed.
Because having further included agitating device, agitating device includes second bearing seat, motor, bull stick and agitating vane, stirs Mix it is Embedded among box top second bearing seat is installed, bull stick, bull stick lower part uniform intervals are installed in second bearing seat Agitating vane is installed, the outer crown center of agitator tank is provided with motor, and for motor in being vertically arranged, the output shaft of motor passes through connection Axis device is connected with bull stick top, and when paint, which is flowed into stirring, to be contacted with water, operating personnel can start motor rotation, and motor turns Dynamic to drive bar rotation, bar rotation drives agitating vane to rotate, and agitating vane is rotated is stirred mixing to paint and water.When After paint and water stir evenly, you can close motor, paint is taken out and is used, without being manually stirred mixing, time saving province Power.
Because having further included flusher, flusher includes water tank, water pump, outlet pipe, check valve and the second valve, Bottom plate top left side is provided with water tank, and water tank is between support base and agitator tank, and bottom right is provided with water pump, water in water tank The water outlet of pump is connected with outlet pipe, and outlet pipe tail end connects on the left of tank top with lower hopper left upper portion with conduit upper Connect, connected in outlet pipe and pipeline, outlet pipe is equipped with check valve, and pipeline is equipped with the second valve, and operating personnel first are by water Pour into water tank, open the second valve, after all outflows are painted in paint kettle, you can close the second valve, start water pump, water Water in water tank is pumped into outlet pipe by pump, and the water in outlet pipe is discharged into pipeline, and then being discharged by conical pipe in pipeline, Water discharge is rinsed remaining paint in paint kettle.After being rinsed clean in paint kettle, you can switch off the pump, open the Two valves, the water after flushing is flowed into agitator tank by pipeline to be stirred.In this way, it can prevent that residual paint causes wave in paint kettle Take.
Because having further included the second slide and the second sliding block, the second slide is installed at the top of bottom plate, the second slide is located at On the left of first cylinder, for the second slide in being vertically arranged, the second slide is equipped with the second sliding block coordinated with it, the second sliding block and the Two slides are slidably matched, and the second sliding block right flank is connected with rack left surface, and when rack moves, rack drives second to slide at the same time Block moves on the second slide, and then the second sliding block makes the more steady of rack movement with the second slide.
Because having further included rubber slab, two arc snap-gauge medial surfaces are fitted with rubber slab, when two arc snap-gauges will When paint kettle is fixedly clamped, rubber slab is contacted with paint kettle, and then increases the frictional force with paint kettle, and makes two arc snap-gauges More firm fixes paint kettle.
(3)Beneficial effect
The present invention can be rinsed the paint in paint kettle by flusher, and prevent paint is remained in paint kettle from leading Cause to waste, reached that time saving and energy saving, mixing speed is fast, and paint will not be spilt in whipping process, without causing to waste, will not be done The effect on dirty ground.
Brief description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is the first overlooking the structure diagram of clamping device of the present invention.
Fig. 3 is second of main structure diagram of the present invention.
Fig. 4 is the third main structure diagram of the present invention.
Fig. 5 is the 4th kind of main structure diagram of the present invention.
Fig. 6 is second of overlooking the structure diagram of clamping device of the present invention.
Mark in attached drawing for:1- bottom plates, 2- agitator tanks, 3- drainage conduits, the first valves of 4-, 5- lower hoppers, 6- cross bars, 7- Pipeline, 8- conical pipes, 9- discharging devices, 91- motion bars, 92- driving devices, the first cylinders of 921-, 922- racks, 923- supports Seat, 924- first bearing seats, 925- first rotating shafts, 926- gears, 93- hold-down devices, the first fixed blocks of 931-, the second gas of 932- Cylinder, the first slides of 933-, the first sliding blocks of 934-, 935- fixed plates, 94- clamping devices, the second shafts of 941-, 942- arc cards Plate, 943- kellies, the second fixed blocks of 944-, 945- through holes, 946- nuts, 10- agitating devices, 101- second bearing seats, 102- Motor, 103- bull sticks, 104- agitating vanes, 11- flushers, 111- water tanks, 112- water pumps, 113- outlet pipes, 114- are unidirectional Valve, the second valves of 115-, the second slides of 12-, the second sliding blocks of 13-, 14- rubber slabs.
Embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
One kind finishing uses wall finiss mixing device, as shown in figures 1 to 6, include bottom plate 1, agitator tank 2, drainage conduit 3, the first valve 4th, lower hopper 5, cross bar 6, pipeline 7, conical pipe 8, discharging device 9 and agitating device 10,1 top right side of bottom plate are provided with agitator tank 2,2 lower right side of agitator tank is connected with drainage conduit 3, and for drainage conduit 3 with being connected in agitator tank 2, drainage conduit 3 is equipped with the first valve 4, Is equipped with agitating device 10 in agitator tank 2,2 left upper portion of agitator tank is provided with lower hopper 5, lower hopper 5 with agitator tank 2 is interior connects, Cross bar 6 is installed in lower hopper 5, pipeline 7 is connected with cross bar 6,7 top of pipeline is connected with conical pipe 8, conical pipe 8 and pipeline 7 Interior connection, 8 top of conical pipe are located at outside lower hopper 5, and 1 top left side of bottom plate is equipped with discharging device 9.
Embodiment 2
One kind finishing uses wall finiss mixing device, as shown in figures 1 to 6, include bottom plate 1, agitator tank 2, drainage conduit 3, the first valve 4th, lower hopper 5, cross bar 6, pipeline 7, conical pipe 8, discharging device 9 and agitating device 10,1 top right side of bottom plate are provided with agitator tank 2,2 lower right side of agitator tank is connected with drainage conduit 3, and for drainage conduit 3 with being connected in agitator tank 2, drainage conduit 3 is equipped with the first valve 4, Is equipped with agitating device 10 in agitator tank 2,2 left upper portion of agitator tank is provided with lower hopper 5, lower hopper 5 with agitator tank 2 is interior connects, Cross bar 6 is installed in lower hopper 5, pipeline 7 is connected with cross bar 6,7 top of pipeline is connected with conical pipe 8, conical pipe 8 and pipeline 7 Interior connection, 8 top of conical pipe are located at outside lower hopper 5, and 1 top left side of bottom plate is equipped with discharging device 9.
Discharging device 9 includes motion bar 91, driving device 92, hold-down devices 93 and clamping device 94,1 top left of bottom plate Side is equipped with driving device 92, and motion bar 91 is connected with driving device 92, and motion bar 91 is located at the front side of driving device 92, motion bar 91 are equipped with hold-down devices 93, and hold-down devices 93 are equipped with clamping device 94.
Embodiment 3
One kind finishing uses wall finiss mixing device, as shown in figures 1 to 6, include bottom plate 1, agitator tank 2, drainage conduit 3, the first valve 4th, lower hopper 5, cross bar 6, pipeline 7, conical pipe 8, discharging device 9 and agitating device 10,1 top right side of bottom plate are provided with agitator tank 2,2 lower right side of agitator tank is connected with drainage conduit 3, and for drainage conduit 3 with being connected in agitator tank 2, drainage conduit 3 is equipped with the first valve 4, Is equipped with agitating device 10 in agitator tank 2,2 left upper portion of agitator tank is provided with lower hopper 5, lower hopper 5 with agitator tank 2 is interior connects, Cross bar 6 is installed in lower hopper 5, pipeline 7 is connected with cross bar 6,7 top of pipeline is connected with conical pipe 8, conical pipe 8 and pipeline 7 Interior connection, 8 top of conical pipe are located at outside lower hopper 5, and 1 top left side of bottom plate is equipped with discharging device 9.
Discharging device 9 includes motion bar 91, driving device 92, hold-down devices 93 and clamping device 94,1 top left of bottom plate Side is equipped with driving device 92, and motion bar 91 is connected with driving device 92, and motion bar 91 is located at the front side of driving device 92, motion bar 91 are equipped with hold-down devices 93, and hold-down devices 93 are equipped with clamping device 94.
Driving device 92 includes the first cylinder 921, rack 922, support base 923, first bearing seat 924, first rotating shaft 925 and gear 926,1 top left side front and rear sides of bottom plate it is symmetrical support base 923,923 crown center of support base peace are installed Equipped with first bearing seat 924, first rotating shaft 925, the middle part of first rotating shaft 925 are connected between front and rear sides first bearing seat 924 Gear 926 is installed, 925 front end of first rotating shaft is connected with motion bar 91, and 1 top left side of bottom plate is provided with the first cylinder 921, the For one cylinder 921 in being vertically arranged, the first cylinder 921 is located at the left side of support base 923, is provided with the telescopic rod of the first cylinder 921 Rack 922, rack 922 are located at the left side of gear 926, and rack 922 is engaged with gear 926.
Embodiment 4
One kind finishing uses wall finiss mixing device, as shown in figures 1 to 6, include bottom plate 1, agitator tank 2, drainage conduit 3, the first valve 4th, lower hopper 5, cross bar 6, pipeline 7, conical pipe 8, discharging device 9 and agitating device 10,1 top right side of bottom plate are provided with agitator tank 2,2 lower right side of agitator tank is connected with drainage conduit 3, and for drainage conduit 3 with being connected in agitator tank 2, drainage conduit 3 is equipped with the first valve 4, Is equipped with agitating device 10 in agitator tank 2,2 left upper portion of agitator tank is provided with lower hopper 5, lower hopper 5 with agitator tank 2 is interior connects, Cross bar 6 is installed in lower hopper 5, pipeline 7 is connected with cross bar 6,7 top of pipeline is connected with conical pipe 8, conical pipe 8 and pipeline 7 Interior connection, 8 top of conical pipe are located at outside lower hopper 5, and 1 top left side of bottom plate is equipped with discharging device 9.
Discharging device 9 includes motion bar 91, driving device 92, hold-down devices 93 and clamping device 94,1 top left of bottom plate Side is equipped with driving device 92, and motion bar 91 is connected with driving device 92, and motion bar 91 is located at the front side of driving device 92, motion bar 91 are equipped with hold-down devices 93, and hold-down devices 93 are equipped with clamping device 94.
Driving device 92 includes the first cylinder 921, rack 922, support base 923, first bearing seat 924, first rotating shaft 925 and gear 926,1 top left side front and rear sides of bottom plate it is symmetrical support base 923,923 crown center of support base peace are installed Equipped with first bearing seat 924, first rotating shaft 925, the middle part of first rotating shaft 925 are connected between front and rear sides first bearing seat 924 Gear 926 is installed, 925 front end of first rotating shaft is connected with motion bar 91, and 1 top left side of bottom plate is provided with the first cylinder 921, the For one cylinder 921 in being vertically arranged, the first cylinder 921 is located at the left side of support base 923, is provided with the telescopic rod of the first cylinder 921 Rack 922, rack 922 are located at the left side of gear 926, and rack 922 is engaged with gear 926.
Hold-down devices 93 include the first fixed block 931, the second cylinder 932, the first slide 933, the first sliding block 934 and consolidate Fixed board 935,91 lower part of motion bar are provided with the first slide 933, and the first slide 933 is equipped with the first sliding block 934, the first sliding block 934 are slidably matched with the first slide 933, and fixed plate 935 is provided with the first sliding block 934, and fixed plate 935 connects with clamping device 94 Connect, 91 lower part of motion bar is provided with the first fixed block 931, and the first fixed block 931 is located at the top of the first slide 933, and first fixes Second cylinder 932 is installed, the telescopic rod of the second cylinder 932 is connected with the first sliding block 934 on block 931.
Clamping device 94 includes the second shaft 941, arc snap-gauge 942, kelly 943, the second fixed block 944 and nut 946, the second shaft 941 is installed in fixed plate 935, two arc snap-gauges 942 are installed in second shaft 941, one of them 942 tail end of arc snap-gauge is provided with kelly 943, and screw thread is carved with kelly 943, another 942 tail end of arc snap-gauge is provided with Two fixed blocks 944, the middle part of the second fixed block 944 are provided with through hole 945, and kelly 943 is located in through hole 945, is provided with kelly 943 Nut 946, nut 946 coordinate with kelly 943.
Agitating device 10 is further included, agitating device 10 includes second bearing seat 101, motor 102, bull stick 103 and stirs Blade 104 is mixed, 2 crown center of agitator tank is Embedded to be provided with second bearing seat 101, is provided with and turns in second bearing seat 101 Bar 103,103 lower part of bull stick is evenly spaced to be provided with agitating vane 104, and 2 outer crown center of agitator tank is provided with motor 102, In being vertically arranged, the output shaft of motor 102 is connected motor 102 by shaft coupling with 103 top of bull stick.
Flusher 11 is further included, flusher 11 includes water tank 111, water pump 112, outlet pipe 113, check valve 114 and second valve 115,1 top left side of bottom plate is provided with water tank 111, water tank 111 be located at support base 923 and agitator tank 2 it Between, bottom right is provided with water pump 112 in water tank 111, and the water outlet of water pump 112 is connected with outlet pipe 113,113 tail of outlet pipe End is connected through 111 top left side of water tank and 5 left upper portion of lower hopper with 7 top of pipeline, outlet pipe 113 with pipeline 7 is interior connects, Outlet pipe 113 is equipped with check valve 114, and pipeline 7 is equipped with the second valve 115.
The second slide 12 and the second sliding block 13 are further included, the top of bottom plate 1 is provided with the second slide 12, the second slide 12 Positioned at the left side of the first cylinder 921, for the second slide 12 in being vertically arranged, the second slide 12 is equipped with the second sliding block coordinated with it 13, the second sliding block 13 is slidably matched with the second slide 12, and 13 right flank of the second sliding block is connected with 922 left surface of rack.
Rubber slab 14 is further included, two 942 medial surfaces of arc snap-gauge are fitted with rubber slab 14.
Operation principle:Operating personnel pour into water in agitator tank 2 first, you can are placed on the paint kettle equipped with paint Expect on device 9, you can start discharging device 9, paint kettle is moved to the top of conical pipe 8 by discharging device 9, and then drives paint kettle Move down, paint kettle is moved down to be contacted with conical pipe 8, and conical pipe 8 is inserted into paint kettle, closes discharging device 9, and is painted By the way that in 8 flow ipe 7 of conical pipe, the paint in pipeline 7 flows out through lower hopper 5 and flows into agitator tank 2, paint connects with water Touch.When having suitable paint in agitator tank 2, you can start discharging device 9 and drive paint kettle to recover to original position, restart stirring Device 10, the mixing component of agitating device 10, which rotates, is stirred paint and water, after paint is stirred evenly with water, you can close Agitating device 10 is closed, the paint being stirred can be taken out and used by operating personnel.
Because discharging device 9 includes motion bar 91, driving device 92, hold-down devices 93 and clamping device 94, bottom plate 1 pushes up Driving device 92 is equipped with the left of portion, motion bar 91 is connected with driving device 92, motion bar 91 is located at the front side of driving device 92, living Lever 91 is equipped with hold-down devices 93, and hold-down devices 93 are equipped with clamping device 94, when water level is when in agitator tank 2, operator Member can paint kettle be fixedly clamped by clamping device 94, restart driving device 92, driving device 92 drives motion bar 91 Rotating forward, motion bar 91 is rotated forward drives paint kettle to rotate forward by hold-down devices 93, and then when paint kettle is just being gone to directly over conical pipe 8 When, you can close driving device 92, restart hold-down devices 93, hold-down devices 93 drive paint kettle to move down, paint kettle to Lower movement is contacted with conical pipe 8, and then conical pipe 8 is inserted into paint kettle, closes hold-down devices 93, and then paint and pass through taper In 8 flow ipe 7 of pipe, and flow into agitator tank 2.Similarly, when the paint in paint kettle all flows out, you can start lower press fitting Put 93 drive paint kettles to move up, close hold-down devices 93, you can start driving device 92 and drive paint kettle to recover to original position, Paint kettle is unclamped by clamping device 94 again, operating personnel can remove paint kettle.
Because driving device 92 includes the first cylinder 921, rack 922, support base 923, first bearing seat 924, first Shaft 925 and gear 926,1 top left side front and rear sides of bottom plate it is symmetrical support base 923 is installed, in the top of support base 923 Between first bearing seat 924 is installed, first rotating shaft 925, first rotating shaft 925 are connected between front and rear sides first bearing seat 924 Middle part is provided with gear 926, and 925 front end of first rotating shaft is connected with motion bar 91, and 1 top left side of bottom plate is provided with the first cylinder 921, in being vertically arranged, the first cylinder 921 is located on the left of support base 923 the first cylinder 921, on the telescopic rod of the first cylinder 921 Rack 922 is installed, rack 922 is located at the left side of gear 926, and rack 922 is engaged with gear 926, after paint kettle is clamped, behaviour The telescopic rod elongation of the first cylinder 921 can be started by making personnel, and the telescopic rod elongated carry-over bar 922 of the first cylinder 921 is upward Mobile, rack 922 moves up band moving gear 926 and rotates forward, and gear 926, which rotates forward, drives first rotating shaft 925 to rotate forward, first rotating shaft 925, which rotate forward drive motion bar 91, rotates forward, and then drives paint kettle to rotate forward, when paint kettle is moved to 8 surface of conical pipe, you can Close the first cylinder 921.Similarly, after the paint in paint kettle all flows out, you can start the telescopic rod contracting of the first cylinder 921 It is short, and then the reversion of gear 926 drives motion bar 91 to invert, and paint kettle inversion recovery to original position, the first cylinder 921 of closing is Can.
Because hold-down devices 93 include the first fixed block 931, the second cylinder 932, the first slide 933, the first sliding block 934 With fixed plate 935,91 lower part of motion bar is provided with the first slide 933, and the first slide 933 is equipped with the first sliding block 934, and first slides Block 934 is slidably matched with the first slide 933, and fixed plate 935, fixed plate 935 and clamping device 94 are provided with the first sliding block 934 Connection, 91 lower part of motion bar are provided with the first fixed block 931, and the first fixed block 931 is located at the top of the first slide 933, and first is solid Determine the second cylinder 932 is installed on block 931, the telescopic rod of the second cylinder 932 is connected with the first sliding block 934, when paint kettle moves During to 8 surface of conical pipe, the telescopic rod that operating personnel can start the second cylinder 932 shortens, the telescopic rod of the second cylinder 932 Shorten and drive the first sliding block 934 to move down, the first sliding block 934, which moves down, drives fixed plate 935 to move down, and then passes through Clamping device 94 drives paint kettle to move down, and paint kettle, which moves down, makes conical pipe 8 be inserted into paint kettle, closes the second cylinder 932, and then paint and flowed out by conical pipe 8.After the paint in paint kettle all flows out, you can start the second cylinder 932 Telescopic rod extends, and then drives paint kettle to move up recovery to original position, closes the second cylinder 932.
Because clamping device 94 includes the second shaft 941, arc snap-gauge 942, kelly 943, the second fixed block 944 and spiral shell Mother 946, is provided with the second shaft 941 in fixed plate 935, two arc snap-gauges 942 is provided with the second shaft 941, wherein one A 942 tail end of arc snap-gauge is provided with kelly 943, and screw thread is carved with kelly 943, another 942 tail end of arc snap-gauge is provided with Second fixed block 944, the middle part of the second fixed block 944 are provided with through hole 945, and kelly 943 is located in through hole 945, is installed on kelly 943 There is nut 946, nut 946 coordinates with kelly 943, and operating personnel twist nut 946 first, and nut 946 rotates de- with kelly 943 From, you can pull two arc snap-gauges 942 to separate, kelly 943 departs from out of through hole 945, then paint kettle is placed on two arcs Between shape snap-gauge 942, operating personnel can close two arc snap-gauges 942, and kelly 943 is inserted into through hole 945, then will Nut 946 is sleeved on kelly 943 and twists, and nut 946 is rotated and contacted with the second fixed block 944, and then nut 946 and second is fixed Block 944, which coordinates, fixes two arc snap-gauges 942, and paint kettle is fixed, you can starts the first cylinder 921 and moves paint kettle To conical pipe 8.Similarly, when in paint kettle paint all flow out after, and recover to original position when, you can twist spiral shell again Mother 946, and then two arc snap-gauges 942 unclamp paint kettle, operating personnel can remove paint kettle.
Because having further included agitating device 10, agitating device 10 includes second bearing seat 101, motor 102, bull stick 103 With agitating vane 104,2 crown center of agitator tank is Embedded to be provided with second bearing seat 101, is installed in second bearing seat 101 There is bull stick 103,103 lower part of bull stick is evenly spaced to be provided with agitating vane 104, and 2 outer crown center of agitator tank is provided with motor 102, in being vertically arranged, the output shaft of motor 102 is connected motor 102 by shaft coupling with 103 top of bull stick, when paint inflow is stirred When being contacted in mixing with water, operating personnel can start motor 102 and rotate, and motor 102, which rotates, drives bull stick 103 to rotate, bull stick 103 Rotate and drive agitating vane 104 to rotate, agitating vane 104 is rotated is stirred mixing to paint and water.When paint and water stirring After uniformly, you can motor 102 is closed, paint is taken out and is used, it is time saving and energy saving without being manually stirred mixing.
Because having further included flusher 11, flusher 11 includes water tank 111, water pump 112, outlet pipe 113, unidirectional 114 and second valve 115 of valve, 1 top left side of bottom plate are provided with water tank 111, water tank 111 be located at support base 923 and agitator tank 2 it Between, bottom right is provided with water pump 112 in water tank 111, and the water outlet of water pump 112 is connected with outlet pipe 113,113 tail of outlet pipe End is connected through 111 top left side of water tank and 5 left upper portion of lower hopper with 7 top of pipeline, outlet pipe 113 with pipeline 7 is interior connects, Outlet pipe 113 is equipped with check valve 114, and pipeline 7 is equipped with the second valve 115, and water is poured into water tank 111 by operating personnel first It is interior, the second valve 115 is opened, after all outflows are painted in paint kettle, you can the second valve 115 is closed, starts water pump 112, Water in water tank 111 is pumped into outlet pipe 113 by water pump 112, and the water in outlet pipe 113 is discharged into pipeline 7, and then in pipeline 7 Discharged by conical pipe 8, water discharge in paint kettle it is remaining paint is rinsed.After being rinsed clean in paint kettle, It can switch off the pump 112, open the second valve 115, the water after flushing passes through pipeline 7 and flows into stirring in agitator tank 2.In this way, can Prevent that residual paint causes to waste in paint kettle.
Because having further included the second slide 12 and the second sliding block 13, the top of bottom plate 1 is provided with the second slide 12, and second slides Rail 12 is located at the left side of the first cylinder 921, and in being vertically arranged, the second slide 12 is equipped with second coordinated with it and slides the second slide 12 Block 13, the second sliding block 13 are slidably matched with the second slide 12, and 13 right flank of the second sliding block is connected with 922 left surface of rack, works as tooth When bar 922 moves, rack 922 drives the second sliding block 13 to be moved on the second slide 12 at the same time, and then the second sliding block 13 and second It is more steady that slide 12 moves rack 922.
Because having further included rubber slab 14, two 942 medial surfaces of arc snap-gauge are fitted with rubber slab 14, when two arcs When paint kettle is fixedly clamped by snap-gauge 942, rubber slab 14 is contacted with paint kettle, and then increases the frictional force with paint kettle, and is made Two arc snap-gauges 942 are more firm to fix paint kettle.
Embodiment described above only expresses the preferred embodiment of the present invention, its description is more specific and detailed, but simultaneously Therefore the limitation to the scope of the claims of the present invention cannot be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these belong to this hair Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (9)

1. one kind finishing uses wall finiss mixing device, it is characterised in that includes bottom plate(1), agitator tank(2), drainage conduit(3)、 First valve(4), lower hopper(5), cross bar(6), pipeline(7), conical pipe(8), discharging device(9)And agitating device(10), bottom Plate(1)Top right side is provided with agitator tank(2), agitator tank(2)Lower right side is connected with drainage conduit(3), drainage conduit(3)With stirring Case(2)Interior connection, drainage conduit(3)It is equipped with the first valve(4), agitator tank(2)It is interior to be equipped with agitating device(10), agitator tank(2) Left upper portion is provided with lower hopper(5), lower hopper(5)With agitator tank(2)Interior connection, lower hopper(5)Cross bar is inside installed(6), Cross bar(6)On be connected with pipeline(7), pipeline(7)Top is connected with conical pipe(8), conical pipe(8)With pipeline(7)Interior connection, cone Shape pipe(8)Top is located at lower hopper(5)Outside, bottom plate(1)Top left side is equipped with discharging device(9).
2. a kind of finishing according to claim 1 uses wall finiss mixing device, it is characterised in that discharging device(9)Including There is motion bar(91), driving device(92), hold-down devices(93)And clamping device(94), bottom plate(1)Top left side is equipped with driving Device(92), driving device(92)On be connected with motion bar(91), motion bar(91)Positioned at driving device(92)Front side, motion bar (91)It is equipped with hold-down devices(93), hold-down devices(93)It is equipped with clamping device(94).
3. a kind of finishing according to claim 2 uses wall finiss mixing device, it is characterised in that driving device(92)Including There is the first cylinder(921), rack(922), support base(923), first bearing seat(924), first rotating shaft(925)And gear (926), bottom plate(1)Top left side front and rear sides symmetrical expression is provided with support base(923), support base(923)Crown center is pacified Equipped with first bearing seat(924), front and rear sides first bearing seat(924)Between be connected with first rotating shaft(925), first rotating shaft (925)Middle part is provided with gear(926), first rotating shaft(925)Front end and motion bar(91)Connection, bottom plate(1)Top left side is pacified Equipped with the first cylinder(921), the first cylinder(921)In being vertically arranged, the first cylinder(921)Positioned at support base(923)Left side, the One cylinder(921)Telescopic rod on rack is installed(922), rack(922)Positioned at gear(926)Left side, rack(922)With tooth Wheel(926)Engagement.
4. a kind of finishing according to claim 3 uses wall finiss mixing device, it is characterised in that hold-down devices(93)Including There is the first fixed block(931), the second cylinder(932), the first slide(933), the first sliding block(934)And fixed plate(935), activity Bar(91)Lower part is provided with the first slide(933), the first slide(933)It is equipped with the first sliding block(934), the first sliding block(934) With the first slide(933)It is slidably matched, the first sliding block(934)On fixed plate is installed(935), fixed plate(935)Filled with clamping Put(94)Connection, motion bar(91)Lower part is provided with the first fixed block(931), the first fixed block(931)Positioned at the first slide (933)Top, the first fixed block(931)On the second cylinder is installed(932), the second cylinder(932)Telescopic rod and first slide Block(934)Connection.
5. a kind of finishing according to claim 4 uses wall finiss mixing device, it is characterised in that clamping device(94)Including There is the second shaft(941), arc snap-gauge(942), kelly(943), the second fixed block(944)And nut(946), fixed plate (935)On the second shaft is installed(941), the second shaft(941)On two arc snap-gauges are installed(942), one of arc Shape snap-gauge(942)Tail end is provided with kelly(943), kelly(943)On be carved with screw thread, another arc snap-gauge(942)Tail end is pacified Equipped with the second fixed block(944), the second fixed block(944)Middle part is provided with through hole(945), kelly(943)Positioned at through hole(945) It is interior, kelly(943)On nut is installed(946), nut(946)With kelly(943)Coordinate.
6. a kind of finishing according to claim 5 uses wall finiss mixing device, it is characterised in that has further included agitating device (10), agitating device(10)Include second bearing seat(101), motor(102), bull stick(103)And agitating vane(104), stir Mix case(2)Crown center is Embedded to be provided with second bearing seat(101), second bearing seat(101)Bull stick is inside installed (103), bull stick(103)Lower part is evenly spaced to be provided with agitating vane(104), agitator tank(2)Outer crown center is provided with electricity Machine(102), motor(102)In being vertically arranged, motor(102)Output shaft pass through shaft coupling and bull stick(103)Top connects.
7. a kind of finishing according to claim 6 uses wall finiss mixing device, it is characterised in that has further included flusher (11), flusher(11)Include water tank(111), water pump(112), outlet pipe(113), check valve(114)With the second valve (115), bottom plate(1)Top left side is provided with water tank(111), water tank(111)Positioned at support base(923)With agitator tank(2)Between, Water tank(111)Interior bottom right is provided with water pump(112), water pump(112)Water outlet be connected with outlet pipe(113), outlet pipe (113)Tail end runs through water tank(111)Top left side and lower hopper(5)Left upper portion and pipeline(7)Top connects, outlet pipe (113)With pipeline(7)Interior connection, outlet pipe(113)It is equipped with check valve(114), pipeline(7)It is equipped with the second valve(115).
8. a kind of finishing according to claim 7 uses wall finiss mixing device, it is characterised in that has further included the second slide (12)With the second sliding block(13), bottom plate(1)Top is provided with the second slide(12), the second slide(12)Positioned at the first cylinder (921)Left side, the second slide(12)In being vertically arranged, the second slide(12)It is equipped with the second sliding block coordinated with it(13), the Two sliding blocks(13)With the second slide(12)It is slidably matched, the second sliding block(13)Right flank and rack(922)Left surface connects.
9. a kind of finishing according to claim 8 uses wall finiss mixing device, it is characterised in that has further included rubber slab (14), two arc snap-gauges(942)Medial surface is fitted with rubber slab(14).
CN201711276765.8A 2017-12-06 2017-12-06 A kind of finishing wall finiss mixing device Expired - Fee Related CN108014690B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711276765.8A CN108014690B (en) 2017-12-06 2017-12-06 A kind of finishing wall finiss mixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711276765.8A CN108014690B (en) 2017-12-06 2017-12-06 A kind of finishing wall finiss mixing device

Publications (2)

Publication Number Publication Date
CN108014690A true CN108014690A (en) 2018-05-11
CN108014690B CN108014690B (en) 2019-09-24

Family

ID=62078658

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711276765.8A Expired - Fee Related CN108014690B (en) 2017-12-06 2017-12-06 A kind of finishing wall finiss mixing device

Country Status (1)

Country Link
CN (1) CN108014690B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110681280A (en) * 2019-09-25 2020-01-14 联邦家私(山东)有限公司 Priming paint mixing arrangement is used in furniture production
CN111036133A (en) * 2019-12-31 2020-04-21 江西兴创木业有限责任公司 Glue mixing machine
CN111420582A (en) * 2020-03-30 2020-07-17 广东博智林机器人有限公司 Slurry mixing equipment and feeding equipment with same
CN112604533A (en) * 2020-12-11 2021-04-06 江门市新会中新造纸网厂有限公司 Dispersion equipment for papermaking

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205361199U (en) * 2016-02-01 2016-07-06 李世杰 Agricultural is with machine that mixes that has automatic feed mechanism
CN205868031U (en) * 2016-07-29 2017-01-11 长沙威保特环保科技股份有限公司 Medicament dissolving device
CN107006193A (en) * 2017-05-05 2017-08-04 安徽大泽生物肥料科技有限公司 A kind of orchid cultivation soil application device
CN206535468U (en) * 2017-03-02 2017-10-03 北京紫禁城漆业有限公司 A kind of device for being used to produce aqueous finish paint

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205361199U (en) * 2016-02-01 2016-07-06 李世杰 Agricultural is with machine that mixes that has automatic feed mechanism
CN205868031U (en) * 2016-07-29 2017-01-11 长沙威保特环保科技股份有限公司 Medicament dissolving device
CN206535468U (en) * 2017-03-02 2017-10-03 北京紫禁城漆业有限公司 A kind of device for being used to produce aqueous finish paint
CN107006193A (en) * 2017-05-05 2017-08-04 安徽大泽生物肥料科技有限公司 A kind of orchid cultivation soil application device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110681280A (en) * 2019-09-25 2020-01-14 联邦家私(山东)有限公司 Priming paint mixing arrangement is used in furniture production
CN111036133A (en) * 2019-12-31 2020-04-21 江西兴创木业有限责任公司 Glue mixing machine
CN111420582A (en) * 2020-03-30 2020-07-17 广东博智林机器人有限公司 Slurry mixing equipment and feeding equipment with same
CN111420582B (en) * 2020-03-30 2022-04-26 广东博智林机器人有限公司 Slurry mixing equipment and feeding equipment with same
CN112604533A (en) * 2020-12-11 2021-04-06 江门市新会中新造纸网厂有限公司 Dispersion equipment for papermaking

Also Published As

Publication number Publication date
CN108014690B (en) 2019-09-24

Similar Documents

Publication Publication Date Title
CN108014690A (en) One kind finishing uses wall finiss mixing device
CN109176869B (en) Clay mixing equipment for clay sculpture
CN208359079U (en) A kind of blender for concrete mixing plant
CN209440519U (en) One kind is for building can stirring easy cleaning blender
CN204725665U (en) Hand-rail type cement paste agitator
CN207616893U (en) A kind of concrete production equipment that water resource recycles
CN209612818U (en) A kind of oilfield sewage flocculant efficient uniform speed adding set
CN111873183A (en) Concrete stirring device for building construction and stirring method thereof
CN219993156U (en) Building construction concrete pouring device
CN219650261U (en) Asphalt mortar stirring equipment for highway engineering
CN208406825U (en) A kind of electrophoretic paint agitating device convenient for cleaning
CN219114395U (en) Concrete pouring equipment
CN215712264U (en) Industrial wastewater desulfurization treatment device
CN213286556U (en) Mixing arrangement is used in waterproof paint production
CN210646144U (en) Blending device
CN209469015U (en) A kind of architectural engineering is with pouring device
CN201357061Y (en) Automatic stirring dreg-sucking machine
CN209317504U (en) A kind of blender with sewage reactant
CN217967621U (en) Raw material stirring device for cement-based artificial board production
CN221182636U (en) Neutral compound blocking remover injection device for oil-water well
CN218398779U (en) Concrete mixing device
CN221066772U (en) Stirring equipment for hydraulic and hydroelectric engineering building
CN221021685U (en) Stirring device for mortar manufacturing
CN219548849U (en) Fracturing equipment for petroleum exploitation
CN212096902U (en) Concrete mixing device with clean function

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190828

Address after: 311800 No. 26, Yangchun Village, Fengqiao Town, Zhuji City, Shaoxing City, Zhejiang Province

Applicant after: Zhou Weidong

Address before: 336000 Yichun Xuefu Road 576 Yichun College Student Pioneering Base No. 10 mailbox

Applicant before: Liu Shirong

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210526

Address after: 102200 423, 4 / F, block a, Xinhua future city building, 175 Litang Road, Changping District, Beijing

Patentee after: Li Qiannan

Address before: 311800 No.26, Yangchun village, Fengqiao town, Zhuji City, Shaoxing City, Zhejiang Province

Patentee before: Zhou Weidong

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211222

Address after: 515000 second floor of Chigang Hongqiao urban construction complex building, Haojiang District, Shantou City, Guangdong Province

Patentee after: DAHAO MUNICIPAL CONSTRUCTION Co.,Ltd.

Address before: 102200 423, 4 / F, block a, Xinhua future city building, 175 Litang Road, Changping District, Beijing

Patentee before: Li Qiannan

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211231

Address after: 067000 No. 16, group 4, Liudaogou village, Liudaohe Town, Xinglong County, Chengde City, Hebei Province

Patentee after: Shang Guilin

Address before: 515000 second floor of Chigang Hongqiao urban construction complex building, Haojiang District, Shantou City, Guangdong Province

Patentee before: DAHAO MUNICIPAL CONSTRUCTION Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190924

Termination date: 20211206