CN107938663A - The PHC pile piles for passing through agent structure position make support system lattice column connector - Google Patents
The PHC pile piles for passing through agent structure position make support system lattice column connector Download PDFInfo
- Publication number
- CN107938663A CN107938663A CN201710865329.8A CN201710865329A CN107938663A CN 107938663 A CN107938663 A CN 107938663A CN 201710865329 A CN201710865329 A CN 201710865329A CN 107938663 A CN107938663 A CN 107938663A
- Authority
- CN
- China
- Prior art keywords
- connector
- reserved
- lattice column
- stake top
- lower floor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 80
- 239000010959 steel Substances 0.000 claims abstract description 80
- 239000003795 chemical substances by application Substances 0.000 claims abstract description 25
- 238000009434 installation Methods 0.000 claims abstract description 13
- 239000000463 material Substances 0.000 claims abstract description 13
- 239000000945 filler Substances 0.000 claims abstract description 9
- 230000003014 reinforcing effect Effects 0.000 claims description 18
- 238000013461 design Methods 0.000 claims description 9
- 210000003205 muscle Anatomy 0.000 claims description 6
- 229910000746 Structural steel Inorganic materials 0.000 claims 1
- 239000004567 concrete Substances 0.000 abstract description 20
- 238000011065 in-situ storage Methods 0.000 abstract description 11
- 230000002787 reinforcement Effects 0.000 abstract description 10
- 238000003912 environmental pollution Methods 0.000 abstract description 5
- 230000010412 perfusion Effects 0.000 abstract description 4
- 238000010276 construction Methods 0.000 description 29
- 238000000034 method Methods 0.000 description 7
- 238000012545 processing Methods 0.000 description 7
- 238000003466 welding Methods 0.000 description 6
- 230000008901 benefit Effects 0.000 description 5
- 238000010586 diagram Methods 0.000 description 5
- 238000005516 engineering process Methods 0.000 description 5
- 238000009412 basement excavation Methods 0.000 description 4
- 230000003068 static effect Effects 0.000 description 4
- 239000011230 binding agent Substances 0.000 description 3
- 230000007547 defect Effects 0.000 description 3
- VYPSYNLAJGMNEJ-UHFFFAOYSA-N Silicium dioxide Chemical compound O=[Si]=O VYPSYNLAJGMNEJ-UHFFFAOYSA-N 0.000 description 2
- 238000005553 drilling Methods 0.000 description 2
- 238000012407 engineering method Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 238000003908 quality control method Methods 0.000 description 2
- 238000010008 shearing Methods 0.000 description 2
- 206010054949 Metaplasia Diseases 0.000 description 1
- 238000003556 assay Methods 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 235000014121 butter Nutrition 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 238000010835 comparative analysis Methods 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000002950 deficient Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000011156 evaluation Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000011031 large-scale manufacturing process Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000015689 metaplastic ossification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 239000013049 sediment Substances 0.000 description 1
- 239000010865 sewage Substances 0.000 description 1
- 239000000377 silicon dioxide Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/52—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
- E02D5/523—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
- E02D5/526—Connection means between pile segments
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/58—Prestressed concrete piles
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
- Foundations (AREA)
Abstract
The invention discloses a kind of PHC pile piles for passing through agent structure position to make support system lattice column connector, including connector body, it is characterized in that the connector body is thick-walled seamless steel pipes, perfusion filler material in thick-walled seamless steel pipes pipe, pre-buried lifting part in the filler material of thick-walled seamless steel pipes upper end, the thick-walled seamless steel pipes upper and lower side tube wall sets groove, and reserved connector is set in the connector;Reserved connector and reserved stake top connector, the reserved connector and supporting structure steel reinforcement abutting joints are set in the connector, and the pre-buried connector installation stake top dowel of stake top dowel causes lattice column to become engineering pile, agent structure position is passed through for lattice column.The pattern that this kind of connector can be by the mode altering of conventional borehole bored concrete pile+steel lattice column for PHC pile piles+connector is used, engineering cost can be substantially reduced, improve speed of application, reduce environmental pollution, reduce all kinds of resource consumptions by cancelling cast-in-situ bored pile and steel column.
Description
Technical field
The present invention relates to building field, and in particular to a kind of PHC pile piles are made the connector of support system lattice column and its applied
Work method, is directed to use with the connector and substitutes PHC pile pile portion segments causing bracing members in the segment zones, concrete branch
Support and structures agent structure are securely and reliably passed through, so as to fulfill the branch for substituting cast-in-situ bored pile+steel column in traditional construction
Support body system.Base pit engineering is built in all kinds of municipal, rooms that can be applied in current building field.
Background technology
As the quick increase of the urban residence size of population, land resource are increasingly deficient, people gradually put into notice
The development and utilization of the underground space, various constructions of structures extend to underground one after another, and incident is exactly deep foundation pit engineering
Increase.The fender body form that can be taken for large deep foundation pit engineering is varied, there is the stake of SMW engineering methods, drill-pouring
Stake, diaphram wall etc., supporting form are ever-changing, have concrete support, steel pipe support, type steel support etc., but wherein rise
The key component stablized to retaining design --- the form of lattice column still uses the form of cast-in-situ bored pile+steel column substantially.
Major defect is:
(1) environmental pollution is big:Since lattice column bottom uses cast-in-situ bored pile form, and in bored pile construction process
In will produce largely discarded mud, have a great influence to surrounding enviroment.
(2) site condition is more:Either the steel reinforcement cage of bored concrete pile or steel column are required to be processed assembly at the scene,
Therefore, it is necessary to prepare corresponding processing site, hoisting transportation equipment etc..
(3) construction speed is slow:For PHC pile piles, the pile-forming speed of cast-in-situ bored pile is only the 1/20 of prefabricated pile,
And with stake footpath, the long increase of stake, effect gap expands all the more.
(4) quality control is difficult:Drilling pouring pile hole aperture, verticality, sediment thickness, concreting and steel reinforcement cage
And the quality critical point such as steel column scene processing installation is more, control difficulty is big.
(5) construction technology defect:Main reinforcement in concrete support and structure, which runs into steel column, to pass through, and cause reinforcing bar to break
Open, even if still suffering from hidden danger using reinforcement measure.In addition, any excess concrete inside steel column is invaded when cast-in-place pile concrete pours
Artificial chisel is needed to remove, it is time consuming, and handle and bad easily trigger structural leakage.
(6) complicated construction technique:Mixed in early period pile foundation construction comprising drilling, borehole cleaning, steel reinforcement cage and steel upright post hoisting, under water
Solidifying soil pours, later stage earth excavation and the multiple working procedures such as the structure fabrication stage cuts comprising pile crown scum silica frost, bar straightening anchors, into
And site operation organization and administration program is caused to become relatively complicated.
(7) operating expenses is high:Cast-in-situ bored pile and steel column construction cost are far above other kinds of stake, meanwhile, on
State pile-type and be only purely by way of lattice column use, the negligible amounts applied in actual Foundation Pit Support Engineering so that unit price is further
Improve, operating expenses increase.
The content of the invention
It is an object of the invention to provide a kind of PHC pile piles for passing through agent structure position to make the connection of support system lattice column
Device, overcomes a series of problems, such as environmental pollution is big, site condition is more, construction speed is slow, quality control is difficult, construction technology defect.
To achieve the above object, technical scheme is as follows:A kind of PHC pile piles for passing through agent structure position prop up
Support body system lattice column connector, including connector body, it is characterised in that the connector body is thick-walled seamless steel pipes, heavy wall
Perfusion filler material in seamless steel pipe pipe, pre-buried lifting part in the filler material of thick-walled seamless steel pipes upper end, on the thick-walled seamless steel pipes
Lower end tube wall sets groove;Reserved connector and reserved stake top connector be set in the connector, the reserved connector with
Supporting structure steel reinforcement abutting joints, the pre-buried connector installation stake top dowel of stake top dowel cause lattice column to become engineering pile, are used for
Lattice column passes through agent structure position.
According to a preferred embodiment of the invention, the connector is used for the retaining design using PHC pile piles as lattice column, institute
State connector to be arranged between epimere lattice column and hypomere lattice column, the epimere lattice column and hypomere lattice column are PHC pipes
Stake.
According to a preferred embodiment of the invention, connector is reserved in the longitudinal direction and laterally reserved connector is structure reinforcing bars
Sleeve, diameter are preferably 25~30mm.
According to a preferred embodiment of the invention, the connector is used to pass through using PHC pile piles as lattice column and lattice column
Agent structure position, the thick-walled seamless steel pipes side wall sets upper strata, and longitudinally connector is laterally reserved on reserved connector and upper strata,
And longitudinally reserved connector and lower floor laterally reserve connector for lower floor, longitudinally reserved connector and lower floor are longitudinally pre- on the upper strata
Stay and longitudinal pre-buried connector of stake top dowel is additionally provided between connector, laterally reserved connector and lower floor are laterally pre- on the upper strata
Stay and the horizontal pre-buried connector of stake top dowel is additionally provided between connector, corresponding upper strata is longitudinally between reserved connector in connection
The longitudinal reserved steel bar of layer, corresponding lower floor connect lower floor's longitudinal direction reserved steel bar, corresponding longitudinal direction stake between longitudinally reserving connector
Stake top dowel is reserved in connection longitudinal direction between pushing up the pre-buried connector of dowel, and upper strata is connected between the corresponding reserved connector of upper strata transverse direction
Horizontal reserved steel bar, corresponding lower floor connect lower floor's transverse direction reserved steel bar, corresponding transverse direction stake top between laterally reserving connector
Laterally reserved stake top dowel is connected between the pre-buried connector of dowel;
The connector is arranged between epimere lattice column and hypomere lattice column, the epimere lattice column and hypomere lattice column
Be PHC pile piles, upper strata longitudinally reserved connector and lower floor longitudinally reserved connector respectively with corresponding longitudinal agent structure
Structure reinforcing bars connection, upper strata laterally reserved connector and lower floor laterally reserved connector respectively with corresponding horizontal agent structure
In structure reinforcing bars connection;The pre-buried connector installation stake top dowel of stake top dowel causes lattice column to become engineering pile.
According to a preferred embodiment of the invention, longitudinally connector, lower floor are laterally reserved in reserved connector, upper strata on the upper strata
Laterally reserved connector is structure reinforcing bars sleeve for the reserved connector in longitudinal direction and lower floor, and diameter is preferably 25~30mm, longitudinal stake
It is stake top dowel sleeve to push up the pre-buried connector of dowel and the horizontal pre-buried connector of stake top dowel, and diameter is preferably 18~22mm.
According to a preferred embodiment of the invention, the lifting part is the hangs muscle of Φ 16.
The connector of the present invention has applied widely, easy construction, reliability height, simultaneously as being connected using this kind
The pattern that the mode altering of conventional borehole bored concrete pile+steel lattice column is PHC pile piles+connector can be cancelled cast-in-situ bored pile by device
And steel column can substantially reduce engineering cost, improve speed of application, reduce environmental pollution, reduce all kinds of resource consumptions.
The connector of the present invention combines to form a kind of support structure that can substitute cast-in-situ bored pile+steel column with PHC pile piles
Part, has the following advantages:
(1) afterwards can be directly using PHC pile piles as lattice column foundation and pile body, without individually being bored using this connector
Hole pouring pile is constructed, and mud is not produced in work progress, meanwhile, using static pressure construction, surrounding enviroment are influenced to substantially reduce.
(2) after using this connector, the material of lattice column is only PHC pile piles and connector, without unnecessary processing space
Ground is processed installation.
(3) using PHC pile piles pile foundation construction speed is greatly speeded up, and if structure pile basis is also same class pile foundation
Form, can share same mechanical equipment, reduce equipment and march into the arena type and quantity.
(4) PHC pile piles and connector be standardized in producer's workshop, large-scale production, processing and fabricating precision is high,
Quality is good.
(5) pre-plugged has connector in connector, can ensure to apply directly with bar connecting in concrete support and structure
Working medium amount, meanwhile, concrete chisel removal process is avoided, reduces hidden danger of quality.
Brief description of the drawings
Fig. 1 is the structure diagram of an example of the invention.
Fig. 2 is the top view of Fig. 1.
Fig. 3 is the sectional side view of Fig. 1.
Fig. 4 is one of profile of bottom plate linkage section.
Fig. 5 is the structure diagram of reserved connector.
Fig. 6 is the two of the profile of bottom plate linkage section.
Fig. 7 is the cross sectional view of Fig. 6.
Figure includes:
1st, thick-walled seamless steel pipes, 2, filler material, 3, lifting part, 4, the reserved connector in longitudinal direction, 5, horizontal reserved connector, 6,
Longitudinal reserved steel bar, 7, horizontal reserved steel bar, 8, the longitudinal reserved connector in middle level, 9, the horizontal reserved connector in middle level, 10, middle level
Longitudinal reserved steel bar, 11, middle level transverse direction reserved steel bar, 104, base arrangement, 107, connector, 108, reserved connector, 111,
Electric welding connection, 112, epimere lattice column, 113, embedded bar, 114, pea gravel concreten, 115, structure reinforcing bars sleeve, 116, plug into
Device protection cap, 117, butter, 118, seal ring, 119, stake top dowel, 127, the pre-buried connector of stake top dowel, 128, lower row's steel
Muscle.
Embodiment
The present invention will be further described below in conjunction with the accompanying drawings.
A kind of PHC pile piles for passing through agent structure position make support system lattice column connector, including connector body, its
It is thick-walled seamless steel pipes 1 to be characterized in that the connector body, and thick-walled seamless steel pipes 1 manage interior perfusion filler material 2, heavy wall seamless steel
Pre-buried lifting part 3 in the filler material of pipe upper end, the thick-walled seamless steel pipes upper and lower side tube wall set groove;Set in the connector
Reserved connector and reserved stake top connector, the reserved connector and supporting structure steel reinforcement abutting joints, the stake top dowel are pre-buried
Connector installation stake top dowel causes lattice column to become engineering pile, and agent structure position is passed through for lattice column.
This product has following features:
1. upper and lower ends can be routinely connected with PHC pile piles;
2. connector, which can install the supporting members such as steel corbel, steel binder, is used as bracing members fulcrum;
3. connector can ensure that steel bar continuous is passed through, without disconnecting;
4. connector can install waterstop member and be used as permanent structure.
To reach These characteristics, this connector designing scheme is as follows:
1. material selection
To meet to select seamless thick walled steel tube with the normal butt connector material of main part of PHC pile piles, can be managed with finished product PHC
Pile end plate is welded, meanwhile, meet that connector can combine connection with steel corbel, steel binder, waterstop member by welding manner.
2. strength checking
Construction and support system during to meet pile sinking produce various loads, select steel strength to carry out for connector
Checking computations, content include PHC tubular pile bodies and are checked by press-bending ultimate bearing capacity and junction weld strength.
Using PHC-500-AB-100 as pile body, each layer vertical force eccentricity takes 350mm to calculate, the moment of flexure that its pile body is born
M=0.35N,.
Result of calculation:Limit eccentric bearing capacities of the PHC-500-AB-100 in the case where considering bias 350mm is 750KN.
To ensure that attachment weld intensity is more than pile strength between connector and PHC pile piles, weld strength checking computation results are shown
Show, connector weld seam need to use groove to weld, and when the wide height of groove size is respectively higher than 12mm, its shearing strength is more than PHC pipe piles
Body shearing strength, weld strength and pile body etc. are strong at this time, it is ensured that safety of welding seam.
Therefore, by taking the pile pile of PHC500-AB-100 as an example, connector selects the seamless thick walled steel tube of wall thickness 16mm, and two
Groove form is taken at end, can meet above-mentioned every load requirement.
If design load value changes, can by adjusting PHC pile piles diameter and stake long, connector diameter and wall
The parameters such as thickness are to meet construction loads requirement.
3. embedded part is set
To meet that concrete support and structure reinforcing bars are continuous across connector area, when connector makes, according to design
Drawing bar gauge and distribution situation, two side opening and connector is put into connector tube wall relevant position, it is middle with design
The identical bar connecting of drawing requirement.
4. auxiliary part
To improve connector self-strength and internal reinforcing bar durability, connector is completed to pour into cavity after installation of embedded parts
With the equal strength pea gravel concreten or mortar of design drawing requirement.Meanwhile for ease of construction hoisting, it is provided with connector one end
Hoisting component.
(3) product configurations
This product is as follows using construction features and the scope of application.
Fig. 1~3 are the structure diagram of connector of the present invention.As shown in the figure, the thick-walled seamless steel pipes side wall is set
Connector and the reserved connector of upper strata transverse direction are reserved in layer longitudinal direction, and longitudinally reserved connector and lower floor's transverse direction are reserved and plugged into for lower floor
Device, longitudinally to be longitudinally additionally provided with least one layer of middle level between reserved connector longitudinally reserved for reserved connector and lower floor for the upper strata
Connector 8, the upper strata are laterally additionally provided with least one layer of middle level horizontal stroke between reserved connector and lower floor laterally reserve connector
To reserved connector 9, corresponding upper strata connects upper strata longitudinal direction reserved steel bar, corresponding lower floor longitudinal direction between longitudinally reserving connector
Lower floor's longitudinal direction reserved steel bar is connected between reserved connector, corresponding middle level connects middle level longitudinal direction between longitudinally reserving connector 8
Reserved steel bar 10, corresponding upper strata connect upper strata transverse direction reserved steel bar between laterally reserving connector, and corresponding lower floor is laterally pre-
Stay and lower floor's transverse direction reserved steel bar is connected between connector, it is laterally pre- that corresponding middle level laterally connects middle level between reserved connector 9
Reinforcing bar 11 is stayed, it longitudinally reserves connector, upper strata at the middle and upper levels, and laterally longitudinally reserved connector and lower floor are horizontal for reserved connector, lower floor
It is structure reinforcing bars sleeve to reserved connector, diameter is preferably 25~30mm, and longitudinally reserved connector and middle level are horizontal in middle level
Reserved connector is stake top dowel sleeve, and diameter is preferably 18~22mm.
This connector is applicable in and horizontal support need to pass through for the retaining design or lattice column of bracing members or concrete support
The region of agent structure.
According to a particular embodiment of the invention, as shown in figure 4, PHC pile piles lattice column includes the base foundation below bottom plate,
Connected between lattice column and base foundation by this type connector 107.
Fig. 5 is the structure diagram of reserved connector.As shown in the figure, the reserved connector is structure reinforcing bars sleeve 115, its
Middle medial extremity is connected with embedded bar, and outboard end sets connector protection cap 116, and the reserved connector applies Huang in the outer part in section
Oil 117.
It is the connection diagram of bottom plate linkage section as shown in figs. 6-7.The heavy wall that connector 107 includes wall thickness 16mm is seamless
Steel pipe 1, the interior perfusion pea gravel concreten 114 of thick-walled seamless steel pipes 1,107 side wall of C type connector reserve connector 108 and stake top
The pre-buried connector 127 of dowel, set in connector 107 embedded bar 113 that is connected with the reserved connector 108 and with institute
The reserved stake top dowel that the pre-buried connector 127 of stake top dowel connects is stated, upper end and the epimere lattice column 112 of connector 107 are welded
Connection 111, lower end and hypomere lattice column electric welding connection.During construction, it is directly right with base plate interior reinforcing bar 127 to reserve connector 108
Connect, while installing stake top dowel on the pre-buried connector 127 of connector side wall stake top dowel can be such that it is used as engineering pile.
128 be lower placing of reinforcement.
The connector 107 is used to pass through agent structure position using PHC pile piles as lattice column and lattice column, it is illustrated that to wear
More base arrangement, 107 side wall of connector set the upper strata longitudinally horizontal reserved connector in reserved connector and upper strata, and under
Connector and the reserved connector of lower floor's transverse direction are reserved in layer longitudinal direction, and longitudinally reserved connector and lower floor longitudinal direction are reserved and plug on the upper strata
Longitudinal pre-buried connector of stake top dowel is additionally provided between device, laterally reserved connector and lower floor's transverse direction are reserved and plugged on the upper strata
The horizontal pre-buried connector of stake top dowel is additionally provided between device, corresponding upper strata connects upper strata longitudinal direction between longitudinally reserving connector
Reserved steel bar, corresponding lower floor connect lower floor's longitudinal direction reserved steel bar, corresponding longitudinal direction stake top dowel between longitudinally reserving connector
The reserved stake top dowel in longitudinal direction is connected between pre-buried connector, it is laterally pre- to connect upper strata between the corresponding reserved connector of upper strata transverse direction
Reinforcing bar, corresponding lower floor is stayed to connect lower floor's transverse direction reserved steel bar between laterally reserving connector, corresponding transverse direction stake top dowel is pre-
Stake top dowel is laterally reserved in connection between burying connector;
The connector is arranged between epimere lattice column 112 and hypomere lattice column, the epimere lattice column and hypomere lattice
Structure column is PHC pile piles, and the sidepiece of the connector sets horizontal agent structure and longitudinal agent structure respectively;Upper strata is longitudinally pre-
Staying connector and lower floor, longitudinally reserved connector is connected with the structure reinforcing bars in corresponding longitudinal agent structure respectively, and upper strata is horizontal
Laterally reserved connector is connected with the structure reinforcing bars in corresponding horizontal agent structure respectively for reserved connector and lower floor;The stake
Dowel pre-buried connector installation stake top dowel 119 in top causes lattice column to become engineering pile, is set above stake top dowel 119
Seal ring 118.
The use of this connector, which can coordinate PHC pile piles to substitute cast-in-situ bored pile+steel column, becomes Extra-Deep Foundation Pit system
A part, has the advantages that:
(1) original cast-in-situ bored pile and steel column partial replacement are simplified, applied into PHC pile piles and connector, construction technology
Work cost substantially reduces;
(2) in formation of pile, mud and outward transport disposal are not produced, can save part expense, meanwhile, substantially reduce to periphery
Environmental pollution;
(3) if the pile foundation form of deep-foundation pit engineering uses PHC pile piles, using this connector, using PHC pile piles as
Lattice column, when construction, can use construction machinery of the same race, reduce site operation mechanical type and quantity, meanwhile, reduce machinery into
Fee for showing up is used, and improves mechanical utilization rate;
(4) this connector can meet static pressure construction operating condition, during construction, can be greatly reduced using static pressure construction and applied
Influence of the work noise to surrounding enviroment;
(5) this connector is installed very easy in bore forming, identical with common PHC pile extension technologies, with drill-pouring
Stake is compared, and speed of application is improved to original more than 10 times;
(6) this connector and the PHC pile piles being used cooperatively be standardized in manufacturer's workshop, scale metaplasia
Production, processing and fabricating precision is high, quality is good.Meanwhile scene can reduce place area occupied without arranging installation processing site;
(7) connector body uses weldable material so that can be outside connector after excavation of foundation pit to connector absolute altitude
Support and the waterstop members such as convenient welding steel corbel, steel binder.
(8) pre-plugged has connector in connector, can ensure to apply directly with bar connecting in concrete support and structure
Working medium amount, meanwhile, eliminate any excess concrete in traditional construction technique cut, reinforcing bar it is outer around additional measures such as, hole reinforcement, subtract
Few cost of labor, accelerates speed of application.
(9) use the lattice stanchion of connector to be used as engineering pile by installing stake top dowel to use.
Following table is the beneficial effects of the present invention evaluation by taking 500mm footpaths as an example.
Present invention is further illustrated below by way of specific embodiment.
(1) project profile
Certain city's sewage plant puies forward mark improvement project and includes a newly-built pond body, and structural plan size is 88.6m × 83.3m, maximum
Cutting depth 12.35m.The pond body pile foundation form is a PHC pile pile clump of piles, and foundation pit enclosure uses SMW engineering methods, and support system is
Shou Dao, the support of two concretes, locally fall deep region and set the 3rd bracing members.
Base form:PHC-500-AB-100 long 33m, totally 1258
Lower part lattice column:The long 35m of 800 Piles of Φ, totally 87
Top lattice column:460mm × 460mm long 12.5m, totally 87
(2) products application
With reference to above-mentioned project profile, if can optimize using this product to designing scheme, substituted and drilled using PHC pile piles
The lattice column system of bored concrete pile+steel column, can effectively improve in construction quality, progress, economic benefit etc..
Changing technological parameter is:
Base form:PHC-500-AB-100 long 33m, totally 1258
Lower part lattice column:PHC-500-AB-100 long 30m, totally 87
Top lattice column:PHC-500-AB-100 long 10m, totally 87
Lattice column (crossing structure linkage section) connector length 1.5m, 87
(3) application scheme
1. being required according to design drawing, the parameters such as connector specification, length, absolute altitude are determined, according to setting in processing workshop
Meter drawing is processed, and comprising fracture, perforate, built-in fitting and grouting etc., treats that product maintenance is transported to scene after the assay was approved.
2. scene is constructed using static pressure method, and carries out piling according to definite with stake scheme, after reaching designed elevation
Positioning, welding, fixed connection device, then next section of pressing pile construction is carried out, it is necessary to which the position of installs connector is respectively positioned at first road concrete
Support, the support of second concrete, three bracing members and pass through baseplate zone.
3. carrying out earth excavation after foundation pit meets excavation condition, dig to supporting structure absolute altitude, exposure connector, to connection
Device carries out exterior installation respective support component and steel bar template concrete construction after simply clearing up.
Connector:Open concrete support region connector side wall and reserve connector protection cap, directly with inside configuration steel
Muscle connects (dowel containing stake top), meanwhile, it can be made to be used as engineering pile in connector side wall installation stake top dowel.
Above-mentioned engineering substitutes the lattice column form of cast-in-situ bored pile+steel column using PHC pile piles as used this product,
334.22 ten thousand yuan of cost input can be reduced in economic benefit, can be shortened the construction period in terms of duration benefit 15 days, in quality, environment side
Face is also improved and improves.
Designing scheme optimizes comparative analysis table
Although giving detailed description and explanation to the embodiment of the present invention above, it should be noted that
We can carry out the above embodiment various equivalent changes and modification according to the conception of the present invention, its caused function is made
, should all be within protection scope of the present invention during with the spirit still covered without departing from specification.
Claims (4)
1. a kind of PHC pile piles for passing through agent structure position make support system lattice column connector, including connector body, it is special
Sign is that the connector body be thick-walled seamless steel pipes, irrigates filler material in thick-walled seamless steel pipes pipe, on thick-walled seamless steel pipes
Pre-buried lifting part in filler material is held, the thick-walled seamless steel pipes upper and lower side tube wall sets groove, set in the connector reserved
Connector;Reserved connector and reserved stake top connector, the reserved connector and supporting structure steel are set in the connector
Muscle docks, and the pre-buried connector installation stake top dowel of stake top dowel causes lattice column to become engineering pile, is passed through for lattice column
Agent structure position.
2. the PHC pile piles as claimed in claim 1 for passing through agent structure position make support system lattice column connector, its feature
Be that the connector is used for retaining design using PHC pile piles as lattice column, the connector be arranged on epimere lattice column with
Between hypomere lattice column, the epimere lattice column and hypomere lattice column are PHC pile piles.
3. the PHC pile piles as claimed in claim 2 for passing through agent structure position make support system lattice column connector, its feature
It is that connector is reserved in the longitudinal direction and laterally reserved connector is structure reinforcing bars sleeve, diameter is preferably 25 ~ 30mm.
4. the PHC pile piles as claimed in claim 3 for passing through agent structure position make support system lattice column connector, its feature
It is that the thick-walled seamless steel pipes side wall sets upper strata longitudinally reserved connector and the reserved connector of upper strata transverse direction, and lower floor to indulge
To the horizontal reserved connector of reserved connector and lower floor, the upper strata longitudinally reserved connector and lower floor longitudinally reserved connector it
Between be additionally provided with longitudinal pre-buried connector of stake top dowel, the upper strata laterally reserved connector and lower floor laterally reserved connector it
Between be additionally provided with the horizontal pre-buried connector of stake top dowel, it is longitudinally reserved that corresponding upper strata longitudinally connects upper strata between reserved connector
Reinforcing bar, corresponding lower floor connect lower floor's longitudinal direction reserved steel bar between longitudinally reserving connector, and corresponding longitudinal direction stake top dowel is pre-buried
The reserved stake top dowel in longitudinal direction is connected between connector, corresponding upper strata connects upper strata laterally reserved steel between laterally reserving connector
Muscle, corresponding lower floor connect lower floor's transverse direction reserved steel bar between laterally reserving connector, and corresponding transverse direction stake top dowel is pre-buried to be connect
Stake top dowel is laterally reserved in connection between refuting device;
Upper strata longitudinally reserved connector and lower floor longitudinally reserved connector respectively with the structural steel in corresponding longitudinal agent structure
Muscle connects, upper strata laterally reserved connector and lower floor laterally reserved connector respectively with the structure in corresponding horizontal agent structure
Bar connecting;The pre-buried connector installation stake top dowel of stake top dowel causes lattice column to become engineering pile.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710865329.8A CN107938663B (en) | 2017-09-22 | 2017-09-22 | PHC pipe pile penetrating through main structure part as supporting system lattice column connector |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710865329.8A CN107938663B (en) | 2017-09-22 | 2017-09-22 | PHC pipe pile penetrating through main structure part as supporting system lattice column connector |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107938663A true CN107938663A (en) | 2018-04-20 |
CN107938663B CN107938663B (en) | 2024-02-06 |
Family
ID=61929116
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710865329.8A Active CN107938663B (en) | 2017-09-22 | 2017-09-22 | PHC pipe pile penetrating through main structure part as supporting system lattice column connector |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107938663B (en) |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001288755A (en) * | 2000-04-04 | 2001-10-19 | Shimizu Corp | Construction method of footing |
JP2004108034A (en) * | 2002-09-19 | 2004-04-08 | Okumura Corp | Foundation structure, construction method and steel-pipe-mounted precast concrete pile for steel-framed building |
JP2006161278A (en) * | 2004-12-02 | 2006-06-22 | Shimizu Corp | Structure for joining pile and column together |
CN101550723A (en) * | 2008-04-03 | 2009-10-07 | 上海市第一建筑有限公司 | Construction method for codes of reserved structural column longitudinal steel bars |
JP2013253471A (en) * | 2013-07-30 | 2013-12-19 | Sumitomo Mitsui Construction Co Ltd | Joint structure of column and pile |
CN203403402U (en) * | 2013-06-27 | 2014-01-22 | 上海三益建筑设计有限公司 | Upright pile |
CN204059361U (en) * | 2014-07-16 | 2014-12-31 | 上海三凯建设管理咨询有限公司 | A kind of braced structures adopting resistance to plucking PHC pile tube to do column |
CN204456131U (en) * | 2015-02-06 | 2015-07-08 | 天颂建设集团有限公司 | A kind of structural floor that utilizes is as the structural system of horizontal support |
CN105239594A (en) * | 2015-10-30 | 2016-01-13 | 江苏中大建设集团有限公司 | Prestressed pipe pile upright |
CN106013472A (en) * | 2016-06-30 | 2016-10-12 | 中铁隧道集团二处有限公司 | Waterproof structure with latticed column penetrating through body structure part and construction method of structure |
-
2017
- 2017-09-22 CN CN201710865329.8A patent/CN107938663B/en active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001288755A (en) * | 2000-04-04 | 2001-10-19 | Shimizu Corp | Construction method of footing |
JP2004108034A (en) * | 2002-09-19 | 2004-04-08 | Okumura Corp | Foundation structure, construction method and steel-pipe-mounted precast concrete pile for steel-framed building |
JP2006161278A (en) * | 2004-12-02 | 2006-06-22 | Shimizu Corp | Structure for joining pile and column together |
CN101550723A (en) * | 2008-04-03 | 2009-10-07 | 上海市第一建筑有限公司 | Construction method for codes of reserved structural column longitudinal steel bars |
CN203403402U (en) * | 2013-06-27 | 2014-01-22 | 上海三益建筑设计有限公司 | Upright pile |
JP2013253471A (en) * | 2013-07-30 | 2013-12-19 | Sumitomo Mitsui Construction Co Ltd | Joint structure of column and pile |
CN204059361U (en) * | 2014-07-16 | 2014-12-31 | 上海三凯建设管理咨询有限公司 | A kind of braced structures adopting resistance to plucking PHC pile tube to do column |
CN204456131U (en) * | 2015-02-06 | 2015-07-08 | 天颂建设集团有限公司 | A kind of structural floor that utilizes is as the structural system of horizontal support |
CN105239594A (en) * | 2015-10-30 | 2016-01-13 | 江苏中大建设集团有限公司 | Prestressed pipe pile upright |
CN106013472A (en) * | 2016-06-30 | 2016-10-12 | 中铁隧道集团二处有限公司 | Waterproof structure with latticed column penetrating through body structure part and construction method of structure |
Also Published As
Publication number | Publication date |
---|---|
CN107938663B (en) | 2024-02-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107542108B (en) | A kind of reverse construction method of building basement structure | |
CN109026064B (en) | Construction method for large-span multi-arch tunnel with semi-bright and semi-dark | |
CN106120812A (en) | A kind of assembled active well structure and construction method | |
CN108343071A (en) | A kind of foundation pit supporting construction and construction method of steel sheet pile combined deposited pile | |
CN104060615B (en) | Newly-built foundation pit supporting construction is utilized to remove the construction method of underground obstacle | |
CN108842819A (en) | A kind of urban track traffic cable run method for tunnel construction | |
CN112502139A (en) | Construction method for excavation of deep pit by three-axis stirring pile curtain water stop and rotary digging cast-in-place pile support | |
CN106988305A (en) | A kind of pile-column pier construction method of underground integrated molding | |
CN104264683A (en) | Concave ultra-deep foundation pit zoned supporting method for three-side surrounded cultural protection building | |
CN206428707U (en) | A kind of integrated pile tube dado structure of pattern foundation pit supporting structure precipitation | |
CN101838957A (en) | Integral type T-shaped outer cantilever roads and construction method thereof | |
CN105926642B (en) | A kind of Urban Underground pipe gallery pattern foundation pit supporting structure and underground structure external mold integral structure and construction method | |
CN115653000A (en) | Gravity pipe gallery in-situ protection structure system in foundation pit range and construction method | |
Sobala et al. | Steel Sheet Piles–Applications and Elementary Design Issues | |
CN211547686U (en) | Prestressed concrete-filled steel tube pipe curtain structure based on prefabricated concrete-filled steel tube connection | |
KR100509707B1 (en) | None open cut tunnelling of arch type with hume pipe and con'c rib | |
CN110670584A (en) | Cast-in-situ bored pile and construction method thereof | |
CN110512594A (en) | The simple and easy method of churning driven opportunity cavity pore-forming | |
CN113898007B (en) | Semi-inverse construction method for long-span corridor structure along street | |
CN108221973A (en) | A kind of PHC pile piles make the connector of support system lattice column | |
CN116756940A (en) | Push pipe engineering design and construction method based on stress performances of different geological environments | |
CN215105392U (en) | Retractable prefabricated retaining wall supporting structure for manual hole digging pile | |
CN107938663A (en) | The PHC pile piles for passing through agent structure position make support system lattice column connector | |
CN107938655A (en) | PHC pile piles make the construction method in support system lattice column crossing structure region | |
CN108277798A (en) | Prestressing force shaped steel support pile and its construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |