A kind of sewage disposal stirs precipitation separation equipment with sewage alum
Technical field
The present invention relates to a kind of sewage disposal device, more particularly to a kind of sewage disposal to stir precipitation separation with sewage alum
Equipment.
Background technology
Sewage, is often referred to discharge water necessarily polluted, from life and production.Sewage mainly has sanitary sewage, work
Industry waste water and initial rainwater.The ill pathogen contaminant of major pollutants, oxygen consumption pollutant, plant nutrient and the poisonous dirt of sewage
Contaminate thing etc..Sewage disposal:The mistake purified for the water quality requirement for making sewage reach a certain water body of draining or reusing to it
Journey.It is each that sewage disposal is widely used in building, agricultural, traffic, the energy, petrochemical industry, environmental protection, urban landscape, medical treatment, food and drink etc.
Field, also comes into the daily life of common people more and more.
At present when alum addition and precipitation process is carried out to sewage, most of is all to use alum being added to dirt
In water, precipitated after simply stirring, then to being separated to sewage and precipitation, but so have the drawback that
It is difficult to which sewage and alum are uniformly mixed, and during separated, water and alum can not also be separated thorough.
Therefore there is an urgent need for research and develop it is a kind of can make sewage and alum separate thoroughly, the dirt that sewage and alum can be uniformly mixed
Water process stirs precipitation separation equipment with sewage alum and is deposited at present when carrying out alum addition and precipitation process to sewage to overcome
Can not make sewage and alum separate thoroughly, sewage and alum can not be also uniformly mixed the shortcomings that.
The content of the invention
(1)Technical problems to be solved
In order to overcome, when carrying out alum addition and precipitation process to sewage, presence can not make sewage and alum point to the present invention at present
From thoroughly, sewage and alum can not be also uniformly mixed the shortcomings that, the technical problem to be solved in the present invention is to provide can make dirt
A kind of sewage disposal sewage alum stirring precipitation separation that water and alum separation are thorough, can be uniformly mixed to sewage and alum
Equipment.
(2)Technical solution
Precipitation separation is stirred in order to solve the above technical problem, the present invention provides such a sewage disposal with sewage alum to set
It is standby, include bottom plate, the first collecting box, support plate, contiguous block, treatment box, the first tremie pipe, the first block, the first push rod,
One guide rail, the first guide sleeve, the first spring, the first blanking plate, bearing block, the first bull stick, paddle, the first circular gear, first
Motor, the second circular gear, foul water tank, downcomer, the first valve, alum case, woven hose and the second valve, right side is put on bottom plate
The first collecting box is equipped with, bottom plate upper left side is provided with support plate by welding, and support plate right side central passes through welding
Mode is provided with contiguous block, and contiguous block right end is provided with treatment box by welding, and right is connected with the on the downside for the treatment of box
One tremie pipe, is placed with the first block in the first tremie pipe, the first block blocks the first tremie pipe, and the first block lower end passes through weldering
The mode connect is provided with the first push rod, and right is provided with the first guide rail by welding on the downside for the treatment of box, on the first guide rail
Slidingtype is connected with the first guide sleeve, is provided with the first spring by welding on the upside of the first guide sleeve, the first spring upper end leads to
The mode for crossing welding is connected on the upside of the first guide rail, and the first guide sleeve right end is provided with the first blanking plate by welding, the
One push rod lower end is installed on middle side part on the first blanking plate by welding, and middle part is bolted in treatment box upper wall
Mode bearing block is installed, be connected with the first bull stick in bearing block, be connected with paddle on the downside of the first bull stick, on the first bull stick
End is connected with the first circular gear, and right is provided with the first motor, the first motor by bolted connection on the upside for the treatment of box
First motor output shaft of upside is connected with the second circular gear by shaft coupling, and the second circular gear is nibbled with the first circular gear
To close, top is provided with foul water tank by bolted connection on the right side of support plate, and left is connected with downcomer on the downside of foul water tank, under
Water pipe is passed through left on the upside for the treatment of box, and the first valve is connected with downcomer, is pacified by bolted connection on the right side of foul water tank
Equipped with alum case, woven hose is connected with the downside of alum case, right on the upside for the treatment of box is passed through on the downside of woven hose, is connected with woven hose
Second valve.
Preferably, filter sewage blanking device has been further included, filter sewage blanking device includes the second tremie pipe, filter
Net, the second guide rail, the second guide sleeve, second spring, the second blanking plate, the second push rod, the second block and the second collecting box, treatment box
Downside left is equipped with filter sewage blanking device, and the second tremie pipe, the second tremie pipe or so are connected with the left for the treatment of box lower inner wall
Both sides are connected with strainer, the second push rod are placed with the second tremie pipe, the second push rod upside left and right sides is by welding
Second block is installed, the second block blocks strainer, and left is provided with the second guide rail by welding on the downside for the treatment of box, the
Slidingtype is connected with the second guide sleeve on two guide rails, and second spring, the second bullet are provided with by welding on the upside of the second guide sleeve
Spring upper end is installed on the upside of the second guide rail by welding, and the second guide sleeve right end is provided with second by welding
Flitch, the second push rod lower end are installed on middle side part on the second blanking plate by welding.
Preferably, rubber block has been further included, rubber block, rubber block right side and the right side in treatment box are connected with the right side of the first block
Wall contacts.
Preferably, further included linkage flusher, linkage flusher include connecting rod, first rotating shaft, spill spin block,
Nozzle, hose, the 3rd spring, the 3rd circular gear, L-shaped bar, the second bull stick, the first angular wheel, fixed block, sector
Wheel, the second angular wheel, runner and transmission bar, contiguous block top are equipped with linkage flusher, and middle side part passes through weldering on contiguous block
The mode connect is provided with connecting rod, and side rotary is connected with first rotating shaft in connecting rod, and spill spin block is connected with rear side of first rotating shaft,
Spill spin block right end is connected with nozzle, and top is provided with through hole on the left for the treatment of box, and nozzle is put in through hole, and soft water is connected with the left of nozzle
Pipe, hose are connected on the left of spill spin block, and left is provided with the 3rd spring, the 3rd spring by welding on the upside of contiguous block
Upper end is installed on the left of spill spin block by welding, and the 3rd circular gear, treatment box upside are connected with front side of first rotating shaft
Left is provided with L-shaped bar by welding, and internal rotation type is connected with the second bull stick on the left of L-shaped bar, connects on the downside of the second bull stick
The first angular wheel is connected to, top is provided with fixed block by welding on the left for the treatment of box, rotatably connects on the left of fixed block
The second angular wheel is connected to, the first angular wheel is engaged with the second angular wheel, and sector is connected with rear side of the second angular wheel
Wheel, sector gear are engaged with the 3rd circular gear, are connected with runner on the upside of the second bull stick upper end and the first bull stick, are connected between runner
It is connected to transmission bar.
Preferably, baffle has been further included, upper side wall passes on left the mode of welding and is provided with baffle, baffle position in treatment box
Above nozzle.
Operation principle:When user needs to carry out the addition and mixing of alum to sewage, user can put sewage
Enter in foul water tank, alum is put into alum case, then user can open the first valve and the second valve, make sewage from sewage
Flowed into case by downcomer in treatment box, alum is flowed into out of alum case by woven hose in treatment box, when flowing to one
When quantitative, user can close the first valve and the second valve, and then user can open the first motor, the first motor band
Dynamic second circular gear rotation, the second circular gear drive the rotation of the first circular gear, and the first circular gear drives the first bull stick
Rotated in bearing block, the first bull stick drives paddle rotation, and paddle carries out mixing to the sewage in treatment box and alum and stirs
Mix, after the completion of stirring, user can close the first motor, and then user can move down the first guide sleeve, the first guide sleeve this
When will stretch the first spring, the first guide sleeve drive the first blanking plate move down, the first blanking plate drive the first push rod and first
Block moves down, and the first block is departed from the first tremie pipe, makes sewage in treatment box and alum mixture by under first
Expects pipe and the first blanking plate are flowed in the first collecting box, sewage and alum mixture is precipitated in the first collecting box.
Because having further included filter sewage blanking device, filter sewage blanking device includes the second tremie pipe, strainer,
Two guide rails, the second guide sleeve, second spring, the second blanking plate, the second push rod, the second block and the second collecting box, treatment box downside
Left is equipped with filter sewage blanking device, and the second tremie pipe, the second tremie pipe left and right sides are connected with the left for the treatment of box lower inner wall
Strainer is connected with, the second push rod is placed with the second tremie pipe, the left and right sides is installed by welding on the upside of the second push rod
There is the second block, the second block blocks strainer, and left is provided with the second guide rail by welding on the downside for the treatment of box, and second leads
Slidingtype is connected with the second guide sleeve on rail, is provided with second spring on the upside of the second guide sleeve by welding, in second spring
End is installed on the upside of the second guide rail by welding, and the second guide sleeve right end is provided with the second blanking by welding
Plate, the second push rod lower end is installed on middle side part on the second blanking plate by welding, when user is needed in treatment box
Sewage and alum mixture carry out separation, and to make to be separated in sewage by the sediment that alum adsorbs, user can be
After the completion of the sewage in treatment box and alum stirring, the second guide sleeve is moved down, the second guide sleeve will stretch second spring, and second
Guide sleeve drives the second blanking plate to move down, so as to drive the second push rod to move down, second the second block of push rod moves down,
The second block is departed from the second tremie pipe, the sewage in treatment box is entered the second tremie pipe by strainer, then pass through second
Blanking plate is flowed in the second collecting box, the sediment that strainer will be blocked in treatment box at this time, enters the sewage of no sediment
In second collecting box, so as to the sewage disposal of next step, after sewage stream is complete, user can unclamp the second guide sleeve, and at this time second
Spring will recover from extended state, pull the second guide sleeve to move up, the second guide sleeve drive the second blanking plate and the second push rod to
Upper movement, so as to drive the second block to block the second tremie pipe again, user can move down the first guide sleeve at this time, make
One tremie pipe is in the conduction state, the sediment in treatment box and sewage is flowed out from the first tremie pipe.
Because having further included rubber block, rubber block, rubber block right side and treatment box inner right wall are connected with the right side of the first block
Contact, when the first block moves up and down, rubber block can be deposited on to avoid sediment on the right side of the first block, cause to block up
Plug.
Because having further included linkage flusher, linkage flusher includes connecting rod, first rotating shaft, spill spin block, spray
Head, hose, the 3rd spring, the 3rd circular gear, L-shaped bar, the second bull stick, the first angular wheel, fixed block, sector gear,
Second angular wheel, runner and transmission bar, contiguous block top are equipped with linkage flusher, and middle side part passes through welding on contiguous block
Mode is provided with connecting rod, and side rotary is connected with first rotating shaft in connecting rod, is connected with spill spin block on rear side of first rotating shaft, rotates
Block right end is connected with nozzle, and top is provided with through hole on the left for the treatment of box, and nozzle is put in through hole, and hose is connected with the left of nozzle,
Hose is connected on the left of spill spin block, and left is provided with the 3rd spring by welding on the upside of contiguous block, on the 3rd spring
End is installed on the left of spill spin block by welding, and the 3rd circular gear is connected with front side of first rotating shaft, and treatment box upside is left
Side is provided with L-shaped bar by welding, and internal rotation type is connected with the second bull stick on the left of L-shaped bar, is connected on the downside of the second bull stick
There is the first angular wheel, treatment box left side top is provided with fixed block, is rotatably connected on the left of fixed block by welding
There is the second angular wheel, the first angular wheel is engaged with the second angular wheel, and sector gear is connected with rear side of the second angular wheel,
Sector gear is engaged with the 3rd circular gear, is connected with runner on the upside of the second bull stick upper end and the first bull stick, is connected between runner
Have transmission bar, when user need in treatment box sediment carry out thoroughly collect when or treatment box is cleaned when
Wait, user can open the first motor, and it is right so as to drive paddle to be driven while rotation that the first motor drives the first bull stick
Side runner rotation, the rotation of right side runner drive left side runner to rotate by being driven bar, and runner rotation in left side drives the rotation of the first bull stick
Turn, the first bull stick drives the rotation of the first angular wheel, and the rotation of the first angular wheel drives the rotation of the second angular wheel, the second taper
Gear rotation drives sector gear rotation, and sector gear rotation drives the rotation of the 3rd circular gear, the 3rd circular gear rotation band
Dynamic first rotating shaft rotation, first rotating shaft drive spill spin block rotation, and spill spin block drives nozzle rotation, and user can be by hose at this time
External source is accessed, nozzle is sprayed water come to being cleaned inside the paddle and treatment box in rotation, user also needs at this time
Pulling downward on the first guide sleeve makes the sediment and water after cleaning be flowed out from the first tremie pipe, and when sector gear rotate to
When 3rd circular gear engages, the 3rd spring will be in stress, and drive nozzle to be rotated around first rotating shaft, so that right
Diverse location in treatment box is cleaned, when sector gear, which is rotated to, not to be engaged with the 3rd circular gear, the 3rd bullet
Spring will recover from stress, promote spill spin block and nozzle to set back and put, so as to be carried out to another position in treatment box
Cleaning, after the completion of cleaning, user can close the first motor, and close external source.
Because having further included baffle, upper side wall passes on left the mode of welding and is provided with baffle in treatment box, and baffle is located at
Above nozzle, when sewage is flowed out from downcomer, baffle can block sewage and will not flow on nozzle, avoid nozzle quilt
Sewage blocks.
(3)Beneficial effect
Invention achieves sewage and alum can be made to separate effect that is thorough, being uniformly mixed to sewage and alum, pass through
The second guide sleeve is pulled to move down so that sewage is flowed out from strainer using user, but precipitation can not be from wherein flowing at this time
The mode gone out, can make both quickly and thoroughly to separate sewage and sediment, by using nozzle to spraying water in treatment box
Mode, can be cleaned the precipitation in treatment box, can be to being cleaned in treatment box, at sewage next time
Reason.
Brief description of the drawings
Fig. 1 is the main structure diagram of the present invention.
Fig. 2 is the main structure diagram of filter sewage blanking device of the present invention.
Fig. 3 is the main structure diagram of rubber block of the present invention.
Fig. 4 is the main structure diagram of present invention linkage flusher.
Fig. 5 is the main structure diagram of present invention linkage flusher.
Mark in attached drawing for:1- bottom plates, the first collecting boxs of 2-, 3- support plates, 4- contiguous blocks, 5- treatment boxes, 6- first
Tremie pipe, the first blocks of 7-, the first push rods of 8-, the first guide rails of 9-, the first guide sleeves of 10-, the first springs of 11-, the first blankings of 12-
Plate, 13- bearing blocks, the first bull sticks of 14-, 15- paddles, the first circular gears of 16-, the first motors of 17-, the second round tooths of 18-
Wheel, 19- foul water tanks, 20- downcomers, the first valves of 21-, 22- alum casees, 23- woven hoses, the second valves of 24-, 30- filterings are dirty
Water blanking device, the second tremie pipes of 301-, 302- strainers, the second guide rails of 303-, the second guide sleeves of 304-, 305- second springs,
The second blanking plates of 3051-, the second push rods of 306-, the second blocks of 307-, the second collecting boxs of 308-, 3021- rubber blocks, 31- linkages
Flusher, 311- connecting rods, 312- first rotating shafts, 313- spill spin blocks, 314- nozzles, 315- hoses, the 3rd springs of 316-,
The 3rd circular gears of 317-, 318-L shape bars, the second bull sticks of 319-, the first angular wheels of 3110-, 3111- fixed blocks, 3112- fans
Shape gear, the second angular wheels of 3113-, 3114- runners, 3115- transmission bars, 3116- through holes, 3121- baffles.
Embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of sewage disposal stirs precipitation separation equipment with sewage alum, as shown in Figs. 1-5, includes bottom plate 1, the first collecting box
2nd, support plate 3, contiguous block 4, treatment box 5, the first tremie pipe 6, the first block 7, the first push rod 8, the first guide rail 9, the first guide sleeve
10th, the first spring 11, the first blanking plate 12, bearing block 13, the first bull stick 14, paddle 15, first the 16, first electricity of circular gear
Machine 17, the second circular gear 18, foul water tank 19, downcomer 20, the first valve 21, alum case 22,23 and second valve of woven hose
24, right side is placed with the first collecting box 2 on bottom plate 1, and 1 upper left side of bottom plate is provided with support plate 3, support plate by welding
3 right side centrals are provided with contiguous block 4 by welding, and 4 right end of contiguous block is provided with treatment box 5 by welding,
5 downside right for the treatment of box is connected with the first tremie pipe 6, and the first block 7 is placed with the first tremie pipe 6, and the first block 7 blocks
One tremie pipe 6,7 lower end of the first block are provided with the first push rod 8 by welding, and 5 downside right for the treatment of box passes through welding
Mode the first guide rail 9 is installed, slidingtype is connected with the first guide sleeve 10 on the first guide rail 9, and the upside of the first guide sleeve 10 passes through weldering
The mode connect is provided with the first spring 11, and 11 upper end of the first spring is connected on the upside of the first guide rail 9 by welding, and first
10 right end of guide sleeve is provided with the first blanking plate 12 by welding, and 8 lower end of the first push rod is installed on by welding
Middle side part on first blanking plate 12, the interior middle part of 5 upper wall for the treatment of box are provided with bearing block 13, bearing block by bolted connection
The first bull stick 14 is connected with 13, the downside of the first bull stick 14 is connected with paddle 15, and 14 upper end of the first bull stick is connected with the first circle
Shape gear 16,5 upside right for the treatment of box are provided with the first motor 17 by bolted connection, and the of the upside of the first motor 17
One motor, 17 output shaft is connected with the second circular gear 18 by shaft coupling, and the second circular gear 18 is nibbled with the first circular gear 16
Close, the right side of support plate 3 top is provided with foul water tank 19 by bolted connection, and 19 downside left of foul water tank is connected with lower water
Pipe 20, downcomer 20 are passed through 5 upside left for the treatment of box, and the first valve 21 is connected with downcomer 20, and the right side of foul water tank 19 passes through
Bolted mode is provided with alum case 22, and the downside of alum case 22 is connected with woven hose 23, and the downside of woven hose 23 is passed through processing
5 upside right of case, is connected with the second valve 24 on woven hose 23.
Embodiment 2
A kind of sewage disposal stirs precipitation separation equipment with sewage alum, as shown in Figs. 1-5, includes bottom plate 1, the first collecting box
2nd, support plate 3, contiguous block 4, treatment box 5, the first tremie pipe 6, the first block 7, the first push rod 8, the first guide rail 9, the first guide sleeve
10th, the first spring 11, the first blanking plate 12, bearing block 13, the first bull stick 14, paddle 15, first the 16, first electricity of circular gear
Machine 17, the second circular gear 18, foul water tank 19, downcomer 20, the first valve 21, alum case 22,23 and second valve of woven hose
24, right side is placed with the first collecting box 2 on bottom plate 1, and 1 upper left side of bottom plate is provided with support plate 3, support plate by welding
3 right side centrals are provided with contiguous block 4 by welding, and 4 right end of contiguous block is provided with treatment box 5 by welding,
5 downside right for the treatment of box is connected with the first tremie pipe 6, and the first block 7 is placed with the first tremie pipe 6, and the first block 7 blocks
One tremie pipe 6,7 lower end of the first block are provided with the first push rod 8 by welding, and 5 downside right for the treatment of box passes through welding
Mode the first guide rail 9 is installed, slidingtype is connected with the first guide sleeve 10 on the first guide rail 9, and the upside of the first guide sleeve 10 passes through weldering
The mode connect is provided with the first spring 11, and 11 upper end of the first spring is connected on the upside of the first guide rail 9 by welding, and first
10 right end of guide sleeve is provided with the first blanking plate 12 by welding, and 8 lower end of the first push rod is installed on by welding
Middle side part on first blanking plate 12, the interior middle part of 5 upper wall for the treatment of box are provided with bearing block 13, bearing block by bolted connection
The first bull stick 14 is connected with 13, the downside of the first bull stick 14 is connected with paddle 15, and 14 upper end of the first bull stick is connected with the first circle
Shape gear 16,5 upside right for the treatment of box are provided with the first motor 17 by bolted connection, and the of the upside of the first motor 17
One motor, 17 output shaft is connected with the second circular gear 18 by shaft coupling, and the second circular gear 18 is nibbled with the first circular gear 16
Close, the right side of support plate 3 top is provided with foul water tank 19 by bolted connection, and 19 downside left of foul water tank is connected with lower water
Pipe 20, downcomer 20 are passed through 5 upside left for the treatment of box, and the first valve 21 is connected with downcomer 20, and the right side of foul water tank 19 passes through
Bolted mode is provided with alum case 22, and the downside of alum case 22 is connected with woven hose 23, and the downside of woven hose 23 is passed through processing
5 upside right of case, is connected with the second valve 24 on woven hose 23.
Filter sewage blanking device 30 is further included, filter sewage blanking device 30 includes the second tremie pipe 301, strainer
302nd, the second guide rail 303, the second guide sleeve 304, second spring 305, the second blanking plate 3051, the second push rod 306, the second block
307 and second collecting box 308,5 downside left for the treatment of box be equipped with filter sewage blanking device 30, connect on the left of 5 lower inner wall for the treatment of box
It is connected to the second tremie pipe 301, the left and right sides of the second tremie pipe 301 is connected with strainer 302, and the is placed with the second tremie pipe 301
Two push rods 306, the upside of the second push rod 306 left and right sides are provided with the second block 307, the second block 307 by welding
Strainer 302 is blocked, 5 downside left for the treatment of box is provided with the second guide rail 303, is slided on the second guide rail 303 by welding
Formula is connected with the second guide sleeve 304, and the upside of the second guide sleeve 304 is provided with second spring 305, second spring by welding
305 upper ends are installed on the upside of the second guide rail 303 by welding, and 304 right end of the second guide sleeve is installed by welding
There is the second blanking plate 3051,306 lower end of the second push rod is installed on middle side part on the second blanking plate 3051 by welding.
Embodiment 3
A kind of sewage disposal stirs precipitation separation equipment with sewage alum, as shown in Figs. 1-5, includes bottom plate 1, the first collecting box
2nd, support plate 3, contiguous block 4, treatment box 5, the first tremie pipe 6, the first block 7, the first push rod 8, the first guide rail 9, the first guide sleeve
10th, the first spring 11, the first blanking plate 12, bearing block 13, the first bull stick 14, paddle 15, first the 16, first electricity of circular gear
Machine 17, the second circular gear 18, foul water tank 19, downcomer 20, the first valve 21, alum case 22,23 and second valve of woven hose
24, right side is placed with the first collecting box 2 on bottom plate 1, and 1 upper left side of bottom plate is provided with support plate 3, support plate by welding
3 right side centrals are provided with contiguous block 4 by welding, and 4 right end of contiguous block is provided with treatment box 5 by welding,
5 downside right for the treatment of box is connected with the first tremie pipe 6, and the first block 7 is placed with the first tremie pipe 6, and the first block 7 blocks
One tremie pipe 6,7 lower end of the first block are provided with the first push rod 8 by welding, and 5 downside right for the treatment of box passes through welding
Mode the first guide rail 9 is installed, slidingtype is connected with the first guide sleeve 10 on the first guide rail 9, and the upside of the first guide sleeve 10 passes through weldering
The mode connect is provided with the first spring 11, and 11 upper end of the first spring is connected on the upside of the first guide rail 9 by welding, and first
10 right end of guide sleeve is provided with the first blanking plate 12 by welding, and 8 lower end of the first push rod is installed on by welding
Middle side part on first blanking plate 12, the interior middle part of 5 upper wall for the treatment of box are provided with bearing block 13, bearing block by bolted connection
The first bull stick 14 is connected with 13, the downside of the first bull stick 14 is connected with paddle 15, and 14 upper end of the first bull stick is connected with the first circle
Shape gear 16,5 upside right for the treatment of box are provided with the first motor 17 by bolted connection, and the of the upside of the first motor 17
One motor, 17 output shaft is connected with the second circular gear 18 by shaft coupling, and the second circular gear 18 is nibbled with the first circular gear 16
Close, the right side of support plate 3 top is provided with foul water tank 19 by bolted connection, and 19 downside left of foul water tank is connected with lower water
Pipe 20, downcomer 20 are passed through 5 upside left for the treatment of box, and the first valve 21 is connected with downcomer 20, and the right side of foul water tank 19 passes through
Bolted mode is provided with alum case 22, and the downside of alum case 22 is connected with woven hose 23, and the downside of woven hose 23 is passed through processing
5 upside right of case, is connected with the second valve 24 on woven hose 23.
Filter sewage blanking device 30 is further included, filter sewage blanking device 30 includes the second tremie pipe 301, strainer
302nd, the second guide rail 303, the second guide sleeve 304, second spring 305, the second blanking plate 3051, the second push rod 306, the second block
307 and second collecting box 308,5 downside left for the treatment of box be equipped with filter sewage blanking device 30, connect on the left of 5 lower inner wall for the treatment of box
It is connected to the second tremie pipe 301, the left and right sides of the second tremie pipe 301 is connected with strainer 302, and the is placed with the second tremie pipe 301
Two push rods 306, the upside of the second push rod 306 left and right sides are provided with the second block 307, the second block 307 by welding
Strainer 302 is blocked, 5 downside left for the treatment of box is provided with the second guide rail 303, is slided on the second guide rail 303 by welding
Formula is connected with the second guide sleeve 304, and the upside of the second guide sleeve 304 is provided with second spring 305, second spring by welding
305 upper ends are installed on the upside of the second guide rail 303 by welding, and 304 right end of the second guide sleeve is installed by welding
There is the second blanking plate 3051,306 lower end of the second push rod is installed on middle side part on the second blanking plate 3051 by welding.
Rubber block 3021 is further included, the right side of the first block 7 is connected with rubber block 3021, the right side of rubber block 3021 and processing
5 inner right wall of case contacts.
Embodiment 4
A kind of sewage disposal stirs precipitation separation equipment with sewage alum, as shown in Figs. 1-5, includes bottom plate 1, the first collecting box
2nd, support plate 3, contiguous block 4, treatment box 5, the first tremie pipe 6, the first block 7, the first push rod 8, the first guide rail 9, the first guide sleeve
10th, the first spring 11, the first blanking plate 12, bearing block 13, the first bull stick 14, paddle 15, first the 16, first electricity of circular gear
Machine 17, the second circular gear 18, foul water tank 19, downcomer 20, the first valve 21, alum case 22,23 and second valve of woven hose
24, right side is placed with the first collecting box 2 on bottom plate 1, and 1 upper left side of bottom plate is provided with support plate 3, support plate by welding
3 right side centrals are provided with contiguous block 4 by welding, and 4 right end of contiguous block is provided with treatment box 5 by welding,
5 downside right for the treatment of box is connected with the first tremie pipe 6, and the first block 7 is placed with the first tremie pipe 6, and the first block 7 blocks
One tremie pipe 6,7 lower end of the first block are provided with the first push rod 8 by welding, and 5 downside right for the treatment of box passes through welding
Mode the first guide rail 9 is installed, slidingtype is connected with the first guide sleeve 10 on the first guide rail 9, and the upside of the first guide sleeve 10 passes through weldering
The mode connect is provided with the first spring 11, and 11 upper end of the first spring is connected on the upside of the first guide rail 9 by welding, and first
10 right end of guide sleeve is provided with the first blanking plate 12 by welding, and 8 lower end of the first push rod is installed on by welding
Middle side part on first blanking plate 12, the interior middle part of 5 upper wall for the treatment of box are provided with bearing block 13, bearing block by bolted connection
The first bull stick 14 is connected with 13, the downside of the first bull stick 14 is connected with paddle 15, and 14 upper end of the first bull stick is connected with the first circle
Shape gear 16,5 upside right for the treatment of box are provided with the first motor 17 by bolted connection, and the of the upside of the first motor 17
One motor, 17 output shaft is connected with the second circular gear 18 by shaft coupling, and the second circular gear 18 is nibbled with the first circular gear 16
Close, the right side of support plate 3 top is provided with foul water tank 19 by bolted connection, and 19 downside left of foul water tank is connected with lower water
Pipe 20, downcomer 20 are passed through 5 upside left for the treatment of box, and the first valve 21 is connected with downcomer 20, and the right side of foul water tank 19 passes through
Bolted mode is provided with alum case 22, and the downside of alum case 22 is connected with woven hose 23, and the downside of woven hose 23 is passed through processing
5 upside right of case, is connected with the second valve 24 on woven hose 23.
Filter sewage blanking device 30 is further included, filter sewage blanking device 30 includes the second tremie pipe 301, strainer
302nd, the second guide rail 303, the second guide sleeve 304, second spring 305, the second blanking plate 3051, the second push rod 306, the second block
307 and second collecting box 308,5 downside left for the treatment of box be equipped with filter sewage blanking device 30, connect on the left of 5 lower inner wall for the treatment of box
It is connected to the second tremie pipe 301, the left and right sides of the second tremie pipe 301 is connected with strainer 302, and the is placed with the second tremie pipe 301
Two push rods 306, the upside of the second push rod 306 left and right sides are provided with the second block 307, the second block 307 by welding
Strainer 302 is blocked, 5 downside left for the treatment of box is provided with the second guide rail 303, is slided on the second guide rail 303 by welding
Formula is connected with the second guide sleeve 304, and the upside of the second guide sleeve 304 is provided with second spring 305, second spring by welding
305 upper ends are installed on the upside of the second guide rail 303 by welding, and 304 right end of the second guide sleeve is installed by welding
There is the second blanking plate 3051,306 lower end of the second push rod is installed on middle side part on the second blanking plate 3051 by welding.
Rubber block 3021 is further included, the right side of the first block 7 is connected with rubber block 3021, the right side of rubber block 3021 and processing
5 inner right wall of case contacts.
Linkage flusher 31 is further included, linkage flusher 31 includes connecting rod 311, first rotating shaft 312, rotation
Block 313, nozzle 314, hose 315, the 3rd spring 316, the 3rd circular gear 317, L-shaped bar 318, the second bull stick 319, first
Angular wheel 3110, fixed block 3111, sector gear 3112, the second angular wheel 3113, runner 3114 and transmission bar 3115, even
Connect the top of block 4 and be equipped with linkage flusher 31, middle side part is provided with connecting rod 311 by welding on contiguous block 4, connects
Side rotary is connected with first rotating shaft 312 on bar 311, and the rear side of first rotating shaft 312 is connected with spill spin block 313,313 right end of spill spin block
Nozzle 314 is connected with, the left side for the treatment of box 5 top is provided with through hole 3116, and nozzle 314 is put in through hole 3116, and the left side of nozzle 314 connects
Hose 315 is connected to, hose 315 is connected to the left side of spill spin block 313, and 4 upside left of contiguous block is installed by welding
There is the 3rd spring 316,316 upper end of the 3rd spring is installed on the left of spill spin block 313 by welding, before first rotating shaft 312
Side is connected with the 3rd circular gear 317, and 5 upside left for the treatment of box is provided with L-shaped bar 318, L-shaped bar 318 by welding
Left side internal rotation type is connected with the second bull stick 319, and the downside of the second bull stick 319 is connected with the first angular wheel 3110, and treatment box 5 is left
Fixed block 3111 is installed by welding, the left side of fixed block 3111 is rotatably connected with the second angular wheel above side
3113, the first angular wheel 3110 is engaged with the second angular wheel 3113, and the rear side of the second angular wheel 3113 is connected with sector
Wheel 3112, sector gear 3112 is engaged with the 3rd circular gear 317,319 upper end of the second bull stick and the connection of the upside of the first bull stick 14
There is runner 3114, transmission bar 3115 is connected between runner 3114.
Baffle 3121 is further included, upper side wall passes on left the mode of welding and is provided with baffle 3121, baffle in treatment box 5
3121 positioned at the top of nozzle 314.
Operation principle:When user needs to carry out the addition and mixing of alum to sewage, user can put sewage
Enter in foul water tank 19, alum is put into alum case 22, then user can open the first valve 21 and the second valve 24, make dirt
Water is flowed into treatment box 5 from foul water tank 19 by downcomer 20, alum is flowed into out of alum case 22 by woven hose 23
In treatment box 5, when flowing to a certain amount of, user can close the first valve 21 and the second valve 24, and then user can be with
The first motor 17 is opened, the first motor 17 drives the second circular gear 18 to rotate, and the second circular gear 18 drives the first round tooth
The rotation of wheel 16, the first circular gear 16 drive the rotation in bearing block 13 of the first bull stick 14, and the first bull stick 14 drives paddle 15
Rotation, the sewage in treatment box 5 and alum is mixed in paddle 15, and after the completion of stirring, user can close the
One motor 17, then user can move down the first guide sleeve 10, the first guide sleeve 10 will stretch the first spring 11 at this time, and first leads
The first blanking plate 12 of drive of set 10 moves down, and the first blanking plate 12 drives the first push rod 8 and the first block 7 to move down, and makes
First block 7 departs from the first tremie pipe 6, the sewage in treatment box 5 and alum mixture is passed through under the first tremie pipe 6 and first
Flitch 12 is flowed in the first collecting box 2, sewage and alum mixture is precipitated in the first collecting box 2.
Because having further included filter sewage blanking device 30, filter sewage blanking device 30 include the second tremie pipe 301,
Strainer 302, the second guide rail 303, the second guide sleeve 304, second spring 305, the second blanking plate 3051, the second push rod 306, second gear
307 and second collecting box 308 of block, 5 downside left for the treatment of box are equipped with filter sewage blanking device 30,5 lower inner wall for the treatment of box left side
The second tremie pipe 301 is connected with, the left and right sides of the second tremie pipe 301 is connected with strainer 302, is placed with the second tremie pipe 301
Second push rod 306, the upside of the second push rod 306 left and right sides are provided with the second block 307, the second block by welding
307 block strainer 302, and 5 downside left for the treatment of box is provided with the second guide rail 303, is slided on the second guide rail 303 by welding
Dynamic formula is connected with the second guide sleeve 304, and the upside of the second guide sleeve 304 is provided with second spring 305, second spring by welding
305 upper ends are installed on the upside of the second guide rail 303 by welding, and 304 right end of the second guide sleeve is installed by welding
There is the second blanking plate 3051,306 lower end of the second push rod is installed on middle side part on the second blanking plate 3051 by welding, when
User needs to carry out separation to the sewage in treatment box 5 and alum mixture, to make the precipitation adsorbed in sewage by alum
Thing is separated, and after the completion of sewage and the alum stirring that user can be in treatment box 5, moves down the second guide sleeve 304, the
Two guide sleeves 304 will stretch second spring 305, and the second guide sleeve 304 drives the second blanking plate 3051 to move down, so as to drive second
Push rod 306 moves down, and 306 second block 307 of the second push rod moves down, and the second block 307 is departed from the second tremie pipe
301, the sewage in treatment box 5 is entered the second tremie pipe 301 by strainer 302, then flowed to by the second blanking plate 3051
In second collecting box 308, strainer 302 will be blocked in treatment box 5 at this time sediment, makes the sewage of no sediment enter second
In collecting box 308, so as to the sewage disposal of next step, after sewage stream is complete, user can unclamp the second guide sleeve 304, and at this time
Two springs 305 will recover from extended state, pull the second guide sleeve 304 to move up, and the second guide sleeve 304 drives the second blanking plate
3051 and second push rod 306 move up, so as to drive the second block 307 to block the second tremie pipe 301 again, user can at this time
The first guide sleeve 10 to be moved down, make the first tremie pipe 6 in the conduction state, make sediment in treatment box 5 and sewage from
Flowed out in first tremie pipe 6.
Because having further included rubber block 3021, the right side of the first block 7 is connected with rubber block 3021, the right side of rubber block 3021 with
5 inner right wall for the treatment of box contacts, and when the first block 7 moves up and down, rubber block 3021 can be deposited on the to avoid sediment
The right side of one block 7, results in blockage.
Because further included linkage flusher 31, linkage flusher 31 include connecting rod 311, first rotating shaft 312,
Spill spin block 313, nozzle 314, hose 315, the 3rd spring 316, the 3rd circular gear 317, L-shaped bar 318, the second bull stick 319,
First angular wheel 3110, fixed block 3111, sector gear 3112, the second angular wheel 3113, runner 3114 and transmission bar
3115, the top of contiguous block 4 is equipped with linkage flusher 31, and middle side part is provided with connecting rod by welding on contiguous block 4
311, side rotary is connected with first rotating shaft 312 in connecting rod 311, and the rear side of first rotating shaft 312 is connected with spill spin block 313, rotates
313 right end of block is connected with nozzle 314, and the left side for the treatment of box 5 top is provided with through hole 3116, and nozzle 314 is put in through hole 3116, nozzle
314 left sides are connected with hose 315, and hose 315 is connected to the left side of spill spin block 313, and 4 upside left of contiguous block passes through welding
Mode is provided with the 3rd spring 316, and 316 upper end of the 3rd spring is installed on the left of spill spin block 313 by welding, first turn
The front side of axis 312 is connected with the 3rd circular gear 317, and 5 upside left for the treatment of box is provided with L-shaped bar 318, L by welding
318 left side internal rotation type of shape bar is connected with the second bull stick 319, and the downside of the second bull stick 319 is connected with the first angular wheel 3110, locates
5 left side top of reason case is provided with fixed block 3111 by welding, and the left side of fixed block 3111 is rotatably connected with the second cone
Shape gear 3113, the first angular wheel 3110 are engaged with the second angular wheel 3113, and the rear side of the second angular wheel 3113 is connected with
Sector gear 3112, sector gear 3112 are engaged with the 3rd circular gear 317, on 319 upper end of the second bull stick and the first bull stick 14
Side is connected with runner 3114, be connected between runner 3114 transmission bar 3115, when user need to the sediment in treatment box 5 into
When cleaning when row is thoroughly collected or to treatment box 5, user can open the first motor 17, and the first motor 17 drives
For first bull stick 14 so as to drive paddle 15 while rotation right side runner 3114 will to be driven to rotate, the rotation of right side runner 3114 is logical
Crossing transmission bar 3115 drives left side runner 3114 to rotate, and the rotation of left side runner 3114 drives the first bull stick 14 to rotate, the first bull stick
14 the first angular wheels 3110 of drive rotate, and the rotation of the first angular wheel 3110 drives the second angular wheel 3113 to rotate, and second
The rotation of angular wheel 3113 drives sector gear 3112 to rotate, and the rotation of sector gear 3112 drives the 3rd circular gear 317 to rotate,
The rotation of 3rd circular gear 317 drives first rotating shaft 312 to rotate, and first rotating shaft 312 drives spill spin block 313 to rotate, spill spin block 313
Nozzle 314 is driven to rotate, hose 315 can be accessed external source by user at this time, nozzle 314 is sprayed water and come in rotation
Paddle 15 and treatment box 5 inside cleaned, at this time user also need to pull downward on the first guide sleeve 10 make it is heavy after cleaning
Starch and water are flowed out from the first tremie pipe 6, and when sector gear 3112 is rotated to and engaged with the 3rd circular gear 317
Wait, the 3rd spring 316 will be in stress, and drive nozzle 314 to be rotated around first rotating shaft 312, so that in treatment box 5
Diverse location is cleaned, when sector gear 3112, which is rotated to, not to be engaged with the 3rd circular gear 317, the 3rd spring
316 will recover from stress, promote spill spin block 313 and nozzle 314 to set back and put, so as to another in treatment box 5
Position is cleaned, and after the completion of cleaning, user can close the first motor 17, and close external source.
Because having further included baffle 3121, upper side wall passes on left the mode of welding and is provided with baffle 3121 in treatment box 5,
Baffle 3121 is located at the top of nozzle 314, and when sewage is flowed out from downcomer 20, baffle 3121 can block sewage will not
Flow on nozzle 314, avoid nozzle 314 from being blocked by sewage.
Embodiment described above only expresses the preferred embodiment of the present invention, its description is more specific and detailed, but simultaneously
Therefore the limitation to the scope of the claims of the present invention cannot be interpreted as.It should be pointed out that for those of ordinary skill in the art
For, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these belong to this hair
Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.