[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN107844639A - A kind of project normal structure automatic generation method and system - Google Patents

A kind of project normal structure automatic generation method and system Download PDF

Info

Publication number
CN107844639A
CN107844639A CN201710980483.XA CN201710980483A CN107844639A CN 107844639 A CN107844639 A CN 107844639A CN 201710980483 A CN201710980483 A CN 201710980483A CN 107844639 A CN107844639 A CN 107844639A
Authority
CN
China
Prior art keywords
project
standard
normal structure
templet
request
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710980483.XA
Other languages
Chinese (zh)
Other versions
CN107844639B (en
Inventor
黄炜标
周小稳
陈咏杰
李金海
杨选平
江丕丕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Luo Ming Automotive Equipment (shanghai) Co Ltd
Guangzhou Mino Automotive Equipment Co Ltd
Original Assignee
Luo Ming Automotive Equipment (shanghai) Co Ltd
Guangzhou Mino Automotive Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Luo Ming Automotive Equipment (shanghai) Co Ltd, Guangzhou Mino Automotive Equipment Co Ltd filed Critical Luo Ming Automotive Equipment (shanghai) Co Ltd
Priority to CN201710980483.XA priority Critical patent/CN107844639B/en
Publication of CN107844639A publication Critical patent/CN107844639A/en
Application granted granted Critical
Publication of CN107844639B publication Critical patent/CN107844639B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of project normal structure automatic generation method and system, this method to include:S1, detect whether to receive the request for establishing project normative document clamping structure, if so, project templet, item Path and project name corresponding to then obtaining;S2, under the item Path, create project of standard development document using the project name as title with reference to project templet;S3, detection obtain the construction standard that request imports, and then from the content of construction standard corresponding to the reading of default normal structure database and generate interim xml document;S4, the thread of program second is opened up, and use global keyboard operation programming technique, the interim xml document is automatically imported Process Designer softwares, generating item mesh normal structure.The present invention is convenient, quickly and efficiently, reduces the cost of manpower setting, can be widely applied in the secondary development industry of Process Designer softwares.

Description

A kind of project normal structure automatic generation method and system
Technical field
It is automatic more particularly to a kind of project normal structure the present invention relates to wire body process planning field and computer realm Generation method and system.
Background technology
At present, the software Pro cess Designer under Siemens and Process Simulate have become world master The process simulation software of stream, particularly in the process planning and emulation of automation wire body, it is more widely applied.For wire body or Work station intermediate item, contained equipment is more, and complex process, participant is more, so entering using Process Designer softwares During row process planning, it is necessary that project resource is managed with technical process.Big entry has all formulated standard at present Project structure is managed to resource.
But, it is necessary to set up phase in software according to project of standard development structure in process software Process Design softwares The hierarchical structure and different type node answered.Level is created in software at present to create one by one using manual mode with type node Build, it is extremely inefficient, and error rate is high, does not often reach standard requirement.And when the presentation of process planning content in software is unclear When clear, for having extremely bad influence in operation item implementation procedure, the communication between different post engineers is also increased Cost, take considerable time, reduce further whole efficiency.
Generally speaking, at present in Process Designer softwares, the method for generating item mesh normal structure is mainly hand Flowing mode, has that efficiency is low, and accuracy rate is low, and cost is high, take it is more, the problems such as using inconvenience.
The content of the invention
In order to solve above-mentioned technical problem, it is an object of the invention to provide a kind of project normal structure automatic generation method And system.
The technical solution adopted for the present invention to solve the technical problems is:
A kind of project normal structure automatic generation method, comprises the following steps:
S1, detect whether to receive the request for establishing project normative document clamping structure, if so, project mould corresponding to then obtaining Plate, item Path and project name;
S2, under the item Path, create project of standard development document using the project name as title with reference to project templet;
S3, detection obtain the construction standard that request imports, and then are tied from corresponding to the reading of default normal structure database The content of structure standard simultaneously generates interim xml document;
S4, the thread of program second is opened up, and use global keyboard operation programming technique, the interim xml document is led automatically Enter Process Designer softwares, generating item mesh normal structure.
Further, the step S1, is specifically included:
S11, detect whether to receive the request for establishing project normative document clamping structure, if so, then performing step S12, instead It, continues to detect;
S12, judge whether to receive corresponding project templet, item Path and project name, if so, then performing step S13, conversely, the non-fill substance of prompting, re-executes this step;
S13, judge whether with the write-in authority to the item Path, if so, then obtaining corresponding project templet, the item Mesh path and project name, conversely, prompting rights concerns, and return and perform step S12.
Further, the default normal structure database purchase has the specific structure content of multiple construction standards, institute Stating multiple construction standards includes:Project of standard development structure, standard wire body structure, standard universal resource tree construction, standard station resource Tree construction, standard robotic technique tree construction and standard technology path structure.
Further, the step S3, specifically includes following steps:
S31, detect whether to receive the information that request imports project of standard development structure, if so, then from default normal structure Database reads the content of project of standard development structure, and after generating interim xml document, step S32 is performed, conversely, directly performing step Rapid S32;
S32, detect whether to receive the information of request importing standard wire body structure, if so, then from default normal structure Database reads the content of standard wire body structure, and after updating the interim xml document, performs step S33, conversely, directly execution Step S33;
S33, detect whether to receive the information that request imports standard universal resource tree construction, if so, then from default mark Quasi- structural database reads the content of standard universal resource tree construction, and after updating interim xml document, performs step S34, instead It, directly performs step S34;
S34, detect whether to receive the information of request importing standard station resource tree construction, if so, then from default mark Quasi- structural database reads the content of standard station resource tree construction, and after updating interim xml document, performs step S35, instead It, directly performs step S35;
S35, detect whether to receive the information that request imports standard robotic technique tree construction, if so, then obtaining user After the robot numbering and vehicle code name of input, from standard robotic artistic tree corresponding to the reading of default normal structure database The content of structure, and after updating interim xml document, step S36 is performed, conversely, directly execution step S36;
S36, detect whether to receive the information that request imports standard technology path structure, if so, then obtaining user's input Robot numbering and vehicle code name after, from default normal structure database read standard technology path structure content, and Interim xml document is updated, conversely, terminating this method.
Further, the project templet is the project folder structure of default standard, and the project folder structure bag Include the sub-folder for being used to deposit different resource of multiple hierarchical categories;
The step S2, it is specially:Under the item Path, the project folder structure with reference to corresponding to project templet, wound Build by title, consistent with project folder structure folder structure of the project name and be used as project of standard development document.
Further, it is further comprising the steps of after the step S4:
S5, the data inputted according to user, the standard nodes for each hierarchical categories established one by one in project normal structure, And each standard nodes for establishing, the counter structure in project templet, the child node of its all level is established automatically, The project normal structure of foundation is updated.
Further, it is further comprising the steps of after the step S5:
S6, the project normal structure after renewal is stored as new project templet.
Another technical scheme is used by the present invention solves its technical problem:
A kind of project normal structure automatic creation system, including storage medium and controller, the storage medium are stored with At least one instruction, the controller is used to load at least one instruction, so as to perform following steps:
S1, detect whether to receive the request for establishing project normative document clamping structure, if so, project mould corresponding to then obtaining Plate, item Path and project name;
S2, under the item Path, create project of standard development document using the project name as title with reference to project templet;
S3, detection obtain the construction standard that request imports, and then are tied from corresponding to the reading of default normal structure database The content of structure standard simultaneously generates interim xml document;
S4, the thread of program second is opened up, and use global keyboard operation programming technique, the interim xml document is led automatically Enter Process Designer softwares, generating item mesh normal structure.
Further, the controller is additionally operable to perform following steps:
S5, the data inputted according to user, the standard nodes for each hierarchical categories established one by one in project normal structure, And each standard nodes for establishing, the counter structure in project templet, the child node of its all level is established automatically, The project normal structure of foundation is updated.
Further, the controller is additionally operable to perform following steps:
S6, the project normal structure after renewal is stored as new project templet.
The inventive method, the beneficial effect of system are:This programme according to default project templet and normal structure database, After the project templet, item Path and project name of user's input is obtained, project of standard development document corresponding to automatic foundation, and root The construction standard for asking to import according to user, the content of corresponding construction standard can be read automatically and generates interim xml document, and The thread of program second is opened up, and uses global keyboard operation programming technique, the interim xml document is automatically imported Process Designer softwares, it is convenient, quickly and efficiently so as to automatically generate project normal structure, reduce manpower setting into This.
Brief description of the drawings
Fig. 1 is a kind of flow chart of project normal structure automatic generation method of the present invention.
Embodiment
The invention will be further described with reference to the accompanying drawings and examples.
Embodiment one
Reference picture 1, a kind of project normal structure automatic generation method is present embodiments provided, is comprised the following steps:
S1, detect whether to receive the request for establishing project normative document clamping structure, if so, project mould corresponding to then obtaining Plate, item Path and project name;
S2, under the item Path, create project of standard development document using the project name as title with reference to project templet;
S3, detection obtain the construction standard that request imports, and then are tied from corresponding to the reading of default normal structure database The content of structure standard simultaneously generates interim xml document;
S4, the thread of program second is opened up, and use global keyboard operation programming technique, the interim xml document is led automatically Enter Process Designer softwares, generating item mesh normal structure.
Due to the function restriction of Process Design software api interfaces, direct node can not be completed and created, therefore this Method is by generating interim xml document, then opens up the thread of program second, and uses global keyboard operation programming technique, and this is faced When xml document be automatically imported the modes of Process Designer softwares, created, can generated by the way of the completion of two steps Project normal structure, it is efficiently and quick, reduce the cost of manpower setting.
Preferred embodiment is further used as, the step S1, is specifically included:
S11, detect whether to receive the request for establishing project normative document clamping structure, if so, then performing step S12, instead It, continues to detect;
S12, judge whether to receive corresponding project templet, item Path and project name, if so, then performing step S13, conversely, the non-fill substance of prompting, re-executes this step;
S13, judge whether with the write-in authority to the item Path, if so, then obtaining corresponding project templet, the item Mesh path and project name, conversely, prompting rights concerns, and return and perform step S12.
Preferred embodiment is further used as, the project templet is the project folder structure of default standard, and The project folder structure includes the sub-folder for being used to deposit different resource of multiple hierarchical categories;
The step S2, it is specially:Under the item Path, the project folder structure with reference to corresponding to project templet, wound Build by title, consistent with project folder structure folder structure of the project name and be used as project of standard development document.
In the present embodiment, project folder structure is used for the actual resource of stock item, and by the classification of resource and layer Level relation is embodied in normal structure, is easy to inquire about during reference entity resource.Each sub-folder is used to deposit specific resources, and And sub-folder has hierarchical categories, multiple sub-folders are comprised additionally in.After the project folder structure for establishing project templet, It is stored under the installation directory of secondary development program, user can directly invoke as needed, select different project templets, i.e., Different project normal structures can be established.User can also directly carry out template expansion as needed.
One example of the project of standard development document of the present embodiment is as follows:
The resource difference of entitled bullets _ sysroot, including multiple sub-folders, title and storage is as follows:
Export, for depositing file and the backup of output;
General, for storage system default folder;
Images, for depositing sectional drawing or video;
Import, for depositing the file received;
Lib_root, for depositing the design document of vehicle body and equipment;
Macros, for depositing robot macroprogram;
Reports, for depositing report file;
RobotsMachineDataFiles, the configuration data for daily robot in stock item.
In addition, the also system default file such as SPSS, TuneCells, Volumes and xmlFiles.
In step S2 is project folder structure, after project folder structure has been established, it is also necessary to is imported default Construction standard, the foundation of finished item normal structure.
Preferred embodiment is further used as, the default normal structure database purchase there are multiple construction standards Specific structure content, the multiple construction standard include:Project of standard development structure, standard wire body structure, standard universal resource tree Structure, standard station resource tree construction, standard robotic technique tree construction and standard technology path structure.Each construction standard tool There are corresponding standard hierarchical structure and type node, by construction standard corresponding to importing, project normal structure is established in realization Purpose.
Preferred embodiment is further used as, the step S3, specifically includes following steps:
S31, detect whether to receive the information that request imports project of standard development structure, if so, then from default normal structure Database reads the content of project of standard development structure, and after generating interim xml document, step S32 is performed, conversely, directly performing step Rapid S32;
S32, detect whether to receive the information of request importing standard wire body structure, if so, then from default normal structure Database reads the content of standard wire body structure, and after updating the interim xml document, performs step S33, conversely, directly execution Step S33;
S33, detect whether to receive the information that request imports standard universal resource tree construction, if so, then from default mark Quasi- structural database reads the content of standard universal resource tree construction, and after updating interim xml document, performs step S34, instead It, directly performs step S34;
S34, detect whether to receive the information of request importing standard station resource tree construction, if so, then from default mark Quasi- structural database reads the content of standard station resource tree construction, and after updating interim xml document, performs step S35, instead It, directly performs step S35;
S35, detect whether to receive the information that request imports standard robotic technique tree construction, if so, then obtaining user After the robot numbering and vehicle code name of input, from standard robotic artistic tree corresponding to the reading of default normal structure database The content of structure, and after updating interim xml document, step S36 is performed, conversely, directly execution step S36;
S36, detect whether to receive the information that request imports standard technology path structure, if so, then obtaining user's input Robot numbering and vehicle code name after, from default normal structure database read standard technology path structure content, and Interim xml document is updated, conversely, terminating this method.
Project normal structure after being established according to this method, includes multiple nodes, specifically includes vehicle body automated production All devices classification, corresponding hierarchy management situation, conventional process etc. included in line, wherein, the title category of each node Property is set according to default construction standard.
It is further used as preferred embodiment, it is further comprising the steps of after the step S4:
S5, the data inputted according to user, the standard nodes for each hierarchical categories established one by one in project normal structure, And each standard nodes for establishing, the counter structure in project templet, the child node of its all level is established automatically, The project normal structure of foundation is updated.This step can meet that change and expansion of the user to project normal structure will Ask, improve efficiency.
It is further used as preferred embodiment, it is further comprising the steps of after the step S5:
S6, the project normal structure after renewal is stored as new project templet.New project mould is stored by this step It is follow-up to use after plate, it can directly invoke, it is automatic to establish.
Generally speaking, this method can be according to default project templet and normal structure database, automatically in Process The various project normal structures that Designer softwares are established during automobile production, without manually adding, it is convenient, quick and Efficiently.
Embodiment two
A kind of project normal structure automatic creation system, including storage medium and controller are present embodiments provided, it is described Storage medium is stored with least one instruction, and the controller is used to load at least one instruction, so as to perform following step Suddenly:
S1, detect whether to receive the request for establishing project normative document clamping structure, if so, project mould corresponding to then obtaining Plate, item Path and project name;
S2, under the item Path, create project of standard development document using the project name as title with reference to project templet;
S3, detection obtain the construction standard that request imports, and then are tied from corresponding to the reading of default normal structure database The content of structure standard simultaneously generates interim xml document;
S4, the thread of program second is opened up, and use global keyboard operation programming technique, the interim xml document is led automatically Enter Process Designer softwares, generating item mesh normal structure.
Preferred embodiment is further used as, the controller is additionally operable to perform following steps:
S5, the data inputted according to user, the standard nodes for each hierarchical categories established one by one in project normal structure, And each standard nodes for establishing, the counter structure in project templet, the child node of its all level is established automatically, The project normal structure of foundation is updated.
Preferred embodiment is further used as, the controller is additionally operable to perform following steps:
S6, the project normal structure after renewal is stored as new project templet.
In the project normal structure automatic creation system of the present embodiment, controller can perform the embodiment of the present invention one and be provided Project normal structure automatic generation method, can perform embodiment one any combination implementation steps, it is corresponding to possess this method Function and beneficial effect.
Above is the preferable implementation to the present invention is illustrated, but the invention is not limited to the implementation Example, those skilled in the art can also make a variety of equivalent variations on the premise of without prejudice to spirit of the invention or replace Change, these equivalent modifications or replacement are all contained in the application claim limited range.

Claims (10)

1. a kind of project normal structure automatic generation method, it is characterised in that comprise the following steps:
S1, detect whether to receive the request for establishing project normative document clamping structure, if so, then obtain corresponding to project templet, Item Path and project name;
S2, under the item Path, create project of standard development document using the project name as title with reference to project templet;
S3, detection obtain request import construction standard, and then from default normal structure database read corresponding to structure mark The content of standard simultaneously generates interim xml document;
S4, the thread of program second is opened up, and use global keyboard operation programming technique, the interim xml document is automatically imported Process Designer softwares, generating item mesh normal structure.
A kind of 2. project normal structure automatic generation method according to claim 1, it is characterised in that the step S1, Specifically include:
S11, detect whether to receive the request for establishing project normative document clamping structure, if so, step S12 is then performed, conversely, after Continuous detection;
S12, judge whether to receive corresponding project templet, item Path and project name, if so, then performing step S13, instead It, prompts non-fill substance, re-executes this step;
S13, judge whether with the write-in authority to the item Path, if so, then obtaining the corresponding project templet, project road Footpath and project name, conversely, prompting rights concerns, and return and perform step S12.
A kind of 3. project normal structure automatic generation method according to claim 1, it is characterised in that the default mark Quasi- structural database is stored with the specific structure content of multiple construction standards, and the multiple construction standard includes:Project of standard development Structure, standard wire body structure, standard universal resource tree construction, standard station resource tree construction, standard robotic technique tree construction With standard technology path structure.
A kind of 4. project normal structure automatic generation method according to claim 3, it is characterised in that the step S3, Specifically include following steps:
S31, detect whether to receive the information that request imports project of standard development structure, if so, then from default normal structure data The content of project of standard development structure is read in storehouse, and after generating interim xml document, step S32 is performed, conversely, directly performing step S32;
S32, detect whether to receive the information of request importing standard wire body structure, if so, then from default normal structure data The content of standard wire body structure is read in storehouse, and after updating the interim xml document, step S33 is performed, conversely, directly performing step S33;
S33, detect whether to receive the information that request imports standard universal resource tree construction, if so, then from default standard knots Structure database reads the content of standard universal resource tree construction, and after updating interim xml document, step S34 is performed, conversely, directly Connect and perform step S34;
S34, detect whether to receive the information of request importing standard station resource tree construction, if so, then from default standard knots Structure database reads the content of standard station resource tree construction, and after updating interim xml document, step S35 is performed, conversely, directly Connect and perform step S35;
S35, detect whether to receive the information that request imports standard robotic technique tree construction, if so, then obtaining user's input Robot numbering and vehicle code name after, from default normal structure database read corresponding to standard robotic technique tree construction Content, and after updating interim xml document, step S36 is performed, conversely, directly execution step S36;
S36, detect whether to receive the information that request imports standard technology path structure, if so, then obtaining the machine of user's input Device people is numbered with after vehicle code name, and the content of standard technology path structure is read from default normal structure database, and is updated Interim xml document, conversely, terminating this method.
A kind of 5. project normal structure automatic generation method according to claim 1, it is characterised in that the project templet For the project folder structure of default standard, and the project folder structure include multiple hierarchical categories be used for deposit difference The sub-folder of resource;
The step S2, it is specially:Under the item Path, with reference to project folder structure corresponding to project templet, create with The project name is title, consistent with project folder structure folder structure as project of standard development document.
A kind of 6. project normal structure automatic generation method according to claim 5, it is characterised in that the step S4 it Afterwards, it is further comprising the steps of:
S5, the data inputted according to user, the standard nodes for each hierarchical categories established one by one in project normal structure, and pin To each standard nodes of foundation, the counter structure in project templet, the child node of its all level is established automatically, to building Vertical project normal structure is updated.
A kind of 7. project normal structure automatic generation method according to claim 6, it is characterised in that the step S5 it Afterwards, it is further comprising the steps of:
S6, the project normal structure after renewal is stored as new project templet.
8. a kind of project normal structure automatic creation system, it is characterised in that including storage medium and controller, the storage is situated between Matter is stored with least one instruction, and the controller is used to load at least one instruction, so as to perform following steps:
S1, detect whether to receive the request for establishing project normative document clamping structure, if so, then obtain corresponding to project templet, Item Path and project name;
S2, under the item Path, create project of standard development document using the project name as title with reference to project templet;
S3, detection obtain request import construction standard, and then from default normal structure database read corresponding to structure mark The content of standard simultaneously generates interim xml document;
S4, the thread of program second is opened up, and use global keyboard operation programming technique, the interim xml document is automatically imported Process Designer softwares, generating item mesh normal structure.
9. a kind of project normal structure automatic creation system according to claim 8, it is characterised in that the controller is also For performing following steps:
S5, the data inputted according to user, the standard nodes for each hierarchical categories established one by one in project normal structure, and pin To each standard nodes of foundation, the counter structure in project templet, the child node of its all level is established automatically, to building Vertical project normal structure is updated.
A kind of 10. project normal structure automatic creation system according to claim 9, it is characterised in that the controller It is additionally operable to perform following steps:
S6, the project normal structure after renewal is stored as new project templet.
CN201710980483.XA 2017-10-19 2017-10-19 Project standard structure automatic generation method and system Active CN107844639B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710980483.XA CN107844639B (en) 2017-10-19 2017-10-19 Project standard structure automatic generation method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710980483.XA CN107844639B (en) 2017-10-19 2017-10-19 Project standard structure automatic generation method and system

Publications (2)

Publication Number Publication Date
CN107844639A true CN107844639A (en) 2018-03-27
CN107844639B CN107844639B (en) 2021-04-27

Family

ID=61662563

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710980483.XA Active CN107844639B (en) 2017-10-19 2017-10-19 Project standard structure automatic generation method and system

Country Status (1)

Country Link
CN (1) CN107844639B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110347976A (en) * 2019-05-22 2019-10-18 广州明珞汽车装备有限公司 Method, system, device and the storage medium of quick equipment leading out data model

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6182285B1 (en) * 1997-12-15 2001-01-30 International Business Machines Corporation Method and apparatus for generating a default list
US6286137B1 (en) * 1997-12-15 2001-09-04 International Business Machines Corporation Method and apparatus of indicating steps in a task which have been completed
CN101403968A (en) * 2008-11-20 2009-04-08 用友软件股份有限公司 Model-driven software development method and system based on template
CN104424159A (en) * 2013-09-04 2015-03-18 上海复旦微电子集团股份有限公司 Software project document generating method and software project document generator
CN106056324A (en) * 2016-08-01 2016-10-26 华中科技大学 Preparation method of product assembly process card based on Markdown

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6182285B1 (en) * 1997-12-15 2001-01-30 International Business Machines Corporation Method and apparatus for generating a default list
US6286137B1 (en) * 1997-12-15 2001-09-04 International Business Machines Corporation Method and apparatus of indicating steps in a task which have been completed
CN101403968A (en) * 2008-11-20 2009-04-08 用友软件股份有限公司 Model-driven software development method and system based on template
CN104424159A (en) * 2013-09-04 2015-03-18 上海复旦微电子集团股份有限公司 Software project document generating method and software project document generator
CN106056324A (en) * 2016-08-01 2016-10-26 华中科技大学 Preparation method of product assembly process card based on Markdown

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110347976A (en) * 2019-05-22 2019-10-18 广州明珞汽车装备有限公司 Method, system, device and the storage medium of quick equipment leading out data model
CN110347976B (en) * 2019-05-22 2023-10-17 广州明珞汽车装备有限公司 Method, system, apparatus and storage medium for fast exporting device data model

Also Published As

Publication number Publication date
CN107844639B (en) 2021-04-27

Similar Documents

Publication Publication Date Title
CN111754138B (en) Engineering construction progress plan management and control system and method based on BIM model
CN105608254A (en) Automated design method and platform oriented to intelligent hardware system development
CN110807015A (en) Big data asset value delivery management method and system
CN104049957A (en) Rapid modeling frame of general business model based on star structure
CN106940553A (en) Industrial flow control management method and device based on industry internet operating system
CN108376065A (en) The system for building the avionics software development environment of model-driven
CN105930344B (en) A kind of database application system quick development platform based on product development process
CN111680070A (en) Building information model transferring and examining method and system based on visual programming
CN110222407A (en) A kind of fusion method and device of BIM data
CN115840567A (en) Application editing method and related equipment
CN110705823A (en) Production process route configuration method
CN106951593B (en) Method and device for generating configuration file of protection measurement and control device
CN112578755A (en) Programmable intelligent controller and application system based on programmable intelligent controller
CN109800402B (en) Equipment information processing method and system for process simulation
CN107844639A (en) A kind of project normal structure automatic generation method and system
CN104239212B (en) Query method and device of test case and establishment method and device of test case
CN106990974A (en) A kind of APP applications update method, device and electronic equipment
CN111880883A (en) Dynamic combined primitive realization method based on equipment object
EP4418179A1 (en) Microservices-architecture-based full-lifecycle management system for new-energy power generation devices
CN111784192A (en) Industrial park emergency plan executable system based on dynamic evolution
CN108132802B (en) Application method of configuration model in system development
CN103164760A (en) Power grid increment planning method and system
CN105930154A (en) Method and apparatus for establishing and using device hardware model in network operation system
CN111694637B (en) Online full-automatic multi-agent control simulation compiling system
CN107577880A (en) A kind of process structure modeling method based on multi views

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant