CN107829736A - A kind of colliery Striping noise and filling displacement coal column method - Google Patents

A kind of colliery Striping noise and filling displacement coal column method Download PDF

Info

Publication number
CN107829736A
CN107829736A CN201710657663.4A CN201710657663A CN107829736A CN 107829736 A CN107829736 A CN 107829736A CN 201710657663 A CN201710657663 A CN 201710657663A CN 107829736 A CN107829736 A CN 107829736A
Authority
CN
China
Prior art keywords
filling
coal
working face
band
strip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710657663.4A
Other languages
Chinese (zh)
Inventor
邵小平
李海波
唐仁龙
刘二帅
李双雄
张航
李龙清
张慧峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Shicheng Mining Co ltd
Xian University of Science and Technology
Original Assignee
Shaanxi Shicheng Mining Co ltd
Xian University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Shicheng Mining Co ltd, Xian University of Science and Technology filed Critical Shaanxi Shicheng Mining Co ltd
Priority to CN201710657663.4A priority Critical patent/CN107829736A/en
Publication of CN107829736A publication Critical patent/CN107829736A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/005Methods or devices for placing filling-up materials in underground workings characterised by the kind or composition of the backfilling material

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The present invention relates to a kind of colliery Striping noise and filling displacement coal column method, including exploitation band working face to exploit with the first stage exploitation and displacement strip coal pillar for filling the mined out region of band with filling the second stage in the mined out region of strip coal pillar.The present invention can greatly improve mine recovery ratio to 60%~70% by the way of Striping noise and coal column displacement, and production zone surface subsidence amount is greatly reduced, and the stability of aquifer structure be safeguarded, so as to reach the purpose of " water protection mining ".

Description

A kind of colliery Striping noise and filling displacement coal column method
Technical field
The present invention relates to a kind of technical field of coal exploitation, and in particular to a kind of colliery Striping noise and filling displacement coal column Method.
Background technology
Since China opens small towns and individual colliery from the 1980s, most of small coal mines are using tradition Backwardness old " house column type " coal-mining method, including:Fall pile formula, draw cave formula etc., its security is completely without guarantee.For " specification ", " code ", " notice " are repeatedly assigned by specification small coal mines coal-mining method, State Administration of Quality and Technical Supervision, Implementation is asked to have the wall type system coal-mining method of full exhaust ventilation system.Coal science research institute of Shaanxi Province has worked out " Shan within 2002 West saves small coal mines coal-mining method design ", to specification coal-mining method in being rectified in small coal mines, undergo technological transformation design, rises Important guiding effect is arrived.Recent Shaanxi to old room pillar-and-panel work rectification on the basis of banning, the excessively following several classes of application Coal-mining method:
(1) long wall with coal pillar coal-mining method.Its basic technical features is working face longwell arrangement, and longwell promotes.One kind is often to push away Enter a segment distance, retain a part of coal column, form so-called " batch (-type) " and promote;One kind is to retain a part of coal column in goaf, Working face open-off cut top is prevented with roof supporting.
(2) modern post and stall.It is primarily referred to as Introduced From Abroad continuous miner house column type coal-mining method, shortwall method With prosperous lattice viral coal-mining method, and the modern pillar mining developed on this basis, dug with continuous miner or development machine Lane room and pillaring, machinery coaling, use shuttle car or rubber-tired cart transport, suspension roof support or special automatic shifting stand to be main special Sign.
(3) Strip mining and band coal caving mining method.This is domestic and international railways and water-bodies, in order to control surface subsidence, A kind of widely used coal-mining method.For production zone by the way of similar longwell arrangement, upper and lower part border is respectively arranged return air And haulage way, several exploitation bands are divided perpendicular to return air and haulage way, bar interband retains the coal column branch of one fixed width Support plate, also it can retain the larger isolated coal pillar of a width after several Striping noises.Exploited using strap arrangements special thick During coal seam, mined bed, and top coal of the let-down above it, referred to as band coal caving mining method can be arranged along seat earth.
At present, the transformation and upgrade substantially of the original small coal mines in Shaanxi Province are medium-sized mine, but by resource reserve and well type Limitation, the coal-mining method of these mines are not greatly improved, and are especially in the Yulin in " water-retaining production " region City's local mine, the improvement of its coal-mining method are more urgent.Monitoring in recent years shows that the earth's surface in some pillar-and-panel work regions is Subsidence area is formed, shows that collapse instability has occurred for goaf part coal column, causes overlying basement rock disrumpent feelings, and it is aqueous to link up ground Layer so that underground gushing water amount is increased sharply, and to mine safety production brings great harm, also the local ecological ring of heavy damage Border.Therefore, it is necessary to the coal-mining method of northern Shensi local mine is optimized, it is necessary for the offer that makes smooth advances of " water protection mining " Technical support.
The content of the invention
The purpose of the present invention is the deficiency being directed in existing production technique, there is provided a kind of colliery Striping noise is replaced with filling The method of strip coal pillar, ensure that big deformation and failure does not occur for whole overlying strata, the stability of aquifer structure is safeguarded with this, from And reach the purpose of " water protection mining ".
To achieve the above object, the invention discloses following technical scheme:
A kind of colliery Striping noise and filling displacement coal column method, comprise the following steps:
S1 exploits band working face and exploited with filling the first stage in the mined out region of band:
Using longwall systems band coal-mining method, i.e. mining system is arranged using longwell, and band is used in work plane system Exploitation, pillar top plate and upper caldding layer are stayed, protect water-bearing layer;
Design first group of two band working face of exploitation, after treating two band working face minings, exploit second group two Individual band working face, while first group of two mined out region of band is filled, by that analogy, until working face mining finishes, and will The mined out region filling of all bands finishes;Selected during filling using earth's surface drift-sand, flyash, cement as filler, and water Filled by a certain percentage with the obturation postponed;
S2 replaces strip coal pillar and exploited with filling the second stage in the mined out region of strip coal pillar:
1 strip coal pillar of each replacement exploitation, after a upper strip coal pillar is replaced, the next band coal of replacement exploitation Post, and substep filling is carried out to the mined out region of a upper strip coal pillar, i.e., the lower area in the mined out region of strip coal pillar is first filled, then The upper area in the mined out region of strip coal pillar is filled, successively remaining each strip coal pillar of displacement working face.
Further, in the step S1, exploitation band working face mining height is 4.0~4.5m, digs mode using machine, first digs Go out excavated section top 3.0~3.5m scopes, when development machine exits, undercut extraction bottom 1.0m coal seams, reserved coal pillar height 4.0 ~4.5m;It is higher for the design requirement of baffle plate in view of 4.0~4.5m of one-time filling height, using filling side stage by stage Formula, i.e., bottom 2.0~2.5m scopes are first filled, refill top 1.5m~2.0m scopes.
Further, in the step S2, when strip coal pillar is exploited, by working face coal geology situation, driving is first excavated Section top 3.0~3.5m scopes, and suspension roof support is carried out to top plate, when development machine exits, undercut extraction bottom 1.0m coal seams, Substep filling is carried out to the mined out region of strip coal pillar, i.e., first fills the lower area in the mined out region of strip coal pillar, refills band Working face remaining each strip coal pillar is completed in the upper area in the mined out region of coal column, successively displacement.
Further, in the step S2, to ensure filling effect, first fill strip coal pillar mined out region bottom 2.0~ 2.5m height, after the obturation initial set of bottom, continue to fill the mined out region upper area of band to top is connect, to prevent from filling interval Overlong time produces plane of weakness in filling interior strips.
Further, during the longwall systems band coal-mining method:Transported by underground panel main haulage roadway digging work face Gallery, by underground panel return air main entry digging work face tailgate, passed through between working face haulage way and working face tailgate It is logical, arrange Striping noise working face;Working face haulage way and working face tailgate spacing 80m, retain between working face 20m every From coal column.
Further, in the step S1, during using working face Striping noise, using " adopting 7 to stay 8 " or " adopt 6 sides for staying 7 " Formula carries out Striping noise, and the Striping noise parameter that each mine uses appropriately adjusts according to working seam preservation situation.
A kind of colliery Striping noise disclosed by the invention and filling displacement coal column method, have following
Beneficial effect:
By the way of the present invention is replaced using Striping noise and coal column, mine recovery ratio can be greatly improved to 60%~70%, And production zone surface subsidence amount is greatly reduced, the stability of aquifer structure is safeguarded, so as to reach the purpose of " water protection mining ".
Brief description of the drawings
Fig. 1 is first group of exploitation 1. and 2. two band working face plans,
Fig. 2 is to exploit 3. and 4. two band working faces, and filling is 1. ' and 2. the mined out region lower area of ' two band is put down Face figure,
Fig. 3 is to exploit 3. and 4. two band working faces, and filling is 1. ' and 2. the mined out region lower area of ' two band cuts open Face figure,
Fig. 4 is to exploit 3. and 4. two band working faces, and filling is 1. ' and 2. the mined out region upper area of ' two band cuts open Face figure,
Fig. 5 is to exploit 9. and 10. band working face, and filling is 7. ' and 8. ' the mined out region lower area plan of band,
Fig. 6 is to exploit 9. and 10. band working face, and filling is 7. ' and 8. ' the mined out region lower area profile of band,
Fig. 7 is No. 2 strip coal pillar plans of replacement exploitation,
Fig. 8 is No. 3 strip coal pillars of replacement exploitation and the filling mined out lower area of the region 2 ' plan of strip coal pillar,
Fig. 9 is No. 3 strip coal pillars of replacement exploitation and the filling mined out upper area of the region 2 ' profile of strip coal pillar,
Figure 10 is No. 11 strip coal pillars of replacement exploitation and the filling mined out lower area of the region 10 ' plan of strip coal pillar,
Figure 11 is No. 11 strip coal pillars of replacement exploitation and the filling mined out lower area of the region 10 ' profile of strip coal pillar.
Embodiment
The technical scheme in the embodiment of the present invention will be clearly and completely described below, it is clear that described implementation Example only part of the embodiment of the present invention, rather than whole embodiments.It is common based on the embodiment in the present invention, this area The every other embodiment that technical staff is obtained under the premise of creative work is not made, belong to the model that the present invention protects Enclose.
The core of the present invention is to provide a kind of method of colliery Striping noise and filling displacement strip coal pillar, and guarantee is entirely covered Big deformation and failure does not occur for rock, and the stability of aquifer structure is safeguarded with this, so as to reach the purpose of " water protection mining ".
A kind of colliery Striping noise and filling displacement coal column method, comprise the following steps:
S1 exploits band working face and exploited with filling the first stage in the mined out region of band:
Using longwall systems band coal-mining method, i.e. mining system is arranged using longwell, and band is used in work plane system Exploitation, pillar top plate and upper caldding layer are stayed, protect water-bearing layer;
Design first group of two band working face of exploitation, after treating two band working face minings, exploit second group two Individual band working face, while first group of two mined out region of band is filled, by that analogy, until working face mining finishes, and will The mined out region filling of all bands finishes;Selected during filling using earth's surface drift-sand, flyash, cement as filler, and water Filled by a certain percentage with the obturation postponed;
S2 replaces strip coal pillar and exploited with filling the second stage in the mined out region of strip coal pillar:
1 strip coal pillar of each replacement exploitation, after a upper strip coal pillar is replaced, the next band coal of replacement exploitation Post, and substep filling is carried out to the mined out region of a upper strip coal pillar, i.e., the lower area in the mined out region of strip coal pillar is first filled, then The upper area in the mined out region of strip coal pillar is filled, successively remaining each strip coal pillar of displacement working face.
In an embodiment of the present invention, in the step S1, exploitation band working face mining height is 4.0~4.5m, is adopted Mode to be dug with machine, first excavates excavated section top 3.0~3.5m scopes, when development machine exits, undercut extraction bottom 1.0m coal seams, 4.0~4.5m of reserved coal pillar height;It is higher for the design requirement of baffle plate in view of 4.0~4.5m of one-time filling height, adopt With filling method stage by stage, i.e., bottom 2.0~2.5m scopes are first filled, refill top 1.5m~2.0m scopes.
In an embodiment of the present invention, in the step S2, when strip coal pillar is exploited, by working face coal geology feelings Condition, excavated section top 3.0~3.5m scopes are first excavated, and suspension roof support is carried out to top plate, when development machine exits, undercut extraction Bottom 1.0m coal seams, substep filling is carried out to the mined out region of strip coal pillar, i.e., first fill the lower region in the mined out region of strip coal pillar Domain, the upper area in the mined out region of strip coal pillar is refilled, successively remaining each strip coal pillar of displacement completion working face.
In an embodiment of the present invention, in the step S2, to ensure filling effect, it is mined out first to fill strip coal pillar 2.0~2.5m of region bottom height, after the obturation initial set of bottom, continue fill the mined out region upper area of band to connect top, It is long in filling interior strips generation plane of weakness to prevent from filling interval time.
In an embodiment of the present invention, during the longwall systems band coal-mining method:By underground panel main haulage roadway Digging work face haulage way (haulage gate), by underground panel return air main entry digging work face tailgate (air return way), Penetrated between working face haulage way and working face tailgate, arrange Striping noise working face;Working face haulage way and work Face tailgate spacing 80m, 20m isolated coal pillars are retained between working face.
In an embodiment of the present invention, in the step S1, during using working face Striping noise, using " adopting 7 and stay 8 " Or " adopting 6 stays 7 " mode to carry out Striping noise, and the Striping noise parameter that each mine uses is fitted according to working seam preservation situation Work as adjustment.
The present invention is using Yulin Shang He collieries as point is implemented, and theory analysis shows, in view of the panel 3216 of upper river colliery two works Face features as poor geologic condition, top plate are unstable, it is proposed that use and " adopt 7 to stay 8 " (mining height 4.5m) or " adopt 6 bands for staying 7 " (mining height 4.0m) Operational parameter, concrete scheme at the scene according to top plate actual conditions choose by the type approval test stage, to ensure the length of strip coal pillar Phase stability.Current coal market price significantly gets warm again after a cold spell, and according to rate in Yuyang county Chang Xing collieries filling mining into This estimation, from the obturation after being prepared by a certain percentage with the fillers such as earth's surface aeolian sand, flyash, cement, and water Cost can make the control of cost of ton coal value added, and at 100 yuan/ton or so, therefore, upper river Coal Exploitation is aided with filling with Striping noise and put The mining type for changing strip coal pillar economically considers to be attempted.The coal of working face extraction is transported by working face Gallery (haulage gate) arrives underground panel main haulage roadway.It is fresh it is distinguished and admirable by underground panel main haulage roadway through working face haulage way (haulage gate) arrives Striping noise working face, and waste air is by working face tailgate (air return way) to underground panel return air main entry.
It may be noted that colliery Work Safety Supervision Bureau of country of general bureau is supervised " on carrying out special return air in small coal mines according to national security The notice of well, wall coal method and support pattern reform " (2007 (216) number text), force to carry out wall coal method, it is desirable to Small coal mines must use wall coal method, and coal-face necessarily be formed full exhaust ventilation system, and at least holding two is unimpeded Extra exit, one leads to intake, and another leads to return aircourse, above-mentioned coal-mining method due to using longwall systems, All meet above-mentioned regulation.
According to Field Research result, the upper working face geology condition of river colliery 3216 is poor, and top plate is unstable, and 3216 working faces are adopted A height of 4.0~4.5m, stay and set 0.5~1m top coals.To the vibration influence of top plate, to be tunneled using development machine during avoiding big gun from adopting Exploit band.When band working face tunnels, by working face coal geology situation, excavated section top 3.0~3.5m models are first excavated Enclosing, and suspension roof support is carried out to top plate, when development machine exits, undercut extraction bottom 1.0m coal seams, reserved coal pillar height 4.0~ 4.5m。
3216 working face open-off cut eye length 80m are designed, using based on " adopting 7 to stay 8 " (mining height 4.5m) or " adopt 6 and stay 7 " (mining heights 4.0m) the filling displacement coal column mode on the basis of the Striping noise of operational parameter.The whole recovery process of 3216 working faces is divided into two The individual stage:First stage is exploitation band working face and the filling mined out regional stage of band, and second stage is displacement strip coal pillar With filling the mined out regional stage of strip coal pillar.Band working face is exploited using machine pick mode, first excavate excavated section top 3.0~ 3.5m scopes, when development machine exits, undercut extraction bottom 1.0m coal seams, 4.0~4.5m of reserved coal pillar height;3216 working faces fill Higher for the design requirement of plate washer in view of 4.0~4.5m of one-time filling height when filling out, experimental stage uses fills stage by stage Embankment formula, i.e., bottom 2.0~2.5m scopes are first filled, refill top 1.5m~2.0m scopes.
(1) first stage
First group of design exploitation 1. and 2. two band working faces, after treating two band working face minings, exploitation the Two groups of 3. and 4. two band working faces, while fill first group two and adopt with mined out region 1. ' and 2. ', by that analogy, general 3216 working face minings are finished, and all mined out region fillings of band are finished.1. and 2. Fig. 1 is adopted for two for first group of exploitation Band working face plan;3. and 4. Fig. 2 adopts band working face for two for second group of exploitation, while fills first group 1. ' and 2. ' two The mined out region lower area plan of band.During filling, it is contemplated that design of 4.0~4.5m of one-time filling height for plate washer It is required that higher, to ensure filling effect, design first fills the mined out region bottom of band 2.0~2.5m scopes, treats bottom as far as possible After obturation initial set, continue to fill the mined out area top of band (prevents that fill interval time long produces in obturation to top is connect Raw plane of weakness), it is exploited with stowing operation section as shown in Figure 3, Figure 4;Fig. 5 be exploit the first stage 9. and 10. band working face with Filling is 7. ' and 8. the mined out region lower area plan of ' two band, its exploitation are as shown in Figure 6 with stowing operation section.
(2) second stage
Treat that the 3216 wide band working face minings of working face 6m or 7m finish, and after the mined out region filling of band, from No. 2 Strip coal pillar starts, each 1 strip coal pillar of replacement exploitation.When strip coal pillar is replaced, exploitation band coal is tunneled using development machine Post.When strip coal pillar is exploited, by working face coal geology situation, excavated section top 3.0~3.5m scopes are first excavated, and to top Plate carries out suspension roof support, and when development machine exits, undercut extraction bottom 1.0m coal seams.After No. 2 strip coal pillars are replaced, formed No. 2 mined out regions 2 ' of strip coal pillar, then No. 3 strip coal pillars of replacement exploitation, and No. 2 mined out regions 2 ' of strip coal pillar are divided Step filling, i.e., first fill the lower area in the mined out region 2 ' of strip coal pillar, the upper zone in the mined out region 2 ' of refilling strip coal pillar Domain, 3216 working faces remaining each strip coal pillars is replaced successively.Fig. 7 is No. 2 strip coal pillar lower area coal body planes of replacement exploitation Figure;Fig. 8 is No. 3 strip coal pillars of replacement exploitation and the filling mined out lower area of the region 2 ' plan of strip coal pillar;Fig. 9 opens for displacement Adopt No. 3 strip coal pillars and the filling mined out upper area of the region 2 ' profile of strip coal pillar;Figure 10 is No. 11 band coals of replacement exploitation Post lower area and the filling mined out lower area of the region 10 ' plan of strip coal pillar;Figure 11 is No. 11 strip coal pillars of replacement exploitation Lower area and the filling mined out lower area of the region 10 ' profile of strip coal pillar.
It is summarized as follows:(1) 3216 working face open-off cut eye length 80m are designed, using based on " adopting 7 to stay 8 " (mining height 4.5m) or " adopt 6 stay the filling displacement coal column mode on the basis of the Striping noise of 7 " (mining height 4.0m) operational parameters.3216 working faces are entirely exploited Process is divided into two stages:First stage is exploitation band working face and the filling mined out regional stage of band, and second stage is to put Change strip coal pillar and the filling mined out regional stage of strip coal pillar.Band working face is exploited using machine pick mode, it is disconnected first to excavate driving Face top 3.0~3.5m scopes, when development machine exits, undercut extraction bottom 1.0m coal seams, 4.0~4.5m of reserved coal pillar height; 3216 working faces fill when in view of 4.0~4.5m of one-time filling height for plate washer design requirement it is higher, experimental stage Using filling method stage by stage, i.e., bottom 2.0~2.5m scopes are first filled, refill top 1.5m~2.0m scopes.
(2) exploit band working face and exploited with filling the first stage in the mined out region of band, design exploitation first group two Band working face is adopted, after treating two band working face minings, exploits second group of two band working face, while fill first group Two are adopted with mined out region, and by that analogy, 3216 working face minings are finished, and all mined out regions of band are filled in two steps Complete complete.To ensure filling effect, design first fills mined out 2.0~2.5m of the region bottom height of band, treats that bottom is filled as far as possible After filling out body initial set, continue to fill the mined out region upper area of band to top is connect, to prevent filling interval time long in filling bar Band is internal to produce plane of weakness.
(3) replace strip coal pillar and exploited with filling the second stage in the mined out region of strip coal pillar, each 1 bar of replacement exploitation Band coal column, after a upper strip coal pillar is replaced, the next strip coal pillar of replacement exploitation, and to the upper mined out region of a strip coal pillar Substep filling is carried out, i.e., first fills the lower area in the mined out region of strip coal pillar, the top in the mined out region of refilling strip coal pillar Region, 3216 working faces remaining each strip coal pillars is replaced successively.To ensure filling effect, design first fills strip coal pillar as far as possible Mined out 2.0~2.5m of region bottom height, after the obturation initial set of bottom, continue to fill the mined out region upper area of band to connecing Top, it is long in filling interior strips generation plane of weakness to prevent from filling interval time.
Compared to the content introduced in background technology, the present invention can be carried significantly by the way of Striping noise and coal column displacement Production zone surface subsidence amount is greatly reduced to 60%~70% in high mine recovery ratio, safeguards the stability of aquifer structure, So as to reach the purpose of " water protection mining ".
Described above is only the preferred embodiment of the present invention, rather than its limitations;It should be pointed out that although with reference to above-mentioned each The present invention is described in detail embodiment, it will be understood by those within the art that, it still can be to above-mentioned each Technical scheme described in embodiment is modified, or carries out equivalent substitution to which part or all technical characteristic;And this A little modifications and replacement, do not make the essence of corresponding technical scheme depart from the scope of various embodiments of the present invention technical scheme.

Claims (6)

1. a kind of colliery Striping noise and filling displacement coal column method, it is characterised in that comprise the following steps:
S1 exploits band working face and exploited with filling the first stage in the mined out region of band:
Using longwall systems band coal-mining method, i.e. mining system is arranged using longwell, and Striping noise is used in work plane system, Pillar top plate and upper caldding layer are stayed, protects water-bearing layer;
Design first group of two band working face of exploitation, after treating two band working face minings, exploit second group of two bar Band working face, while first group of two mined out region of band is filled, by that analogy, until working face mining finishes, and will be all The filling of band mined out region finish;Selected during filling using earth's surface drift-sand, flyash, cement as filler, and water presses one Certainty ratio is matched somebody with somebody the obturation postponed and filled;
S2 replaces strip coal pillar and exploited with filling the second stage in the mined out region of strip coal pillar:
1 strip coal pillar of each replacement exploitation, after a upper strip coal pillar is replaced, the next strip coal pillar of replacement exploitation, and Substep filling is carried out to the mined out region of a upper strip coal pillar, i.e., first fills the lower area in the mined out region of strip coal pillar, refilling The upper area in the mined out region of strip coal pillar, working face remaining each strip coal pillar is replaced successively.
2. a kind of colliery Striping noise according to claim 1 and filling displacement coal column method, it is characterised in that the step In rapid S1, exploitation band working face mining height is 4.0~4.5m, digs mode using machine, first excavates 3.0~3.5m of excavated section top Scope, when development machine exits, undercut extraction bottom 1.0m coal seams, 4.0~4.5m of reserved coal pillar height;In view of one-time filling 4.0~4.5m height is higher for the design requirement of baffle plate, using filling method stage by stage, i.e., first fills 2.0~2.5m of bottom Scope, refill top 1.5m~2.0m scopes.
3. a kind of colliery Striping noise according to claim 1 and filling displacement coal column method, it is characterised in that the step In rapid S2, when strip coal pillar is exploited, by working face coal geology situation, excavated section top 3.0~3.5m scopes are first excavated, and Suspension roof support is carried out to top plate, when development machine exits, undercut extraction bottom 1.0m coal seams, and the mined out region of strip coal pillar is divided Step filling, i.e., the lower area in the mined out region of strip coal pillar is first filled, refill the upper area in the mined out region of strip coal pillar, according to Remaining each strip coal pillar of secondary displacement completion working face.
4. a kind of colliery Striping noise according to claim 1 and filling displacement coal column method, it is characterised in that the step In rapid S2, to ensure filling effect, mined out 2.0~2.5m of the region bottom height of strip coal pillar is first filled, at the beginning for the treatment of bottom obturation After solidifying, continue to fill the mined out region upper area of band to top is connect, to prevent filling interval time long in filling interior strips Produce plane of weakness.
5. a kind of colliery Striping noise according to claim 1 and filling displacement coal column method, it is characterised in that the length During wall system band coal-mining method:By underground panel main haulage roadway digging work face haulage way, by underground panel return air main entry Digging work face tailgate, penetrated between working face haulage way and working face tailgate, arrange Striping noise working face;Work Make face haulage way and working face tailgate spacing 80m, retain 20m isolated coal pillars between working face.
6. a kind of colliery Striping noise according to claim 1 and filling displacement coal column method, it is characterised in that the step In rapid S1, during using working face Striping noise, using " adopt 7 stay 8 " or " adopt 6 stay 7 " by the way of carry out Striping noise, each mine is adopted Striping noise parameter appropriately adjusts according to working seam preservation situation.
CN201710657663.4A 2017-08-03 2017-08-03 A kind of colliery Striping noise and filling displacement coal column method Pending CN107829736A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710657663.4A CN107829736A (en) 2017-08-03 2017-08-03 A kind of colliery Striping noise and filling displacement coal column method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710657663.4A CN107829736A (en) 2017-08-03 2017-08-03 A kind of colliery Striping noise and filling displacement coal column method

Publications (1)

Publication Number Publication Date
CN107829736A true CN107829736A (en) 2018-03-23

Family

ID=61643089

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710657663.4A Pending CN107829736A (en) 2017-08-03 2017-08-03 A kind of colliery Striping noise and filling displacement coal column method

Country Status (1)

Country Link
CN (1) CN107829736A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109798148A (en) * 2019-01-23 2019-05-24 西安科技大学 A kind of coal mine strip filling exploitation self-pulling type baffle
CN109882239A (en) * 2019-03-27 2019-06-14 中国矿业大学 A kind of outdoor end side pressure emanant filling mining method of coal
CN110295905A (en) * 2019-07-15 2019-10-01 中国矿业大学 A kind of accurate broken coal filling mining method of the high pressure water of inclined seam
CN110374598A (en) * 2019-07-22 2019-10-25 中国矿业大学 The method of artificial ore pillar collaboration waste filling displacement surface plant protection coal pillar
CN111156000A (en) * 2020-04-07 2020-05-15 北京中矿创新联盟能源环境科学研究院 Low seam coal-pillar-free retreating type coal mining method
CN111894589A (en) * 2020-08-21 2020-11-06 郝万东 Green filling replacement mining method for industrial waste
CN111927455A (en) * 2020-09-10 2020-11-13 山东为华智能设备制造有限公司 Drilling type full-air-pressure ventilation strip type coal mining device and coal mining method
CN113482711A (en) * 2021-08-16 2021-10-08 中国矿业大学(北京) Pre-filling method for reducing end mining coal pillar
CN113513345A (en) * 2021-08-16 2021-10-19 中国矿业大学(北京) Method for reducing protective coal pillar by filling and reinforcing along with withdrawing of support

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2123109C1 (en) * 1996-04-29 1998-12-10 Акционерное общество "Угольная компания "Прокопьевскуголь" Method for mining of coal series in marginal zones of opencast
CN102505943A (en) * 2011-11-21 2012-06-20 西安科技大学 Water conservation coal cutting method for small and medium-sized coal mines in waterhead area
CN103410515A (en) * 2013-08-23 2013-11-27 山东科技大学 Three-soft-coal-layer reciprocating-type coal-pillar-free fully-mechanized mining method
CN103883350A (en) * 2014-04-04 2014-06-25 山东科技大学 Interval skip-mining type filling coal mining method
CN104832178A (en) * 2015-03-23 2015-08-12 中国矿业大学 A layering and partially filling coal mining method of thick seams
CN105971606A (en) * 2016-05-05 2016-09-28 湖南科技大学 Extremely-thick coal seam longwall working face mining method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2123109C1 (en) * 1996-04-29 1998-12-10 Акционерное общество "Угольная компания "Прокопьевскуголь" Method for mining of coal series in marginal zones of opencast
CN102505943A (en) * 2011-11-21 2012-06-20 西安科技大学 Water conservation coal cutting method for small and medium-sized coal mines in waterhead area
CN103410515A (en) * 2013-08-23 2013-11-27 山东科技大学 Three-soft-coal-layer reciprocating-type coal-pillar-free fully-mechanized mining method
CN103883350A (en) * 2014-04-04 2014-06-25 山东科技大学 Interval skip-mining type filling coal mining method
CN104832178A (en) * 2015-03-23 2015-08-12 中国矿业大学 A layering and partially filling coal mining method of thick seams
CN105971606A (en) * 2016-05-05 2016-09-28 湖南科技大学 Extremely-thick coal seam longwall working face mining method

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109798148A (en) * 2019-01-23 2019-05-24 西安科技大学 A kind of coal mine strip filling exploitation self-pulling type baffle
CN109882239A (en) * 2019-03-27 2019-06-14 中国矿业大学 A kind of outdoor end side pressure emanant filling mining method of coal
CN110295905A (en) * 2019-07-15 2019-10-01 中国矿业大学 A kind of accurate broken coal filling mining method of the high pressure water of inclined seam
CN110374598A (en) * 2019-07-22 2019-10-25 中国矿业大学 The method of artificial ore pillar collaboration waste filling displacement surface plant protection coal pillar
CN110374598B (en) * 2019-07-22 2021-03-02 中国矿业大学 Method for replacing industrial square protective coal pillar by artificial ore pillar in cooperation with gangue filling
CN111156000A (en) * 2020-04-07 2020-05-15 北京中矿创新联盟能源环境科学研究院 Low seam coal-pillar-free retreating type coal mining method
CN111894589A (en) * 2020-08-21 2020-11-06 郝万东 Green filling replacement mining method for industrial waste
CN111927455A (en) * 2020-09-10 2020-11-13 山东为华智能设备制造有限公司 Drilling type full-air-pressure ventilation strip type coal mining device and coal mining method
CN113482711A (en) * 2021-08-16 2021-10-08 中国矿业大学(北京) Pre-filling method for reducing end mining coal pillar
CN113513345A (en) * 2021-08-16 2021-10-19 中国矿业大学(北京) Method for reducing protective coal pillar by filling and reinforcing along with withdrawing of support
CN113482711B (en) * 2021-08-16 2022-04-12 中国矿业大学(北京) Pre-filling method for reducing end mining coal pillar
CN113513345B (en) * 2021-08-16 2022-04-12 中国矿业大学(北京) Method for reducing protective coal pillar by filling and reinforcing along with withdrawing of support

Similar Documents

Publication Publication Date Title
CN107829736A (en) A kind of colliery Striping noise and filling displacement coal column method
CN110242301B (en) Two-step grouting modification water-retention coal mining method for roof aquifer
CN101275469B (en) Yolk coal rock formation downward hole pumping and mining pressure relief mash gas construction method
CN102518438B (en) Roof regeneration medium-length hole ore blast backfill mining method
CN105221179B (en) A kind of highly gassy mine Y type method of ventilations
CN104481536B (en) Cover rock crack and surface subsidence controlled digging, mining and filling parallel operation coal mining method
CN108868771B (en) Mining method for horizontal medium-length hole stoping of inclined medium-thickness ore body
CN104847355B (en) Continuous mining method for hollow ground of medium-thickness steeply inclined ore body
CN104100270B (en) A kind of low-angle dip mineral ore Truckless mining method
CN103089266A (en) Drift-pillar-free sublevel barnyard caving mining method of open pit transferred underground transitional period
CN110259451A (en) A kind of efficient mining methods of gently inclined medium thick orebody Pre-control roof
CN109630112B (en) N00 mining method of cut top filling
CN105952453B (en) Longwell protrusive working face of coal seam mechanization exploits complete set of equipments without lane
CN113738367B (en) Sublevel caving downward filling mining method for complex broken and steeply inclined thin vein
CN104806285A (en) Coal mine goaf gas control method based on ground horizontal well
CN101881167B (en) Coal face stump mining method
CN101915118A (en) Method for progressive gas drainage in high gas medium-hard coal seam
CN114837663B (en) Construction method for improving recovery rate of fault waterproof coal pillar through ground pre-grouting
CN110410076A (en) A kind of filling mining method for leaving Pillar Recovery for old pillars of a house goaf
CN104863588A (en) Advanced pier column pre-arranging gob-side entry retaining method
CN115749776A (en) Coal pillar recovery method based on fault grouting transformation
CN103174424A (en) Breast and pillar method under long-wall arrangement
CN113803071B (en) Thin ore body mining method based on remote intelligent heading machine
CN110778317A (en) Construction method for ground grouting filling drilling structure in caving zone in mining process
CN110118085A (en) A kind of compound advanced secondary tunneling method in two lane of top working face of large mining depth high working face

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180323

RJ01 Rejection of invention patent application after publication