[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN107676949A - Air supply device and air conditioner - Google Patents

Air supply device and air conditioner Download PDF

Info

Publication number
CN107676949A
CN107676949A CN201610630793.4A CN201610630793A CN107676949A CN 107676949 A CN107676949 A CN 107676949A CN 201610630793 A CN201610630793 A CN 201610630793A CN 107676949 A CN107676949 A CN 107676949A
Authority
CN
China
Prior art keywords
air
outlet
supply
supply arrangement
weatherseal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610630793.4A
Other languages
Chinese (zh)
Inventor
廖俊杰
李树云
朱芳勇
彭光前
蔡剑
高智强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201610630793.4A priority Critical patent/CN107676949A/en
Publication of CN107676949A publication Critical patent/CN107676949A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/02Ducting arrangements
    • F24F13/06Outlets for directing or distributing air into rooms or spaces, e.g. ceiling air diffuser

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Duct Arrangements (AREA)

Abstract

The invention provides an air supply device and an air conditioner. The air supply device comprises: the first air supply part comprises a first air inlet end, a first air outlet end and a first air supply air channel communicated with the first air inlet end and the first air outlet end; the wind shielding part comprises a wind shielding part, and the wind shielding part is arranged at the tail end of the first wind outlet end along the wind outlet direction; an annular first air outlet is formed between the tail end of the first air outlet end and the periphery of the wind shielding part. According to the air supply device and the air conditioner, the annular first air outlet is formed between the port of the first air outlet end of the first air supply part and the periphery of the wind shielding part, and airflow blown out of the first air outlet can be ejected to the periphery of the room, so that heat convection can be realized at all angles in the room; meanwhile, the outlet area of the annular first air outlet is large relative to the outlet area in the existing single direction, and the air outlet speed is relatively low, so that the comfort degree of a human body can be enhanced.

Description

Air-supply arrangement and air conditioner
Technical field
The present invention relates to field of air conditioning, in particular to a kind of air-supply arrangement and air conditioner.
Background technology
Existing cabinet air conditioner air channel structure is typically all made up of air inlet, centrifugal blower, evaporator and air outlet.It is indoor Air enters inside air-conditioning from air inlet, and after centrifugal blower CENTRIFUGAL ACCELERATING, air carries out heat exchange by evaporator, and heat is handed over Air after changing blows to interior by air outlet again.
At present, the air-supply arrangement of air-conditioning includes air outlet and the grid or flabellum that are arranged at air outlet, grid or fan Leaf is used to balance air-out volume at air outlet and for controlling air-out wind direction.But the air supply mode of this air-supply arrangement is sent The wind gone out is not soft enough, and because wind direction is limited, air-supply dead angle occurs in interior, so as to cause the heat exchange of interior uneven Even, indoor thermograde is obvious, and the comfort level of user is bad.
The content of the invention
The present invention is intended to provide, there is air-supply in a kind of air-supply arrangement and air conditioner to solve air-supply arrangement of the prior art The technical problem at dead angle.
The invention provides a kind of air-supply arrangement, including:First air-supply part, the first air-supply part include the first air intake, the One outlet air end and the first supply air duct of the first air intake of connection and the first outlet air end;Weatherseal, weatherseal include windshied part, edge Air-out direction, windshied part are arranged at the end of the first outlet air end;Formed between the end of first outlet air end and the periphery of windshied part The first air outlet in a ring.
Further, spacing is preset to form the first air-out in interval first between the end of windshied part and the first outlet air end Mouthful.
Further, weatherseal also includes the distributary division being arranged on windshied part, and distributary division is stretched into the first supply air duct.
Further, distributary division is tapered shunting portion, arc transition between tapered shunting portion and windshied part;Tapered shunting portion Axle center and the axle center of the first supply air duct be correspondingly arranged.
Further, the tangential direction of the end of the first outlet air end is less than or equal to 40 ° horizontal by angle, angle.
Further, weatherseal is telescopically fixed with respect to the first air-supply part, and weatherseal has relative first air-supply part Stretch out to open the open position of the first air outlet and retract to close the closed position of the first air outlet.
Further, the first air intake is cylindrical, and the first outlet air end is in horn-like.
Further, air-supply arrangement also includes the second air-supply part, and the second air-supply part includes the second air intake, the second outlet air end And the second supply air duct of the second air intake of connection and the second outlet air end;First air intake of the first air-supply part is nested in second and sent The second air inlet in a ring, the end of the first outlet air end are formed in wind air channel, and between the first air intake and the second air intake The second air outlet in a ring is formed between the end of the second outlet air end.
Present invention also offers a kind of air conditioner, including above-mentioned air-supply arrangement.
Further, air conditioner includes shell, and air-supply arrangement is arranged on shell, and stretches out shell.
According to the air-supply arrangement and air conditioner of the present invention, by the end of the first outlet air end in the first air-supply part with keeping out the wind The first air outlet in a ring is formed between the periphery of the windshied part of part, can be to the four of interior from the air-flow of the first air outlet blowout Week is projected, and makes all angles of interior can realize heat convection;Meanwhile the first annular air outlet discharge area relative to The discharge area in existing single direction is big, and air-out is relatively lower speed, therefore can also strengthen human comfort.
Brief description of the drawings
The accompanying drawing for forming the part of the application is used for providing a further understanding of the present invention, schematic reality of the invention Apply example and its illustrate to be used to explain the present invention, do not form inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the structural representation of the first embodiment of the air-supply arrangement of the present invention;
Fig. 2 is the structural representation of the second embodiment of the air-supply arrangement of the present invention;
Fig. 3 is the structural representation of the air conditioner of the present invention.
Description of reference numerals:
1st, air-supply arrangement;10th, the first air-supply part;11st, the first air intake;12nd, the first outlet air end;13rd, the first supply air duct; 20th, weatherseal;21st, windshied part;22nd, distributary division;30th, the second air-supply part;31st, the second air intake;32nd, the second outlet air end;33rd, Two supply air ducts;2nd, shell.
Embodiment
Describe the present invention in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
As shown in figure 1, air-supply arrangement 1 according to a first embodiment of the present invention, including:First air-supply part 10 and weatherseal 20, the first air-supply part 10 includes the first air intake 11, the first outlet air end 12 and the first air intake 11 of connection and the first outlet air end 12 The first supply air duct 13;Weatherseal 20 includes windshied part 21, and along air-out direction, windshied part 21 is arranged at the first outlet air end 12 End;The first air outlet in a ring is formed between the end of first outlet air end 12 and the periphery of windshied part 21.According to the present invention Air-supply arrangement 1 and air conditioner, pass through the windshied part of end and the weatherseal 20 of the first outlet air end 12 in the first air-supply part 10 The first air outlet in a ring is formed between 21 periphery, can be projected from the air-flow of the first air outlet blowout to the surrounding of interior, Make all angles of interior can realize heat convection;Meanwhile the first annular air outlet discharge area is relative to existing The discharge area in single direction is big, and air-out is relatively lower speed, therefore can also strengthen human comfort.
Specifically, the first air intake 11 of the first air-supply part 10 connects with the fan outlet of air conditioner, the first outlet air end 12 Directly and atmosphere.The section of first air intake 11 and the second outlet air end 32 is circle, or square or other are special-shaped Shape.In the embodiment shown in fig. 1, the first air intake 11 is cylindrical, and the first outlet air end 12 is horn-like in horn-like Outlet air end can have bigger air-out area.Along the air-out direction of air-supply arrangement 1, the windshied part 21 of weatherseal 20 is fixedly installed In the end of the first outlet air end 12, the first air-out in a ring is formed between the end of the periphery of windshied part 21 and the first outlet air end 12 Mouthful.When air-flow is blown out from the first outlet air end 12, windshied part 21 keeps out the first outlet air end 12 so that air-flow goes out from the first of annular Air port is blown out.Due to the first air outlet in a ring, therefore air-flow is enabled to be projected to the surrounding of interior.Specifically implementing In example, air-supply arrangement 1 can be placed vertically, the endways of the first outlet air end 12, then windshied part 31 is fixedly installed on first and gone out The top of the end at wind end 12;Can be horizontal positioned by air-supply arrangement 1, the end of the first outlet air end 12 is towards the right side, then windshied part 31 is solid Surely it is arranged at the right of the end of the first outlet air end 12.
In the present embodiment, spacing is preset to be formed in interval first between the end of the outlet air end 12 of windshied part 21 and first First air outlet.I.e. windshied part 21 presets spacing higher than the end first of the first outlet air end 12, goes out so as to form the first of annular Air port, the first default spacing can air output is calculated according to spacing.Preferably, can at the first air outlet of annular Grid is set.
Preferably, weatherseal 20 also includes the distributary division 22 being arranged on windshied part 21, and distributary division 22 stretches into the first air-supply In air channel 13.The outer surface of distributary division 22 and the inner surface tool of the first supply air duct 13 are at regular intervals, to form sending for annular Wind air channel, distributary division 22 are used to guide the air-flow in the first supply air duct 13 to the first outlet air end 12.It is highly preferred that distributary division 22 be tapered shunting portion 22, arc transition between tapered shunting portion 22 and windshied part 21;The axle center in tapered shunting portion 22 and first The axle center of supply air duct 13 is correspondingly arranged, and to ensure the stability of air current flow and uniformity, makes air-flow in the first outlet air end 12 VELOCITY DISTRIBUTION it is more uniform.
Preferably, (namely the first air outlet goes out horizontal by angle for the tangential direction of the end of the first outlet air end 12 Wind direction and the angle of horizontal plane), angle is less than or equal to 40 °, to tilt upward from the air-flow that the first air outlet projects, So as to which human body will not be emitted directly toward, cause human body uncomfortable.
Preferably, the relative first air-supply part 10 of weatherseal 20 is telescopically fixed, and weatherseal 20 has relative first to send Wind part 10 is stretched out to open the open position of the first air outlet and retract to close the closed position of the first air outlet;When air-supply fills When putting 1 air-supply, weatherseal 20 is arranged at open position, when air-supply arrangement 1 is not blown, weatherseal 20 can be arranged at closing Position.When weatherseal 20 is located at closed position, dust or water etc. can be avoided to enter air-supply arrangement 1, to protect air-supply arrangement 1。
As shown in Fig. 2 the air-supply arrangement 1 of the second embodiment of the present invention may also be configured to double-deck or multilayer air outlet knot The layering of structure, i.e. two or more air outlets is set, and to increase air-out area, ensures the mildness of air-out.
As shown in Fig. 2 compared to the air-supply arrangement 1 of first embodiment, the air-supply arrangement 1 of second embodiment also includes second Air-supply part 30, the second air-supply part 30 are the structure similar to the first air-supply part 10.Second air-supply part 30 include the second air intake 31, Second outlet air end 32 and the second supply air duct 33 of the second air intake 31 of connection and the second outlet air end 32;The of first air-supply part 10 One air intake 11 is nested in the second supply air duct 33, and is formed in a ring between the first air intake 11 and the second air intake 31 The second air outlet in a ring is formed between the end of second air inlet, the end of the first outlet air end 12 and the second outlet air end 32. Second air outlet of annular and the first air outlet layering of annular are set, and the air-flow of blowout does not disturb between each other, and can increase Air-out area, strengthen the mildness of air-out;The first air intake 11 of the first air-supply part 10 is nested in the second supply air duct in addition In 33, space can be saved on the basis of air-out area is increased.
As shown in figure 3, present invention also offers a kind of air conditioner, air conditioner includes above-mentioned air-supply arrangement 1, is somebody's turn to do with improving The mildness of air conditioner air-supply and make indoor without air-supply dead angle, ensure that indoor heat exchange is uniform, indoor thermograde it is smaller from And improve the comfort level of user.The air conditioner also includes shell 2, and air-supply arrangement 1 is arranged on shell 2, and air-supply arrangement 1 stretches out Shell 2.Preferably, air-supply arrangement 1 is arranged at the top of shell 2, and air-supply arrangement 1 is arranged to the top of shell 2, enabled to The air-flow blown out from air-supply arrangement 1 is fallen by the upper end of air conditioner, is realized that shower type is blown, is improved the mildness of air-supply;Simultaneously Thermograde can be avoided in indoor sustained height excessive and cause human comfort bad.
Preferably, above-mentioned air conditioner is cabinet air conditioner.
As can be seen from the above description, the above embodiments of the present invention realize following technique effect:
According to the present invention air-supply arrangement and air conditioner, by first air-supply part 10 the first outlet air end 12 end with The first air outlet in a ring is formed between the periphery of the windshied part 21 of weatherseal 20, can be to room from the wind of the first air outlet blowout Interior surrounding projects, and makes all angles of interior can realize heat convection;Meanwhile the first annular air outlet discharge area Discharge area relative to existing single direction is big, and air-out is relatively lower speed, therefore can also strengthen human comfort.
The preferred embodiments of the present invention are these are only, are not intended to limit the invention, for those skilled in the art For member, the present invention can have various modifications and variations.Any modification within the spirit and principles of the invention, being made, Equivalent substitution, improvement etc., should be included in the scope of the protection.

Claims (10)

  1. A kind of 1. air-supply arrangement, it is characterised in that including:
    First air-supply part (10), the first air-supply part (10) include the first air intake (11), the first outlet air end (12) and connection First air intake (11) and the first supply air duct (13) of first outlet air end (12);
    Weatherseal (20), the weatherseal (20) includes windshied part (21), and along air-out direction, the windshied part (21) is arranged at institute State the end of the first outlet air end (12);
    The first air outlet in a ring is formed between the end of first outlet air end (12) and the periphery of the windshied part (21).
  2. 2. air-supply arrangement according to claim 1, it is characterised in that
    The first default spacing of interval is to form described the between the windshied part (21) and the end of first outlet air end (12) One air outlet.
  3. 3. air-supply arrangement according to claim 1, it is characterised in that
    The weatherseal (20) also includes the distributary division (22) being arranged on the windshied part (21), and the distributary division (22) is stretched into In first supply air duct (13).
  4. 4. air-supply arrangement according to claim 3, it is characterised in that
    The distributary division (22) is tapered shunting portion (22), circular arc between the tapered shunting portion (22) and the windshied part (21) Transition;
    The axle center of the tapered shunting portion (22) and the axle center of first supply air duct (13) are correspondingly arranged.
  5. 5. air-supply arrangement according to claim 1, it is characterised in that
    The tangential direction of the end of first outlet air end (12) is less than or equal to 40 ° horizontal by angle, the angle.
  6. 6. according to the air-supply arrangement described in any one of claim 1 to 5, it is characterised in that
    The relatively described first air-supply part (10) of the weatherseal (20) is telescopically fixed, and the weatherseal (20) has relatively The first air-supply part (10) is stretched out to open the open position of first air outlet and retract to close first air-out The closed position of mouth.
  7. 7. according to the air-supply arrangement described in any one of claim 1 to 5, it is characterised in that
    First air intake (11) is cylindrical, and first outlet air end (12) is in horn-like.
  8. 8. air-supply arrangement according to claim 1, it is characterised in that
    The air-supply arrangement also includes the second air-supply part (30), and the second air-supply part (30) includes the second air intake (31), the Two outlet air ends (32) and the second supply air duct (33) of connection second air intake (31) and second outlet air end (32);
    The first air intake (11) of the first air-supply part (10) is nested in second supply air duct (33), and described first The second air inlet in a ring is formed between air intake (11) and second air intake (31), first outlet air end (12) The second air outlet in a ring is formed between end and the end of second outlet air end (32).
  9. 9. a kind of air conditioner, it is characterised in that including the air-supply arrangement (1) as described in any one of claim 1 to 8.
  10. 10. air conditioner according to claim 9, it is characterised in that
    The air conditioner includes shell (2), and the air-supply arrangement (1) is arranged on the shell (2), and stretches out the shell (2)。
CN201610630793.4A 2016-08-01 2016-08-01 Air supply device and air conditioner Pending CN107676949A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610630793.4A CN107676949A (en) 2016-08-01 2016-08-01 Air supply device and air conditioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610630793.4A CN107676949A (en) 2016-08-01 2016-08-01 Air supply device and air conditioner

Publications (1)

Publication Number Publication Date
CN107676949A true CN107676949A (en) 2018-02-09

Family

ID=61133106

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610630793.4A Pending CN107676949A (en) 2016-08-01 2016-08-01 Air supply device and air conditioner

Country Status (1)

Country Link
CN (1) CN107676949A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112624052A (en) * 2020-12-29 2021-04-09 北京诚益通科技有限公司 Quick generating device of gaseous chlorine dioxide
CN113137385A (en) * 2020-01-19 2021-07-20 广东美的环境电器制造有限公司 Air duct component for air supply device and air supply device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU1496397A (en) * 1996-02-27 1997-09-04 Nordin Engineered Air Technologies Pty Ltd Air diffuser
FR2955921A1 (en) * 2010-02-01 2011-08-05 Baillindustrie Device for deflecting air e.g. hot air, blown in direction from diffusion nozzle opened on part to be ventilated, has deflection surface conformed in manner so as to direct air blown from direction towards side of diffusion nozzle
CN203655663U (en) * 2012-05-24 2014-06-18 夏普株式会社 Charged particle output apparatus and air supply device
CN104329786A (en) * 2014-09-18 2015-02-04 青岛海尔空调器有限总公司 Top cover of air treatment system
CN104596064A (en) * 2013-10-31 2015-05-06 海尔集团公司 Indoor unit of cabinet type air conditioner
CN206001661U (en) * 2016-08-01 2017-03-08 珠海格力电器股份有限公司 Air supply device and air conditioner

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU1496397A (en) * 1996-02-27 1997-09-04 Nordin Engineered Air Technologies Pty Ltd Air diffuser
FR2955921A1 (en) * 2010-02-01 2011-08-05 Baillindustrie Device for deflecting air e.g. hot air, blown in direction from diffusion nozzle opened on part to be ventilated, has deflection surface conformed in manner so as to direct air blown from direction towards side of diffusion nozzle
CN203655663U (en) * 2012-05-24 2014-06-18 夏普株式会社 Charged particle output apparatus and air supply device
CN104596064A (en) * 2013-10-31 2015-05-06 海尔集团公司 Indoor unit of cabinet type air conditioner
CN104329786A (en) * 2014-09-18 2015-02-04 青岛海尔空调器有限总公司 Top cover of air treatment system
CN206001661U (en) * 2016-08-01 2017-03-08 珠海格力电器股份有限公司 Air supply device and air conditioner

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113137385A (en) * 2020-01-19 2021-07-20 广东美的环境电器制造有限公司 Air duct component for air supply device and air supply device
CN112624052A (en) * 2020-12-29 2021-04-09 北京诚益通科技有限公司 Quick generating device of gaseous chlorine dioxide

Similar Documents

Publication Publication Date Title
CN206001661U (en) Air supply device and air conditioner
CN104676744B (en) Wall-hanging air conditioner indoor unit
CN105091083B (en) A kind of vertical air conditioner indoor unit and floor air conditioner
CN208222677U (en) A kind of air conditioner
CN105674527A (en) Air conditioner indoor unit and air conditioner
CN104807077B (en) A kind of indoor apparatus of air conditioner
WO2017166935A1 (en) Indoor air conditioning unit
CN108731227A (en) Air conditioner air deflector and air-conditioning with it
CN109959075A (en) Floor air conditioner indoor machine and air conditioner
WO2020215788A1 (en) Air outlet mechanism and air treatment device
CN110056951A (en) A kind of exhaust apparatus, air conditioner indoor unit and air-conditioning
CN107676949A (en) Air supply device and air conditioner
CN205505332U (en) Air conditioner indoor unit and air conditioner
CN105091084B (en) A kind of indoor apparatus of air conditioner
CN206410216U (en) A kind of wall hanging type air conditioner indoor unit and air conditioner
CN209274603U (en) A kind of rail vehicle and through air delivery duct
WO2023273620A1 (en) Air conditioner indoor unit
CN105091118B (en) A kind of air conditioner
CN105091086B (en) Air conditioner
CN105091085B (en) A kind of air regulator
CN211119684U (en) Panel assembly of ceiling machine and ceiling machine with panel assembly
CN208749670U (en) Air guide structure and fan
CN105485762B (en) A kind of Split wall-mounted type air conditioner
CN106369669A (en) Indoor unit of air conditioner and circular hanging unit
CN108571771A (en) A kind of wall attachment jet air-supply arrangement of combination fan coil

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180209