CN107631676A - Just prop up the monitoring method of the relative vertical displacement between two linings in a kind of tunnel - Google Patents

Just prop up the monitoring method of the relative vertical displacement between two linings in a kind of tunnel Download PDF

Info

Publication number
CN107631676A
CN107631676A CN201711069333.XA CN201711069333A CN107631676A CN 107631676 A CN107631676 A CN 107631676A CN 201711069333 A CN201711069333 A CN 201711069333A CN 107631676 A CN107631676 A CN 107631676A
Authority
CN
China
Prior art keywords
pvc pipe
tape measure
tunnel
linings
msub
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711069333.XA
Other languages
Chinese (zh)
Other versions
CN107631676B (en
Inventor
牛泽林
郑蕾
刘刚
程锋
叶延军
朱瑞强
许王亮
杨贵阳
臧鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian University of Architecture and Technology
First Engineering Co Ltd of China Railway Beijing Engineering Group Co Ltd
Original Assignee
Xian University of Architecture and Technology
First Engineering Co Ltd of China Railway Beijing Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Architecture and Technology, First Engineering Co Ltd of China Railway Beijing Engineering Group Co Ltd filed Critical Xian University of Architecture and Technology
Priority to CN201711069333.XA priority Critical patent/CN107631676B/en
Publication of CN107631676A publication Critical patent/CN107631676A/en
Application granted granted Critical
Publication of CN107631676B publication Critical patent/CN107631676B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The monitoring method of the relative vertical displacement between two linings is just propped up the invention discloses a kind of tunnel, belongs to Tunnel Excavation Monitoring method and technology field.It the described method comprises the following steps:Step 1:In the smooth loading pvc pipe of tape measure, tape measure one end is stretched out outside pvc pipe and fixed, and the tape measure other end reserves certain length and is used for reading;Step 2:Before Second Lining Construction, the hole greater diameter than pvc pipe diameter is bored perpendicular to preliminary bracing face, then in the pvc pipe vertical fitting hole for installing tape measure and will be anchored;Step 3:Tape measure is filled in pvc pipe, closure pvc pipe reserves one end of tape measure, and block-up position is opened after secondary lining form removal, is then monitored;Step 4:According to L1、L2、A1Calculate tunnel and just prop up the relatively vertical relative displacement between two linings.The method of the present invention more can accurately monitor relative displacement caused by lining cutting twice, while can have the features such as operating efficiency is high, manpower and materials less investment.

Description

Just prop up the monitoring method of the relative vertical displacement between two linings in a kind of tunnel
Technical field
The monitoring method of the relative vertical displacement between two linings is just propped up present invention relates particularly to a kind of tunnel, belongs to constructing tunnel Monitoring method technical field.
Background technology
During constructing tunnel, to prevent surrouding rock deformation or caving in, preliminary bracing and secondary lining play important Effect.From New Austrian Tunneling Method, the active time of Tunnel and secondary lining is entirely different, and secondary lining is as tunnel The guarantee of road normal operation in the future must have certain safety reservior.Tunnel Second Lining Construction is deformed in Tunnel This stabilization is carried out afterwards, still, because the factors such as its residing geological environment, excavation and lining construction technique cause two Soon cracking phenomena occurs after secondary lining construction, and the especially longitudinal crack of Lining Crack is the most dangerous, goes into seriously tunnel-liner and indulges The tension that liner structure receives disoriented to crack main cause, produce tension the reason for it is a lot, have plenty of knot The change of structure load, have plenty of foundation bearing capacity deficiency, the causes of cracks that also a kind of engineers and technicians tentatively infer Precisely due to different parts produce different relative displacements due to different cohesive forces between preliminary bracing and secondary lining, with Cause to occur relatively growing longitudinal crack in secondary lining surface, this will have a strong impact on the normal service of tunnel structure, jeopardize The safety of life and property of the people.At present, both at home and abroad to secondary lining and the monitoring taken of preliminary bracing relative displacement Method still puts a mensuration for traditional, and because secondary lining covers all preliminary bracing, therefore, such a method only can be to two Monitoring is made in the relative displacement with fixing point of secondary lining cutting, can not make accurate measurement to relative displacement caused by both, so as to Evaluation to integrally-built stability and security has considerable influence, and need in measurement process to spend substantial amounts of manpower, Material resources and financial resources, operating efficiency are relatively low.
The content of the invention
Therefore, for the above mentioned problem of prior art, the present invention provides a kind of tunnel and just props up the relatively vertical position between two linings The monitoring method of shifting.
Specifically, it the described method comprises the following steps:
Step 1:In the smooth loading pvc pipe of tape measure, pvc pipe length is L1, it is outer and solid that pvc pipe is stretched out in tape measure one end Fixed, the tape measure other end reserves certain length and is used for reading;
Step 2:Before Second Lining Construction, the hole greater diameter than pvc pipe diameter is bored perpendicular to preliminary bracing face, then It in the pvc pipe vertical fitting hole for installing tape measure and will anchor, recycle ruler to read the pvc pipe length for exposing to preliminary bracing L2
Step 3:Tape measure is filled in pvc pipe, closure pvc pipe reserves one end of tape measure, is opened after secondary lining form removal Block-up position, be then monitored, monitoring reading mode be stretch tape measure along pvc pipe peripheral-edge lower and make sight perpendicular to Secondary lining inwall carries out reading, reads pvc pipe outer end tape measure reading A1
Step 4:According to L1、L2、A1Calculate tunnel and just prop up the relatively vertical relative displacement between two linings.
Further, tape measure one end is stretched out outside pvc pipe and fixed specifically, tape measure is stretched out into 50mm patches in the step 1 Fixed on the outside of pvc pipe and with tied silk, fixing end is blocked with foamed glue after installing tape measure.
Further, in the pvc pipe vertical fitting hole for installing tape measure and will be anchored in the step 2 specifically, vertical Bore greater diameter than pvc pipe diameter 1-2cm, depth 20cm hole, then the pvc pipe for installing tape measure hangs down in preliminary bracing face Directly insert in the hole and fixed with anchor adhesive.
Further, the step 4 calculation formula specifically,
Tape measure stretches out 50mm and is affixed on outside pvc pipe, and tunnel just props up the relatively vertical relative displacement between two linings
The beneficial effects of the present invention are:The present invention provides the monitoring that a kind of tunnel just props up the relative vertical displacement between two linings Method, the method more can accurately monitor relative displacement caused by lining cutting twice, while can have operating efficiency height, people The features such as power material resources less investment.There is important more practical value to China tunnel Fast Construction and construction safety.To study and surveying The relative displacement between preliminary bracing and secondary lining is measured, theoretical direction is provided in order to avoid the generation in such crack.
Brief description of the drawings:
Fig. 1 is that tape measure fixes schematic diagram in embodiment;
Fig. 2 is two lining construction and installation schematic diagram in embodiment;
Fig. 3 is the displacement schematic diagram calculation in embodiment.
Embodiment
The embodiment of the present invention is illustrated below:
A kind of monitoring method that the relative vertical displacement between two linings is just propped up available for tunnel that the present embodiment proposes can be real The monitoring of existing preliminary bracing and secondary lining relative displacement.Its main process is as follows:
As shown in figure 1, smooth (the known length L of loading pvc pipe 1 of high-precision moccasin chi 21, unit:Mm in), one Tape measure fixing end 3 is stretched out 50mm and is affixed on the outside of pvc pipe 1 and is fixed with tied silk 4 by end, and the other end of tape measure 2 reserve certain length, use In reading tape measure reading.Fixing end foamed glue 5 blocks after installing tape measure 2.
As shown in Fig. 2 before secondary lining 9 is constructed, bored perpendicular to the surface of preliminary bracing 1 greater diameter than pvc pipe diameter 1-2cm depth 20cm or so hole, then it will be fixed in the vertical fitting hole of pvc pipe 1 for installing tape measure 2 and with anchor adhesive 6, then The length L for the pvc pipe 1 for exposing to preliminary bracing is read using ruler2
Tape measure 2 is filled in pvc pipe 1, before ensureing that tape measure 2 has enough surplus capacities, blend rubber pad 6 to block pvc pipe 1 End.Rubber blanket 6 is opened after secondary lining form removal, tape measure 2 is stretched and reads the outer end tape measure reading A of pvc pipe 11.Then supervised Survey.
All tape measure 2 should be stretched per this reading along the peripheral-edge lower of pvc pipe 1 and carries out the vertical inwall of secondary lining 9 of sight Reading.
The computational methods of lining cutting relative displacement twice:
As shown in Figure 3, it is known that preliminary bracing 8 to the distance of the outer wall of secondary lining 9 is:L2(mm), then relative displacement
Above is the preferred embodiment of the present invention, it is noted that for those skilled in the art, Under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should be regarded as this The protection domain of invention.

Claims (4)

1. a kind of tunnel just props up the monitoring method of the relative vertical displacement between two linings, it is characterised in that methods described includes following Step:
Step 1:In the smooth loading pvc pipe of tape measure, pvc pipe length is L1, outside pvc pipe and fixed, skin is stretched out in tape measure one end The chi other end reserves certain length and is used for reading;
Step 2:Before Second Lining Construction, the hole greater diameter than pvc pipe diameter is bored perpendicular to preliminary bracing face, then will peace Install in the pvc pipe vertical fitting hole of tape measure and anchor, recycle ruler to read the pvc pipe length L for exposing to preliminary bracing2
Step 3:Tape measure is filled in pvc pipe, closure pvc pipe reserves one end of tape measure, and closure is opened after secondary lining form removal Position, then it is monitored, monitoring reading mode is to stretch tape measure along pvc pipe peripheral-edge lower and make sight perpendicular to secondary Lining cutting inwall carries out reading, reads pvc pipe outer end tape measure reading A1
Step 4:According to L1、L2、A1Calculate tunnel and just prop up the relatively vertical relative displacement between two linings.
2. tunnel as claimed in claim 1 just props up the monitoring method of the relative vertical displacement between two linings, it is characterised in that described It is outer and fixed specifically, tape measure stretching 50mm is affixed on the outside of pvc pipe and consolidated with tied silk to stretch out pvc pipe for tape measure one end in step 1 Fixed, fixing end is blocked with foamed glue after installing tape measure.
3. tunnel as claimed in claim 1 just props up the monitoring method of the relative vertical displacement between two linings, it is characterised in that described In step 2 by the pvc pipe vertical fitting hole for installing tape measure and anchor specifically, perpendicular to preliminary bracing face bore a diameter More than pvc pipe diameter 1-2cm, depth 20cm hole, in the pvc pipe vertical fitting hole for installing tape measure and anchor adhesive then will be used It is fixed.
4. tunnel as claimed in claim 1 just props up the monitoring method of the relative vertical displacement between two linings, it is characterised in that described The calculation formula of step 4 specifically,
Tape measure stretches out 50mm and is affixed on outside pvc pipe, and tunnel just props up the relatively vertical relative displacement between two linings
<mrow> <mi>&amp;Delta;</mi> <mo>=</mo> <msqrt> <mrow> <msup> <mrow> <mo>(</mo> <msub> <mi>A</mi> <mn>1</mn> </msub> <mo>-</mo> <msub> <mi>L</mi> <mn>1</mn> </msub> <mo>-</mo> <mn>50</mn> <mo>-</mo> <msub> <mi>L</mi> <mn>2</mn> </msub> <mo>)</mo> </mrow> <mn>2</mn> </msup> <mo>-</mo> <msup> <mrow> <mo>(</mo> <msub> <mi>L</mi> <mn>2</mn> </msub> <mo>)</mo> </mrow> <mn>2</mn> </msup> </mrow> </msqrt> <mo>.</mo> </mrow>
CN201711069333.XA 2017-10-30 2017-10-30 Just prop up the monitoring method of the relative vertical displacement between two linings in a kind of tunnel Active CN107631676B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711069333.XA CN107631676B (en) 2017-10-30 2017-10-30 Just prop up the monitoring method of the relative vertical displacement between two linings in a kind of tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711069333.XA CN107631676B (en) 2017-10-30 2017-10-30 Just prop up the monitoring method of the relative vertical displacement between two linings in a kind of tunnel

Publications (2)

Publication Number Publication Date
CN107631676A true CN107631676A (en) 2018-01-26
CN107631676B CN107631676B (en) 2019-09-20

Family

ID=61107096

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711069333.XA Active CN107631676B (en) 2017-10-30 2017-10-30 Just prop up the monitoring method of the relative vertical displacement between two linings in a kind of tunnel

Country Status (1)

Country Link
CN (1) CN107631676B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112762873A (en) * 2020-12-29 2021-05-07 江苏法尔胜光电科技有限公司 Displacement sensor with embedded body and assembling method thereof
CN112857299A (en) * 2020-12-30 2021-05-28 江苏法尔胜光电科技有限公司 Mounting method of displacement sensor for tunnel

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04286910A (en) * 1991-03-15 1992-10-12 Toda Constr Co Ltd Method and apparatus for automatically measuring in-cavity displacement of tunnel
CN101749996A (en) * 2010-01-12 2010-06-23 浙江大学 Soil internal displacement measuring device and measuring method thereof
CN101881592A (en) * 2010-06-17 2010-11-10 同济大学 Self-advancing slide rail pendulous ground fissure deformation monitoring device
CN102183194A (en) * 2011-01-26 2011-09-14 北京工业大学 Soil body internal horizontal displacement test technology for underground structure vibration table testing
JP2011214240A (en) * 2010-03-31 2011-10-27 Fujita Corp Device for detection of ground/mountain displacement
CN105332739A (en) * 2015-10-14 2016-02-17 同济大学 Tunnel supporting structure stress monitoring device and method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04286910A (en) * 1991-03-15 1992-10-12 Toda Constr Co Ltd Method and apparatus for automatically measuring in-cavity displacement of tunnel
CN101749996A (en) * 2010-01-12 2010-06-23 浙江大学 Soil internal displacement measuring device and measuring method thereof
JP2011214240A (en) * 2010-03-31 2011-10-27 Fujita Corp Device for detection of ground/mountain displacement
CN101881592A (en) * 2010-06-17 2010-11-10 同济大学 Self-advancing slide rail pendulous ground fissure deformation monitoring device
CN102183194A (en) * 2011-01-26 2011-09-14 北京工业大学 Soil body internal horizontal displacement test technology for underground structure vibration table testing
CN105332739A (en) * 2015-10-14 2016-02-17 同济大学 Tunnel supporting structure stress monitoring device and method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
孙洋等: "云母片岩隧道二衬开裂特征数值计算研究", 《公路》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112762873A (en) * 2020-12-29 2021-05-07 江苏法尔胜光电科技有限公司 Displacement sensor with embedded body and assembling method thereof
CN112857299A (en) * 2020-12-30 2021-05-28 江苏法尔胜光电科技有限公司 Mounting method of displacement sensor for tunnel
CN112857299B (en) * 2020-12-30 2022-10-11 江苏法尔胜光电科技有限公司 Mounting method of displacement sensor for tunnel

Also Published As

Publication number Publication date
CN107631676B (en) 2019-09-20

Similar Documents

Publication Publication Date Title
CN108678777B (en) Support method for tunnel fault fracture zone section
CN101761346B (en) Method for constructing metamorphic rock confined water tunnel
Zhang et al. An incident of water and soil gushing in a metro tunnel due to high water pressure in sandy silt
CN105332710A (en) Construction method suitable for up-down overlapped tunnel with small clear space and long distance under weak geological condition
CN112627832B (en) Method for integrating detection, treatment and monitoring operation and maintenance of water inrush and mud inrush of karst tunnel
CN104989411A (en) Liquefaction discriminating device and method of pipe piece surrounding saturated sand caused by shield construction
CN106988754A (en) Narrow space shield tunneling machine starting method
CN204690723U (en) A kind of earth pressure cell side direction fastening devices
CN103471648A (en) Disturbance construction monitoring method of top pipe tunnel
CN112081595B (en) Shield construction method, and waterproof and monitoring method for shield construction
WO2020119019A1 (en) Anchor rod length determination method based on monitoring of roof rock stratum horizontal extrusion force
CN110439463A (en) Mined-out Area control injected hole pore-creating technique
CN106918322A (en) A kind of deep rock mass or soil body horizontal and vertical deformation joint test method
He et al. Research on spatiotemporal evolution law of surrounding rock fractures and hierarchical collaborative control technology in high-stress soft rock roadway: A case study
CN107631676A (en) Just prop up the monitoring method of the relative vertical displacement between two linings in a kind of tunnel
CN116677453A (en) Round TBM tunnel surrounding rock stability monitoring method and system
CN108756809A (en) A kind of method for sealing of shield tunnel geological prospecting borehole
CN103615012B (en) Steel construction self-drilling hollow anchor bars reinforces the most wired gear safeguard structure
CN105257326B (en) A kind of constant-resistance extends anchor cable and O-shaped hole packer cooperation method for protecting support
CN104018499A (en) Grouting method capable of saving grouting amount on pre-stressed anchor cable tension section
CN110926859A (en) Method for testing ground stress in deep part of coal mine
CN108918287A (en) A kind of tunnel creep model experimental rig and test method
CN206419043U (en) A kind of tunnel changes arch construction supporting structure
CN207093100U (en) A kind of tunnel arch is accurately positioned and fixed device
Fan et al. Key issues in rock mechanics of the Three Gorges Project in China

Legal Events

Date Code Title Description