[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN107538723A - The efficient blow-forming facility of hollow container and technique - Google Patents

The efficient blow-forming facility of hollow container and technique Download PDF

Info

Publication number
CN107538723A
CN107538723A CN201710908603.5A CN201710908603A CN107538723A CN 107538723 A CN107538723 A CN 107538723A CN 201710908603 A CN201710908603 A CN 201710908603A CN 107538723 A CN107538723 A CN 107538723A
Authority
CN
China
Prior art keywords
hollow container
blowing
blow
blow needle
low temperature
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710908603.5A
Other languages
Chinese (zh)
Inventor
钱玉茂
陈金春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU JRB PACKAGING MATERIAL CO Ltd
Original Assignee
JIANGSU JRB PACKAGING MATERIAL CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU JRB PACKAGING MATERIAL CO Ltd filed Critical JIANGSU JRB PACKAGING MATERIAL CO Ltd
Priority to CN201710908603.5A priority Critical patent/CN107538723A/en
Publication of CN107538723A publication Critical patent/CN107538723A/en
Pending legal-status Critical Current

Links

Landscapes

  • Blow-Moulding Or Thermoforming Of Plastics Or The Like (AREA)

Abstract

The invention discloses a kind of efficient blow-forming facility of hollow container, including the source of the gas preparation device for manufacturing low temperature compressed air, the blowning installation and exhaust apparatus that are connected with the source of the gas preparation device, the blowning installation includes blow needle, blow needle centre is provided with the blow needle central tube that can be twitched up and down.The efficient technological process for blowing of hollow container of the present invention, including have the following steps:1)Low temperature compression source of the gas prepares;2)Low temperature compressed air, which is continuously blown, blows hollow container while is vented.It is an advantage of the invention that:Hollow container is blown using continuous blow, and gas is gone out from container bottom blowing, shorten the molding cycle of extrusion blow hollow container, facts have proved it is effective shorten be manufactured the cycle up to 20% or so, provided with exhaust shutter, control capacity, ensure that container internal pressure, blow needle central tube are connected with valve group, air conditioner by heat-preserving hose while heat is taken away in exhaust, prevent the heated heating of low temperature compressed air.

Description

The efficient blow-forming facility of hollow container and technique
Technical field
The present invention relates to a kind of efficient blow-forming facility of hollow container and technique.
Background technology
The hollow container (such as bottle, bucket) of extrusion blow is typically blown with 8bar compressed airs, and mold design has water channel, is passed through cold Freeze water, take away heat, make plasthetics shaping perfect in mould water channel design comparison, blow air pressure, freeze hydraulic pressure/water temperature Under normal circumstances, in order to improve the manufacturing cycle, have producer both at home and abroad and use in subzero 25 degree of 8bar compressed airs blowing Empty container, and using interruption blowing method (one, which blows a row, takes away heat, such as blows 3S, arranges 0.5S), facts have proved effectively Shorten and be manufactured the cycle up to 15% or so.
But current cold air blowing hollow container technology has the following disadvantages.
It is real as a result of interruption blowing method (one, which blows a row, takes away heat), subzero 25 degree of 8bar compressed airs May there was only 6bar pressure in the container blown on border, the heat that mould chilled water is taken away can be influenceed, can also influence to make in addition Some mark definition on product surface.
With subzero 25 degree of compressed air blown container, the blow needle of prior art, can only ensure container blowing mouth that Portion of gas flows, one, which blows a row, takes away heat, and container bottom or remotely, and interruption blowing effect is limited.
The content of the invention
The present invention seeks to:A kind of efficient blow-forming facility of hollow container and technique are provided.
In order to solve the above-mentioned technical problem, a kind of technical scheme for using of the present invention is:
A kind of efficient blow-forming facility of hollow container, including for the source of the gas preparation device for manufacturing low temperature compressed air and the gas The blowning installation and exhaust apparatus that source preparation device is connected, the blowning installation includes blow needle, blow needle centre is provided with The blow needle central tube that can be twitched up and down.
Further:1-3mm gaps are provided between the blow needle central tube and the blow needle.
Further:The source of the gas preparation device includes being used for by the booster pump of Ordinary Compression supercharging air and via cooling The air conditioner that device is connected with the booster pump.
Further:The blow needle central tube is connected by heat-preserving hose with the air conditioner, and the blow needle center Pipe is connected with sensor and valve by heat-preserving hose.
Further:The blow needle central tube is driven by the cylinder.
Further:The exhaust apparatus includes the exhaust shutter that the blow needle is provided with.
The efficient technological process for blowing of hollow container of the present invention, including have the following steps:
1)Low temperature compression source of the gas prepares;
2)Low temperature compressed air, which is continuously blown, blows hollow container while is vented.
Further:The step 1)Including by Ordinary Compression supercharging air, then cool, it is empty that low temperature compression is made Gas.
Further:The step 2)Low temperature compressed air goes out from hollow container bottom blowing.
Further:The step 2)Discharge part gas while continuous air blowing.
It is an advantage of the invention that:
1. invention increases blow needle central tube, and continuously air blowing/exhaust, and gas is gone out from container bottom blowing, is made whole Container internal gas flow, takes away heat.
The present invention blows hollow container using continuous blow, and shortens the molding cycle of extrusion blow hollow container, in practice it has proved that Effective shorten is manufactured the cycle up to 20% or so.
The present invention will further cool down after Ordinary Compression supercharging air, shorten the molding cycle of extrusion blow hollow container.
The present invention is provided with exhaust shutter, controls capacity, and exhaust ensures container internal pressure while taking away heat.
Blow needle central tube of the present invention is connected with valve group, air conditioner by heat-preserving hose, prevents low temperature compressed air to be heated Heating.
Brief description of the drawings
Below in conjunction with the accompanying drawings and embodiment the invention will be further described:
Fig. 1 is blow needle structural representation;
Fig. 2 is source of the gas preparation device structural representation;
Fig. 3 is valve block structure schematic diagram;
Wherein:1. hollow container;2. blow needle;3. blow needle central tube;4. Ordinary Compression air intake;5. booster pump;6. cooler; 7. cooler;8. heat-preserving hose;9. cylinder;10. intake valve;11. exhaust shutter;12. control valve;13. sensor.
Embodiment
Embodiment:The efficient blow-forming facility of a kind of hollow container with reference to shown in Fig. 1 to Fig. 3, including for manufacturing low temperature pressure The source of the gas preparation device of contracting air, the blowning installation and exhaust apparatus being connected with the source of the gas preparation device, the air blowing Device includes blow needle 2, the blow needle central tube 3 that can be twitched up and down is provided among the blow needle 2, the blow needle central tube 3 with it is described 1-3mm gaps are provided between blow needle 2.
The blow needle central tube 3 is connected with valve by heat-preserving hose.In the present embodiment, the valve includes intake valve 10, row Air valve 11 and the control valve 12 for controlling air blowing central tube to be twitched about 3.
The source of the gas preparation device includes being used for by the booster pump 5 of Ordinary Compression supercharging air and via cooler 6 and institute State the air conditioner 7 that booster pump 5 is connected.The blow needle central tube 3 is connected by heat-preserving hose 8 with the air conditioner 7.
When blowing hollow container 1, Ordinary Compression air is pressurized through Ordinary Compression air intake 4 into booster pump 5, then by cold But cooler 7 is sent into after device 6 cools down, low temperature compressed air is made.Control valve 12 is opened, and cylinder 9 drives blow needle central tube 3 into The bottom of empty container 1, sensor 13 transmit signal, and intake valve 10 is opened, and the warm flexible pipe 8 of low temperature compressed air is by blow needle central tube 3 are continuously blown out into hollow container 1, while exhaust shutter 11 is opened, and stabilization discharges gas and takes away heat.
Certainly the above embodiments merely illustrate the technical concept and features of the present invention, and its object is to allow be familiar with technique People can understand present disclosure and implement according to this, it is not intended to limit the scope of the present invention.It is all according to this hair The modification that the Spirit Essence of bright main technical schemes is done, it should all be included within the scope of the present invention.

Claims (10)

  1. A kind of 1. efficient blow-forming facility of hollow container, it is characterised in that:Prepare including the source of the gas for manufacturing low temperature compressed air Device, the blowning installation and exhaust apparatus being connected with the source of the gas preparation device, the blowning installation include blow needle, described The blow needle central tube that can be twitched up and down is provided among blow needle.
  2. 2. the equipment used in the efficient technological process for blowing of hollow container according to claim 1, it is characterised in that:In the blow needle 1-3mm gaps are provided between heart pipe and the blow needle.
  3. 3. the equipment used in the efficient technological process for blowing of hollow container according to claim 1, it is characterised in that:The source of the gas is accurate Standby device includes being used for the booster pump of Ordinary Compression supercharging air and the cold air with the booster pump being connected via cooler Machine.
  4. 4. the equipment used in the efficient technological process for blowing of hollow container according to claim 3, it is characterised in that:In the blow needle Heart pipe is connected by heat-preserving hose with the air conditioner, and the blow needle central tube by heat-preserving hose be connected with sensor with Valve.
  5. 5. the equipment used in the efficient technological process for blowing of hollow container according to claim 1, it is characterised in that:In the blow needle Heart pipe is driven by the cylinder.
  6. 6. the equipment used in the efficient technological process for blowing of hollow container according to claim 1, it is characterised in that:The exhaust dress Put the exhaust shutter being provided with including the blow needle.
  7. 7. a kind of efficient technological process for blowing of hollow container, it is characterised in that including having the following steps:
    1)Low temperature compression source of the gas prepares;
    2)Low temperature compressed air, which is continuously blown, blows hollow container while is vented.
  8. 8. the efficient technological process for blowing of hollow container according to claim 7, it is characterised in that:The step 1)Including by commonly Compressed air is pressurized, then is cooled, and low temperature compressed air is made.
  9. 9. the efficient technological process for blowing of hollow container according to claim 7, it is characterised in that:The step 2)Low temperature compression is empty Gas goes out from hollow container bottom blowing.
  10. 10. the efficient technological process for blowing of hollow container according to claim 7, it is characterised in that:The step 2)It is continuous to blow While discharge part gas.
CN201710908603.5A 2017-09-29 2017-09-29 The efficient blow-forming facility of hollow container and technique Pending CN107538723A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710908603.5A CN107538723A (en) 2017-09-29 2017-09-29 The efficient blow-forming facility of hollow container and technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710908603.5A CN107538723A (en) 2017-09-29 2017-09-29 The efficient blow-forming facility of hollow container and technique

Publications (1)

Publication Number Publication Date
CN107538723A true CN107538723A (en) 2018-01-05

Family

ID=60965066

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710908603.5A Pending CN107538723A (en) 2017-09-29 2017-09-29 The efficient blow-forming facility of hollow container and technique

Country Status (1)

Country Link
CN (1) CN107538723A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110450443A (en) * 2019-08-16 2019-11-15 亚普汽车部件股份有限公司 Ducted body exhaust structure forms accessory, exhaust structure and ducted body forming method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202008005393U1 (en) * 2008-04-18 2008-07-03 Krones Ag Device for expanding plastic containers
CN102729455A (en) * 2012-07-11 2012-10-17 马革 Molding blowing system capable of shortening plastic hollow molding period and control method of molding blowing system
WO2018188788A1 (en) * 2017-04-11 2018-10-18 Krones Ag Fluid channel, method for the production thereof, and container-processing system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202008005393U1 (en) * 2008-04-18 2008-07-03 Krones Ag Device for expanding plastic containers
CN102729455A (en) * 2012-07-11 2012-10-17 马革 Molding blowing system capable of shortening plastic hollow molding period and control method of molding blowing system
WO2018188788A1 (en) * 2017-04-11 2018-10-18 Krones Ag Fluid channel, method for the production thereof, and container-processing system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘全校: "《包装材料成型加工技术》", 31 January 2017, 印刷工业出版社 *
张广成 等: "《塑料成型加工技术》", 31 January 2016, 西北工业大学出版社 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110450443A (en) * 2019-08-16 2019-11-15 亚普汽车部件股份有限公司 Ducted body exhaust structure forms accessory, exhaust structure and ducted body forming method

Similar Documents

Publication Publication Date Title
FI77833C (en) FOERFARANDE OCH ANORDNING FOER ATT TILLVERKA IHAOLIGA GLASFOEREMAOL.
CN105235228A (en) Technological method and device for preparing biaxial orientation plastic pipe through one-step method
CN107538723A (en) The efficient blow-forming facility of hollow container and technique
CN104527013A (en) Waste heat recovering and utilizing system and method of plastic pipe production line
CN208288940U (en) Inorganic precoated sand coremaking equipment
CN209682792U (en) A kind of injection mold with air-flow assisting demolding device
JP6843453B2 (en) Stretch blow molding equipment and blow molding method
CN101554655B (en) Cooling system for low pressure casting device
CN207156451U (en) A kind of blown film blowing device
CN108000844A (en) A kind of extrusion molding apparatus
CN219114786U (en) Novel blown film processing device
CN209409275U (en) A kind of split type bottle embryo stretch blow device
CN207240813U (en) The rotary air cooling device of 3D printing consumptive material
CN2522237Y (en) Temperature-regulating plastic-tube blanket-type extrusion die
CN205467873U (en) Circular screen printer cropping cooling device
CN207172724U (en) A kind of high-efficiency type injection mold of rate of good quality rate
CN202356435U (en) Novel continuous extrusion die cavity
CN208148313U (en) Cooling device in a kind of inflation film
CN207059197U (en) A kind of ring type cooling device of blow moulding machine
CN219256395U (en) Injection mold of T-shaped drainage catheter
CN206937955U (en) A kind of bottle blowing machine of fast cooling shaping bottle
CN117382148B (en) Blow molding device with uniform speed cooling structure
CN221292261U (en) Flaring tubular product design mould and cooling forming die
WO2004024419A1 (en) Moulding apparatus with external mold block cooling
CN207273823U (en) A kind of protective film blowing head

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180105