CN107503727B - It is a kind of that a layer hydraulic fracturing range investigation method is worn based on in-situ stress monitoring - Google Patents

It is a kind of that a layer hydraulic fracturing range investigation method is worn based on in-situ stress monitoring Download PDF

Info

Publication number
CN107503727B
CN107503727B CN201710970260.5A CN201710970260A CN107503727B CN 107503727 B CN107503727 B CN 107503727B CN 201710970260 A CN201710970260 A CN 201710970260A CN 107503727 B CN107503727 B CN 107503727B
Authority
CN
China
Prior art keywords
stress
point
hydraulic fracturing
drilling
fracturing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201710970260.5A
Other languages
Chinese (zh)
Other versions
CN107503727A (en
Inventor
胡千庭
梁运培
付厚利
李全贵
姜志忠
王晓光
李学龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing University
Original Assignee
Chongqing University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing University filed Critical Chongqing University
Priority to CN201710970260.5A priority Critical patent/CN107503727B/en
Publication of CN107503727A publication Critical patent/CN107503727A/en
Application granted granted Critical
Publication of CN107503727B publication Critical patent/CN107503727B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/06Measuring temperature or pressure
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/02Agriculture; Fishing; Forestry; Mining

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Physics & Mathematics (AREA)
  • Geochemistry & Mineralogy (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geophysics (AREA)
  • Business, Economics & Management (AREA)
  • Primary Health Care (AREA)
  • Theoretical Computer Science (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Human Resources & Organizations (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Health & Medical Sciences (AREA)
  • Economics (AREA)
  • Health & Medical Sciences (AREA)
  • Marine Sciences & Fisheries (AREA)
  • Animal Husbandry (AREA)
  • Agronomy & Crop Science (AREA)
  • Force Measurement Appropriate To Specific Purposes (AREA)

Abstract

The invention discloses a kind of, and layer hydraulic fracturing range of wearing based on in-situ stress monitoring investigates method, belong to underground coal mine hydraulic fracturing technical field, wears the problems such as layer hydraulic fracturing range is difficult to assess, fracturing effect only relies on the uncertainty of later period extraction single factor exploration for coal mine;It is mainly comprised the following steps, corresponding hydraulic fracturing is selected to drill, around it different direction according to golden section setting the spacing of wells arrange stress test drilling, carry out pressure break before, fracturing process, post-fracturing stress intensity monitoring, hydraulic fracturing coverage is judged according to test result;It is investigated using this method to hydraulic fracturing coverage, technically simple, project amount is small, as a result reliably, wears a layer hydraulic fracturing process to advanced optimize and provides technical foundation.

Description

It is a kind of that a layer hydraulic fracturing range investigation method is worn based on in-situ stress monitoring
Technical field
The invention belongs to underground coal mine hydraulic fracturing technical fields, and in particular to hydraulic fracturing coverage investigates method.
Background technique
China's coal seam reservoirs more belong to low air permeability coal seam and be rich in gas, increase gas permeability of coal seam be conducive to gas evolution to Coal seam gas-bearing capacity is reduced, to guarantee Safety of Coal Mine Production and promote gas drainage.Hydraulic fracturing technology is as a kind of coal mine The lower anti-reflection measure in subterranean zone has been widely used, and obtains good result.However, influencing model for underground coal mine hydraulic fracturing The investigation enclosed is at present still in the exploratory stage, and for underground coal mine hydraulic fracturing investigation, to only rely on later period gas drainage dense so far Degree, flow and the relationship of time measure fracturing effect, only rely on later period driving and back production record case to judge waterpower Pressure break range lacks more reliable underground coal mine hydraulic fracturing coverage and investigates method, is unfavorable for underground coal mine water and forces Split the perfect and progress of design.Therefore, it is necessary to develop more reliable underground coal mine hydraulic fracturing coverage to investigate method.
Summary of the invention
In view of the above shortcomings of the prior art, the present invention provides a kind of wears a layer waterpower pressure based on in-situ stress monitoring It splits range and investigates method, this method is technically simple, as a result reliable, it can be achieved that underground coal mine wears commenting for layer hydraulic fracturing coverage Estimate.
In order to solve the above-mentioned technical problem, present invention employs following technical solutions:
It is a kind of that a layer hydraulic fracturing range investigation method is worn based on in-situ stress monitoring, comprising the following steps:
Step 1: it in-situ stress monitoring reconnaissance: using fracturing borehole borehole bottom location as center O point, moves towards along bottom plate lane in coal seam Stress monitoring point A, B are selected in the point side O in top plate plant tilting, and 30 meters of OA long, 50 meters of OB long, edge is ± 120 ° with the angular separation OA Both direction respectively select stress monitoring point C, D and E, F, OC=OE=30 meters, OD=OF=50 meters;A, B, C, D, E, F distinguish As stress monitoring drilling I, stress monitoring drilling II, stress monitoring drilling III, stress monitoring drilling IV, stress monitoring drilling V, the borehole bottom location of stress monitoring drilling VI;Bottom plate lane internal pressure ceasma is opening for stress monitoring drilling I toward 30 meters of one lateral deviation of A point Hole site;Bottom plate lane internal pressure ceasma toward 50 meters of one lateral deviation of B point for stress monitoring drilling II position of opening;Bottom plate lane internal pressure ceasma Toward 15 meters of one lateral deviation of the C point position of opening for stress monitoring drilling III and stress monitoring drilling V;Bottom plate lane internal pressure ceasma is toward D point Position of opening of 25 meters of the side for stress monitoring drilling IV and stress monitoring drilling VI;
Step 2: stress monitoring drilling construction: arrange that drill site, rigging up are quasi- in each stress monitoring drilling position of opening The amount of preparing enough drilling rod and matched 75mm drill bit and 42mm drill bit, drill first with 75mm drill bit, discharge hole to be drilled Withdraw from drilling rod after coal dust, change 42mm drill bit and continue to creep into along original direction, it is hole to be drilled be not then exhausted from coal dust after continue to creep into 0.5m withdraws from drilling rod;The construction of all stress monitoring drillings is completed in this way;
Step 3: strain gauge installation: first the strain gauge alignment stress drilling for connecting oil pressure pipe, simultaneously Mounting rod is connected, installation head groove is embedded in sensor bottom end iron pin, smoothes out with the fingers along oil pressure pipe;Then sensor is pushed into coal seam It is interior, exit mounting rod;Finally data logger is connected in oil pipe end;
Step 4: Grouting Pipe and slurry recovering tube, length in slip casting pore stress monitoring drilling and sealing: are sent into drilling first 6m, slurry recovering tube be inserted to drilling bottom, using AB glue block aperture, Grouting Pipe connect high-pressure injection pump, start slip casting, injecting paste material with The sealing material of investigated fracturing borehole is consistent, blocks slurry recovering tube after slurry recovering tube has slurries outflow, continues slip casting, pass to stress Sensor pressure stops slip casting after being greater than 4Mpa;
Step 5: stress test before hydraulic fracturing: sealing of hole described in step 4 is completed, each stress meter pressure is read after 5 hours Value, if pressure be down to 4Mpa hereinafter, if using manual portable oil pressure pump oil pressure is squeezed into oil pressure pipe, return stress meter pressure 4~4.5Mpa is risen to, continues to monitor the numerical value 5 hours, beginning stress monitoring after pressure stabilisation is recorded and acquired each in 15 days A stress meter institute measuring pressure changes with time, and last five days stress ranges monitored are labeled as section A;
Step 6: hydraulic fracturing process stress monitoring: implementing hydraulic fracturing, records hydraulic fracturing beginning and ending time, waterpower pressure Stress data is acquired after splitting, analyzes the variation of hydraulic fracturing process stress, continues the change for monitoring the latter all internal stress of pressure break Change, finally acquire the stress data in this week, the variation range of stress in its variation range and fracturing process is merged into area Between B;
Step 7: exporting data after hydraulic fracturing, carries out data validity analysis, answers according to obtained by step 5 and step 6 Power constant interval judges that each direction farthest influences distance:
IfThen the stress monitoring point is not influenced by hydraulic fracturing;
IfThen the stress monitoring point is influenced by hydraulic fracturing;
Step 8: according to step 7 acquired results, the effective borehole coordinate of farthest stress monitoring is demarcated, these brills are sequentially connected Hydraulic fracturing coverage is drawn a circle to approve in hole.
Compared with prior art, the present invention has the following technical effect that
1, a kind of layer hydraulic fracturing range of wearing based on stress monitoring of the present invention investigates method, can directly contact institute Pressure break coal seam monitors the variation of coal seam internal stress, so that the coverage and fracturing effect to hydraulic fracturing make evaluation, as a result Reliably, foundation is provided for hydraulic fracturing job design.
2, a kind of layer hydraulic fracturing range of wearing based on stress monitoring of the present invention investigates method, has fully considered water The difference split and influence direction is forced, arrangement investigates drilling on the direction that three angles are 120 °, and project amount is few, technically simple easy Operation, hydraulic fracturing coverage demarcation method is simple, and engineering construction is high-efficient.
Detailed description of the invention
Fig. 1 is stress monitoring of the present invention drilling borehole bottom location schematic diagram;
Fig. 2 is sectional view of the Fig. 1 along I-I direction;
Fig. 3 is sectional view of the Fig. 1 along II-II direction;
Fig. 4 is sectional view of the Fig. 1 along III-III direction;
Fig. 5 is strain gauge of the present invention installation and drilling and sealing schematic diagram;
Fig. 6 is that the present invention delimit hydraulic fracturing coverage schematic diagram.
In attached drawing: 1-pressure break hole;21-stress monitorings drilling I;22-stress monitorings drilling II;23-stress monitorings bore Hole III;24-stress monitorings drilling IV;25-stress monitorings drilling V;26-stress monitorings drilling VI;3-bottom plate lanes;4-coals Layer;5-oil pressure pipes;6-crustal stress sensors;7-crustal stress recorders;8-Grouting Pipes;9-slurry recovering tubes;10-hydraulic fracturings Coverage.
Specific embodiment
The present invention is described in further detail with reference to the accompanying drawings and detailed description.
It is a kind of that a layer hydraulic fracturing range investigation method is worn based on in-situ stress monitoring, comprising the following steps:
Step 1: as shown in Figure 1, using pressure break hole borehole bottom location as center O, it is selected first in 4 top plate plant tilting of coal seam to answer Power test point A, B, C, D, E, F, A, B point are located at bottom plate lane 3 and walk upward O point side, OA=30 meters, OB=50 meters, along and the side OA To angle be ± 120 ° both direction respectively select stress monitoring point C, D and E, F, OC=OE=30 meters, OD=OF=50 meters.
As shown in Figure 2,3, 4, I 21 position of opening of stress monitoring drilling are that 3 internal pressure ceasma 1 of bottom plate lane deviates toward the point side A 30 meters, borehole bottom location is A point;Stress monitoring II 22 position of opening of drilling deviate 30 toward the point side B for 3 internal pressure ceasma 1 of bottom plate lane Rice, borehole bottom location are B point;Stress monitoring drilling III 23 and stress monitoring drill V 25 position of opening as 3 internal pressure ceasma 1 of bottom plate lane Deviate 15 meters toward the point side C, borehole bottom location is respectively C and E point;Stress monitoring drilling IV 24 and stress monitoring VI 26 apertures of drilling Position is 3 internal pressure ceasma 1 of bottom plate lane toward 15 meters of the point side D deviation, and borehole bottom location is respectively D and F point, according to drilling start-stop position Calculate each stress monitoring hole hole depth and inclination angle.
Step 2: each stress monitoring drilling position of opening arranges that drill site, rigging up prepare enough brills in bottom plate lane 3 Bar and matched 75mm drill bit and 42mm drill bit are adjusted and are bored according to bore direction obtained by step 1, inclination angle and hole depth Machine drill is drilled first with 75mm drill bit, withdraws from drilling rod after discharge coal dust hole to be drilled into reversed, is changed 42mm drill bit and is continued along original The direction drilling come, hole to be drilled be not then exhausted from after coal dust continue to creep into 0.5m, withdraw from drilling rod;All stress are completed in this way Monitor the construction of drilling.
Step 3: prepare 6 crustal stress recorders 7 of oil pressure pipe 5,6 of strain gauge 6,6, enough sensor peaces Bar is filled, as shown in figure 5, the strain gauge 6 for connecting oil pressure pipe 5 is directed at stress drilling first, while mounting rod is connected, pacifies It fills head groove and is embedded in sensor bottom end iron pin, smooth out with the fingers along oil pressure pipe 5;Then sensor 6 is pushed in coal seam 4, exits installation Bar;Finally data logger 7 is connected in oil pipe end;Complete the installation of strain gauge.
Step 4: after strain gauge is installed, as shown in figure 5, Grouting Pipe 8 and slurry recovering tube 9 are sent into drilling, note Length 6m in 8 hole of pipe is starched, slurry recovering tube 9 is inserted to drilling bottom, blocks aperture using AB glue, and Grouting Pipe connects high-pressure injection pump, starts Slip casting, injecting paste material is consistent with the sealing material of investigated fracturing borehole 1, blocks slurry recovering tube after slurry recovering tube 9 has slurries outflow 9, continue slip casting, stops slip casting after strain gauge pressure is greater than 4Mpa.
Step 5: complete step 4 described in sealing of hole, each stress meter pressure value is read after 5 hours, if pressure be down to 4Mpa with Under, then oil pressure is squeezed into oil pressure pipe 5 using manual portable oil pressure pump, so that stress meter pressure is gone up to 4~4.5Mpa, continue Monitor the numerical value 5 hours, beginning stress monitoring after pressure stabilisation, record and acquire in 15 days each stress meter institute's measuring pressure with Last five days stress ranges monitored are labeled as section A by the variation of time.
Step 6: connection hydraulic fracturing pipeline after checking each equipment normal operation, starts hydraulic fracturing, and when pressure break is a length of 24 hours, the hydraulic fracturing beginning and ending time has been recorded, stress data is acquired after hydraulic fracturing, has analyzed hydraulic fracturing process stress Variation, continue the variation for monitoring the latter all internal stress of pressure break, the stress data in this week finally acquired, by its variation range Interval B is merged into the variation range of stress in fracturing process.
Step 7: export in-situ stress monitoring data carry out data validity analysis, answer according to obtained by step 5 and step 6 Power constant interval judges that each direction farthest influences distance:
IfThen the stress monitoring point is not influenced by hydraulic fracturing;
IfThen the stress monitoring point is influenced by hydraulic fracturing.
Step 8: according to step 7 acquired results, the effective borehole coordinate of farthest stress monitoring is demarcated, as shown in fig. 6, successively These drillings are connected, it is final to draw a circle to approve hydraulic fracturing coverage 10.
Finally, it is stated that the above examples are only used to illustrate the technical scheme of the present invention and are not limiting, although referring to compared with Good embodiment describes the invention in detail, those skilled in the art should understand that, it can be to skill of the invention Art scheme is modified or replaced equivalently, and without departing from the objective and range of technical solution of the present invention, should all be covered at this In the scope of the claims of invention.

Claims (1)

1. a kind of layer hydraulic fracturing range of wearing based on in-situ stress monitoring investigates method, it is included in base plate tunnel implementation and wears a layer waterpower Fracturing borehole and sealing of hole, which comprises the following steps:
A. using fracturing borehole borehole bottom location as center O point, along bottom plate lane (3) trend, the point side O is selected in coal seam (4) top plate plant tilting Determine stress monitoring point A, B, 30 meters of OA long, 50 meters of OB long, selectes and answer respectively along the both direction for being ± 120 ° with the angular separation OA Power monitoring point C, D and E, F, OC=OE=30 meters, OD=OF=50 meters;
B. I (21) are drilled eventually toward A point one lateral deviation, 30 meters of construction drills I (21) in bottom plate lane (3) internal pressure ceasma (1) orifice position Hole location is set to A point;In bottom plate lane (3) internal pressure ceasma (1) orifice position toward B point one lateral deviation, 50 meters of construction drills II (22), drill II (22) borehole bottom location is B point;In bottom plate lane (3) internal pressure ceasma (1) orifice position toward C point one lateral deviation, 15 meters of construction drills III (23) and V (25) of drilling, III (23) borehole bottom location of drilling are C point, and V (25) borehole bottom location of drilling is E point;In bottom plate lane (3) Internal pressure ceasma (1) orifice position is toward VI (26) of one lateral deviation of D point, 25 meters of construction drills IV (24) and drilling, the whole hole location in IV (24) that drill It is set to D point, VI (26) borehole bottom location of drilling is F point;Each drilling orifice to coal seam (4) floor section aperture is 75mm, into coal Layer (4) back aperture is 42mm;
C. the strain gauge (6) for connecting oil pressure pipe (5) is pushed into each stress monitoring point along drilling using mounting rod, after Implement drilling and sealing, when injection hole sealing fills entire drilling, oil pressure pipe (5) outer segment connection stress recorder (7) at aperture, benefit It is pressed into hydraulic oil in oil pressure pipe with hand-driven oil hydraulic pump, until stopping suppressing when oil pressure pressure is 4~4.5MPa, completes stress and passes Sensor (6) installation;It is inserted into Grouting Pipe (8) and slurry recovering tube (9), blocks aperture using AB glue, implementation injection hole sealing, when slip casting fills Entire drilling;
D. the stress variation that 15 days are monitored before pressure break, analyzes 15 days internal stress changing rules, determines that the preceding coal seam internal stress of pressure break becomes Change range [σminmax], which is set as stress stability section A;
E. implement hydraulic fracturing, while carrying out stress monitoring, continue to stress monitoring 5 days after the completion of pressure break, acquire pressure break mistake Journey and post-fracturing stress data, analyze its changing rule, determine fracturing process and post-fracturing stress range [σ12], The range is set as to the stress disturbance constant interval B of pressure break generation;
F. according to each drilling hole stress constant interval A, B obtained by step d and step e, impacted stress monitoring point is determined;
IfThen the stress monitoring point is not influenced by hydraulic fracturing;
IfThen the stress monitoring point is influenced by hydraulic fracturing;
G. it delimit coverage: point is influenced according to the determined hydraulic fracturing of step f, find out b3 difference of step respectively radially most Remote to influence point, connecting these three to put drawn a circle to approve range with straight line is to wear the effective coverage of layer hydraulic fracturing (10).
CN201710970260.5A 2017-10-16 2017-10-16 It is a kind of that a layer hydraulic fracturing range investigation method is worn based on in-situ stress monitoring Expired - Fee Related CN107503727B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710970260.5A CN107503727B (en) 2017-10-16 2017-10-16 It is a kind of that a layer hydraulic fracturing range investigation method is worn based on in-situ stress monitoring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710970260.5A CN107503727B (en) 2017-10-16 2017-10-16 It is a kind of that a layer hydraulic fracturing range investigation method is worn based on in-situ stress monitoring

Publications (2)

Publication Number Publication Date
CN107503727A CN107503727A (en) 2017-12-22
CN107503727B true CN107503727B (en) 2019-05-03

Family

ID=60701864

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710970260.5A Expired - Fee Related CN107503727B (en) 2017-10-16 2017-10-16 It is a kind of that a layer hydraulic fracturing range investigation method is worn based on in-situ stress monitoring

Country Status (1)

Country Link
CN (1) CN107503727B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108843391B (en) * 2018-05-31 2020-04-14 天地科技股份有限公司 Method for evaluating high-pressure hydraulic fracturing effect of coal seam
CN109736779A (en) * 2019-03-15 2019-05-10 吕梁学院 A kind of pressure break radius measurement method of this coal seam hydraulic fracture
CN110259442B (en) * 2019-06-28 2022-10-21 重庆大学 Coal measure stratum hydraulic fracturing fracture horizon identification method
CN110426501A (en) * 2019-08-01 2019-11-08 重庆市能源投资集团科技有限责任公司 A method of a layer hydraulic fracturing coverage is worn based on the determination of salinity measurement method
CN111173487B (en) * 2019-12-25 2022-02-08 天地科技股份有限公司 Monitoring method for regional hydraulic fracturing
CN112145073B (en) * 2020-09-28 2022-04-01 中国矿业大学 In-situ controllable coal and gas outburst process physical simulation method
CN113513313A (en) * 2021-04-28 2021-10-19 中煤科工集团重庆研究院有限公司 Experimental device and method for simulating coal seam hydraulic fracturing

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7946340B2 (en) * 2005-12-01 2011-05-24 Halliburton Energy Services, Inc. Method and apparatus for orchestration of fracture placement from a centralized well fluid treatment center
CN102182437B (en) * 2011-04-19 2013-09-25 河南理工大学 Method for determining and eliminating hydraulic fracture stress boundary of coal mine underground drilling
CN104594868B (en) * 2015-01-29 2017-03-08 河南理工大学 Multiparty control hydraulic fracturing anti-reflection outburst elimination method
CN105156085B (en) * 2015-09-11 2018-02-02 重庆大学 The coal mine underground coal bed tree-shaped uniform anti-reflection method of drilling composite fracturing
CN107100612B (en) * 2017-04-17 2020-05-05 山东科技大学 Method for investigating underground hydraulic fracturing influence area

Also Published As

Publication number Publication date
CN107503727A (en) 2017-12-22

Similar Documents

Publication Publication Date Title
CN107503727B (en) It is a kind of that a layer hydraulic fracturing range investigation method is worn based on in-situ stress monitoring
CN103076119B (en) Method for measuring floor heave main control stress of laneway
CN110397428A (en) A kind of gas displacing coal-bed method for increasing of straight well and U-shaped butt shaft unitized production coal bed gas
CN110006760B (en) Method for accurately measuring deep hole hydraulic fracturing induced fracture heavy tension pressure
CN104569352A (en) Structural discrimination indexes of ordovician limestone top filling zones and determination method
CN106593422A (en) Storage type testing method in oil pipe of horizontal well and pipe column
CN104406895A (en) Novel coal bed permeability testing device and method
CN109469474A (en) Based on the lower device and method for measuring multiple seam gas pressure simultaneously to layer-through drilling
CN109736779A (en) A kind of pressure break radius measurement method of this coal seam hydraulic fracture
CN109242364A (en) A kind of volume displaced evaluating production capacity method of gas well at HTHP simulation wellbore hole
CN106401557B (en) A kind of method of joint test coal seam gas-bearing capacity and the determining effective extraction radius that drills of gas pressure
CN103147741B (en) Coal bed roadside pressure relief zone width measuring method based on drill hole gas leakage
CN109973082A (en) The device and method for measuring multiple seam gas pressure simultaneously to layer-through drilling based on
CN109973059B (en) Rapid analysis method for gas injection mechanism of fracture-cavity oil reservoir
CN113622907B (en) Single-hole synchronous monitoring method for movement and fracture distribution in coal seam mining overburden rock
CN204255815U (en) A kind of novel coal seam permeability tester for testing
CN206617162U (en) Storage type test pipe column in oil pipe of horizontal well
CN115807665B (en) Method for measuring and calculating static pressure in middle joint of hydraulic fracture and minimum horizontal principal stress of stratum
CN106968664A (en) A kind of floor undulation destruction band deep drilling water filling detection method
CN108343431B (en) Method for exploring flow network of bedrock fracture underground water system
CN109899050A (en) Form the bed gas reservoir fracturing process of complex fracture network
CN101886543A (en) Exploring tube used for observing coal seam goaf fissure zone subsection water injection
CN105257288A (en) Method for determining tight reservoir original reservoir pressure based on injection pressure decline well testing technology
CN113466099A (en) Testing device and testing method for water pressurizing test
CN110630320B (en) Overburden rock isolation grouting filling position determination method based on drilling injection flow measurement

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Hu Qianting

Inventor after: Liang Yunpei

Inventor after: Fu Houli

Inventor after: Li Quangui

Inventor after: Jiang Zhizhong

Inventor after: Wang Xiaoguang

Inventor after: Li Xuelong

Inventor before: Hu Qianting

Inventor before: Fu Houli

Inventor before: Liang Yunpei

Inventor before: Li Quangui

Inventor before: Jiang Zhizhong

Inventor before: Wang Xiaoguang

Inventor before: Li Xuelong

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190503

Termination date: 20201016