CN107423912A - A kind of method and system for becoming dynamic mesh dynamic division based on personnel - Google Patents
A kind of method and system for becoming dynamic mesh dynamic division based on personnel Download PDFInfo
- Publication number
- CN107423912A CN107423912A CN201710651762.1A CN201710651762A CN107423912A CN 107423912 A CN107423912 A CN 107423912A CN 201710651762 A CN201710651762 A CN 201710651762A CN 107423912 A CN107423912 A CN 107423912A
- Authority
- CN
- China
- Prior art keywords
- amount
- latitude
- grid
- longitude value
- default
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06315—Needs-based resource requirements planning or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/29—Geographical information databases
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Strategic Management (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Educational Administration (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Databases & Information Systems (AREA)
- Remote Sensing (AREA)
- Data Mining & Analysis (AREA)
- General Engineering & Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention relates to informationization technology field, more particularly to a kind of method and system for becoming dynamic mesh dynamic division based on personnel.A kind of method for being become dynamic mesh dynamic division based on personnel, is comprised the following steps:Obtain different zones population amount on map;The latitude and longitude value according to corresponding to default amount scope determines each net boundary, different grids are marked off according to latitude and longitude value on map;In real time or timing judges that amount is whether in the range of default amount in grid, if not redefining latitude and longitude value corresponding to net boundary, and net boundary is adjusted on map in the range of default amount.According to default amount scope grid division, when amount change is not fallen within the range of default amount in grid, the latitude and longitude value according to corresponding to default amount scope redefines net boundary, and net boundary is adjusted on map,, can the situation of change very directly perceived that personnel amount known at a glance by watching the change of grid on map.
Description
Technical field
The present invention relates to informationization technology field, it is more particularly to a kind of based on personnel become dynamic mesh dynamic division method and
System.
Background technology
With the development in epoch, in China, population is more and more, and with Development of Urbanization, the flowing of population is increasingly
Frequently, it is metastable with previous local population, and in today's society, particularly inside some big cities, one
All real-time change is being presented in the size of population in even one street of cell, is merely not only the change of population in birth and old age, sickness and death,
It is more personnel's migration.
No one of quick change, prior art method in different zones personnel amount can intuitively rapidly
The change of personnel amount is embodied on interface, because the change of personnel amount can not be known in time, also results in the domestic-investment source capsule in region
Reason can not follow up in time to be changed therewith, will cause subregion resource for not demand, and supply exceed demand for subregion resource, pole
It is unfavorable for the rationalization distribution and management of resource.
The content of the invention
For this reason, it may be necessary to a kind of method and system for becoming dynamic mesh dynamic division based on personnel is provided, to solve can not be straight
The problem of seeing the change of quick obtaining different zones personnel amount.
To achieve the above object, a kind of method for becoming dynamic mesh dynamic division based on personnel, specific skill are inventor provided
Art scheme is as follows:
A kind of method for being become dynamic mesh dynamic division based on personnel, is comprised the following steps:Obtain different zones people on map
Mouth amount;The latitude and longitude value according to corresponding to default amount scope determines each net boundary, according to the latitude and longitude value on map
Different grids are marked off, wherein the amount that each grid encloses the region of choosing is all fallen within the range of default amount;In real time or regularly
Judge that amount is whether in the range of default amount in grid, if amount is not in the range of default amount in grid, according to default
Amount scope redefines latitude and longitude value corresponding to net boundary, and according to the latitude and longitude value on map to the Grid Edge
Boundary is adjusted.
Further, described " then determining latitude and longitude value corresponding to each net boundary according to default amount scope " also includes:
The latitude and longitude value of each vertex correspondence of each grid is determined according to default amount scope.
It is further, described that " if amount is not in the range of default amount in grid, according to presetting, amount scope is again true
Determine latitude and longitude value corresponding to net boundary, and the net boundary be adjusted on map according to the latitude and longitude value ", also
Including step:If amount is less than default amount scope minimum in grid, the inhabitation amount of the grid adjacent building is obtained,
Judge that amount with adjacent building amount and whether in the range of default amount, if in the range of default amount, obtains in grid
The latitude and longitude value on adjacent building border, and net boundary is expanded to adjacent building border according to the latitude and longitude value.
It is further, described that " if amount is not in the range of default amount in grid, according to presetting, amount scope is again true
Determine latitude and longitude value corresponding to net boundary, and the net boundary be adjusted on map according to the latitude and longitude value ", also
Including step:If amount is less than default amount scope minimum in grid, the inhabitation amount of the grid adjacent building is obtained,
Judge that amount with adjacent building amount and whether in the range of default amount, if in the range of default amount, obtains in grid
The latitude and longitude value on adjacent building border, and net boundary is expanded to adjacent building border according to the latitude and longitude value.
Further, described " latitude and longitude value according to corresponding to default amount scope determines each net boundary " also includes:Root
Latitude and longitude value corresponding to each net boundary is determined according to default amount scope, and Grid Edge is adjusted according to administrative division and urban planning
Latitude and longitude value corresponding to boundary, the urban planning include:Road network and building.To achieve the above object, one kind is inventor provided
Become the system of dynamic mesh dynamic division based on personnel, concrete technical scheme is as follows:
A kind of system for becoming dynamic mesh dynamic division based on personnel, including:Amount acquisition module, mesh generation module and net
Lattice adjusting module;The amount acquisition module is used for:Obtain different zones population amount on map;The mesh generation module is used
In:The latitude and longitude value according to corresponding to default amount scope determines each net boundary, is divided according to the latitude and longitude value on map
Go out different grids, wherein the amount that each grid encloses the region of choosing is all fallen within the range of default amount;The grid adjusts mould
Block is used for:In real time or timing judges that amount is whether in the range of default amount in grid, if amount is not in default amount in grid
In the range of, then latitude and longitude value corresponding to net boundary is redefined according to default amount scope, and exist according to the latitude and longitude value
The net boundary is adjusted on map.
Further, the mesh generation module is additionally operable to:Each vertex correspondence of each grid is determined according to default amount scope
Latitude and longitude value.
Further, the grid adjusting module is additionally operable to:If amount is less than default amount scope minimum in grid,
The inhabitation amount of the grid adjacent building is obtained, judges that amount is with adjacent building amount and whether in default amount model in grid
In enclosing, if in the range of default amount, the latitude and longitude value on adjacent building border is obtained, and according to the latitude and longitude value expansion web
Lattice border to adjacent building border.
Further, the grid adjusting module is additionally operable to:If amount is higher than default amount scope peak in grid,
The inhabitation amount of the building on neighbouring border is obtained in the grid, judges in grid amount with adjacent building amount difference whether pre-
If in the range of amount, if in the range of default amount, the latitude and longitude value on the building border is obtained, and according to the longitude and latitude
Value reduces net boundary to the building border.
Further, the mesh generation module is additionally operable to:According to corresponding to default amount scope determines each net boundary
Latitude and longitude value, and the latitude and longitude value according to corresponding to administrative division and urban planning adjustment net boundary, the urban planning include:
Road network and building.
The beneficial effects of the invention are as follows:According to default amount scope grid division so that the amount in each grid exists
, will be according to default amount scope when amount changes in grid, does not fall within the range of default amount in the range of default amount
Latitude and longitude value corresponding to net boundary is redefined, the net boundary is adjusted on map according to the latitude and longitude value
It is whole, by watching the change of grid on map, the situation of change of personnel amount can be intuitively known very much at a glance, also can root
According to the situation simultaneously follow up resource scheduling and redistribute, maximally utilized resource.
Brief description of the drawings
Fig. 1 is a kind of flow chart for the method for becoming dynamic mesh dynamic division based on personnel described in embodiment;
Fig. 2 is that amount is less than the flow chart of default amount scope minimum in grid described in embodiment;
Fig. 3 is that amount is higher than the flow chart of default amount scope peak in grid described in embodiment;
Fig. 4 is a kind of schematic diagram for the method for becoming dynamic mesh dynamic division based on personnel described in embodiment;
Fig. 5 is a kind of schematic diagram for the method for becoming dynamic mesh dynamic division based on personnel described in embodiment;
Fig. 6 is a kind of module map for the system for becoming dynamic mesh dynamic division based on personnel described in embodiment.
Description of reference numerals:
600th, the system of dynamic mesh dynamic division is become based on personnel,
601st, amount acquisition module,
602nd, mesh generation module,
603rd, grid adjusting module.
Embodiment
To describe the technology contents of technical scheme, construction feature, the objects and the effects in detail, below in conjunction with specific reality
Apply example and coordinate accompanying drawing to be explained in detail.
Fig. 1 and Fig. 5 are referred to, in the present embodiment, a kind of method for becoming dynamic mesh dynamic division based on personnel can answer
With it is any possess obtain different zones personnel's amount authority system on, in the present embodiment, as shown in figure 5, with ground
Exemplified by A counties on figure, concrete implementation technical scheme is as follows:
Step S101:Obtain different zones population amount on map.Can be in the following way:Obtained by background data base
Different zones amount quantity, in the present embodiment, as shown in figure 5, A counties include five towns of a, b, c, d, e, then can be by rear
Platform database gets the amount number in this five towns, the village that can also be more sub-divided under each town, the street below each village
Amount.Obtain on map after different zones amount quantity, performed step S102:Each grid is determined according to default amount scope
Latitude and longitude value corresponding to border.Can be in the following way:In the present embodiment, it is 300-500 families to preset amount scope, at it
In its embodiment, default amount scope can be made any adjustments according to actual conditions, and each net boundary pair is determined according to this scope
The latitude and longitude value answered, wherein can be the latitude and longitude value for determining each each vertex correspondence of grid, such as in the present embodiment, just a,
B, the amount in five towns of c, d, e is all fallen within the range of the default amount, then by determining the borderline several points in this five towns
Latitude and longitude value, such as a towns, the latitude and longitude value of four points on its border is determined, b towns determine the latitude and longitude value of nine points on its border, c
Town determines the latitude and longitude value of four points on its border, and d towns determine the latitude and longitude value of six points on its border.In other embodiment
In, the possible amount that will have more than default amount scope on a town, such as 4000 families, now it is necessary to be sub-divided into village, segment
Street below to village, each net boundary is determined according to default amount scope corresponding to latitude and longitude value, it is preferable that Ruo Yige streets
The amount in road is in the range of default amount, such as 320 families, then directly obtains the latitude and longitude value on the street border.In other embodiment party
In formula, the latitude and longitude value according to corresponding to default amount scope determines each net boundary also includes:Determined according to default amount scope
Latitude and longitude value corresponding to each net boundary, and the latitude and longitude value according to corresponding to administrative division and urban planning adjustment net boundary,
The urban planning includes:Road network and building.Determination i.e. for latitude and longitude value corresponding to each net boundary is not only only limited to
In default amount scope, also need to consider the factors such as actual administrative division, road network and building, such as:It is corresponding in net boundary
Latitude and longitude value confirmation during, amount corresponding to some complete road network may slightly above or less than default amount model
Enclose, will the complete road network border latitude and longitude value of the latitude and longitude value as net boundary;Similarly, some building is divided
Enter grid, can cause amount in the grid may slightly above default amount scope, will whole of the building be partitioned into grid,
Certainly can also select to remove this whole building from grid, although the amount in grid may slightly lower than default amount
Scope, advantage of this is that being easy to manage.
Step S103:Different grids are marked off on map according to the latitude and longitude value, wherein each grid encloses choosing
The amount in region is all fallen within the range of default amount.Can be in the following way:Such as just five towns of a, b, c, d, e in step S102
Amount all fall within the range of the default amount, and obtained the latitude and longitude value put on each town border, can be by map
Point corresponding to upper each latitude and longitude value of connection marks off different grids, as shown in figure 5, five grids of a, b, c, d, e are marked off, wherein
The amount in the region that each grid encloses choosing is all fallen within the range of default amount.After mesh generation is good, step S104 is performed:In real time
Or timing judges that amount is whether in the range of default amount in gridCan be in the following way:The amount in each region is real-time
Change, amount corresponding to database can be obtained in real time, judge that amount is whether in the range of default amount in grid, in other realities
Apply in mode, it is such as every because the change of some region amounts is very slowly, can also regularly to go to obtain amount corresponding to database
Even just went to obtain the amount of regional in database every 1 year every two weeks, to judge that whether amount is pre- in grid
If in the range of amount.
If amount performs step S105 not in the range of default amount in grid:It is again true according to default amount scope
Determine latitude and longitude value corresponding to net boundary.After determining latitude and longitude value, step S106 is performed:According to the latitude and longitude value in map
On the net boundary is adjusted.Can be in the following way:Such as a towns in Fig. 5, because of various reasons, more and more
People moves away from or moved into a towns so that the amount in a towns in the range of default amount, does not need to redefine grid corresponding to a towns now
Latitude and longitude value corresponding to border.Fig. 2, Fig. 3 and Fig. 4 are referred to, following two situations can be divided into:
Step S201 does not do repeat specification with step S104.Step S202:Whether amount is less than default amount model in grid
Enclose minimumIf so, then perform step S203:Obtain the inhabitation amount of the grid adjacent building, judge in grid amount with
Adjacent building amount and whether in the range of default amount.Can be in the following way:As shown in figure 4, there is building in h grids
D3, d4 are a buildings of neighbouring h grids, and now the amount in h grids is less than default amount scope minimum, then pays the utmost attention to
The building nearest from h grids, in the present embodiment, d4 are the building nearest from h grids, judge that amount is built with d4 in h grids
The amount built and whether in the range of default amount.If in the range of default amount, step S204 is performed:If in default amount
In the range of, then the latitude and longitude value on adjacent building border is obtained, and net boundary is expanded to adjacent building according to the latitude and longitude value
Border.Can be in the following way:The latitude and longitude value on d4 buildings border is obtained, and net boundary is expanded extremely according to the latitude and longitude value
Adjacent building border, as shown in Fig. 4 dotted lines, net boundary expansion, d4 is included in h grids.If amount is built with d4 in h grids
The amount built and not in the range of default amount, and amount and still less than the minimum for presetting amount scope, then continue acquisition one
The amount of individual adjacent building, then judge amount and whether presetting in the range of amount.
Step S301 does not do repeat specification with step S104.Step S302:Whether amount is higher than default amount model in grid
Enclose peakIf so, then perform step S303:The inhabitation amount of the building on neighbouring border in the grid is obtained, judges grid
Whether interior amount is with adjacent building amount difference in the range of default amount.Can be in the following way:As shown in figure 4, have in f grids
Building d1 and d2, wherein d2 is a building on neighbouring border in f grids, and now the amount in f grids is higher than default amount
Scope peak, then pay the utmost attention in f grids and from f grids adjacent to the nearest building in border, in the present embodiment, d2 is
In f grids, and from f grids adjacent to the nearest building in border, judge amount is built with d2 in f grids amount difference whether pre-
If in the range of amount.If in the range of default amount, step S304 is performed:If in the range of default amount, described in acquisition
The latitude and longitude value on border is built, and net boundary is reduced to adjacent building border according to the latitude and longitude value.Such as lower section can be used
Formula:The latitude and longitude value on d2 buildings border is obtained, and net boundary is reduced to adjacent building border according to the latitude and longitude value, is such as schemed
Shown in 4 dotted lines, net boundary is reduced, and d2 is marked off into f grids.If amount and the amount difference of d2 buildings are not being preset in f grids
In the range of amount, and amount difference then continues to obtain in f grids adjacent to one of border still greater than the peak of default amount scope
The amount of building, then judge amount difference whether in the range of default amount.
According to default amount scope grid division so that the amount in each grid works as net in the range of default amount
Amount changes in lattice, when not falling within the range of default amount, will redefine net boundary pair according to default amount scope
The latitude and longitude value answered, the net boundary is adjusted on map according to the latitude and longitude value, surfed the Net by watching map
The change of lattice, the situation of change of personnel amount can be intuitively known very much at a glance, can also follow up money simultaneously according to the situation
The scheduling in source and redistribute, maximally utilized resource.
Referring to Fig. 6, in the present embodiment, a kind of specific implementation for the system for becoming dynamic mesh dynamic division based on personnel
Technical scheme is as follows:
A kind of system 600 for becoming dynamic mesh dynamic division based on personnel, including:Amount acquisition module 601, mesh generation mould
Block 602 and grid adjusting module 603;The amount acquisition module 601 is used for:Obtain different zones population amount on map;Institute
Mesh generation module 602 is stated to be used for:The latitude and longitude value according to corresponding to default amount scope determines each net boundary, according to the warp
Latitude value marks off different grids on map, wherein the amount that each grid encloses the region of choosing all falls within default amount scope
It is interior;The grid adjusting module 603 is used for:In real time or timing judges that amount is whether in the range of default amount in grid, if net
Amount then redefines latitude and longitude value corresponding to net boundary not in the range of default amount according to default amount scope in lattice,
And the net boundary is adjusted on map according to the latitude and longitude value.
Further, the mesh generation module 602 is additionally operable to:Each summit pair of each grid is determined according to default amount scope
The latitude and longitude value answered.
Further, the grid adjusting module 603 is additionally operable to:If it is minimum to be less than default amount scope for amount in grid
Value, then the inhabitation amount of the grid adjacent building is obtained, judge that amount is with adjacent building amount and whether default in grid
In the range of amount, if in the range of default amount, the latitude and longitude value on adjacent building border is obtained, and according to the latitude and longitude value
Net boundary is expanded to adjacent building border.
Further, the grid adjusting module 603 is additionally operable to:If amount is higher than default amount scope highest in grid
Value, then the inhabitation amount of the building on neighbouring border in the grid is obtained, judges that amount is with adjacent building amount difference in grid
It is no, if in the range of default amount, to obtain the latitude and longitude value on the building border in the range of default amount, and according to described
Latitude and longitude value reduces net boundary to the building border.
Further, the mesh generation module 602 is additionally operable to:Determine that each net boundary is corresponding according to default amount scope
Latitude and longitude value, and according to administrative division and urban planning adjustment net boundary corresponding to latitude and longitude value, the urban planning bag
Include:Road network and building.Different zones population amount on map is obtained by amount acquisition module 601, passes through mesh generation module
602 according to default amount scope grid division so that the amount in each grid is in the range of default amount, when family in grid
Number changes, will be again true according to default amount scope by grid adjusting module 603 when not falling within the range of default amount
Determine latitude and longitude value corresponding to net boundary, the net boundary is adjusted on map according to the latitude and longitude value, passed through
The change of grid on map is watched, can intuitively know very much the situation of change of personnel amount at a glance, also can be according to the feelings
Condition simultaneously follow up resource scheduling and redistribute, maximally utilized resource.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality
Body or operation make a distinction with another entity or operation, and not necessarily require or imply and deposited between these entities or operation
In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to
Nonexcludability includes, so that process, method, article or terminal device including a series of elements not only include those
Key element, but also the other element including being not expressly set out, or it is this process, method, article or end also to include
The intrinsic key element of end equipment.In the absence of more restrictions, limited by sentence " including ... " or " including ... "
Key element, it is not excluded that other key element in the process including the key element, method, article or terminal device also be present.This
Outside, herein, " being more than ", " being less than ", " exceeding " etc. are interpreted as not including this number;" more than ", " following ", " within " etc. understand
It is to include this number.
It should be understood by those skilled in the art that, the various embodiments described above can be provided as method, apparatus or computer program production
Product.These embodiments can use the embodiment in terms of complete hardware embodiment, complete software embodiment or combination software and hardware
Form.All or part of step in the method that the various embodiments described above are related to can by program come instruct the hardware of correlation come
Complete, described program can be stored in the storage medium that computer equipment can be read, for performing the various embodiments described above side
All or part of step described in method.The computer equipment, include but is not limited to:Personal computer, server, general-purpose computations
It is machine, special-purpose computer, the network equipment, embedded device, programmable device, intelligent mobile terminal, intelligent home device, wearable
Smart machine, vehicle intelligent equipment etc.;Described storage medium, include but is not limited to:RAM, ROM, magnetic disc, tape, CD, sudden strain of a muscle
Deposit, USB flash disk, mobile hard disk, storage card, memory stick, webserver storage, network cloud storage etc..
The various embodiments described above are with reference to method, equipment (system) and the computer program product according to embodiment
Flow chart and/or block diagram describe.It should be understood that can be by every in computer program instructions implementation process figure and/or block diagram
One flow and/or the flow in square frame and flow chart and/or block diagram and/or the combination of square frame.These computers can be provided
Programmed instruction is to the processor of computer equipment to produce a machine so that passes through the finger of the computing device of computer equipment
Order, which produces, to be used to realize what is specified in one flow of flow chart or multiple flows and/or one square frame of block diagram or multiple square frames
The device of function.
These computer program instructions may be alternatively stored in the computer that computer equipment can be guided to work in a specific way and set
In standby readable memory so that the instruction being stored in the computer equipment readable memory produces the manufacture for including command device
Product, the command device is realized to be referred in one flow of flow chart or multiple flows and/or one square frame of block diagram or multiple square frames
Fixed function.
These computer program instructions can be also loaded on computer equipment so that performed on a computing device a series of
Operating procedure is to produce computer implemented processing, so as to which the instruction performed on a computing device is provided for realizing in flow
The step of function of being specified in one flow of figure or multiple flows and/or one square frame of block diagram or multiple square frames.
Although the various embodiments described above are described, those skilled in the art once know basic wound
The property made concept, then other change and modification can be made to these embodiments, so embodiments of the invention are the foregoing is only,
Not thereby the scope of patent protection of the present invention, every equivalent structure made using description of the invention and accompanying drawing content are limited
Or equivalent flow conversion, or other related technical areas are directly or indirectly used in, similarly it is included in the patent of the present invention
Within protection domain.
Claims (10)
- A kind of 1. method for becoming dynamic mesh dynamic division based on personnel, it is characterised in that comprise the following steps:Obtain different zones population amount on map;The latitude and longitude value according to corresponding to default amount scope determines each net boundary, is divided according to the latitude and longitude value on map Go out different grids, wherein the amount that each grid encloses the region of choosing is all fallen within the range of default amount;In real time or timing judges that amount is whether in the range of default amount in grid, if amount is not in default amount scope in grid It is interior, then latitude and longitude value corresponding to net boundary is redefined according to default amount scope, and according to the latitude and longitude value in map On the net boundary is adjusted.
- 2. a kind of method for becoming dynamic mesh dynamic division based on personnel according to claim 1, it is characterised in that described " then determining latitude and longitude value corresponding to each net boundary according to default amount scope " also includes:Determined according to default amount scope each The latitude and longitude value of each vertex correspondence of grid.
- 3. a kind of method for becoming dynamic mesh dynamic division based on personnel according to claim 1, it is characterised in that described " if amount redefines longitude and latitude corresponding to net boundary not in the range of default amount according to default amount scope in grid Angle value, and the net boundary is adjusted on map according to the latitude and longitude value ", in addition to step:If amount is less than default amount scope minimum in grid, the inhabitation amount of the grid adjacent building is obtained, is judged Whether amount, if in the range of default amount, obtains neighbouring with adjacent building amount and in the range of default amount in grid The latitude and longitude value on border is built, and net boundary is expanded to adjacent building border according to the latitude and longitude value.
- 4. a kind of method for becoming dynamic mesh dynamic division based on personnel according to claim 1, it is characterised in that described " if amount redefines longitude and latitude corresponding to net boundary not in the range of default amount according to default amount scope in grid Angle value, and the net boundary is adjusted on map according to the latitude and longitude value ", in addition to step:If amount is higher than default amount scope peak in grid, the inhabitation family of the building on neighbouring border in the grid is obtained Number, judge that whether amount is being preset in the range of amount with adjacent building amount difference in grid, if in the range of default amount, obtains The latitude and longitude value on the building border is taken, and net boundary is reduced to the building border according to the latitude and longitude value.
- A kind of 5. method for becoming dynamic mesh dynamic division based on personnel according to claim 1, it is characterised in that" latitude and longitude value according to corresponding to default amount scope determines each net boundary " also includes:The latitude and longitude value according to corresponding to default amount scope determines each net boundary,And the latitude and longitude value according to corresponding to administrative division and urban planning adjustment net boundary, the urban planning include:Road network And building.
- A kind of 6. system for becoming dynamic mesh dynamic division based on personnel, it is characterised in that including:Amount acquisition module, grid are drawn Sub-module and grid adjusting module;The amount acquisition module is used for:Obtain different zones population amount on map;The mesh generation module is used for:The latitude and longitude value according to corresponding to default amount scope determines each net boundary, according to institute State latitude and longitude value and different grids are marked off on map, wherein the amount that each grid encloses the region of choosing all falls within default amount In the range of;The grid adjusting module is used for:In real time or timing judges that amount is whether in the range of default amount in grid, if grid Interior amount then redefines latitude and longitude value corresponding to net boundary not in the range of default amount according to default amount scope, and The net boundary is adjusted on map according to the latitude and longitude value.
- A kind of 7. system for becoming dynamic mesh dynamic division based on personnel according to claim 6, it is characterised in thatThe mesh generation module is additionally operable to:The latitude and longitude value of each vertex correspondence of each grid is determined according to default amount scope.
- A kind of 8. system for becoming dynamic mesh dynamic division based on personnel according to claim 6, it is characterised in thatThe grid adjusting module is additionally operable to:If amount is less than default amount scope minimum in grid, the grid is obtained The inhabitation amount of adjacent building, judge that amount is with adjacent building amount and whether in the range of default amount in grid, if pre- If in the range of amount, then the latitude and longitude value on adjacent building border is obtained, and net boundary is expanded to neighbour according to the latitude and longitude value Nearly building border.
- A kind of 9. system for becoming dynamic mesh dynamic division based on personnel according to claim 6, it is characterised in thatThe grid adjusting module is additionally operable to:If amount is higher than default amount scope peak in grid, the grid is obtained The inhabitation amount of the building on interior neighbouring border, judge that whether amount and adjacent building amount difference are in default amount scope in grid It is interior, if in the range of default amount, the latitude and longitude value on the building border is obtained, and grid is reduced according to the latitude and longitude value Border to the building border.
- A kind of 10. system for becoming dynamic mesh dynamic division based on personnel according to claim 6, it is characterised in thatThe mesh generation module is additionally operable to:The latitude and longitude value according to corresponding to default amount scope determines each net boundary, and root Include according to latitude and longitude value, the urban planning corresponding to administrative division and urban planning adjustment net boundary:Road network and building.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710651762.1A CN107423912A (en) | 2017-08-02 | 2017-08-02 | A kind of method and system for becoming dynamic mesh dynamic division based on personnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710651762.1A CN107423912A (en) | 2017-08-02 | 2017-08-02 | A kind of method and system for becoming dynamic mesh dynamic division based on personnel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107423912A true CN107423912A (en) | 2017-12-01 |
Family
ID=60437165
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710651762.1A Pending CN107423912A (en) | 2017-08-02 | 2017-08-02 | A kind of method and system for becoming dynamic mesh dynamic division based on personnel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107423912A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109146360A (en) * | 2018-07-24 | 2019-01-04 | 拉扎斯网络科技(上海)有限公司 | Grid establishing method and device and distribution method and device |
CN109308839A (en) * | 2018-11-01 | 2019-02-05 | 武汉科技大学 | A kind of map aid mark device |
CN111967698A (en) * | 2020-10-23 | 2020-11-20 | 北京国新智电新能源科技有限责任公司 | Electric automobile charging system and device based on mobile charging pile scheduling |
CN112016771A (en) * | 2020-10-23 | 2020-12-01 | 北京国新智电新能源科技有限责任公司 | Mobile charging pile scheduling method and system based on electric vehicle demand prediction |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1786948A (en) * | 2005-09-30 | 2006-06-14 | 南京市鼓楼区民政局 | Method for setting service information and communicty managing based on GIS |
CN101083618A (en) * | 2007-06-28 | 2007-12-05 | 重庆大学 | Wireless mobile station for supporting large-capacity mobile grid network |
CN102103635A (en) * | 2011-01-05 | 2011-06-22 | 安徽兴博远实信息科技有限公司 | Household condition grid management mode of population social affair comprehensive service information |
CN102959996A (en) * | 2010-10-27 | 2013-03-06 | 株式会社Ntt都科摩 | Number of terminal estimation device and number of terminal estimation method |
CN104021274A (en) * | 2014-05-08 | 2014-09-03 | 烽火通信科技股份有限公司 | Dynamic clustering algorithm for geographic grids |
EP2927644A1 (en) * | 2014-03-31 | 2015-10-07 | Alcatel Lucent | System and method for performing problem-solving in smart grid networks |
CN105046267B (en) * | 2015-05-19 | 2018-08-28 | 广州杰赛科技股份有限公司 | Generation method, generating means, polymerization and the polyplant of dynamic grid |
-
2017
- 2017-08-02 CN CN201710651762.1A patent/CN107423912A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1786948A (en) * | 2005-09-30 | 2006-06-14 | 南京市鼓楼区民政局 | Method for setting service information and communicty managing based on GIS |
CN101083618A (en) * | 2007-06-28 | 2007-12-05 | 重庆大学 | Wireless mobile station for supporting large-capacity mobile grid network |
CN102959996A (en) * | 2010-10-27 | 2013-03-06 | 株式会社Ntt都科摩 | Number of terminal estimation device and number of terminal estimation method |
CN102103635A (en) * | 2011-01-05 | 2011-06-22 | 安徽兴博远实信息科技有限公司 | Household condition grid management mode of population social affair comprehensive service information |
EP2927644A1 (en) * | 2014-03-31 | 2015-10-07 | Alcatel Lucent | System and method for performing problem-solving in smart grid networks |
CN104021274A (en) * | 2014-05-08 | 2014-09-03 | 烽火通信科技股份有限公司 | Dynamic clustering algorithm for geographic grids |
CN105046267B (en) * | 2015-05-19 | 2018-08-28 | 广州杰赛科技股份有限公司 | Generation method, generating means, polymerization and the polyplant of dynamic grid |
Non-Patent Citations (4)
Title |
---|
丁占峰: "基于 GIS 的人口网格化管理系统的设计与实现", 《中国优秀硕士学位论文全文数据库·基础科学辑》 * |
李淑娟等: "城市建筑物人口时空分布模型与实验分析――以北京东华门街道为例 ", 《地球信息科学学报》 * |
梁亚婷等: "人口的时空分布模拟及其在灾害与风险管理中的应用 ", 《灾害学》 * |
祁瑞等: "城市统一空间基础网格划分", 《地理空间信息》 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109146360A (en) * | 2018-07-24 | 2019-01-04 | 拉扎斯网络科技(上海)有限公司 | Grid establishing method and device and distribution method and device |
CN109146360B (en) * | 2018-07-24 | 2022-04-26 | 拉扎斯网络科技(上海)有限公司 | Grid establishing method and device and distribution method and device |
CN109308839A (en) * | 2018-11-01 | 2019-02-05 | 武汉科技大学 | A kind of map aid mark device |
CN109308839B (en) * | 2018-11-01 | 2020-12-29 | 武汉科技大学 | Map auxiliary marking device |
CN111967698A (en) * | 2020-10-23 | 2020-11-20 | 北京国新智电新能源科技有限责任公司 | Electric automobile charging system and device based on mobile charging pile scheduling |
CN112016771A (en) * | 2020-10-23 | 2020-12-01 | 北京国新智电新能源科技有限责任公司 | Mobile charging pile scheduling method and system based on electric vehicle demand prediction |
CN111967698B (en) * | 2020-10-23 | 2021-01-29 | 北京国新智电新能源科技有限责任公司 | Electric automobile charging system and device based on mobile charging pile scheduling |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107423912A (en) | A kind of method and system for becoming dynamic mesh dynamic division based on personnel | |
CN104077446B (en) | The method and system of two-dimentional electrical construction document are extracted from digital three-dimemsional model | |
Gong et al. | Spatiotemporal dynamics in the cultivated and built-up land of Guangzhou: Insights from zoning | |
CN106992517A (en) | Electric power line loss analysis method, device and system | |
CN105528460A (en) | Establishing method of tile pyramid model and tile reading method | |
CN103810753A (en) | Method for visually showing power grid dispatching businesses | |
CN103970835A (en) | Vector map data storage method and system | |
CN110580263B (en) | Method and system for generating wind resource data report | |
CN103516912A (en) | Mobile terminal locating and power saving method | |
CN103714124B (en) | Ultra-large-scale low-voltage data processing method | |
CN103049640A (en) | Power grid multi-state and multi-dimensional display control method based on geographic information system | |
CN107451740A (en) | A kind of method and system of the scheduling of resource changed based on grid cell | |
CN108509495A (en) | The processing method and processing device of seismic data, storage medium, processor | |
Rao et al. | Comparisons of three‐dimensional urban forms in different urban expansion types: 58 sample cities in China | |
CN118036165B (en) | Automatic generation method, device and storage medium for skirt house form of high-rise building | |
CN112580977B (en) | Grid supervision method and device for distribution network service, computer equipment and storage medium | |
CN104361534A (en) | Transformer substation site selection method capable of achieving accurate positioning | |
CN112541047A (en) | Mass data aggregation method suitable for multistage gridding management system | |
CN109087401B (en) | Three-dimensional review method and system for transformer substation engineering design result | |
CN115588086A (en) | Map dividing method, map dividing device, computer readable storage medium and processor | |
CN116488335A (en) | Dynamic monitoring and allocation method, system and equipment for electric power consumption of urban scale | |
CN102117495B (en) | New data partitioning method and device in three-dimensional modeling | |
CN108597013B (en) | Method for snapshot map filling of meteorological hydrological data in specific area | |
CN115168112B (en) | Method, device, equipment and medium for restoring section data under dynamic section change | |
CN116522045A (en) | Method, device, equipment and medium for calculating floor space passable capacity of electric power facility |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171201 |