CN107420115A - A kind of shallow-depth-excavation tunnel fall changes arch processing unit and its processing method - Google Patents

A kind of shallow-depth-excavation tunnel fall changes arch processing unit and its processing method Download PDF

Info

Publication number
CN107420115A
CN107420115A CN201710342983.0A CN201710342983A CN107420115A CN 107420115 A CN107420115 A CN 107420115A CN 201710342983 A CN201710342983 A CN 201710342983A CN 107420115 A CN107420115 A CN 107420115A
Authority
CN
China
Prior art keywords
arch
shelf
steel arch
haunch
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710342983.0A
Other languages
Chinese (zh)
Inventor
郭宝德
梁成舸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangmen Municipal Enterprise Group Co Ltd
Original Assignee
Jiangmen Municipal Enterprise Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangmen Municipal Enterprise Group Co Ltd filed Critical Jiangmen Municipal Enterprise Group Co Ltd
Priority to CN201710342983.0A priority Critical patent/CN107420115A/en
Publication of CN107420115A publication Critical patent/CN107420115A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a kind of shallow-depth-excavation tunnel fall to change arch processing unit, including below massif pitfall and for Shed-pipe Advanced Support, the vault steel arch-shelf below Shed-pipe Advanced Support, the haunch steel arch-shelf being connected with vault steel arch-shelf both sides, the inverted arch steel arch-shelf being connected with the haunch steel arch-shelf bottom of vault steel arch-shelf both sides of supporting massif, the inner bottom part of inverted arch steel arch-shelf has poured inverted arch concrete, and the inner side of vault steel arch-shelf and haunch steel arch-shelf has poured secondary lining concrete;Vault steel arch-shelf, haunch steel arch-shelf, the installation connection of inverted arch steel arch-shelf form closed hoop structure.The shallow-depth-excavation tunnel fall changes arch processing unit and its processing method after tunnel generation fall accident, can obtain timely and effectively technical finesse, it is ensured that construction quality and construction safety.

Description

A kind of shallow-depth-excavation tunnel fall changes arch processing unit and its processing method
Technical field
The present invention relates to a kind of technical field of mountain tunnel shallow burial hidden digging construction, especially mainly for shallow buried covered excavation Tunnel, after excavating stage massif and fall occurs, how to handle a kind of shallow embedding that landslide section and vault sinking section propose Bored tunnel fall changes arch processing unit and its processing method.
Background technology
Mountain tunnel, particularly those height above sea level are not high, buried depth is shallower short and small tunnel when being excavated using benching tunnelling method, due to Up/down steps are too long for gap, and inverted arch bow member is installed not in time, and arch ring can not close as early as possible, the reasons such as secondary lining does not catch up with, then Rainy season construction is met, rainwater is largely assembled in massif, and vault load-bearing increases severely, and it is common engineering that the landslide of roof fall formula, which occurs, for tunnel Accident.
The direct result that tunnel occurs to present after fall is that mountain upper ground surface huge pitfall occurs, and a large amount of soil bodys pour in In hole, landslide Duan Chuzhi steelframe almost all collapses, and landslide section front and rear sides vault sinking, first branch steelframe invades tunnel clearance circle Limit.
The method for handling such Tunnel Landslide accident is more, but treatment effect is very different, cannot definitely protect safely Card.For standard construction, improve treatment effect, improve operating efficiency, increase safety guarantee, research and probe is a kind of safely and effectively, Practicable tunnel fall changes arch handling process to be had very for the construction risk for reducing shallow buried covered excavation mountain tunnel Important meaning.
The content of the invention
It is an object of the invention to solve the shortcomings that above-mentioned prior art and deficiency, there is provided a kind of shallow-depth-excavation tunnel roof fall Arch processing unit and its processing method are changed in landslide, and the shallow-depth-excavation tunnel fall changes arch processing unit and its processing method energy It is enough that shallow buried covered excavation mountain tunnel is carried out after fall accident occurs, timely and effectively technical finesse can be obtained, it is ensured that work Cheng Zhiliang and construction safety, safety reliability is high, construction quality is guaranteed.
The present invention solve technical scheme that its technical problem uses for:A kind of shallow-depth-excavation tunnel fall changes arch processing Device, including positioned at massif pitfall lower section and the Shed-pipe Advanced Support for supporting massif, the vault steel arch below Shed-pipe Advanced Support Frame, the haunch steel arch-shelf being connected with vault steel arch-shelf both sides, face upward with what the haunch steel arch-shelf bottom of vault steel arch-shelf both sides was connected Encircle steel arch-shelf, the inner bottom part of inverted arch steel arch-shelf has poured inverted arch concrete, and the inner side of vault steel arch-shelf and haunch steel arch-shelf is poured Secondary lining concrete is built;Vault steel arch-shelf, haunch steel arch-shelf, the installation connection of inverted arch steel arch-shelf form closed hoop structure.
Further, the Shed-pipe Advanced Support top, which has poured, is oriented to wall or is erected with guiding trestle, and Shed-pipe Advanced Support is provided with pipe Canopy drills;It is oriented to wall or guiding trestle is able to ensure that the drilling of pipe canopy without departing from supporting scope.
Further, after described vault steel arch-shelf, haunch steel arch-shelf, the installation of inverted arch steel arch-shelf are connected and inverted arch mixes Closely coupled integral type closed hoop structure is formed after solidifying soil and secondary lining concreting, after ensureing each steel arch-shelf cyclization Supporting is strong.
Further, the pipe canopy of described Shed-pipe Advanced Support use a diameter of 108mm, wall thickness for 6mm hot rolled seamless steel tube, The supporting length of Shed-pipe Advanced Support exceeds 5~8m of process range.
It is in addition, the invention further relates to a kind of shallow-depth-excavation tunnel fall to change arch processing method, the step of the processing:
(1)Massif pitfall backfills:After fall occurs for tunnel, that reconnoitres massif original ground first collapses scope, is fallen into massif Set up a cordon around hole, and protection network is set, prevent that people and poultry crash into pitfall on mountain;Excavate and intercept water on massif pitfall periphery Ditch, prevent surface water from importing in massif pitfall, penetrate into tunnel, secondary landslide occurs;After execution conditions possess, using cement or water Soil backfills massif pitfall, often backfills one layer, and appropriate water must be sprayed into massif pitfall, ensures that cement or soil cement can be hard Change, if rain work, watering link can be removed from;
(2)Shed-pipe Advanced Support:Should first construct to be formed before the drilling of pipe canopy and be oriented to wall or set up guiding trestle, pipe canopy using diameter 108mm, Wall thickness 6mm hot rolled seamless steel tube, supporting length exceed 5~8m of process range, to carrying out slurries in hot rolled seamless steel tube to full Full closely knit, final grouting pressure is not less than 1.0MPa;
(3)Haunch excavates and the installation of haunch steel arch-shelf:After pipe canopy strength of cement grout reaches design strength, tunnel is excavated by Pin slottings Road both sides haunch part, installation haunch steel arch-shelf and combined bolting and shotcrete synchronous coordination are carried out, and make the arch springing and lock pin of haunch steel arch-shelf Anchor tube firm welding;
(4)Inverted arch excavates and the installation of inverted arch steel arch-shelf:Inverted arch is excavated in slotting, installs inverted arch steel arch-shelf, makes inverted arch steel arch-shelf and arch Waist steel arch-shelf firmly connects;
(5)Vault excavates and the installation of vault steel arch-shelf:Vault, installation vault steel arch-shelf and combined bolting and shotcrete are excavated by Pin slottings, it is complete Into the connection with haunch steel arch-shelf, haunch steel arch-shelf, inverted arch steel arch-shelf and vault steel arch-shelf is set to be closed into the steel arch circle of ring-type;
(6)Inverted arch concreting:Excavation supporting often complete four circulation, Excavation Length about 2m, inverted arch concreting once, Or situation of change can be restrained according to country rock, adjust inverted arch concreting length;
(7)Secondary lining:After inverted arch concreting length reaches the length of a lining trolley, secondary lining of constructing is secondary After the completion of lining cutting, construction is completed, processing terminates.
Further, described step(3)In, haunch is excavated and haunch steel arch-shelf is arranged on before preliminary bracing construction, Lining trolley is promoted into the scope of operation, serves as the emergent protection place of operating personnel;Excavation uses slotting local excavation, reduces as far as possible Disturbance to the periphery soil body.
Further, the step(7)In secondary lining should carry out after the inverted arch concrete, shorten secondary lining as far as possible Build the distance between excavation face.
In summary, shallow-depth-excavation tunnel fall of the invention changes arch processing unit and its processing method with as follows Advantage:
(1)Using cement or cement earthen backfill massif pitfall, massif pitfall periphery soil strength is improved, increases its stability, has The effect prevention secondary landslide in tunnel;
(2)Using the reliable Shed-pipe Advanced Support of supporting, change arch process for follow-up excavation and carry arch safety work barrier, and utilize lining cutting platform Car protects place as emergent, the life security of operating personnel is protected;
(3)Ring structure is closed into using each steel arch-shelf, with reference to the scheme of inverted arch concrete and secondary lining, effectively enhanced just The rigidity of phase supporting arch ring, the deformation of country rock are controlled, and then improve the resistance to overturning in tunnel.
Brief description of the drawings
Below in conjunction with the accompanying drawings, and by reference to following detailed description, the present invention will be better understood and understand its advantage And feature, accompanying drawing are used to illustrate the present invention, are not intended to limit the present invention;Representing the accompanying drawing of structure may be not necessarily drawn to scale;And And in accompanying drawing, same or similar element indicates same or similar label:
Fig. 1 is the schematic cross-sectional view that a kind of shallow-depth-excavation tunnel fall of the present invention changes arch processing unit;
Fig. 2 is that a kind of shallow-depth-excavation tunnel fall of the present invention changes schematic diagram of the arch processing unit in tunnel.
Embodiment
Embodiment 1
A kind of shallow-depth-excavation tunnel fall described described in the present embodiment 1 changes arch processing unit, as depicted in figs. 1 and 2, bag Include positioned at the lower section of massif pitfall 1 and the Shed-pipe Advanced Support 2 for supporting massif, the vault steel arch-shelf 5 below Shed-pipe Advanced Support, with The haunch steel arch-shelf 3 of vault steel arch-shelf both sides connection, the inverted arch steel being connected with the haunch steel arch-shelf bottom of vault steel arch-shelf both sides Bow member 4, the inner bottom part of inverted arch steel arch-shelf have poured inverted arch concrete 6, and the inner side of vault steel arch-shelf and haunch steel arch-shelf pours There is secondary lining concrete seven;Vault steel arch-shelf, haunch steel arch-shelf, the installation connection of inverted arch steel arch-shelf form closed hoop structure.
The Shed-pipe Advanced Support top, which has poured, to be oriented to wall or is erected with guiding trestle, and Shed-pipe Advanced Support drills provided with pipe canopy;It is oriented to Wall or guiding trestle are able to ensure that the drilling of pipe canopy without departing from supporting scope.
The vault steel arch-shelf, haunch steel arch-shelf, inverted arch steel arch-shelf installation be connected after and inverted arch concrete and secondary lining Building concrete forms closely coupled integral type closed hoop structure after pouring, supporting is strong after ensureing each steel arch-shelf cyclization.
The pipe canopy of the Shed-pipe Advanced Support uses a diameter of 108mm, wall thickness as 6mm hot rolled seamless steel tube, the branch of Shed-pipe Advanced Support Shield length exceeds 5~8m of process range.
It is in addition, the invention further relates to a kind of shallow-depth-excavation tunnel fall to change arch processing method, the step of the processing:
(1)Massif pitfall backfills:After fall occurs for tunnel, that reconnoitres massif original ground first collapses scope, is fallen into massif Set up a cordon around hole, and protection network is set, prevent that people and poultry crash into pitfall on mountain;Excavate and intercept water on massif pitfall periphery Ditch, prevent surface water from importing in massif pitfall, penetrate into tunnel, secondary landslide occurs;After execution conditions possess, using cement or water Soil backfills massif pitfall, often backfills one layer, and appropriate water must be sprayed into massif pitfall, ensures that cement or soil cement can be hard Change, if rain work, watering link can be removed from;
(2)Shed-pipe Advanced Support:Should first construct to be formed before the drilling of pipe canopy and be oriented to wall or set up guiding trestle, pipe canopy using diameter 108mm, Wall thickness 6mm hot rolled seamless steel tube, supporting length exceed 5~8m of process range, to carrying out slurries in hot rolled seamless steel tube to full Full closely knit, final grouting pressure is not less than 1.0MPa;
(3)Haunch excavates and the installation of haunch steel arch-shelf:After pipe canopy strength of cement grout reaches design strength, tunnel is excavated by Pin slottings Road both sides haunch part, installation haunch steel arch-shelf and combined bolting and shotcrete synchronous coordination are carried out, and make the arch springing and lock pin of haunch steel arch-shelf Anchor tube firm welding;
(4)Inverted arch excavates and the installation of inverted arch steel arch-shelf:Inverted arch is excavated in slotting, installs inverted arch steel arch-shelf, makes inverted arch steel arch-shelf and arch Waist steel arch-shelf firmly connects;
(5)Vault excavates and the installation of vault steel arch-shelf:Vault, installation vault steel arch-shelf and combined bolting and shotcrete are excavated by Pin slottings, it is complete Into the connection with haunch steel arch-shelf, haunch steel arch-shelf, inverted arch steel arch-shelf and vault steel arch-shelf is set to be closed into the steel arch circle of ring-type;
(6)Inverted arch concreting:Excavation supporting often complete four circulation, Excavation Length about 2m, inverted arch concreting once, Or situation of change can be restrained according to country rock, adjust inverted arch concreting length;
(7)Secondary lining:After inverted arch concreting length reaches the length of a lining trolley, secondary lining of constructing is secondary After the completion of lining cutting, construction is completed, processing terminates.
The step(3)In, haunch is excavated and haunch steel arch-shelf is arranged on before preliminary bracing construction, and lining trolley 8 is pushed away Enter the scope of operation, serve as the emergent protection place of operating personnel;Excavation uses slotting local excavation, reduces as far as possible to the periphery soil body Disturbance.
The step(7)In secondary lining should carry out after the inverted arch concrete, shorten secondary lining and excavation face as far as possible The distance between.
Label 9 in Fig. 2 is expressed as vault sinking end, and label 10 is expressed as the region that caves in, and table 11 is expressed as face, marks Numbers 12 are expressed as IV grade of country rock.
The above described is only a preferred embodiment of the present invention, not the structure of the present invention is made any formal Limitation.Any simple modification, equivalent change and modification that every technical spirit according to the present invention is made to above example, In the range of still falling within technical scheme.

Claims (7)

1. a kind of shallow-depth-excavation tunnel fall changes arch processing unit, it is characterised in that including below the massif pitfall simultaneously Shed-pipe Advanced Support for supporting massif, the vault steel arch-shelf below Shed-pipe Advanced Support, the arch being connected with vault steel arch-shelf both sides Waist steel arch-shelf, the inverted arch steel arch-shelf being connected with the haunch steel arch-shelf bottom of vault steel arch-shelf both sides, the inner bottom part of inverted arch steel arch-shelf Inverted arch concrete is poured, the inner side of vault steel arch-shelf and haunch steel arch-shelf has poured secondary lining concrete;Vault steel arch Frame, haunch steel arch-shelf, the installation connection of inverted arch steel arch-shelf form closed hoop structure.
2. a kind of shallow-depth-excavation tunnel fall according to claim 1 changes arch processing unit, it is characterised in that described Shed-pipe Advanced Support top, which has poured, to be oriented to wall or is erected with guiding trestle, and Shed-pipe Advanced Support drills provided with pipe canopy.
3. a kind of shallow-depth-excavation tunnel fall according to claim 2 changes arch processing unit, it is characterised in that described Vault steel arch-shelf, haunch steel arch-shelf, inverted arch steel arch-shelf installation be connected after and inverted arch concrete and secondary lining concrete Closely coupled integral type closed hoop structure is formed after pouring.
4. a kind of shallow-depth-excavation tunnel fall according to claim 3 changes arch processing unit, it is characterised in that described The pipe canopy of Shed-pipe Advanced Support use a diameter of 108mm, wall thickness the supporting length of Shed-pipe Advanced Support surpass for 6mm hot rolled seamless steel tube Go out 5~8m of process range.
5. a kind of shallow-depth-excavation tunnel fall changes arch processing method, it is characterised in that is the step of the processing:
(1)Massif pitfall backfills:After fall occurs for tunnel, that reconnoitres massif original ground first collapses scope, is fallen into massif Set up a cordon around hole, and protection network is set, prevent that people and poultry crash into pitfall on mountain;Excavate and intercept water on massif pitfall periphery Ditch, prevent surface water from importing in massif pitfall, penetrate into tunnel, secondary landslide occurs;After execution conditions possess, using cement or water Soil backfills massif pitfall, often backfills one layer, and appropriate water must be sprayed into massif pitfall, ensures that cement or soil cement can be hard Change, if rain work, watering link can be removed from;
(2)Shed-pipe Advanced Support:Should first construct to be formed before the drilling of pipe canopy and be oriented to wall or set up guiding trestle, pipe canopy using diameter 108mm, Wall thickness 6mm hot rolled seamless steel tube, supporting length exceed 5~8m of process range, to carrying out slurries in hot rolled seamless steel tube to full Full closely knit, final grouting pressure is not less than 1.0MPa;
(3)Haunch excavates and the installation of haunch steel arch-shelf:After pipe canopy strength of cement grout reaches design strength, tunnel is excavated by Pin slottings Road both sides haunch part, installation haunch steel arch-shelf and combined bolting and shotcrete synchronous coordination are carried out, and make the arch springing and lock pin of haunch steel arch-shelf Anchor tube firm welding;
(4)Inverted arch excavates and the installation of inverted arch steel arch-shelf:Inverted arch is excavated in slotting, installs inverted arch steel arch-shelf, makes inverted arch steel arch-shelf and arch Waist steel arch-shelf firmly connects;
(5)Vault excavates and the installation of vault steel arch-shelf:Vault, installation vault steel arch-shelf and combined bolting and shotcrete are excavated by Pin slottings, it is complete Into the connection with haunch steel arch-shelf, haunch steel arch-shelf, inverted arch steel arch-shelf and vault steel arch-shelf is set to be closed into the steel arch circle of ring-type;
(6)Inverted arch concreting:Excavation supporting often complete four circulation, Excavation Length about 2m, inverted arch concreting once, Or situation of change can be restrained according to country rock, adjust inverted arch concreting length;
(7)Secondary lining:After inverted arch concreting length reaches the length of a lining trolley, secondary lining of constructing is secondary After the completion of lining cutting, construction is completed, processing terminates.
6. described a kind of shallow-depth-excavation tunnel fall according to claim 5 changes arch processing method, it is characterised in that institute The step of stating(3)In, haunch is excavated and haunch steel arch-shelf is arranged on before preliminary bracing construction, and lining trolley is promoted into operation Face, serve as the emergent protection place of operating personnel;Excavation uses slotting local excavation, reduces the disturbance to the periphery soil body as far as possible.
7. described a kind of shallow-depth-excavation tunnel fall according to claim 6 changes arch processing method, it is characterised in that institute State step(7)In secondary lining should carry out after the inverted arch concrete, shorten as far as possible between secondary lining and excavation face away from From.
CN201710342983.0A 2017-05-16 2017-05-16 A kind of shallow-depth-excavation tunnel fall changes arch processing unit and its processing method Pending CN107420115A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710342983.0A CN107420115A (en) 2017-05-16 2017-05-16 A kind of shallow-depth-excavation tunnel fall changes arch processing unit and its processing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710342983.0A CN107420115A (en) 2017-05-16 2017-05-16 A kind of shallow-depth-excavation tunnel fall changes arch processing unit and its processing method

Publications (1)

Publication Number Publication Date
CN107420115A true CN107420115A (en) 2017-12-01

Family

ID=60425953

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710342983.0A Pending CN107420115A (en) 2017-05-16 2017-05-16 A kind of shallow-depth-excavation tunnel fall changes arch processing unit and its processing method

Country Status (1)

Country Link
CN (1) CN107420115A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108561156A (en) * 2018-04-30 2018-09-21 安徽省公路桥梁工程有限公司 Separate tunnel changes arch supporting construction and its construction method
CN108798718A (en) * 2018-07-09 2018-11-13 中铁十七局集团第四工程有限公司 Subsequent grouting method is held before tunnel
CN108843344A (en) * 2018-06-05 2018-11-20 中铁二局集团有限公司 One kind is collapsed the closely knit dam filling construction of chamber
CN111779510A (en) * 2020-08-05 2020-10-16 湖南科技大学 A method of arch-replacing for primary branch encroachment limit of high liquid limit red clay surrounding rock tunnel

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11303592A (en) * 1998-04-17 1999-11-02 Shimizu Corp Multiple support construction method
JP2010090607A (en) * 2008-10-08 2010-04-22 Taisei Corp Method for constructing tunnel and structure of the tunnel
CN203547760U (en) * 2013-10-23 2014-04-16 中铁二院工程集团有限责任公司 Base weak stratum channel bent wall belt flat base inverted arch lining structure
CN106437760A (en) * 2016-07-20 2017-02-22 中铁二院工程集团有限责任公司 Large-section tunnel novel multi-layer lining structure
CN207177920U (en) * 2017-05-16 2018-04-03 江门市政企业集团有限公司 A kind of shallow-depth-excavation tunnel fall changes arch processing unit

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11303592A (en) * 1998-04-17 1999-11-02 Shimizu Corp Multiple support construction method
JP2010090607A (en) * 2008-10-08 2010-04-22 Taisei Corp Method for constructing tunnel and structure of the tunnel
CN203547760U (en) * 2013-10-23 2014-04-16 中铁二院工程集团有限责任公司 Base weak stratum channel bent wall belt flat base inverted arch lining structure
CN106437760A (en) * 2016-07-20 2017-02-22 中铁二院工程集团有限责任公司 Large-section tunnel novel multi-layer lining structure
CN207177920U (en) * 2017-05-16 2018-04-03 江门市政企业集团有限公司 A kind of shallow-depth-excavation tunnel fall changes arch processing unit

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
钟国等: "蛟岭隧道洞口暗挖段塌方处理", 《科技资讯》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108561156A (en) * 2018-04-30 2018-09-21 安徽省公路桥梁工程有限公司 Separate tunnel changes arch supporting construction and its construction method
CN108561156B (en) * 2018-04-30 2024-03-19 安徽省公路桥梁工程有限公司 Separated tunnel arch-changing supporting structure and construction method thereof
CN108843344A (en) * 2018-06-05 2018-11-20 中铁二局集团有限公司 One kind is collapsed the closely knit dam filling construction of chamber
CN108798718A (en) * 2018-07-09 2018-11-13 中铁十七局集团第四工程有限公司 Subsequent grouting method is held before tunnel
CN111779510A (en) * 2020-08-05 2020-10-16 湖南科技大学 A method of arch-replacing for primary branch encroachment limit of high liquid limit red clay surrounding rock tunnel

Similar Documents

Publication Publication Date Title
CN104806267B (en) The shield end reinforcement system and its construction method of land pebble stratum super-front large pipe shed
CN104278993B (en) A kind of bias voltage Skew Tunnel enters the constructional method in hole
CN204253054U (en) Mountain tunnel stake arch cap excavation method comprehensive support structure
CN205742213U (en) Foundation pit supporting construction
CN104452809A (en) Ultra-shallow buried tunnel cover-excavation construction method
CN106400813A (en) Foundation pit support system and construction method thereof
CN202117686U (en) Surrounding rock advanced support structure for railway tunnel at deep-buried watery and weak stratums
CN207633352U (en) A kind of slope reinforcement structure for rapid rescue construction
CN107083771B (en) A kind of drilling construction method of artificial digging pile
CN101215834A (en) Construction Method of Outrigger Type Diaphragm Wall
CN104329095B (en) A kind of existing tunnel Widening Construction method
CN102587924A (en) Construction method for shallow-buried high-water-content clayed soil tunnel
CN105041333A (en) Method for treating tunnel collapse through dugand covered method
CN101603431A (en) A reinforcement method for uncovering coal at the stone gate of the outburst dangerous coal seam
CN108625879A (en) Mountain Tunnels half-open and half-hidden structure and its construction method
CN103195455A (en) Large section tunnel construction support and protection system and construction method under flabby geological environment
CN107420115A (en) A kind of shallow-depth-excavation tunnel fall changes arch processing unit and its processing method
CN110541422A (en) A construction method for a tunnel passing through a biased landslide zone at the entrance
CN104141500A (en) Hardened sand gravel stratum cavern construction method
CN104453915B (en) Big cross section vertical shaft pre-pouring grout reinforces Rapid Excavation method
CN102839980A (en) Highway tunnel structure and construction method thereof
CN209923935U (en) Co-location combined pile wall supporting structure in upper-soft and lower-hard stratum
CN206477341U (en) A kind of foundation pit support system
CN108374674B (en) Six pilot tunnels, 12 step Underground Space Excavation method for protecting support
CN212642730U (en) Collapsible loess area tunnel passes people's air defense structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171201

RJ01 Rejection of invention patent application after publication