CN107316121A - One kind is based on the workflow examination and approval method of BIM (BIM) - Google Patents
One kind is based on the workflow examination and approval method of BIM (BIM) Download PDFInfo
- Publication number
- CN107316121A CN107316121A CN201610774894.9A CN201610774894A CN107316121A CN 107316121 A CN107316121 A CN 107316121A CN 201610774894 A CN201610774894 A CN 201610774894A CN 107316121 A CN107316121 A CN 107316121A
- Authority
- CN
- China
- Prior art keywords
- node
- bim
- approval process
- approval
- circulation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 131
- 230000004087 circulation Effects 0.000 claims abstract description 112
- 238000010276 construction Methods 0.000 claims description 11
- 230000000694 effects Effects 0.000 abstract description 4
- 238000005516 engineering process Methods 0.000 abstract description 4
- 238000012545 processing Methods 0.000 description 7
- 238000010586 diagram Methods 0.000 description 5
- 238000012790 confirmation Methods 0.000 description 3
- 238000013461 design Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009430 construction management Methods 0.000 description 1
- 230000000977 initiatory effect Effects 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- General Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- General Health & Medical Sciences (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Health & Medical Sciences (AREA)
- Game Theory and Decision Science (AREA)
- Primary Health Care (AREA)
- Data Mining & Analysis (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Data Exchanges In Wide-Area Networks (AREA)
Abstract
The invention belongs to build work systems technology field, more particularly to a kind of workflow examination and approval method for being based on BIM (BIM), the approval process circulation portion is used to judge whether approval process figure is the mixing land transaction model, whether judge approval process figure is serial land transaction model, whether judge approval process figure is parallel land transaction model, the present invention is solved during approval distributing, a kind of situation is in the case of the mutual circulation that is independent of each other, next node could be normally reached when some parallel branch's flow completes flow, another situation is could normally to reach next node when parallel all branch's flows complete flow, therefore there should be the integrated functionality information system for handling both different branched structures respectively, with realizing the informationization of approval process, improve the flexibility of system application, reduce the complexity of system, improve node examination & approval efficiency, improve the advantageous effects of the efficiency of approval process execution.
Description
Technical field
The invention belongs to build work systems technology field, more particularly to a kind of flow based on BIM (BIM) is examined
The method of criticizing.
Background technology
It is, including owner, design and its all kinds of numerous due to building participant by project based on BIM (BIM)
Advisory group, general contractor and each specialized contractors, operation management team and end user etc..Smoothly enter for guarantee project
OK, cooperation mutual between each participant work just seems particularly important.How in the project implementation process, effectively management
The data that each participant of project is produced and needed, ensure that the data interaction of each participant is efficient, timely, orderly and safe, and make
These data eventually become the data assets after project is smoothly built up, and are the significant challenges that project management will be faced, together
When, this project introduces BIM in Design coordination and construction management.BIM dissolves as a kind of newest numeral of engineering construction industry
Certainly scheme, this to the storing of this projects data, share, safety proposes higher requirement, but in the mistake of approval distributing
Cheng Zhong, when circulation arrive some node before need flow between several departments or mechanism parallel circulate when, a kind of situation be
It is independent of each other in the case of mutual circulation, when some parallel branch, flow completion flow could normally reach next section
Point, while same flow chart data are shared by each branch, but realizes and possesses form data independent operating right, separately
A kind of situation is the circulation situation for being independent of each other mutual, when and all branch's flows complete flow and could normally reach next section
Point, while same flow chart data are shared by each branch, but realizes and possesses form data independent operating right, because
This should have the integrated functionality information system for handling both different branched structures respectively.
The content of the invention
The present invention provides a kind of workflow examination and approval method for being based on BIM (BIM), to solve above-mentioned background technology
During approval distributing, when circulation is to needing flow to be circulated parallel between several departments or mechanism before some node
When, a kind of situation is that in the case of the mutual circulation that is independent of each other, when some parallel branch, flow completes flow
Next node can be normally reached, while same flow chart data are shared by each branch, but realizes and form data is possessed
Independent operating right, another situation is the circulation situation for being independent of each other mutual, when and all branch's flows complete flow
Next node could be normally reached, while same flow chart data are shared by each branch, but realizes and form data is gathered around
There is independent operating right, therefore there should be the integrated functionality information system for handling both different branched structures respectively.
Technical problem solved by the invention is realized using following technical scheme:One kind is based on BIM
(BIM) workflow examination and approval method, it is characterised in that including approval process circulation portion(Approval process editorial office is that flow is carried out
The department of editor).
The approval process circulation portion is used for:When obtaining the approval process figure that approval process editorial office is formed:
Whether judge approval process figure is that (serial land transaction model has been handled and could carried out serial land transaction model for a flow nodes
Next flow) and parallel land transaction model (parallel stream revolving die type is to have multiple processing people in some node, as long as one of them
People is by being negotiable to next node) and the mixing land transaction model deposited, if very, then judging the next adjacent of present node
Whether structure is serial circulation structure, if very, then successively after last node of order circulation current serial circulation structure,
Circulate to the next node of current serial circulation structure;
Whether be the mixing land transaction model, if very, then judging next adjacent bonds of present node if judging approval process figure
Whether structure is parallel stream rotation structure, if whether very, then it is selection branch knot to judge the adjacent parallel branch structure of present node
Structure, if very, then in any bar sub-branch that circulates after last node, circulating to next section of present parallel branched structure
Point;
Whether be the mixing land transaction model, if very, then judging next adjacent bonds of present node if judging approval process figure
Whether structure is parallel stream rotation structure, if very, judging whether the adjacent parallel branch structure of present node is multiple-branching construction, if
It is true, then in whole sub-branches that circulate respectively after last node, circulates to the next node of present parallel branched structure.
Further, also include whether judging approval process figure when obtaining the approval process figure that approval process editorial office is formed
For serial land transaction model, if very, then sequential flow goes to last node successively.
Further, also include when obtaining the approval process figure that approval process editorial office is formed:
Whether be parallel land transaction model, if very, then judging the adjacent parallel branch structure of present node if judging approval process figure
Whether it is selection branched structure, if very, then in any bar sub-branch that circulates after last node, circulation to present parallel point
The next node of branch structure;
Whether be parallel land transaction model, if very, judging that the adjacent parallel branch structure of present node is if judging approval process figure
No is multiple-branching construction, if very, then in whole sub-branches that circulate respectively after last node, circulation to present parallel branch
The next node of structure.
Further, if present node circulation is to next adjacent node, judging next adjacent node of present node is
No is ordinary node, if very, then directly circulating to next adjacent node of present node;
If present node circulation is to next adjacent node, whether the next adjacent node for judging present node is conditional sections
Point, if very, then whether Rule of judgment node meets, if meeting, circulates to next adjacent node of present node;
If present node circulation is to next adjacent node, whether the next adjacent node for judging present node is to redirect section
Point, if very, then skip present node next adjacent node circulate to present node next adjacent node it is next adjacent
Node.
Further, if present node circulation is to next adjacent node, judge whether present node meets the condition of retracting,
If meeting, corresponding node is retracted.
Further, the condition of retracting of the present node may specify a certain node for being retracted into a certain node or a certain node
Operator.
Further, the approval process circulation portion also supports nested land transaction model, and the nested land transaction model includes current
Next adjacent node of node can be the arbitrary node in approval process figure.
Further, the approval process circulation portion also supports triangle land transaction model, and the triangle land transaction model includes current
The next node of next parallel branch structure circulation of node and the next node that present node circulates are same node.
Further, the approval process editorial office is used to grasp to being currently located node, node by BIM graphical tools
Editor and pull to form approval process figure that author, the route flowed through and the route that will be flowed through are patterned.
Beneficial effects of the present invention are:
1 present invention is using approval process circulation portion, and the approval process circulation portion is used for when acquisition approval process editorial office is formed
Approval process figure when, whether judge approval process figure is serial land transaction model and parallel land transaction model and the mixed flow revolving die deposited
Formula, if very, then whether the next adjacent structure for judging present node is serial circulation structure, if very, then successively sequentially
Circulate after last node of current serial circulation structure, circulate to the next node of current serial circulation structure, judge
Whether approval process figure is the mixing land transaction model, if very, then judge present node next adjacent structure whether be
Parallel stream rotation structure, if whether very, then it is selection branched structure to judge the adjacent parallel branch structure of present node, if
Very, then in circulation any bar sub-branch after last node, circulate to the next node of present parallel branched structure, judge
Whether approval process figure is the mixing land transaction model, if very, then judge present node next adjacent structure whether be
Parallel stream rotation structure, if very, judging whether the adjacent parallel branch structure of present node is multiple-branching construction, if very, then
In the whole that circulates respectively sub-branches after last node, circulate to the next node of present parallel branched structure, in application
When, serially each approval node order execution successively in circulation structure, selecting for parallel stream rotation structure is every in branched structure
Flow completion flow could normally reach next node for one branch, while same flow table odd number is shared by each branch
According to, but realize and possess form data independent operating right, flow is needed in several departments before circulation to some node
Or circulated parallel between mechanism, the circulation situation for being independent of each other mutual is all in the multiple-branching construction of parallel stream rotation structure
Branch flow complete flow and could normally reach next node, while same flow chart data are shared by each branch, but
It is to realize to possess form data independent operating right, flow is needed in several departments or machine before circulation to some node
Circulated parallel between structure, the circulation situation for being independent of each other mutual, by the mixing of three kinds of different examination & approval patterns, realizes examination & approval stream
The informationization of journey.
If 2 present invention by present node using circulating to next adjacent node, judge whether present node meets
Retract condition, if meeting, retract corresponding node, the condition of retracting of the present node may specify be retracted into a certain node or
The a certain nodal operation person of a certain node, due in the application, when the condition of retracting is met, returns to its corresponding node weight
New examination & approval, the node of system, which has, retracts condition, improves the flexibility of system application.
3 present invention also support nested land transaction model using the approval process circulation portion, and the nested land transaction model includes
Next adjacent node of present node can be the arbitrary node in approval process figure, in the processing procedure of workflow, very
Can go on business, borrow money in the case of many, submit an expense account between association, occur as soon as under such circumstances between time flow and flow, list
Association between list, due in nested structure the degree of modularity of system can be improved with a certain structure of Reusability,
Reduce the complexity of system.
4 present invention also support triangle land transaction model using the approval process circulation portion, and the triangle land transaction model includes
The next node of next parallel branch structure circulation of present node and the next node that present node circulates are same node
Regional model and triangle land transaction model are supported simultaneously, due to that in triangle land transaction model can be virtually individual branches, be being carried
While high node utilization rate, node examination & approval efficiency is improved.
The 5th, if the present invention uses present node circulation to next adjacent node, next adjacent segments of present node are judged
Whether point is ordinary node, if very, then directly circulation, to next adjacent node of present node, is arrived down if present node circulates
During one adjacent node, whether the next adjacent node for judging present node is condition node, if very, then Rule of judgment node
Whether meet, if meeting, circulate to next adjacent node of present node, if next adjacent node is arrived in present node circulation
When, whether the next adjacent node for judging present node is to redirect node, if very, then skipping next adjacent segments of present node
Point circulation to next adjacent node of present node next adjacent node, in the application, the characteristics of due to nodal community, currently
If node condition node, support according to condition carries out different circulations, enters issued transaction branch flow according to condition;In flow
Judge the branch of next step as Rule of judgment according to field in the post of user, role, list etc. in node setting.In stream
During journey outlet is set, field that can be in list is as the Rule of judgment of next step, and any one field in list all may be used
Think Rule of judgment, many condition can be combined, if present node redirects node, it is assumed that present node is registration, next node is
Department shares, and is Confirmation by Finance in next node, can complete to leap to the 3rd node after first node, be used due to node
Flexibility, improves the efficiency of approval process execution.
Brief description of the drawings
Fig. 1 is a kind of flow chart of workflow examination and approval method based on BIM (BIM) of the invention.
Fig. 2 is a kind of mixing land transaction model flow of workflow examination and approval method based on BIM (BIM) of the invention
Figure.
Fig. 3 is a kind of nested land transaction model structure of workflow examination and approval method based on BIM (BIM) of the invention
Schematic diagram.
Fig. 4 is a kind of serial land transaction model structure of workflow examination and approval method based on BIM (BIM) of the invention
Schematic diagram.
Fig. 5 is a kind of choosing of the parallel land transaction model of workflow examination and approval method based on BIM (BIM) of the invention
Select branched structure schematic diagram.
Fig. 6 is a kind of many of the parallel land transaction model of workflow examination and approval method based on BIM (BIM) of the invention
Branched structure schematic diagram.
Fig. 7 is a kind of choosing of the triangle land transaction model of workflow examination and approval method based on BIM (BIM) of the invention
Select branched structure schematic diagram.
Fig. 8 is a kind of setting frame of the condition node of workflow examination and approval method based on BIM (BIM) of the invention
Figure.
Fig. 9 is that a kind of structure for redirecting node of workflow examination and approval method based on BIM (BIM) of the invention is shown
It is intended to.
Embodiment
The present invention is described further below in conjunction with accompanying drawing:
In figure:The serial land transaction models of 1-, the parallel land transaction models of 2-, 3- mixing land transaction models, 4- serially circulates structure, 5- parallel streams
The selection branched structure of rotation structure, the multiple-branching construction of 6- parallel stream rotation structures, 7- ordinary nodes, 8- condition nodes(Do not show
Go out), 9- redirects node.
Embodiment:
The present embodiment includes:As shown in Figure 1, 2, a kind of workflow examination and approval method for being based on BIM (BIM), including examination & approval
Workflow portion, the approval process circulation portion is used for:When obtaining the approval process figure that approval process editorial office is formed:
Whether judge approval process figure is serial land transaction model 1 and parallel land transaction model 2 and the mixing land transaction model 3 deposited, if
Very, then whether the next adjacent structure for judging present node is serial circulation structure 4, if very, then order circulation is worked as successively
After last node of preceding serial circulation structure 4, circulate to the next node of current serial circulation structure 4;
Whether be the mixing land transaction model 3, if very, then judging next adjacent bonds of present node if judging approval process figure
Whether structure is parallel stream rotation structure, if whether very, then it is selection branch knot to judge the adjacent parallel branch structure of present node
Structure 5, if very, then in any bar sub-branch of circulating after last node, circulating next to present parallel branched structure
Node;
Whether be the mixing land transaction model 3, if very, then judging next adjacent bonds of present node if judging approval process figure
Whether structure is parallel stream rotation structure, if whether very, it is multiple-branching construction 6 to judge the adjacent parallel branch structure of present node,
If true, then in whole sub-branches that circulate respectively after last node, circulate to next section of present parallel branched structure
Point.
The system supports mixing examination & approval, and the meaning of the mixing examination & approval has a lot, the mixing examination & approval between an organization;
For example, the initiation and examination & verification of flow are completed in general headquarters, it is necessary to each when needing to be related to each branch when countersign
The personnel of individual branch are confirmed.Other a layer of meaning is exactly that condition examination & approval, parallel processing are contained during workflow examination and approval
Situations such as.
Also include judging whether approval process figure is serial when obtaining the approval process figure that approval process editorial office is formed
Land transaction model 1, if very, then sequential flow goes to last node successively.
As shown in figure 4, the system supports serial examination & approval, the serial examination & approval are exactly the processing in one stage an of node
(serial land transaction model, that is, arrive general manager after having applied, general manager is affixed one's seal after having examined by control of stamping person).
Also include when obtaining the approval process figure that approval process editorial office is formed:
Whether be parallel land transaction model 2, if very, then judging the adjacent parallel branch structure of present node if judging approval process figure
Whether it is selection branched structure 5, if very, then in any bar sub-branch that circulates after last node, circulation to present parallel
The next node of branched structure;
As shown in figure 5, the system supports parallel examination & approval (one passes through pattern):It is described that one is exactly by the parallel examination & approval of pattern
Flow is needed to be circulated parallel between several departments or mechanism before circulation to some node, the circulation feelings for being independent of each other mutual
Condition, when some parallel branch, flow completion flow could normally reach next node, while each branch is shared same
The flow chart data of sample, but realize and possess form data independent operating right.
Whether be parallel land transaction model 2, if very, judging the adjacent parallel branch knot of present node if judging approval process figure
Whether structure is multiple-branching construction 6, if very, then in whole sub-branches that circulate respectively after last node, circulation is to currently simultaneously
The next node of row branched structure.
As shown in fig. 6, the system supports parallel examination & approval (owner passes through pattern):The owner passes through the parallel of pattern
Examination & approval are exactly that same mode is exactly to need flow parallel stream between several departments or mechanism before circulation to some node
Turn, the circulation situation for being independent of each other mutual, when and all branch's flows complete flow and could normally reach next node, simultaneously
Same flow chart data are shared by each branch, but realize and possess form data independent operating right.
As shown in Fig. 1,2,4,5,6, because using approval process circulation portion, the approval process circulation portion is used for when acquisition
Whether during the approval process figure that approval process editorial office is formed, it is serial land transaction model and parallel stream revolving die to judge approval process figure
Formula and the mixing land transaction model deposited, if very, then whether the next adjacent structure for judging present node is serial circulation structure,
If very, then successively after last node of order circulation current serial circulation structure, circulation to current serial circulation structure
Next node, whether be the mixing land transaction model, if very, then judging the next of present node if judging approval process figure
Whether individual adjacent structure is parallel stream rotation structure, if very, then judging whether the adjacent parallel branch structure of present node is choosing
Branched structure is selected, if very, then in any bar sub-branch that circulates after last node, circulation to present parallel branched structure
Next node, whether be the mixing land transaction model, if very, then judging the next of present node if judging approval process figure
Whether adjacent structure is parallel stream rotation structure, if very, judging whether the adjacent parallel branch structure of present node is multiple-limb
Structure, if very, then in whole sub-branches that circulate respectively after last node, circulating next to present parallel branched structure
Individual node, in use, the serially order execution successively of each approval node, the selection point of parallel stream rotation structure in circulation structure
Flow completion flow could normally reach next node for each branch in branch structure, while each branch shares equally
Flow chart data, but realize and possess form data independent operating right, need flow before circulation to some node
Circulated parallel between several departments or mechanism, the circulation situation for being independent of each other mutual, the multiple-limb knot of parallel stream rotation structure
All branch's flows in structure, which complete flow, could normally reach next node, while same flow table is shared by each branch
Forms data, but realize and possess form data independent operating right, flow is needed several before circulation to some node
Circulated parallel between department or mechanism, the circulation situation for being independent of each other mutual is real by the mixing of three kinds of different examination & approval patterns
The informationization of approval process is showed.
If present node circulation is to next adjacent node, whether the next adjacent node for judging present node is common
Node 7, if very, then directly circulating to next adjacent node of present node;
If present node circulation is to next adjacent node, whether the next adjacent node for judging present node is condition node
8, if very, then whether Rule of judgment node 8 meets, if meeting, circulate to next adjacent node of present node;
As shown in figure 8, condition is examined:Support according to condition carries out different circulations, enters issued transaction branch flow according to condition;
Judge point of next step as Rule of judgment according to field in the post of user, role, list etc. in flow nodes setting
Branch.In process outlet setting, field that can be in list is as the Rule of judgment of next step, any one word in list
Section can be Rule of judgment, and many condition can be combined.
If present node circulation is to next adjacent node, whether the next adjacent node for judging present node is to redirect
Node 9, if very, then the next adjacent node for skipping present node circulates to next phase of next adjacent node of present node
Neighbors.
If Fig. 9 is the structural representation that redirects node, that is, it can be transferred to after having filled in after department shares, then by finance
Confirm, directly can also be confirmed by finance.Support process is redirected;System can support process redirect procedure, the first step is
Registration, second step is shared for department, and the 3rd step is Confirmation by Finance, can complete to leap to the 3rd step after the first step.
If during due to using present node circulation to next adjacent node, judging next adjacent node of present node is
No is ordinary node, if very, then directly circulating to next adjacent node of present node, if next phase is arrived in present node circulation
During the node of neighbour, whether the next adjacent node for judging present node is condition node, if very, then whether Rule of judgment node
Meet, if meeting, circulate to next adjacent node of present node, if present node circulation is to next adjacent node,
Whether the next adjacent node for judging present node is to redirect node, if very, then skipping next adjacent node of present node
Circulate to next adjacent node of next adjacent node of present node, in the application, the characteristics of due to nodal community, work as prosthomere
If point condition node, support according to condition carries out different circulations, issued transaction branch flow is entered according to condition;In flow section
Judge the branch of next step as Rule of judgment according to field in the post of user, role, list etc. in point setting.In flow
During outlet is set, field that can be in list is as the Rule of judgment of next step, and any one field in list can
For Rule of judgment, many condition can be combined, if present node redirects node, it is assumed that present node is registration, and next node is portion
Door is shared, and is Confirmation by Finance in next node, can complete to leap to the 3rd node after first node, the spirit used due to node
Activity, improves the efficiency of approval process execution.
If present node circulation is to next adjacent node, judge whether present node meets the condition of retracting, if satisfaction,
Corresponding node is then retracted, the condition of retracting of the present node may specify a certain section for being retracted into a certain node or a certain node
Point operator.
The system also supports rejection to handle;In the processing procedure of flow, user may be selected to retract, and user can be in flow
Outlet, which is set, centers the node retracted or personnel.
If during due to using being circulated by present node to next adjacent node, judging whether present node meets and retracting
Condition, if meeting, retracts corresponding node, the condition of retracting of the present node, which may specify, is retracted into a certain node or a certain
The a certain nodal operation person of node, due in the application, when the condition of retracting is met, returns to its corresponding node and examines again
Batch, the node of system, which has, retracts condition, improves the flexibility of system application.
The approval process circulation portion also supports nested land transaction model, and the nested land transaction model is included under present node
One adjacent node can be the arbitrary node in approval process figure.
As shown in figure 3, the pass between in the processing procedure of workflow, going on business, borrow money in many cases, submitting an expense account
Connection, is occurred as soon as between time flow and flow, the association between list and list under such circumstances.
As shown in figure 3, due to also supporting nested land transaction model, the nested circulation mould using the approval process circulation portion
Next adjacent node that formula includes present node can be the arbitrary node in approval process figure, in the processing procedure of workflow
In, can go on business, borrow money in many cases, submit an expense account between association, occur as soon as under such circumstances between time flow and flow,
Association between list and list, due in nested structure the modularization of system can be improved with a certain structure of Reusability
Degree, reduces the complexity of system.
The approval process circulation portion also supports triangle land transaction model, and the triangle land transaction model is included under present node
The next node and the next node that present node circulates of one parallel branched structure circulation are same node.
As shown in fig. 7, when routine branches start, flow You Jitiao branches will generate several groups of different opinion groups, often
Bar branch, which realizes, produces a task to related realization object, and operator may feel that every Branch Tasks one are complete
Small flow.
As shown in fig. 7, due to also supporting triangle land transaction model, the triangle circulation mould using the approval process circulation portion
The next node that the next node that next parallel branch structure that formula includes present node circulates circulates with present node is same
One node supports regional model and triangle land transaction model simultaneously, due to virtually can divide to be independent in triangle land transaction model
Branch, while Duty-circle is improved, improves node examination & approval efficiency.
The workflow examination and approval system also includes approval process editorial office, and the approval process editorial office is used for by BIM's
What graphical tools were patterned to being currently located node, nodal operation person, the route flowed through and the route that will flow through
Edit and pull to form approval process figure.
Operation principle:The present invention is by using approval process circulation portion, and the approval process circulation portion, which is used to work as, to be examined
Whether when criticizing the approval process figure that flow editorial office is formed, it is serial land transaction model and parallel land transaction model to judge approval process figure
And the mixing land transaction model deposited, if very, then whether the next adjacent structure for judging present node is serial circulation structure, if
It is true, then successively after last node of order circulation current serial circulation structure, circulates to current serial circulation structure
Next node, whether be the mixing land transaction model, if very, then judging the next of present node if judging approval process figure
Whether adjacent structure is parallel stream rotation structure, if very, then judging whether the adjacent parallel branch structure of present node is selection
Branched structure, if very, then in any bar sub-branch that circulates after last node, under circulation to present parallel branched structure
One node, whether be the mixing land transaction model, if very, then judging next phase of present node if judging approval process figure
Whether adjacent structure is parallel stream rotation structure, if whether very, it is multiple-limb knot to judge the adjacent parallel branch structure of present node
Structure, if very, then in whole sub-branches that circulate respectively after last node, circulating next to present parallel branched structure
Node, in use, serially each approval node order execution, the selection branch of parallel stream rotation structure successively in circulation structure
Flow completion flow could normally reach next node for each branch in structure, while same stream is shared by each branch
Journey form data, but realize and possess form data independent operating right, need flow to exist before circulation to some node
Circulated parallel between several departments or mechanism, the circulation situation for being independent of each other mutual, the multiple-branching construction of parallel stream rotation structure
In all branch's flows complete flows and could normally reach next node, while same flow chart is shared by each branch
Data, but realize and possess form data independent operating right, flow is needed in several portions before circulation to some node
Circulated parallel between door or mechanism, the circulation situation for being independent of each other mutual, by the mixing of three kinds of different examination & approval patterns, is realized
The informationization of approval process, the present invention is solved during approval distributing, when needing flow before circulation to some nodes
Between several departments or mechanism during parallel circulation, a kind of situation is in the case of the mutual circulation that is independent of each other, when parallel
Some branch flow completes flow and could normally reach next node, while same flow table is shared by each branch
Forms data, but realize and possess form data independent operating right, another situation is the circulation feelings for being independent of each other mutual
Condition, when and all branch's flows complete flow and could normally reach next node, while same flow is shared by each branch
Form data, but realize and possess form data independent operating right, therefore should be different with both are handled respectively
The integrated functionality information system of branched structure, with realize approval process flexibility that is information-based, improving system application,
Reduce the complexity of system, the Advantageous effect for improving node examination & approval efficiency, improving the efficiency that approval process is performed
Really.
Using technical scheme, or those skilled in the art is under the inspiration of technical solution of the present invention, design
Go out similar technical scheme, and reach above-mentioned technique effect, be to fall into protection scope of the present invention.
Claims (9)
1. one kind is based on the workflow examination and approval method of BIM (BIM), it is characterised in that specific steps include approval process
Circulation portion;The approval process circulation portion is used for:When obtaining the approval process figure that approval process editorial office is formed:
Whether judge approval process figure is serial land transaction model and parallel land transaction model and the mixing land transaction model deposited, if very,
Whether the next adjacent structure for then judging present node is serial circulation structure, if very, then sequentially circulate current string successively
After last node of row circulation structure, circulate to the next node of current serial circulation structure;
Whether be the mixing land transaction model, if very, then judging next adjacent bonds of present node if judging approval process figure
Whether structure is parallel stream rotation structure, if whether very, then it is selection branch knot to judge the adjacent parallel branch structure of present node
Structure, if very, then in any bar sub-branch that circulates after last node, circulating to next section of present parallel branched structure
Point;
Whether be the mixing land transaction model, if very, then judging next adjacent bonds of present node if judging approval process figure
Whether structure is parallel stream rotation structure, if very, judging whether the adjacent parallel branch structure of present node is multiple-branching construction, if
It is true, then in whole sub-branches that circulate respectively after last node, circulates to the next node of present parallel branched structure.
2. a kind of workflow examination and approval method for being based on BIM (BIM) according to claim 1, it is characterised in that
Also include judging whether approval process figure is serial land transaction model when obtaining the approval process figure that approval process editorial office is formed,
If true, then sequential flow goes to last node successively.
3. a kind of workflow examination and approval method for being based on BIM (BIM) according to claim 2, it is characterised in that
Also include when obtaining the approval process figure that approval process editorial office is formed:
Whether be parallel land transaction model, if very, then judging the adjacent parallel branch structure of present node if judging approval process figure
Whether it is selection branched structure, if very, then in any bar sub-branch that circulates after last node, circulation to present parallel point
The next node of branch structure;
Whether be parallel land transaction model, if very, judging that the adjacent parallel branch structure of present node is if judging approval process figure
No is multiple-branching construction, if very, then in whole sub-branches that circulate respectively after last node, circulation to present parallel branch
The next node of structure.
4. a kind of workflow examination and approval method for being based on BIM (BIM) according to claim 3, it is characterised in that
If present node circulation is to next adjacent node, whether the next adjacent node for judging present node is ordinary node, if
It is true, then directly circulates to next adjacent node of present node;
If present node circulation is to next adjacent node, whether the next adjacent node for judging present node is conditional sections
Point, if very, then whether Rule of judgment node meets, if meeting, circulates to next adjacent node of present node;
If present node circulation is to next adjacent node, whether the next adjacent node for judging present node is to redirect section
Point, if very, then skip present node next adjacent node circulate to present node next adjacent node it is next adjacent
Node.
5. a kind of workflow examination and approval method for being based on BIM (BIM) according to claim 4, it is characterised in that
If present node circulation is to next adjacent node, judge whether present node meets the condition of retracting, if satisfaction, retracts phase
The node answered.
6. a kind of workflow examination and approval method for being based on BIM (BIM) according to claim 5, it is characterised in that
The condition of retracting of the present node may specify a certain nodal operation person for being retracted into a certain node or a certain node.
7. a kind of workflow examination and approval method for being based on BIM (BIM) according to claim 1, it is characterised in that
The approval process circulation portion also supports nested land transaction model, and the nested land transaction model includes next adjacent segments of present node
Point can be the arbitrary node in approval process figure.
8. a kind of workflow examination and approval method for being based on BIM (BIM) according to claim 1, it is characterised in that
The approval process circulation portion also supports triangle land transaction model, and the triangle land transaction model includes next parallel point of present node
The next node of branch structure circulation is same node with the next node that present node circulates.
9. a kind of workflow examination and approval method for being based on BIM (BIM) according to claim 1, it is characterised in that
Described approval process editorial office, for the graphical tools by BIM to being currently located node, nodal operation person, being flowed through
Route and the editor that is patterned of the route that will flow through and dragging to form approval process figure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610774894.9A CN107316121A (en) | 2016-08-31 | 2016-08-31 | One kind is based on the workflow examination and approval method of BIM (BIM) |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610774894.9A CN107316121A (en) | 2016-08-31 | 2016-08-31 | One kind is based on the workflow examination and approval method of BIM (BIM) |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107316121A true CN107316121A (en) | 2017-11-03 |
Family
ID=60185205
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610774894.9A Pending CN107316121A (en) | 2016-08-31 | 2016-08-31 | One kind is based on the workflow examination and approval method of BIM (BIM) |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107316121A (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108229909A (en) * | 2017-12-14 | 2018-06-29 | 四川虹慧云商科技有限公司 | A kind of resident's transaction methods |
CN109146227A (en) * | 2018-06-26 | 2019-01-04 | 四川驹马科技有限公司 | A kind of parallel measures and procedures for the examination and approval of workflow and its system |
WO2019033790A1 (en) * | 2017-08-18 | 2019-02-21 | 平安科技(深圳)有限公司 | Project information processing method and apparatus, server and storage medium |
CN109559085A (en) * | 2018-09-20 | 2019-04-02 | 中建科技有限公司深圳分公司 | The measures and procedures for the examination and approval and terminal device based on BIM light weighed model |
CN110377269A (en) * | 2019-06-17 | 2019-10-25 | 平安科技(深圳)有限公司 | Business approval system configuration method, apparatus and storage medium |
CN110490425A (en) * | 2019-07-24 | 2019-11-22 | 中国铁建电气化局集团有限公司 | The electric construction safety method for quality control of railway four and device based on BIM |
CN111192021A (en) * | 2019-12-31 | 2020-05-22 | 深圳市跨越新科技有限公司 | OA document approval implementation method and system |
CN111382983A (en) * | 2018-12-27 | 2020-07-07 | 中国电信股份有限公司 | Workflow control method, workflow node and system |
CN115526599A (en) * | 2022-10-09 | 2022-12-27 | 杭州龙即信息技术有限公司 | Official document circulation method and system based on flow parallel autonomous propulsion |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101819652A (en) * | 2009-11-26 | 2010-09-01 | 苏州锐创通信有限责任公司 | Multistage workflow modeling method based on serial number |
CN102063333A (en) * | 2011-01-14 | 2011-05-18 | 南京莱斯信息技术股份有限公司 | Recursive structure workflow model and dispatching method thereof |
CN102486730A (en) * | 2010-12-06 | 2012-06-06 | 上海协讯软件有限公司 | Workflow realization method and workflow system capable of customizing flow in user-defined manner |
CN103530740A (en) * | 2013-10-25 | 2014-01-22 | 金蝶软件(中国)有限公司 | Method and device for carrying out node control on task flow |
CN104091222A (en) * | 2014-05-08 | 2014-10-08 | 武大吉奥信息技术有限公司 | Workflow engine supporting multimode driving |
CN104850665A (en) * | 2015-06-12 | 2015-08-19 | 江苏中威科技软件系统有限公司 | Method and system for realizing flow circulation based on flow embedding |
CN105844380A (en) * | 2016-01-26 | 2016-08-10 | 湖北文理学院 | BIM-based BIM project element management method and system |
-
2016
- 2016-08-31 CN CN201610774894.9A patent/CN107316121A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101819652A (en) * | 2009-11-26 | 2010-09-01 | 苏州锐创通信有限责任公司 | Multistage workflow modeling method based on serial number |
CN102486730A (en) * | 2010-12-06 | 2012-06-06 | 上海协讯软件有限公司 | Workflow realization method and workflow system capable of customizing flow in user-defined manner |
CN102063333A (en) * | 2011-01-14 | 2011-05-18 | 南京莱斯信息技术股份有限公司 | Recursive structure workflow model and dispatching method thereof |
CN103530740A (en) * | 2013-10-25 | 2014-01-22 | 金蝶软件(中国)有限公司 | Method and device for carrying out node control on task flow |
CN104091222A (en) * | 2014-05-08 | 2014-10-08 | 武大吉奥信息技术有限公司 | Workflow engine supporting multimode driving |
CN104850665A (en) * | 2015-06-12 | 2015-08-19 | 江苏中威科技软件系统有限公司 | Method and system for realizing flow circulation based on flow embedding |
CN105844380A (en) * | 2016-01-26 | 2016-08-10 | 湖北文理学院 | BIM-based BIM project element management method and system |
Non-Patent Citations (1)
Title |
---|
郭敏帅: ""基于BIM技术的应用管理公共平台建立和分析"", 《四川建筑》 * |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019033790A1 (en) * | 2017-08-18 | 2019-02-21 | 平安科技(深圳)有限公司 | Project information processing method and apparatus, server and storage medium |
CN108229909A (en) * | 2017-12-14 | 2018-06-29 | 四川虹慧云商科技有限公司 | A kind of resident's transaction methods |
CN109146227A (en) * | 2018-06-26 | 2019-01-04 | 四川驹马科技有限公司 | A kind of parallel measures and procedures for the examination and approval of workflow and its system |
CN109559085A (en) * | 2018-09-20 | 2019-04-02 | 中建科技有限公司深圳分公司 | The measures and procedures for the examination and approval and terminal device based on BIM light weighed model |
CN111382983A (en) * | 2018-12-27 | 2020-07-07 | 中国电信股份有限公司 | Workflow control method, workflow node and system |
CN110377269A (en) * | 2019-06-17 | 2019-10-25 | 平安科技(深圳)有限公司 | Business approval system configuration method, apparatus and storage medium |
CN110377269B (en) * | 2019-06-17 | 2024-04-19 | 平安科技(深圳)有限公司 | Service approval system collocation method, device and storage medium |
CN110490425A (en) * | 2019-07-24 | 2019-11-22 | 中国铁建电气化局集团有限公司 | The electric construction safety method for quality control of railway four and device based on BIM |
CN111192021A (en) * | 2019-12-31 | 2020-05-22 | 深圳市跨越新科技有限公司 | OA document approval implementation method and system |
CN115526599A (en) * | 2022-10-09 | 2022-12-27 | 杭州龙即信息技术有限公司 | Official document circulation method and system based on flow parallel autonomous propulsion |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107316121A (en) | One kind is based on the workflow examination and approval method of BIM (BIM) | |
White | Process modeling notations and workflow patterns | |
CN103714414B (en) | A kind of flow nodes backing method for intelligent grid scheduling | |
CN106777758A (en) | Process data automatic analysis method and device | |
CN109284924A (en) | Visual scheduling method and device based on Gantt chart | |
CN104809551B (en) | A kind of cross-system workflow Synergistic method based on mobile Agent client | |
Gunasekaran et al. | Concurrent engineering: a multi‐disciplinary approach for construction | |
Bocewicz et al. | Multimodal processes prototyping subject to grid-like network and fuzzy operation time constraints | |
Kawakami-Arevalo et al. | Increased Productivity through a Production Model Based on Lean Manufacturing and SLP Tools in Small Furniture Manufacturing Workshops | |
Vajna | Workflow for design | |
CN104517186A (en) | Business process design method based on data drive | |
Capodieci et al. | Adopting collaborative business process patterns for an enterprise 2.0 banking information system | |
Dauzère-Pérès et al. | Extensions of an integrated approach for multi-resource shop scheduling | |
Dubler et al. | Using lean theory to identify waste associated with information exchanges on a building project | |
Lee et al. | Deadlock-free resource allocation control for a reconfigurable manufacturing system with serial and parallel configuration | |
Sanchez et al. | Proposal to Improve the Dyeing Process Applying Preventive Maintenance, SMED and Standardization in an Industrial Dry Cleaner | |
CN104217058B (en) | Slab intellectual material design method | |
Sawhney et al. | Simulation of the structural steel erection process | |
Bocewicz et al. | Multimodal cyclic processes scheduling in fractal structure networks environment | |
Matsuura et al. | Makespan comparison between resequencing and switching in a dynamic manufacturing environment | |
Bachy et al. | Engineering data management: a tool for technical coordination | |
Senkova | Integration of intelligentware in complex software: stratification aproach | |
DE69622078T2 (en) | Animation procedure for compound behavior of scenarios | |
Sawhney et al. | Hierarchical and modular modeling of structural steel erection process using Petri nets | |
Drissen-Silva et al. | A model for collaborative decision-making for the evolution of virtual enterprises |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20171103 |