CN107288557A - A kind of integrated flow string of changeable oil-extracting and water-injecting - Google Patents

A kind of integrated flow string of changeable oil-extracting and water-injecting Download PDF

Info

Publication number
CN107288557A
CN107288557A CN201710596734.4A CN201710596734A CN107288557A CN 107288557 A CN107288557 A CN 107288557A CN 201710596734 A CN201710596734 A CN 201710596734A CN 107288557 A CN107288557 A CN 107288557A
Authority
CN
China
Prior art keywords
oil
valve
oil pipe
pipe
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710596734.4A
Other languages
Chinese (zh)
Inventor
靳书凯
王尔钧
田宗强
简成
何连
马磊
鹿传世
孙桂宝
孙龙波
朱观进
杨凯宇
邓华根
苏剑波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
CNOOC China Ltd Zhanjiang Branch
Original Assignee
China National Offshore Oil Corp CNOOC
CNOOC China Ltd Zhanjiang Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Offshore Oil Corp CNOOC, CNOOC China Ltd Zhanjiang Branch filed Critical China National Offshore Oil Corp CNOOC
Priority to CN201710596734.4A priority Critical patent/CN107288557A/en
Publication of CN107288557A publication Critical patent/CN107288557A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/18Pipes provided with plural fluid passages
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/06Valve arrangements for boreholes or wells in wells
    • E21B34/08Valve arrangements for boreholes or wells in wells responsive to flow or pressure of the fluid obtained
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • E21B43/121Lifting well fluids
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/20Displacing by water

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a kind of integrated flow string of changeable oil-extracting and water-injecting, including well inner sleeve, oil pipe, storm valve, electric submersible pump, packer is provided between oil pipe and well inner sleeve and positioned at the lower section of storm valve, seating nipple and runner conversion pipe nipple are sequentially provided with oil pipe and below packer, runner conversion pipe nipple includes check valve and near valve, when from water filling in the export-oriented oil pipe of well, under hydraulic pressure, closed check valve, near valve is opened, the water injected in oil pipe is through near valve access wall inner sleeve, when electric submersible pump starts oil recovery or the draining to outside well, under oil pressure or hydraulic pressure, check valve is opened, near valve is closed, oil or water in well inner sleeve enter in oil pipe through electric submersible pump and check valve and discharged upwards outside well through oil pipe.The present invention changes the free switching that pipe nipple coordinates the operation of start and stop pump to realize runner by runner.By oil recovery metaideophone water when only need termination of pumping, operation step is poly- simple, shortens the activity duration, reduces operating cost.

Description

A kind of integrated flow string of changeable oil-extracting and water-injecting
Technical field
The present invention relates to oil well completion technical field, specifically a kind of integrated flow string of oil-extracting and water-injecting.
Background technology
At present, injection-production well requires early stage electric submersible pumping, later stage water filling;Water injection well early stage electric submersible pump discharge opeing, later stage water filling, And it is conventional at present using Y-shaped electric submersible pump producing tubular column, its tubing string needs steel wire operation when by recovering the oil or discharge opeing carries out metaideophone water Branch pipe blanking plug is picked up, causes field operation amount and operating cost increase;Marine some jacket platforms do not possess steel wire operation Condition, steel wire operation need to rearrange drilling platforms, and the activity duration increases with cost by huge.
Existing many offshore oilfield production casings are 7 ", are limited by wellbore space, it is impossible to use conventional Y-shaped electric submersible pump pipe Post;Special Y-shaped tubing string is parallel due to its electric submersible pump unit and bypass line, bypass branch pipe diameter and electric submersible pump unit it is straight Footpath selection needs balance, and the tubing string of this structure type limits the selection of the latent pump assembly of large-discharge electric of larger diameter size, Water filling is also limit simultaneously and bypasses the selection of manifold size, is recovered the oil or discharge opeing, huge discharge water filling it is difficult to meet huge discharge simultaneously It is required that.
It is conventional " Y " type electric submersible pump producing tubular columns, during metaideophone, steel wire operation pulling bypass branch pipe plug need to be carried out, and steel Silk Job Operations are limited by hole deviation, and conventional Y-piece post can not also meet steel wire metaideophone job requirements in high angle hole.
The content of the invention
In order to overcome above-mentioned deficiency, operated it is an object of the invention to provide a kind of simplified metaideophone, shorten the activity duration, Reduce the integrated flow string of changeable oil-extracting and water-injecting of operating cost.
In order to solve the above technical problems, the technical solution adopted in the present invention is:
A kind of integrated flow string of changeable oil-extracting and water-injecting, including well inner sleeve, the oil pipe in well inner sleeve, it is arranged on oil The storm valve for being connected with liquid controling pipe line on pipe top, the electric submersible pump for being connected with cable for being arranged on oil pipe bottom, the oil It is provided between pipe and well inner sleeve and positioned at the lower section of storm valve on packer, the oil pipe and positioned at the lower section of packer Seating nipple and runner conversion pipe nipple are sequentially provided with, the runner conversion pipe nipple includes check valve and near valve, when export-oriented oily from well In pipe during water filling, under hydraulic pressure, closed check valve, near valve is opened, and the water in injection oil pipe is through near valve access wall inner sleeve In, when electric submersible pump starts oil recovery or the draining to outside well, under oil pressure or hydraulic pressure, check valve is opened, and near valve is closed, well inner sleeve Oil or water in pipe enter in oil pipe through electric submersible pump and check valve and discharged upwards outside well through oil pipe.
Further, it is provided with the vent valve for being connected with liquid controling pipe line on the packer.
The beneficial effects of the present invention are:
(1)The present invention is mounted with that runner changes pipe nipple, and changing pipe nipple by multi-functional runner coordinates the operation of start and stop pump to realize production With the free switching of waterflood path.By oil recovery metaideophone water when only need termination of pumping, operation step is poly- simple, without carrying out steel wire work Industry, shortens the activity duration, reduces operating cost.
(2)The present invention is applied to the pit shaft of 7 " production casings, and electric submersible pump unit and oil pipe selection size selection scope are wide, energy Huge discharge is met simultaneously to recover the oil or discharge opeing, the requirement of huge discharge water filling.
(3)The operation that the present invention turns water-filling function by oil recovery can meet high angle hole oil-extracting and water-injecting one not by Well Deflection Influence The requirement of body tubing string.
(4)The present invention production packer be provided with vent valve, with multi-functional runner conversion pipe nipple coordinate, without deblocking or Steel wire operation, so that it may realize direct circulation or reacting cycle kill-job, can effectively shorten activity duration, reduction operating cost.
Brief description of the drawings
The present invention is described in further detail with reference to the accompanying drawings and detailed description:
Fig. 1 is structural representation of the invention;
Working state schematic representation when Fig. 2 recovers the oil for the present invention;
Working state schematic representation when Fig. 3 is water filling of the present invention.
In figure:1st, well inner sleeve;2nd, oil pipe;3rd, storm valve;4th, packer;5th, seating nipple;6th, runner is changed Pipe nipple;7th, electric submersible pump;8th, cable;9th, liquid controling pipe line;10th, liquid controling pipe line;11st, vent valve;12nd, check valve;13rd, it is close to logical Valve.
Embodiment
In order that those skilled in the art more fully understands technical scheme, it is below in conjunction with the accompanying drawings and specific real Apply example the present invention is described in further detail, it is necessary to explanation, in the case where not conflicting, present invention and hair Bright feature can be mutually combined.
As shown in Figure 1, 2, 3, the integrated flow string of a kind of changeable oil-extracting and water-injecting, including well inner sleeve 1, well inner sleeve Oil pipe 2 in pipe 1, it is arranged on the storm valve 3 for being connected with liquid controling pipe line 9 on the top of oil pipe 2, is arranged on the bottom of oil pipe 2 The electric submersible pump 7 of cable 8 is connected with, provided with packing between the oil pipe 2 and well inner sleeve 1 and positioned at the lower section of storm valve 3 Seating nipple 5 and runner conversion pipe nipple 6, the runner conversion are sequentially provided with device 4, the oil pipe 2 and positioned at the lower section of packer 4 Pipe nipple 6 includes check valve 12 and near valve 13, and when from water filling in the export-oriented oil pipe 2 of well, under hydraulic pressure, check valve 12 is closed, and is close to Port valve 13 is opened, and the water in injection oil pipe 2 is through in the access wall inner sleeve 1 of near valve 13, when electric submersible pump 7 starts to recover the oil or to outside well During draining, under oil pressure or hydraulic pressure, check valve 12 is opened, and near valve 13 is closed, and the oil or water in well inner sleeve 1 are through electric submersible pump 7 Enter with check valve 12 in oil pipe 2 and discharged upwards outside well through oil pipe 2.
Further, the vent valve 11 for being connected with liquid controling pipe line 10, vent valve 11 and many work(are provided with the packer 4 Energy runner conversion pipe nipple coordinates, without deblocking or steel wire operation, so that it may realize direct circulation or reacting cycle kill-job, can effectively shorten work Industry time, reduction operating cost.
Many details are elaborated in above description to facilitate a thorough understanding of the present invention, still, the present invention can be with It is different from other modes described here to implement using other, it is thus impossible to be interpreted as limiting the scope of the invention.

Claims (2)

1. a kind of integrated flow string of changeable oil-extracting and water-injecting, including well inner sleeve, the oil pipe in well inner sleeve, it is arranged on The storm valve for being connected with liquid controling pipe line on oil pipe top, the electric submersible pump for being connected with cable for being arranged on oil pipe bottom, it is described Packer is provided between oil pipe and well inner sleeve and positioned at the lower section of storm valve, it is characterised in that:On the oil pipe and position Seating nipple and runner conversion pipe nipple are sequentially provided with below packer, the runner conversion pipe nipple includes check valve and is close to logical Valve, when from water filling in the export-oriented oil pipe of well, under hydraulic pressure, closed check valve, near valve is opened, and the water in injection oil pipe is logical through being close to In valve access wall inner sleeve, when electric submersible pump starts oil recovery or the draining to outside well, under oil pressure or hydraulic pressure, check valve is opened, and is close to Port valve is closed, and the oil or water in well inner sleeve enter in oil pipe through electric submersible pump and check valve and discharged upwards outside well through oil pipe.
2. the integrated flow string of a kind of changeable oil-extracting and water-injecting according to claim 1, it is characterised in that:The envelope Every being provided with the vent valve that is connected with liquid controling pipe line on device.
CN201710596734.4A 2017-07-20 2017-07-20 A kind of integrated flow string of changeable oil-extracting and water-injecting Pending CN107288557A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710596734.4A CN107288557A (en) 2017-07-20 2017-07-20 A kind of integrated flow string of changeable oil-extracting and water-injecting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710596734.4A CN107288557A (en) 2017-07-20 2017-07-20 A kind of integrated flow string of changeable oil-extracting and water-injecting

Publications (1)

Publication Number Publication Date
CN107288557A true CN107288557A (en) 2017-10-24

Family

ID=60101992

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710596734.4A Pending CN107288557A (en) 2017-07-20 2017-07-20 A kind of integrated flow string of changeable oil-extracting and water-injecting

Country Status (1)

Country Link
CN (1) CN107288557A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108547603A (en) * 2018-02-28 2018-09-18 中国石油天然气股份有限公司 Water injection and oil extraction integrated tubular column and water injection and oil extraction method
CN109736759A (en) * 2019-01-17 2019-05-10 中国石油天然气股份有限公司 Water injection and oil extraction integrated tubular column for horizontal well and process method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0588421A1 (en) * 1992-09-18 1994-03-23 NORSK HYDRO a.s. Method and production pipe in an oil or gas reservoir
CN201908632U (en) * 2010-11-11 2011-07-27 中国石油天然气股份有限公司 Integrated well completion pipe string for offshore self-blowing and artificial lifting
CN202000980U (en) * 2011-03-28 2011-10-05 刘巍 Detection device capable of automatically switching oil inlets of two oil layers
CN105422053A (en) * 2015-12-29 2016-03-23 中国石油天然气股份有限公司 Oil-submersible direct-drive screw pump huff and puff oil production device
CN205172449U (en) * 2015-10-30 2016-04-20 中石化石油工程技术服务有限公司 Runner conversion equipment is kept apart in pit to double fluid drilling rod

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0588421A1 (en) * 1992-09-18 1994-03-23 NORSK HYDRO a.s. Method and production pipe in an oil or gas reservoir
CN1084936A (en) * 1992-09-18 1994-04-06 挪威海德罗公司 From oil or gas field, produce the method and the produce oil pipe of oil or natural gas
CN201908632U (en) * 2010-11-11 2011-07-27 中国石油天然气股份有限公司 Integrated well completion pipe string for offshore self-blowing and artificial lifting
CN202000980U (en) * 2011-03-28 2011-10-05 刘巍 Detection device capable of automatically switching oil inlets of two oil layers
CN205172449U (en) * 2015-10-30 2016-04-20 中石化石油工程技术服务有限公司 Runner conversion equipment is kept apart in pit to double fluid drilling rod
CN105422053A (en) * 2015-12-29 2016-03-23 中国石油天然气股份有限公司 Oil-submersible direct-drive screw pump huff and puff oil production device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108547603A (en) * 2018-02-28 2018-09-18 中国石油天然气股份有限公司 Water injection and oil extraction integrated tubular column and water injection and oil extraction method
CN109736759A (en) * 2019-01-17 2019-05-10 中国石油天然气股份有限公司 Water injection and oil extraction integrated tubular column for horizontal well and process method

Similar Documents

Publication Publication Date Title
CN202108493U (en) Horizontal well hydraulic jet multi-cluster staged fracturing string
CN201241664Y (en) Pipe column for jet pump oil extraction and water injection integrated process
CN204663496U (en) A kind of canned pair of down-hole electric submersible pump producing tubular column
CN201705249U (en) Continuous jet flow blockage removing pipe column for horizontal well
CN201810286U (en) Separate mining mixed pumping pipe column suitable for two-layer mining
CN201705276U (en) Well completion and flow string of horizontal well
CN101503955A (en) Segmented well completion method and column jacket
CN107740685A (en) It is a kind of with adopted under submersible electric pump it is upper note completion flow string
CN109322647A (en) Layered injection-production integrated pipe column and process
CN107288557A (en) A kind of integrated flow string of changeable oil-extracting and water-injecting
CN103452531A (en) Method for underbalanced tubing descending, non-well-killing gas lifting, rotary pumping, pump maintaining and tubing maintaining
CN107420070A (en) A kind of closed flow string of Oil/gas Well list submersible electric pump
CN107630685A (en) Rodless oil production pipe column and method for oil pumping motor-pumped well
CN105019858B (en) The plug cementing cement head device of hp-ht well three and well cementing operation method
CN104453754B (en) Bidirectional channel check valve and method for washing sand and well by using bidirectional channel check valve
CN111911086B (en) Multifunctional pipe column and injection-production alternate method based on same
CN103470233B (en) Heavy oil reservoir natural gas huff-puff oil production process system and oil production method
CN203403868U (en) Heavy oil well double-jet-pump lifting pipe string
CN210134883U (en) Injection-production integrated pipe column in same well
CN206419004U (en) A kind of electric pump couples lifting tubing string with gaslift
CN206190240U (en) Pumpingh well tubular column
CN202832408U (en) Oil-submersible screw pump gas-lift composite pipe column for water drainage and gas production
CN2586812Y (en) Continuous sand flushing tool
CN204344428U (en) A kind of thick oil pump
CN104806211B (en) One kind takes over calm the anger extracting device of oil and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 100010 Beijing, Chaoyangmen, North Street, No. 25, No.

Applicant after: China Offshore Oil Group Co., Ltd.

Applicant after: CNOOC (China) Limited Zhanjiang Branch

Address before: Chinese CNOOC Building No. 25 Beijing 100010 Dongcheng District Chaoyangmen North Street

Applicant before: China National Offshore Oil Corporation

Applicant before: CNOOC (China) Limited Zhanjiang Branch

CB02 Change of applicant information
CB03 Change of inventor or designer information

Inventor after: Li Zhong

Inventor after: Sun Longbo

Inventor after: Zhu Guanjin

Inventor after: Yang Kaiyu

Inventor after: Deng Huagen

Inventor after: Su Jianbo

Inventor after: Jin Shukai

Inventor after: Wang Erjun

Inventor after: Tian Zongqiang

Inventor after: Jian Cheng

Inventor after: He Lian

Inventor after: Ma Lei

Inventor after: Lu Chuanshi

Inventor after: Sun Guibao

Inventor before: Jin Shukai

Inventor before: Zhu Guanjin

Inventor before: Yang Kaiyu

Inventor before: Deng Huagen

Inventor before: Su Jianbo

Inventor before: Wang Erjun

Inventor before: Tian Zongqiang

Inventor before: Jian Cheng

Inventor before: He Lian

Inventor before: Ma Lei

Inventor before: Lu Chuanshi

Inventor before: Sun Guibao

Inventor before: Sun Longbo

CB03 Change of inventor or designer information
RJ01 Rejection of invention patent application after publication

Application publication date: 20171024

RJ01 Rejection of invention patent application after publication