CN107285799A - Few maintenance massage type with filter layer crosses water Water penetrable grass planting brick and preparation method thereof - Google Patents
Few maintenance massage type with filter layer crosses water Water penetrable grass planting brick and preparation method thereof Download PDFInfo
- Publication number
- CN107285799A CN107285799A CN201710551962.XA CN201710551962A CN107285799A CN 107285799 A CN107285799 A CN 107285799A CN 201710551962 A CN201710551962 A CN 201710551962A CN 107285799 A CN107285799 A CN 107285799A
- Authority
- CN
- China
- Prior art keywords
- water
- filter layer
- grass planting
- massage type
- planting brick
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C04—CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
- C04B—LIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
- C04B28/00—Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
- C04B28/02—Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing hydraulic cements other than calcium sulfates
- C04B28/06—Aluminous cements
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B1/00—Producing shaped prefabricated articles from the material
- B28B1/14—Producing shaped prefabricated articles from the material by simple casting, the material being neither forcibly fed nor positively compacted
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B11/00—Apparatus or processes for treating or working the shaped or preshaped articles
- B28B11/08—Apparatus or processes for treating or working the shaped or preshaped articles for reshaping the surface, e.g. smoothing, roughening, corrugating, making screw-threads
- B28B11/0818—Apparatus or processes for treating or working the shaped or preshaped articles for reshaping the surface, e.g. smoothing, roughening, corrugating, making screw-threads for roughening, profiling, corrugating
- B28B11/0827—Apparatus or processes for treating or working the shaped or preshaped articles for reshaping the surface, e.g. smoothing, roughening, corrugating, making screw-threads for roughening, profiling, corrugating for corrugating, profiling or the like of plates such as asbestos cement sheets
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B17/00—Details of, or accessories for, apparatus for shaping the material; Auxiliary measures taken in connection with such shaping
- B28B17/02—Conditioning the material prior to shaping
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/22—Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
- E01C11/224—Surface drainage of streets
- E01C11/225—Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C5/00—Pavings made of prefabricated single units
- E01C5/06—Pavings made of prefabricated single units made of units with cement or like binders
- E01C5/065—Pavings made of prefabricated single units made of units with cement or like binders characterised by their structure or component materials, e.g. concrete layers of different structure, special additives
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C9/00—Special pavings; Pavings for special parts of roads or airfields
- E01C9/004—Pavings specially adapted for allowing vegetation
-
- C—CHEMISTRY; METALLURGY
- C04—CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
- C04B—LIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
- C04B2111/00—Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
- C04B2111/00241—Physical properties of the materials not provided for elsewhere in C04B2111/00
- C04B2111/00284—Materials permeable to liquids
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Structural Engineering (AREA)
- Ceramic Engineering (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Inorganic Chemistry (AREA)
- Materials Engineering (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Organic Chemistry (AREA)
- Manufacturing & Machinery (AREA)
- Cultivation Of Plants (AREA)
Abstract
The invention discloses the preparation method that a kind of few maintenance massage type with filter layer crosses water Water penetrable grass planting brick, there is few maintenance massage type of filter layer, which to cross water Water penetrable grass planting brick, for this includes Water permeable body, water gallery is crossed positioned at Water permeable body bottom, the dress soil body positioned at Water permeable body top, massaging body and the sand filter layer in the dress soil body positioned at Water permeable body upper surface, Water permeable body proportioning includes rubble/regenerative bone material by concrete, sulphate aluminium cement, slag, water and water reducer, present invention process is simple, low raw-material cost, and intensity can obtain design strength, and regenerative bone material by concrete and substantial amounts of slag can be used in large quantities, its structure can be effectively reduced the turbidity of water, reach the purpose of purifying water body.
Description
Technical field
The present invention relates to technical field of inorganic nonmetallic materials, especially a kind of few maintenance massage type mistake with filter layer
Water Water penetrable grass planting brick and preparation method thereof.
Background technology
Gui Anxinqu is located at Guiyang City, Guizhou Province and Anshun calmodulin binding domain CaM, is that the whole nation is uniquely fixed using Ecological Civilization Construction
The national new district of position, is the pilot new district in sponge city, the demand to water-permeable brick is larger.Due to concrete it is generally necessary to support
Shield can be only achieved design standard in 28 days, and this factor will have a strong impact on the duration of new district engineering construction, in order to reduce this influence
Factor, urgent need searches out a kind of method of rapid shaping water-permeable brick.As the improvement of people's living standards, this noun of health is standby
Concerned, it is contemplated that this problem, conventional pervious concrete is made the grass-planting brick with certain massage effect by the present invention, is made
People just reach the effect to foot massages after stroll.With reference to Guizhou lithotome the characteristics of abundant and discarded concrete
Dismounting problem, the present invention prepares that maintenance massage type is permeable less crosses water grass-planting brick using rubble/Aggregate of recycled concrete, by brick
Reserved water body of crossing realizes this function of the confluxing of current-retaining.In addition, due to conventional Water penetrable grass planting brick, the soil body is filled
Part is smaller, causes to generally require often to water during planting plants, is unfavorable for the walking of people for these positions of pavement.Base
In this, charcoal is obtained by Pintsch process using spicy stalk or cotton stalk, because charcoal has flourishing pore structure,
With preferable moistening effect.Therefore mix charcoal with soil, it can guarantee that the humidity of soil improves the life-span of plant, and reduce
The number of times watered.Therefore, achievement of the invention provides sound assurance for the construction in sponge city.
The content of the invention
The technical problems to be solved by the invention are:A kind of few maintenance massage type with filter layer is provided and crosses the permeable plant of water
Careless brick and preparation method thereof, it can use regenerative bone material by concrete and substantial amounts of slag in large quantities, meanwhile, the transition zone is set
Put, the turbidity of water can be effectively reduced, reach the purpose of purifying water body, to overcome the deficiencies in the prior art.
What the present invention was realized in:
The preparation method that a kind of few maintenance massage type with filter layer crosses water Water penetrable grass planting brick, should few maintenance with filter layer
Massage type, which crosses water Water penetrable grass planting brick, includes Water permeable body, and water gallery, the dress soil positioned at Water permeable body top are crossed positioned at Water permeable body bottom
Body, the massaging body positioned at Water permeable body upper surface and the sand filter layer in the dress soil body, Water permeable body proportioning include rubble/coagulation
Native regeneration aggregate, sulphate aluminium cement, slag, water and water reducer.
Foregoing few maintenance massage type with filter layer is crossed in the preparation method of water Water penetrable grass planting brick, by weight,
By weight, the match ratio of the Water permeable body is sulphate aluminium cement:Slag:Water:Water reducer:Retarder:Rubble/concrete is again
Raw aggregate=1:0.3~0.6:0.24~0.28:0.01~0.015:0.005~0.01:235~255.
Foregoing few maintenance massage type with filter layer is crossed in the preparation method of water Water penetrable grass planting brick, should have filter layer
The making of crossing water Water penetrable grass planting brick of few maintenance massage type comprise the following steps:
1)Select C30 ~ C50 concrete through broken, screening, selection particle diameter is standby for 15 ~ 40mm regenerative bone material by concrete;Or
Particle diameter is standby for 15 ~ 40mm rubble;
2)By sulphate aluminium cement:Slag:Water:Water reducer:Retarder:Rubble/regenerative bone material by concrete=1:0.3~0.6:0.24
~0.28:0.01~0.015:0.005~0.01:235 ~ 255 match ratio mix non-fine concrete;
3)Die trial is made, and the non-fine concrete mixed is cast in die trial, permeable body portion is poured;And by Water permeable body
Surface is fabricated to wave, i.e. massaging body;After specimen molding, form removal after 24h is conserved in 20 DEG C ± 2 DEG C of fog room;
4)Few maintenance massage type after the demoulding crosses water Water penetrable grass planting brick and continues to conserve 2 days in 20 DEG C ± 2 DEG C of fog room
Use;
5)The dress soil body is filled up from the bottom to top respectively by sand and soil, and plants grass planting wherein, that is, is formed filter layer and planted grass layer, reach
To the purpose of purifying water body and greening environment.
Foregoing few maintenance massage type with filter layer is crossed in the preparation method of water Water penetrable grass planting brick, the sand filter layer
Making comprise the following steps:
1)Prepare 0.16mm ~ 1.25mm sand, by 0.16mm ~ 0.63mm and 0.63mm ~ 1.25mm screening, clean it is standby;
2)By 500 DEG C ~ 600 DEG C cracking corns or spicy stalk, the charcoal that particle diameter is 0.16mm ~ 1.25mm is prepared, is pressed
0.16mm ~ 0.63mm and 0.63mm ~ 1.25mm screenings are standby;
3)According to filter layer demand, it is 0.16mm ~ 0.63mm by particle diameter, accounts for 50 ~ 60%;Particle diameter is 0.63mm ~ 1.25mm, accounts for 40
~ 50%, it is well mixed to fill out in dress soil body bottom, form sand filter layer;
4)For kind of a grass planting, and reach the demand that nutrient and humidity are provided, filled out on sand filter layer the addition of charcoal for 4 ~
8% mixed soil;
5)In order to be able to readily replaceable soil, it is fixed, is placed into the dress soil body using the GSZ string bag.
A kind of few maintenance massage type with filter layer crosses water Water penetrable grass planting brick, including Water permeable body, and the Water permeable body is cube
Structure, water gallery was set in Water permeable body lower surface, is evenly distributed in the upper surface the arrangement dress soil body in Water permeable body, sand is set in the dress soil body
Filter layer, massaging body is set in the Water permeable body upper surface of dress soil body surrounding.
Foregoing few maintenance massage type with filter layer is crossed in water Water penetrable grass planting brick, the Water permeable body using 300mm ×
The standard-sized solid cube structures of 300mm × 260-290mm.
Foregoing few maintenance massage type with filter layer is crossed in water Water penetrable grass planting brick, and the water gallery of crossing is chute knot
Structure, this crosses water gallery two ends and Water permeable body front/rear end insertion, and this is crossed the plane of symmetry of water gallery and overlapped with the plane of symmetry of Water permeable body.
Foregoing few maintenance massage type with filter layer is crossed in water Water penetrable grass planting brick, and the dress soil body is shallow slot and the side of being
Body or column structure, the dress soil body quantity are 4 or 9 and are distributed in using uniform method for arranging on Water permeable body upper surface.
Foregoing few maintenance massage type with filter layer is crossed in water Water penetrable grass planting brick, and the massaging body is sinusoidal or cosine
Shape.
Foregoing few maintenance massage type with filter layer is crossed in water Water penetrable grass planting brick, and the sand filter layer includes being located at dress
The sand of soil body bottom, biological layer of charcoal is set on sand upper strata, and soil is filled into biological layer of charcoal, and the GSZ string bag is by above layers
It is fixed.
By adopting the above-described technical solution, compared with prior art, present invention process is simple, low raw-material cost, and
And intensity can obtain design strength, and regenerative bone material by concrete and substantial amounts of slag can be used in large quantities, its structure can be effective
Ground reduces the turbidity of water, reaches the purpose of purifying water body.
Brief description of the drawings
Accompanying drawing 1 is the three-view diagram one of the present invention;
Accompanying drawing 2 is the three-view diagram two of the present invention;
Accompanying drawing 3 is the structural representation of sand filter layer in the present invention.
Embodiment
Embodiments of the invention one:Few maintenance massage type with filter layer crosses water Water penetrable grass planting brick(Such as 1 ~ accompanying drawing of accompanying drawing
Shown in 2, wherein the dress soil body can be square or circle,)By crossing water gallery, Water permeable body, massaging body, the dress soil body and sand filter layer 5
It is grouped into, wherein, cross a height of 300mm × 140mm × 50 of length and width ~ 100mm of water gallery, a height of 300mm of length and width of Water permeable body ×
300mm × 260 ~ 290mm, fill a height of 60mm × 60mm × 120 of length and width ~ 150mm of the soil body, and the dress soil body is constituted by 4 ~ 9;Regeneration
Aggregate/rubble celluar concrete match ratio is sulphate aluminium cement:Slag:Water:Water reducer:Retarder:Rubble/concrete regenerating
Aggregate=1:0.3~0.6:0.24~0.28:0.01~0.015:0.005~0.01:235~255.
Comprise the following steps that:
1) strength grade is used for C30 ~ C50 discarded concrete, is crushed, is sieved, chooses the concrete between 15mm ~ 40mm
Regeneration aggregate particle is standby, or the cobble that selection particle diameter is 15 ~ 40mm, cleans standby.
2)By sulphate aluminium cement:Slag:Water:Water reducer:Retarder:Rubble/regenerative bone material by concrete=1:0.3~0.6:
0.24~0.28:0.01~0.015:0.005~0.01:235 ~ 255 match ratio mix regeneration aggregate/rubble celluar concrete.
3)Die trial is made, and by the concreting mixed in die trial, pours permeable body portion;Water permeable body upper surface
It is fabricated to wave(Sinusoidal or cosine etc.), form removal after 24h is conserved after shaping in 20 DEG C ± 2 DEG C of fog room.
4)Massage type after the demoulding crosses water Water penetrable grass planting brick and continues to conserve to 2 days in 20 DEG C ± 2 DEG C of fog room
Use.Massage type crosses the water Water penetrable grass planting brick compression strength of 3 days for 16.4 ~ 18.5MPa, can meet parking lot, pavement and wide
The demand of field etc..
Filter layer is comprised the following steps that:
1)Prepare 0.16mm ~ 1.25mm sand, by 0.16mm ~ 0.63mm and 0.63mm ~ 1.25mm screening, clean it is standby.
2)By 500 DEG C ~ 600 DEG C cracking corns or spicy stalk, the charcoal that particle diameter is 0.16mm ~ 1.25mm is prepared,
It is standby by 0.16mm ~ 0.63mm and 0.63mm ~ 1.25mm screenings.
3)According to filter layer demand, it is 0.16mm ~ 0.63mm by particle diameter, accounts for 50 ~ 60%;Particle diameter is 0.63mm ~ 1.25mm,
40 ~ 50% are accounted for, it is well mixed to fill out in dress soil body bottom, i.e. sand filter layer(First layer), gross thickness is 20mm ~ 30mm, through overtesting
Influent turbidity is in below 450NTU, and delivery turbidity ensure that as 0NTU substantially.
4)For kind of a grass planting, and the demand that nutrient and humidity are provided is reached, the addition of charcoal is filled out on sand filter layer
For 4 ~ 8% mixed soil.
5)In order to be able to readily replaceable soil, it is fixed, is placed into the dress soil body using the GSZ string bag.
It is only the mentality of designing of some embodiments of the present invention above, it is clear that the above embodiment of the present invention, which is only,
Illustrate to Chu example of the present invention, and be not the restriction to embodiments of the present invention.For the common of art
For technical staff, it can also make other changes in different forms on the basis of the above description.Here need not
All embodiments can not be exhaustive.Any modification for being made within the spirit and principles of the invention, equally replace
Change and improve, should be included within the protection domain of the claims in the present invention.
Claims (10)
1. the preparation method that a kind of few maintenance massage type with filter layer crosses water Water penetrable grass planting brick, it is characterised in that:This has
Few maintenance massage type of filter layer, which crosses water Water penetrable grass planting brick, includes Water permeable body, and water gallery is crossed, positioned at saturating positioned at Water permeable body bottom
The dress soil body, the massaging body positioned at Water permeable body upper surface and the sand filter layer in the dress soil body on water body top, the Water permeable body are matched somebody with somebody
Than including rubble/regenerative bone material by concrete, sulphate aluminium cement, slag, water and water reducer.
2. the preparation method that few maintenance massage type according to claim 1 with filter layer crosses water Water penetrable grass planting brick, its
It is characterised by:By weight, by weight, the match ratio of the Water permeable body is sulphate aluminium cement:Slag:Water:Water reducer:
Retarder:Rubble/regenerative bone material by concrete=1:0.3~0.6:0.24~0.28:0.01~0.015:0.005~0.01:235~255.
3. the preparation method that few maintenance massage type according to claim 1 with filter layer crosses water Water penetrable grass planting brick, its
It is characterised by:The making that there is few maintenance massage type of filter layer to cross water Water penetrable grass planting brick comprises the following steps:
1)Select C30 ~ C50 concrete through broken, screening, selection particle diameter is standby for 15 ~ 40mm regenerative bone material by concrete;Or
Particle diameter is standby for 15 ~ 40mm rubble;
2)By sulphate aluminium cement:Slag:Water:Water reducer:Retarder:Rubble/regenerative bone material by concrete=1:0.3~0.6:0.24
~0.28:0.01~0.015:0.005~0.01:235 ~ 255 match ratio mix non-fine concrete;
3)Die trial is made, and the non-fine concrete mixed is cast in die trial, permeable body portion is poured;And by Water permeable body
Surface is fabricated to wave, i.e. massaging body;After specimen molding, form removal after 24h is conserved in 20 DEG C ± 2 DEG C of fog room;
4)Few maintenance massage type after the demoulding crosses water Water penetrable grass planting brick and continues to conserve 2 days in 20 DEG C ± 2 DEG C of fog room
Use;
5)The dress soil body is filled up from the bottom to top respectively by sand and soil, and plants grass planting wherein, that is, is formed filter layer and planted grass layer, reach
To the purpose of purifying water body and greening environment.
4. the preparation method that few maintenance massage type according to claim 1 with filter layer crosses water Water penetrable grass planting brick, its
It is characterised by:The making of the sand filter layer comprises the following steps:
1)Prepare 0.16mm ~ 1.25mm sand, by 0.16mm ~ 0.63mm and 0.63mm ~ 1.25mm screening, clean it is standby;
2)By 500 DEG C ~ 600 DEG C cracking corns or spicy stalk, the charcoal that particle diameter is 0.16mm ~ 1.25mm is prepared, is pressed
0.16mm ~ 0.63mm and 0.63mm ~ 1.25mm screenings are standby;
3)According to filter layer demand, it is 0.16mm ~ 0.63mm by particle diameter, accounts for 50 ~ 60%;Particle diameter is 0.63mm ~ 1.25mm, accounts for 40
~ 50%, it is well mixed to fill out in dress soil body bottom, form sand filter layer;
4)For kind of a grass planting, and reach the demand that nutrient and humidity are provided, filled out on sand filter layer the addition of charcoal for 4 ~
8% mixed soil;
5)In order to be able to readily replaceable soil, it is fixed, is placed into the dress soil body using the GSZ string bag.
5. a kind of few maintenance massage type with filter layer crosses water Water penetrable grass planting brick, including Water permeable body(1), it is characterised in that:Should
Water permeable body(1)For cube structure, in Water permeable body(1)Lower surface set water gallery(2), in Water permeable body(1)It is evenly distributed in the upper surface cloth
Put the dress soil body(3), in the dress soil body(3)Interior setting sand filter layer(4), in the dress soil body(3)The Water permeable body of surrounding(1)Upper surface is set
Massaging body(5).
6. few maintenance massage type according to claim 5 with filter layer crosses water Water penetrable grass planting brick, it is characterised in that:Institute
State Water permeable body(1)Using the standard-sized solid cube structures of 300mm × 300mm × 260-290mm.
7. few maintenance massage type according to claim 5 with filter layer crosses water Water penetrable grass planting brick, it is characterised in that:Institute
Stated water gallery(2)For sliding groove structure, this crosses water gallery(2)Two ends and Water permeable body(1)Front/rear end insertion, this crosses water gallery
(2)The plane of symmetry and Water permeable body(1)The plane of symmetry overlap.
8. few maintenance massage type according to claim 5 with filter layer crosses water Water penetrable grass planting brick, it is characterised in that:Institute
State the dress soil body(3)For shallow slot and be cube or column structure, the dress soil body(3)Quantity is for 4 or 9 and using uniform arrangement side
Method is distributed in Water permeable body(1)On upper surface.
9. few maintenance massage type according to claim 5 with filter layer crosses water Water penetrable grass planting brick, it is characterised in that:Institute
State massaging body(5)For sinusoidal or cosine shape.
10. few maintenance massage type according to claim 5 with filter layer crosses water Water penetrable grass planting brick, it is characterised in that:
The sand filter layer(4)Including positioned at the dress soil body(3)The sand of bottom(6), in sand(6)Upper strata sets biological layer of charcoal(7), soil
(8)It is filled into biological layer of charcoal(7)It is interior, the GSZ string bag(9)Above layers are fixed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710551962.XA CN107285799B (en) | 2017-07-07 | 2017-07-07 | Less-maintenance massage type water-permeable grass planting brick with filter layer and manufacturing method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710551962.XA CN107285799B (en) | 2017-07-07 | 2017-07-07 | Less-maintenance massage type water-permeable grass planting brick with filter layer and manufacturing method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107285799A true CN107285799A (en) | 2017-10-24 |
CN107285799B CN107285799B (en) | 2020-11-20 |
Family
ID=60100067
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710551962.XA Expired - Fee Related CN107285799B (en) | 2017-07-07 | 2017-07-07 | Less-maintenance massage type water-permeable grass planting brick with filter layer and manufacturing method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107285799B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110192476A (en) * | 2019-06-06 | 2019-09-03 | 沈阳农业大学 | A kind of stalk greening brick and preparation method thereof |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06335323A (en) * | 1993-05-26 | 1994-12-06 | Shin Etsu Chem Co Ltd | Artificial soil structure and method for raising plant using the same |
US5383943A (en) * | 1992-08-08 | 1995-01-24 | Shin-Etsu Chemical Co. Ltd. | Soil block for pot plant cultivation and a method of cultivating pot plants using the same |
CN2898174Y (en) * | 2006-04-26 | 2007-05-09 | 邱志强 | Massaging floor tiles |
-
2017
- 2017-07-07 CN CN201710551962.XA patent/CN107285799B/en not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5383943A (en) * | 1992-08-08 | 1995-01-24 | Shin-Etsu Chemical Co. Ltd. | Soil block for pot plant cultivation and a method of cultivating pot plants using the same |
JPH06335323A (en) * | 1993-05-26 | 1994-12-06 | Shin Etsu Chem Co Ltd | Artificial soil structure and method for raising plant using the same |
CN2898174Y (en) * | 2006-04-26 | 2007-05-09 | 邱志强 | Massaging floor tiles |
Non-Patent Citations (2)
Title |
---|
柯旭等: "再生骨料透水混凝土蓄水植草砖", 《四川建材》 * |
田丹等: "生物炭对砂土水力特征参数及持水特性影响试验研究", 《灌溉排水学报》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110192476A (en) * | 2019-06-06 | 2019-09-03 | 沈阳农业大学 | A kind of stalk greening brick and preparation method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN107285799B (en) | 2020-11-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207003174U (en) | Anti-block water permeable concrete road surface structure | |
CN205205600U (en) | Regeneration road surface structure | |
CN103936346B (en) | A kind of haydites of book structure pervious ecological concrete | |
CN106518032B (en) | A kind of water-permeable brick and preparation method thereof | |
CN107324723A (en) | A kind of environment friendly pervious brick and the press-moulding die and preparation method for preparing the water-permeable brick | |
CN105297575A (en) | Novel sponge body double-waste pervious concrete pavement | |
CN106747114A (en) | A kind of novel pavement porous concrete product and preparation method thereof | |
CN103553471A (en) | Method for manufacturing water permeable brick from waste concrete, and pavement method of water permeable brick | |
CN106365553A (en) | Water-permeable brick and preparation method thereof, and pavement construction technique | |
EP2812292B1 (en) | Binder composition and path material comprising a binder composition | |
CN104072026B (en) | A kind of road pavements utilizing ceramic waste material and preparation method thereof | |
CN108252181A (en) | A kind of pervious concrete pavement structure and construction method | |
CN107285799A (en) | Few maintenance massage type with filter layer crosses water Water penetrable grass planting brick and preparation method thereof | |
CN104631258A (en) | High-strength concrete permeable pavement brick | |
CN107165019A (en) | One kind crosses water Water penetrable grass planting brick and preparation method thereof | |
CN106365554A (en) | Novel water-permeable brick and pavement construction method thereof | |
CN207031284U (en) | Massage type with heavy metal filter layer crosses water Water penetrable grass planting brick | |
CN104045282B (en) | Nonporous closed water-permeable drainage ditch cover plate and manufacturing method thereof | |
CN109056455A (en) | A kind of sponge urban construction permeable side walk slab and method for paving | |
CN107266106A (en) | Massage type with heavy metal filter layer crosses water Water penetrable grass planting brick and preparation method thereof | |
CN205974055U (en) | Collect curb that purifies rainwater | |
CN206902877U (en) | A kind of permeable cobble ditch and permeable structure | |
CN109400090A (en) | Environment friendly road paves block, preparation method and building waste processing method | |
CN104529516B (en) | A kind of preparation method of cultivating and growing base | |
CN106242609A (en) | A kind of preparation method of mine tailing flint clay water-permeable brick |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201120 Termination date: 20210707 |
|
CF01 | Termination of patent right due to non-payment of annual fee |