CN107237398A - A kind of new multi and tall steel building assembled combined structure system - Google Patents
A kind of new multi and tall steel building assembled combined structure system Download PDFInfo
- Publication number
- CN107237398A CN107237398A CN201710492339.1A CN201710492339A CN107237398A CN 107237398 A CN107237398 A CN 107237398A CN 201710492339 A CN201710492339 A CN 201710492339A CN 107237398 A CN107237398 A CN 107237398A
- Authority
- CN
- China
- Prior art keywords
- steel
- prefabricated
- truss
- section
- combined structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/32—Floor structures wholly cast in situ with or without form units or reinforcements
- E04B5/36—Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor
- E04B5/38—Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor with slab-shaped form units acting simultaneously as reinforcement; Form slabs with reinforcements extending laterally outside the element
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
- E04C3/04—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
- E04C3/06—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal with substantially solid, i.e. unapertured, web
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/30—Columns; Pillars; Struts
- E04C3/32—Columns; Pillars; Struts of metal
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
- E04B2001/2418—Details of bolting
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The present invention announces a kind of new multi and tall steel building assembled combined structure system and its implementation, the bearing carrier of body series vertical direction and horizontal bending resistance component use L-shaped truss steel column, welded at the scene with the built-in fitting in basis, L-shaped truss steel column can reach stable state without temporary support after welding.L-shaped truss steel column sets overhanging beam section in the horizontal direction, is attached prefabricated girder steel and truss leg by high-strength bolt at overhanging beam section.Flooring uses prefabricated reinforced concrete superimposed sheet, and pouring concrete surface layer is reproduced after being attached at the scene by peg and girder steel.The exterior wall of system uses external hanging type prefabricated panel, removes live external decoration work from.The present invention can improve building industrialization degree, reduce labor strength, and product quality is easily controllable, meet building assembly industry demand, can be widely applied to multi and tall steel building building.
Description
Technical field
The invention belongs to the technical field of Structural Engineering, it is related to a kind of new multi and tall steel building assembled combining structure body
System and its implementation.
Background technology
Building industrialization is the important development trend of current China's building field, is also the hair that country carries forward vigorously and supported
Open up direction.Prefabricated construction is the product of building industrialization, and fast with construction rhythm, good product quality, estimated cost are low,
Efficiency of construction is high, the advantage such as simple production process.Assembled architecture is typically characterized by simplified site operation work, significantly
Shorten the site operation duration, its core seeks to reduce work on the spot amount, particularly influences the work of crucial duration.
Traditional steel construction uses frame beam column system always, steel construction prefabrication, on-site consolidation, and floor is using cast-in-place
Floor, though traditional steel construction substantially falls within assembled architecture, has that Site Welding workload is big, rod member quantity is more, existing
Floor is poured from great, the construction period is long, it is the problems such as cost is higher than normal concrete structure, quick, economical away from industrialized building
Core, actual accounting share is relatively low in whole building engineering so far.
For problem present in above-mentioned existing engineering, the present invention proposes a kind of new multi and tall steel building assembled group
Structural system is closed, using L-shaped truss steel column as the bearing carrier of vertical direction and horizontal bending resistance component, one in work progress
Secondary lifting, without setting temporary support.Change traditional form that is rigidly connected on beam, truss column connected node, use high-strength spiral shell instead
Tether and connect, so as to save a large amount of welding jobs, substantially reduce the duration.Floorboard uses the form of prefabricated superimposed sheet, both can be real
The prefabrication and assembly construction of existing system, while ensureing that structural system has preferable globality.System exterior wall uses assembled cladding panel
System, convenience quick for installation.New steel structure assembled combined structure system overcomes the deficiency of traditional steel construction, realizes steel
Quick, the economic advantage of structural construction, is to be manufactured in plant produced by the most of program simplification of construction site, is reduced pair
The influence of site environment, improves building products quality, reduces building cost, embodies the basal core of building industrialization, can be with
The extensive use in multi-rise building structure.
The content of the invention
A kind of new multi and tall steel building assembled is provided the present invention seeks to the defect existed for prior art to combine
Structural system and its implementation.
The present invention is achieved through the following technical solutions:
By prefabricated L-shaped truss steel column as the bearing carrier of vertical direction and horizontal bending resistance component;In truss leg level
Direction sets overhanging beam section, is attached with girder steel with bolt;Floorboard uses prefabricated reinforced concrete superimposed sheet, and prefabricated board leads to
Peg is crossed to be connected with girder steel;The cast-in-place concrete surface layer on the prefabricated board completed, each purlin is cooperateed with by assembled integral floorboard
Frame steel column cooperation;Exterior wall uses external hanging type prefabricated panel, removes the work of live external decoration from, thus formed beam, post, plate,
Wall highly prefabricated assembled combined structure system.
It is L-shaped in described L-shaped truss steel column, horizontal layout, in the vertical direction is with horizontal web member and diagonal web member
Truss form, L-shaped truss steel column can be processed in factory, be determined on the premise of structure and movement requirement is met by calculating
The width and length of each section steel truss wall column.Truss steel column is welded with the built-in fitting in basis at the scene, without interim
Support can reach stable state.
Described L-shaped truss steel column sets overhanging beam section in the horizontal direction, and overhanging beam section section is I-shaped, overhanging beam
The height of section is the half of pre-manufactured steel depth of beam, in the horizontal direction spaced set ribbed stiffener, in overhanging beam section equidistantly
Symmetrical prepared screw-bolt hole.
Described prefabricated girder steel, makes overhanging section of variable cross-section at beam two ends, overhanging section of section of variable cross-section be it is I-shaped, it is prefabricated
Overhanging section of variable cross-section is made at the two ends of girder steel, and the height in overhanging section of section of variable cross-section is the half of prefabricated girder steel whole height, with
The overhanging beam section of steel column is symmetrical arranged ribbed stiffener and bolt hole, during site operation directly by prefabricated girder steel two ends variable cross-section overhanging section take
On truss steel column overhanging beam section, it will be attached after ribbed stiffener and bolt hole consistency from top to bottom with high-strength bolt.
Described Shear Behavior of R. c. Laminated Slabs, concrete uses lightweight concrete, and reinforcing bar uses triangular truss muscle, prefabricated
The thickness of plate is 80-120mm, in floor two ends prepared screw-bolt hole, is directly ridden over plate on girder steel during site operation, and with high-strength
Prefabricated board and girder steel are attached by bolt by prepared screw-bolt hole.It is existing in casting concrete above after the completion of prefabricated board laying
Surface layer is poured, each truss steel column cooperation is cooperateed with by assembled integral floorboard.
Described prefabricated panel, can be according to requirement of engineering in prefabricated, the side pulled up at the scene by lower branch of progress of factory
Formula is attached with steel frame.
It is an advantage of the invention that:Truss steel column, girder steel, floor, wallboard can plant produced, on-site consolidation, construction is fast
Victory is convenient.Truss steel column replaces once to be lifted in traditional single-column, work progress, without setting temporary support, prefabricated girder steel and
Truss leg is connected with, and reduces the cumbersome workflows such as welding, and assembled integral floorboard cooperates with each truss steel column to be total to
With work, the prefabrication and assembly construction of system can be both realized, while ensureing that structural system has preferable globality, system exterior wall is adopted
With assembled cladding panel system, convenience quick for installation.
Brief description of the drawings
Fig. 1 is the elevational schematic view of structural system of the present invention;
Fig. 2 is the facade and floor map of the truss steel column of the present invention;
Fig. 3 is the floor map of the prefabricated board of the present invention;
Fig. 4 is the schematic diagram of the prefabricated bean column node of the present invention;
Fig. 5 is the 1-1 profiles of bean column node schematic diagram;
Fig. 6 is the 2-2 profiles of bean column node schematic diagram;
In figure, the horizontal web member of 1-truss leg;2-truss leg diagonal web member;3-truss leg montant;4-prefabricated board;5-prefabricated
Girder steel;6-bolt hole;7-girder rib;8-ribbed stiffener;9-high-strength bolt.
Embodiment
Shown in Fig. 1-Fig. 6, a kind of new multi and tall steel building assembled combined structure system, specific implementation of the invention
Step is as follows.
1st, the multi and tall steel building assembled combined structure system elevational schematic view of invention is as shown in Figure 1;
2nd, the good L-type truss steel column of prefabrication is subjected to lifting welding with basic built-in fitting at the scene, by itself structure
Make and reach stability, truss leg construction is as shown in Figure 2;
3rd, after whole truss steel columns have been welded in disposable lifting, by prefabricated girder steel and truss leg high-strength bolt bolt
Carry out assembled connection, beam, the practice of Column border node and connected mode such as Fig. 4, Fig. 5, shown in Fig. 6;
4th, be prefabricated in the factory floor, prefabricated plate thickness 80-120mm, and floor places grid reinforcing bar prefabricated when, in plate
Two ends it is each reserve 4 bolts hole, the practice of plate is as shown in Figure 3;
5th, prefabricated plate is ridden on girder steel, welded with bolt and girder steel, the plate of each floor is all completed afterwards again
In cast-in-place concrete surface layer above, assembled integral floorboard is formed;
6th, wallboard is prefabricated in the factory, and is attached at the scene by way of lower branch is pulled up with steel frame.
Claims (7)
1. a kind of new multi and tall steel building assembled combined structure system, it is characterised in that:Using L-shaped truss steel column as vertical
Nogata to bearing carrier and horizontal bending resistance component, built-in fitting is welded in steel column and basis;Truss leg horizontal direction is set
Overhanging beam section is put, is attached with girder steel with bolt;Floor uses prefabricated reinforced concrete superimposed sheet, is carried out with girder steel with peg
Connection;Superimposed sheet complete after in cast-in-place concrete surface layer above, cooperate with each truss steel column common by assembled integral floorboard
Work.The exterior wall of system uses external hanging type prefabricated panel, removes live external decoration work from.
2. new multi and tall steel building assembled combined structure system as claimed in claim 1, it is characterised in that:L-shaped truss
Steel column is L-shaped in horizontal layout, and in the vertical direction is the truss form with horizontal web member and diagonal web member, utilizes construction features
Reach that homeostasis is balanced, it is not necessary to which temporary support is set.
3. new multi and tall steel building assembled combined structure system as claimed in claim 1, it is characterised in that:L-shaped truss
Steel column sets overhanging beam section in the horizontal direction, and overhanging beam section section is I-shaped, and the height of overhanging beam section is pre-manufactured steel deck-molding
The half of degree, in the horizontal direction spaced set ribbed stiffener, the equidistant symmetrical prepared screw-bolt hole in overhanging beam section.
4. new multi and tall steel building assembled combined structure system as claimed in claim 1, it is characterised in that:Prefabricated girder steel
Two ends make overhanging section of variable cross-section, the height in overhanging section of section of variable cross-section is the half of prefabricated girder steel whole height, with steel column
Overhanging beam section is symmetrical arranged ribbed stiffener and bolt hole, and prefabricated overhanging section of girder steel two ends directly are ridden over into truss steel column during site operation
On overhanging beam section, it will be attached after ribbed stiffener and bolt hole consistency from top to bottom with high-strength bolt.
5. new multi and tall steel building assembled combined structure system as claimed in claim 1, it is characterised in that:Floor is used
Prefabricated reinforced concrete superimposed sheet, concrete uses lightweight concrete, and reinforcing bar uses triangular truss muscle, and the thickness of prefabricated board is
80-120mm, in floor two ends prepared screw-bolt hole, directly rides over plate on girder steel during site operation, and is passed through with high-strength bolt pre-
Bolt hole is stayed to be attached prefabricated board and girder steel.
6. new multi and tall steel building assembled combined structure system as claimed in claim 1, it is characterised in that:Prefabricated board is spread
If after the completion of, in the cast-in-place surface layer of casting concrete above, each truss steel column cooperation is cooperateed with by assembled integral floorboard.
7. new multi and tall steel building assembled combined structure system as claimed in claim 1, it is characterised in that:Outside system
Wall uses external hanging type prefabricated panel, may be designed to integrate external decoration, the composite heat preserving external wall extension that insulation, wall are gone along with sb. to guard him
Plate, reduces site operation link, efficiency of construction is greatly improved.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710492339.1A CN107237398A (en) | 2017-06-26 | 2017-06-26 | A kind of new multi and tall steel building assembled combined structure system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710492339.1A CN107237398A (en) | 2017-06-26 | 2017-06-26 | A kind of new multi and tall steel building assembled combined structure system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107237398A true CN107237398A (en) | 2017-10-10 |
Family
ID=59987188
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710492339.1A Pending CN107237398A (en) | 2017-06-26 | 2017-06-26 | A kind of new multi and tall steel building assembled combined structure system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107237398A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110374240A (en) * | 2019-08-13 | 2019-10-25 | 盈创新材料(苏州)有限公司 | Form bracing structure and its manufacturing method |
CN110984640A (en) * | 2019-12-24 | 2020-04-10 | 北京华瑞国盾信息科技有限公司 | Assembly type substation structure system for pipeline station |
CN111021532A (en) * | 2019-11-21 | 2020-04-17 | 江南大学 | Assembly type combined structure system and implementation method thereof |
CN114313126A (en) * | 2022-01-13 | 2022-04-12 | 东北石油大学 | Fabricated FRP concrete combined guyed tower type platform system and construction method thereof |
CN114348197A (en) * | 2022-01-13 | 2022-04-15 | 东北石油大学 | Fabricated FRP concrete guyed tower type small displacement platform group and construction method thereof |
CN115853197A (en) * | 2022-12-06 | 2023-03-28 | 海南大学 | Assembly type staggered column light steel truss structure and construction method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103147509A (en) * | 2013-04-10 | 2013-06-12 | 北京市建筑工程设计有限责任公司 | Fully-enclosed assembled string structural system and construction method thereof |
CN103276833A (en) * | 2013-06-10 | 2013-09-04 | 北京工业大学 | Industrialized assembling type special-shaped column steel structure-steel plate shear wall steel structure system |
CN103276807A (en) * | 2013-06-10 | 2013-09-04 | 北京工业大学 | Industrialized assembly type special-shaped column steel structure system |
CN204551730U (en) * | 2015-03-19 | 2015-08-12 | 北京亚太可建钢结构技术研发有限公司 | A kind of multi-rise building steel structure frame |
CN106149879A (en) * | 2016-07-01 | 2016-11-23 | 四川省建筑科学研究院 | The spelling dress floor system of spelling dress plate-column structure and composition thereof |
CN205894419U (en) * | 2016-06-28 | 2017-01-18 | 中天建设集团浙江钢构有限公司 | Trussed girder integrated form building face mould piece |
-
2017
- 2017-06-26 CN CN201710492339.1A patent/CN107237398A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103147509A (en) * | 2013-04-10 | 2013-06-12 | 北京市建筑工程设计有限责任公司 | Fully-enclosed assembled string structural system and construction method thereof |
CN103276833A (en) * | 2013-06-10 | 2013-09-04 | 北京工业大学 | Industrialized assembling type special-shaped column steel structure-steel plate shear wall steel structure system |
CN103276807A (en) * | 2013-06-10 | 2013-09-04 | 北京工业大学 | Industrialized assembly type special-shaped column steel structure system |
CN204551730U (en) * | 2015-03-19 | 2015-08-12 | 北京亚太可建钢结构技术研发有限公司 | A kind of multi-rise building steel structure frame |
CN205894419U (en) * | 2016-06-28 | 2017-01-18 | 中天建设集团浙江钢构有限公司 | Trussed girder integrated form building face mould piece |
CN106149879A (en) * | 2016-07-01 | 2016-11-23 | 四川省建筑科学研究院 | The spelling dress floor system of spelling dress plate-column structure and composition thereof |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110374240A (en) * | 2019-08-13 | 2019-10-25 | 盈创新材料(苏州)有限公司 | Form bracing structure and its manufacturing method |
CN111021532A (en) * | 2019-11-21 | 2020-04-17 | 江南大学 | Assembly type combined structure system and implementation method thereof |
CN110984640A (en) * | 2019-12-24 | 2020-04-10 | 北京华瑞国盾信息科技有限公司 | Assembly type substation structure system for pipeline station |
CN114313126A (en) * | 2022-01-13 | 2022-04-12 | 东北石油大学 | Fabricated FRP concrete combined guyed tower type platform system and construction method thereof |
CN114348197A (en) * | 2022-01-13 | 2022-04-15 | 东北石油大学 | Fabricated FRP concrete guyed tower type small displacement platform group and construction method thereof |
CN114348197B (en) * | 2022-01-13 | 2024-04-19 | 东北石油大学 | Assembled FRP concrete guy cable tower type small displacement platform group and construction method thereof |
CN114313126B (en) * | 2022-01-13 | 2024-04-19 | 东北石油大学 | Assembled FRP concrete combined guy cable tower platform system and construction method thereof |
CN115853197A (en) * | 2022-12-06 | 2023-03-28 | 海南大学 | Assembly type staggered column light steel truss structure and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107237398A (en) | A kind of new multi and tall steel building assembled combined structure system | |
CN105735464B (en) | A kind of assembled composite structure and its installation method | |
CN101538896B (en) | Construction method for jettied structure at high attitude of high-rise building | |
CN204876059U (en) | Prefabricated assembled shaped steel concrete frame structure system | |
CN107143034A (en) | A kind of assembly concrete frame structure beam column rigid connection node | |
CN107780576A (en) | A kind of assembled architecture bottom composite floor and its connected mode | |
CN104563305B (en) | A kind of concrete composite beam and concrete filled steel tube column connected node and construction method | |
CN105089204A (en) | Cold-formed thin-walled ribbed U-shaped steel-encased concrete laminated slab composite beam | |
CN103046645B (en) | A kind of whole casting structure and construction method of Large-span Precast | |
CN206737116U (en) | Node dry and wet Hybrid connections assembled integral concrete frame structure | |
CN206016309U (en) | A kind of overall assembled building system | |
CN106481023B (en) | Assembled steel-concrete composite beam structure and its implementation method | |
CN206859479U (en) | A kind of steel bar girder laminated floor slab | |
CN207063269U (en) | The beam-column node structure of assembled floor | |
CN108755963A (en) | A kind of partial precast assembled steel reinforced concrete giant frame structure and construction method | |
CN107893500A (en) | A kind of large-span concrete prismatic surface arch grid shell roof structure and preparation method thereof | |
CN204645414U (en) | A kind of cold bending thin wall U-shaped outsourcing steel-concrete folding plate combined beam with ribbing | |
CN103953147A (en) | Two-way sandwich panel for split mounting type reinforcing bar girder | |
CN206289884U (en) | A kind of heat insulation integrated light roof board of fabricated construction | |
CN207739674U (en) | A kind of assembled Residential System of Steel-concrete Composite Structure | |
CN206267309U (en) | A kind of assembled steel concrete frame core wall structure system | |
CN209556195U (en) | Fabricated Beam-Slab connection structure | |
CN206467828U (en) | A kind of fabricated construction insulation and decoration integrated plate wall | |
CN108951982A (en) | Assembly concrete superposed floor plate and its construction method based on cement fibrolite plate composite reinforcing steel bar skeleton | |
CN105649259B (en) | A kind of wallboard structural system of the dark framework of band of precast concrete wall panel and its structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20171010 |