CN107218024A - Method for adjusting rhombus inverted nine-point well pattern in high water-cut period of multilayer low-permeability sandstone oil reservoir - Google Patents

Method for adjusting rhombus inverted nine-point well pattern in high water-cut period of multilayer low-permeability sandstone oil reservoir Download PDF

Info

Publication number
CN107218024A
CN107218024A CN201710301343.5A CN201710301343A CN107218024A CN 107218024 A CN107218024 A CN 107218024A CN 201710301343 A CN201710301343 A CN 201710301343A CN 107218024 A CN107218024 A CN 107218024A
Authority
CN
China
Prior art keywords
water
well
oil
reservoir
cut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710301343.5A
Other languages
Chinese (zh)
Other versions
CN107218024B (en
Inventor
甘俊奇
王俊文
张原�
周杨
曾倩
李锦�
王璐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN201710301343.5A priority Critical patent/CN107218024B/en
Publication of CN107218024A publication Critical patent/CN107218024A/en
Application granted granted Critical
Publication of CN107218024B publication Critical patent/CN107218024B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/30Specific pattern of wells, e.g. optimising the spacing of wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/20Displacing by water

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Geophysics And Detection Of Objects (AREA)

Abstract

The invention provides a method for adjusting a rhombus inverted nine-point well pattern in a high water-cut period of a multilayer low-permeability sandstone reservoir, which comprises the following steps: the method comprises the following steps: judging the dominant direction on the plane of the reservoir; step two: on the plane, judging a high water-cut oil well; in the longitudinal direction, judging high water-bearing layers in the multiple sets of oil layers; step three: dividing a development layer system based on the water drive effect of the oil layer; step four: for high water content oil wells, plugging high water content oil layers; for the water injection well, separate-layer water injection is carried out; step five: and (4) adjusting the structure of the rhombic nine-point reverse well pattern in a mode of converting the high-water-content oil well in the step four into a water injection well. The adjusting method provided by the invention can reduce the ineffective water circulation of the layer with relatively high permeability and large thickness, and improve the water drive effect and reserve utilization degree of the layer with relatively low permeability and small thickness, thereby improving the oil well yield, and improving the oil extraction speed, the final water drive recovery rate and the economic benefit of oil reservoir development.

Description

The method of adjustment of multilayer low permeability sandstone reservoir high water-cut stage rhombic inverted nini-spot well pattern
Technical field
The invention belongs to the field of petroleum exploitation of multilayer sandstone oil reservoir, and in particular to a kind of multilayer low permeability sandstone reservoir is high The method of adjustment of Water-cut Period rhombic inverted nini-spot well pattern.
Background technology
Low-permeability oil deposit refers to that ground level air infiltration rate is less than 50mD oil reservoir.China has put into the hyposmosis of exploitation at present Oil field, largely belongs to river-delta deposit type, reservoir have in the plane certain anisotropism and it is infiltrative it is each to The opposite sex.On longitudinal direction, the oil-containing number of plies is more, and well section is longer, and interlayer heterogeneity is stronger.The type oil reservoir development is typically anti-using rhombus Nine-spot pattern (see Fig. 1).After long-term injecting water, oil reservoir comprehensive water cut is begun to ramp up.When comprehensive water cut is more than 60%, the oil reservoir enters Enter high water-cut development period.In this period, due to the influence of interlayer permeability contrast, there is individual layer water filling and dashed forward in multilayer sandstone oil reservoir Enter the problems such as phenomenon is serious, each layer waterflooding effect difference is big, reserves exploitation degree is unbalanced, water consumption increases.This is because, oozing The filtrational resistance for the layer that rate is of a relatively high, core intersection is larger thoroughly is small, and injection water is preferential to be flowed in this kind of layer, causes this layer Oil well water breakthrough is early, aqueous rising is fast, and waterflooding effect is good, and reserves exploitation degree is high, and invalid water circulation is serious, and water consumption is big;And ooze Saturating rate is relatively low, thinner thickness layer filtrational resistance is larger, under the conditions of commingled water injection, and injection water enters relative difficulty, Waterflooding effect is poor, and reserves exploitation degree is low.Therefore, in order to solve these technical problems, it is necessary to study that a kind of to be applied to multilayer low The method of adjustment of the rhombic inverted nini-spot well pattern of permeability sandstone oil reservoir high water-cut stage.
The content of the invention
To reach above-mentioned purpose, the invention provides a kind of anti-9 wells of multilayer low permeability sandstone reservoir high water-cut stage rhombus The method of adjustment of net.To solve the exploitation of multilayer low permeability sandstone reservoir high water-cut stage, to there is individual layer water filling phenomenon of advancing by leaps and bounds serious, each The problems such as layer waterflooding effect difference is big, reserves exploitation degree is unbalanced, water consumption increases.
Present invention also offers the multilayer low permeability sandstone reservoir high water-cut stage rhombus obtained by above-mentioned method of adjustment is anti- Nine-spot pattern.
To reach above-mentioned purpose, the invention provides a kind of anti-9 wells of multilayer low permeability sandstone reservoir high water-cut stage rhombus The method of adjustment of net, wherein, this method comprises the following steps:
Step one:Judge the predominant direction in reservoir plane;
Step 2:In plane, high-water-cut oil-producing well is judged;On longitudinal direction, the high aquifer formation in many set oil reservoirs is judged;
Step 3:Using the waterflooding effect of oil reservoir as foundation, straticulate exploration is divided;
Step 4:For high-water-cut oil-producing well, high watercut layer is blocked;For water injection well, seperated layer water injection is carried out;
Step 5:By way of the high-water-cut oil-producing well in step 4 is changed into water injection well, anti-9 wells of rhombus are adjusted Web frame.
The method of adjustment that the present invention is provided is that reservoir infiltration is considered on the predominant direction that reservoir is considered in a kind of plane, longitudinal direction Sex differernce, with reference to the method for adjustment of the rhombic inverted nini-spot well pattern of the technologies such as seperated layer water injection, water blockoff and artificial fracturing, with good Application prospect.
In the art, when the moisture content of oil well is higher than 60%, it is considered that the oil well is high-water-cut oil-producing well;When aqueous When the moisture content of layer is higher than 60%, it is considered that the water-bearing layer is high aquifer formation.
In the method for adjustment of above-mentioned multilayer low permeability sandstone reservoir high water-cut stage rhombic inverted nini-spot well pattern, it is preferable that upper State in step one, judge predominant direction in reservoir plane foundation include sand thickness distributed data, reservoir permeability respectively to Different in nature data, the intrinsic fracture data of core observation, artificial fracture directional surveillance data or dynamic analysis of data.
In the method for adjustment of above-mentioned multilayer low permeability sandstone reservoir high water-cut stage rhombic inverted nini-spot well pattern, it is preferable that upper State in step 2, judging the foundation of the high aquifer formation in many set oil reservoirs includes oil well liquid-producing sectional data, profile-log of water injection Data or Submerged Layer Logging Interpretation data.
In the method for adjustment of above-mentioned multilayer low permeability sandstone reservoir high water-cut stage rhombic inverted nini-spot well pattern, it is preferable that upper State in step 3, judging the data of reservoir water flooding effect includes core intersection data, permeability value data or every thickness of interlayer money Material.The step is that the oil reservoir of the good oil reservoir of waterflooding effect and waterflooding effect difference is distinguished, so as to divide straticulate exploration;Generally In the case of, the waterflooding effect for the oil reservoir that core intersection is big, permeability is of a relatively high is good;Core intersection is smaller, permeability relatively The waterflooding effect of small oil reservoir is poor.
In the method for adjustment of above-mentioned multilayer low permeability sandstone reservoir high water-cut stage rhombic inverted nini-spot well pattern, it is preferable that upper State in step 4, the mode of closure high watercut layer is machine plugging or chemical plugging.
In the method for adjustment of above-mentioned multilayer low permeability sandstone reservoir high water-cut stage rhombic inverted nini-spot well pattern, it is preferable that upper State in step 4, be to realize seperated layer water injection by way of packer card is sealed.
In the method for adjustment of above-mentioned multilayer low permeability sandstone reservoir high water-cut stage rhombic inverted nini-spot well pattern, it is preferable that upper State in step 5, the detailed process that high-water-cut oil-producing well is changed into water injection well includes:
(1) normal production is implemented to blocking the high-water-cut oil-producing well after high watercut layer in step 4, until moisture content is again More than High water cut boundary;
(2) and then the oil well is changed into water injection well and carries out water injection work.
In the method for adjustment of above-mentioned multilayer low permeability sandstone reservoir high water-cut stage rhombic inverted nini-spot well pattern, it is preferable that upper State in step (2), the water injection work is to use to carry out seperated layer water injection with the water injection well identical mode in step 4.
The present invention separately provides a kind of multilayer low permeability sandstone reservoir high water-cut stage water chestnut obtained by above-mentioned method of adjustment Shape inverted nine-spot pattern, in the well pattern, at least a bite high-water-cut oil-producing well in former well pattern has been converted to the water filling in existing well pattern Well.
In above-mentioned multilayer low permeability sandstone reservoir high water-cut stage rhombic inverted nini-spot well pattern, it is preferable that the height in former well pattern Aqueous well all has been converted to the water injection well in existing well pattern.
The scheme that the present invention is provided can be good at the high water-cut stage exploitation of solution multilayer low permeability sandstone reservoir and there is individual layer Water filling is advanced by leaps and bounds the problems such as phenomenon is serious, each layer waterflooding effect difference big, reserves exploitation degree is unbalanced, water consumption increases.This hair The method of adjustment of bright offer can reduce that permeability is of a relatively high, thickness larger layers invalid water circulations, improve permeability it is relatively low, The waterflooding effect and reserves exploitation degree of thinner thickness layer, and then oil well output is improved, improve rate of oil production, the harvesting of final water drive The economic benefit of rate and oil reservoir development.
Brief description of the drawings
Accompanying drawing described herein is used for providing a further understanding of the present invention, constitutes the part of the application, not Constitute limitation of the invention.In the accompanying drawings:
Fig. 1 is the rhombic inverted nini-spot well pattern schematic diagram in background technology;
Fig. 2 is the flow chart of a specific embodiment of the rhombic inverted nini-spot well pattern method of adjustment of the present invention;
Seperated layer water injections and oilwell water shutoff schematic diagram of the Fig. 3 for embodiments of the invention 1;
Fig. 4 adjusts the schematic diagram of structure for the rhombic inverted nini-spot well pattern of the embodiment of the present invention 2;
Fig. 5 adjusts the schematic diagram of structure for the rhombic inverted nini-spot well pattern of the embodiment of the present invention 3.
The reference of the figures above:1st, corner well;2nd, end hole;3rd, corner well;4th, end hole;5th, corner well;6th, end hole;7th, corner well; 8th, end hole;9th, water injection well;10th, the line of the anti-9 flooding pattern construction units of rhombus;11st, packer;12nd, distributing tap.
Embodiment
In order to which technical characteristic, purpose and beneficial effect to the present invention are more clearly understood from, now to the skill of the present invention Art scheme carry out it is described further below, but it is not intended that to the present invention can practical range restriction.
Following embodiment is specifically described the implementation process of the present invention by taking anti-9 well groups of a rhombus as an example.Rhombus is anti- The long-diagonal of nine-spot pattern is partly called well spacing, is designated as a;Short diagonal is partly called array pitch, is designated as b.
Embodiment 1
Present embodiments provide a kind of method of adjustment of multilayer low permeability sandstone reservoir high water-cut stage rhombic inverted nini-spot well pattern Specific implementation process.Such as the flow chart that Fig. 2 is rhombic inverted nini-spot well pattern method of adjustment in the present embodiment.
In step 201, the predominant direction in reservoir plane is judged;Detailed process is:
According to sand thickness distributed data, reservoir permeability anisotropy data, the intrinsic fracture data of core observation, people The data such as work pressure-break directional surveillance and dynamic analysis, judges the predominant direction in reservoir plane.
The basically identical direction of sand thickness, is the predominant direction in reservoir plane;On the contrary, be perpendicularly to the direction, it is Non-advantage direction in reservoir plane.
According to reservoir permeability anisotropy data, the big direction of penetration value is the predominant direction in reservoir plane; On the contrary, be perpendicularly to the direction, it is the non-advantage direction in reservoir plane.
The direction of rock core intrinsic fracture extension, is the predominant direction in reservoir plane;Opposed vertical, in the direction, is storage Non-advantage direction on layer plane.
The direction of artificial fracture extension, is the predominant direction in reservoir plane;Opposed vertical, in the direction, is reservoir Non-advantage direction in plane.
According to dynamic analysis, in a rhombic inverted nini-spot well pattern unit, in the oil well closed on being connected with water injection well, The line direction of daily fluid production rate highest, moisture content highest oil well and water injection well is the predominant direction of reservoir.
Under normal circumstances, the predominant direction in reservoir plane differentiated according to this five kinds of data is consistent.In example 1 In, by permeability anisotropy's data and dynamic analysing method, judge the folder of reservoir predominant direction and rhombus long-diagonal Angle is less than 0.5arctan (2b/a), i.e. reservoir predominant direction and No. 7 wells and No. 3 well line directions are basically identical.Flow is entered Step 202.
In step 202, plane, high-water-cut oil-producing well is judged;On longitudinal direction, the high aquifer formation in many set oil reservoirs is judged;Specifically Process is:
In plane, the oil well of High water cut is judged.When the moisture content of oil well is higher than 60%, that is, it is High water cut to think the oil well Oil well.For example in Fig. 1, the moisture content of No. 1 oil well is 58%, and the moisture content of No. 2 oil wells is 70%, and the moisture content of No. 3 oil wells is 58%, the moisture content of No. 4 oil wells is 70%, and the moisture content of No. 5 oil wells is 58%, and the moisture content of No. 6 oil wells is 70%, No. 7 oil The moisture content of well is 58%, and the moisture content of No. 8 oil wells is 70%.So, the oil well of High water cut be No. 2, No. 4, No. 6 and No. 8 this Four mouthfuls of oil wells (referred to as " end hole ") in the rhombus length of side, low aqueous oil well is No. 1, No. 3, No. 5 and No. 7 this four mouthfuls and is located at Oil well (referred to as " corner well ") on dicing.
On longitudinal direction, according to data such as oil well liquid-producing section, profile-log of water injection and Submerged Layer Logging Interpretations, judge many Cover the high aquifer formation in oil reservoir.Table 1 is the production profile tables of data of No. 2 oil wells, and the layer position of no data is non-oil reservoir.It can be seen that the well The moisture content of No. 9 floor is higher than 60%, and it is the oil reservoir of High water cut to show this layer.
If there is no production profile table, it can also be judged with the intake profile data binder course position connected relation of water injection well The oil reservoir of High water cut.Table 2 is the intake profile tables of data of No. 9 water injection wells, and the layer position of no data is non-oil reservoir.Geological research is thought No. 9 floor of No. 4 oil wells and No. 9 floor of No. 9 water injection wells have preferable connected relation, but No. 4 oil wells do not have production profile data. As long as the relative injectivity of a certain oil reservoir of so No. 9 water injection wells is more than 70%, you can judge that the height in No. 4 adjacent oil wells contains Water layer is exactly the layer.It can be seen that, the high watercut layer of No. 4 oil wells is No. 9 floor.Flow enters step 203.
The production profile tables of data of 1 No. 2 oil wells of table
Layer position Thickness (m) Permeability (mD) Produce liquid (t/d) daily Moisture content (%) Relative production liquid (%)
1
2
3 1.8 2.4 1.4 36 9.6
4
5 2.6 6.2 2 48 13.7
6
7 1.5 1.8 1.2 42 8.2
8
9 4.2 10.6 10.4 82 71.2
The intake profile tables of data of 2 No. 9 water injection wells of table
Layer position Thickness (m) Permeability (mD) Absolute water absorption (m3/d) Relative injectivity (%)
1
2
3 1.4 1.8 3 6.7
4
5 2.8 6.4 8 17.8
6
7 1.6 2.0 4 8.9
8
9 4.8 14.2 32 71.1
In step 203, the oil reservoir of the good oil reservoir of waterflooding effect and waterflooding effect difference is distinguished, straticulate exploration is divided; Detailed process is:
According to data such as core intersection, permeability values, the oil reservoir of the good oil reservoir of waterflooding effect and waterflooding effect difference is distinguished Come, divide straticulate exploration.Under normal circumstances, the waterflooding effect for the oil reservoir that core intersection is big, permeability is of a relatively high is good;Oil reservoir The waterflooding effect for the oil reservoir that thickness is smaller, permeability is relatively small is poor.The high watercut layer identified according to step 202 is Therefore No. 3 floor, No. 5 floor and No. 7 floor, are divided into the first series of strata, No. 9 floor are divided into the second series of strata by No. 9 floor.Flow enters To step 204.
In step 204, for high-water-cut oil-producing well, high watercut layer is blocked;For water injection well, seperated layer water injection is carried out;Specifically Process is (schematic diagram is shown in Fig. 3):
For high-water-cut oil-producing well, using mechanically or chemically blocking high watercut layer.By taking No. 2 oil wells as an example, High aquifer formation is No. 9 floor, between No. 7 and No. 9 floor, will insulate high aquifer formation under packer.For water injection well 9, pass through " double envelopes The mode of dispensing ", i.e., by under the first packer at more than No. 3 floor 3 meters, by under the second packer to No. 7 floor and No. 9 floor it Between, the first distributing tap is loaded onto on the oil pipe between the first and second packers, is loaded onto on the oil pipe below the second packer Second distributing tap, the depth of distributing tap is equal to the middle part depth of No. 9 floor, is divided to two sections of water fillings to realize.Flow enters step 205。
In step 205, by way of the high-water-cut oil-producing well in step 4 is changed into water injection well, anti-9 points of rhombus is adjusted Well pattern structure;Detailed process is:
By way of oil well is changed into water injection well (referred to as " metaideophone "), rhombic inverted nini-spot well pattern structure is adjusted, changed The flow circuits (referred to as " streamline ") of water in the earth formation are injected, so as to improve development effectiveness.Reservoir predominant direction and rhombus length pair When the angle of linea angulata is less than 0.5arctan (2b/a), i.e. reservoir predominant direction and No. 7 wells and basically identical No. 3 well line directions, No. 2, No. 4, No. 6 and No. 8 oil wells take packing high aquifer formation operation, No. 3 floor of continuation production, No. 5 floor and No. 7 according to step 204 First series of strata of layer composition;No. 9 water injection wells take " double envelope dispensings " operation according to step 204;No. 1, No. 3, No. 5 and No. 7 oil well Continue normal production.
Embodiment 2:
Present embodiments provide a kind of method of adjustment of multilayer low permeability sandstone reservoir high water-cut stage rhombic inverted nini-spot well pattern Specific implementation process.Fig. 2 flow chart is also suitable the present embodiment.
In step 201, by permeability anisotropy's data and dynamic analysing method, judge the predominant direction of reservoir with The angle of rhombus long-diagonal be more than 0.5arctan (2b/a) and less than 1.5arctan (2b/a) when, i.e., reservoir predominant direction with No. 6 wells and No. 2 well line directions are basically identical.Flow enters step 202.
In step 202, the moisture content of No. 1 oil well is 58%, and the moisture content of No. 2 oil wells is 70%, the moisture content of No. 3 oil wells It is 58%, the moisture content of No. 4 oil wells is 58%, the moisture content of No. 5 oil wells is 58%, the moisture content of No. 6 oil wells is 70%, No. 7 The moisture content of oil well is 58%, and the moisture content of No. 8 oil wells is 58%.So, the oil well of High water cut is No. 2 and No. 6 this two mouthfuls of oil Well, remaining is low aqueous well.On longitudinal direction, the oil reservoir of High water cut is No. 9 floor.
In step 203, No. 3 floor, No. 5 floor and No. 7 floor are divided into the first series of strata, No. 9 floor are divided into the second series of strata.Stream Journey enters step 204.
In step 204, for No. 2 and No. 6 oil wells, between No. 7 and No. 9 floor, high aquifer formation will be insulated under packer.It is right In water injection well, by way of " double envelope dispensings ", i.e., by under the first packer at more than No. 3 floor 3 meters, by under the second packer To between No. 7 floor and No. 9 floor, the first distributing tap is loaded onto on the oil pipe between the first and second packers, in the second packer The second distributing tap is loaded onto on following oil pipe, the depth of distributing tap is equal to the middle part depth of No. 9 floor, is divided to two sections of water fillings to realize. Flow enters step 205.
In step 205, No. 2 and No. 6 oil wells take packing high aquifer formation operation according to step 204, continue to produce No. 3 floor, First series of strata of No. 5 floor and No. 7 floor compositions;No. 9 water injection wells take " double envelope dispensings " operation according to step 204;Remaining oil well is just Often production.Produce after a period of time, when the moisture content of No. 2 and No. 6 oil wells reaches 60%, no longer insulate the High water cut of No. 9 floor Layer, using with No. 9 water injection well identical methods, take " double envelope dispensings " operation, form the adjustment well pattern such as Fig. 4.Now streamline Become, No. 5, No. 7 and No. 8 oil wells of injection current direction of No. 6 converted production wells;The injection current direction of No. 9 water injection wells No. 4, No. 5, No. 8 With No. 1 oil well;No. 3, No. 4 and No. 1 oil wells of injection current direction of No. 2 converted production wells.The swept volume of injection water is expanded, is improved Development effectiveness.
Embodiment 3:
Present embodiments provide a kind of method of adjustment of multilayer low permeability sandstone reservoir high water-cut stage rhombic inverted nini-spot well pattern Specific implementation process.Fig. 2 flow chart is also suitable the present embodiment.
In step 201, by permeability anisotropy's data and dynamic analysing method, judge the predominant direction of reservoir with When the angle of rhombus long-diagonal is more than [180 ° of -1.5arctan (2b/a)] and is less than [180 ° of -0.5arctan (2b/a)], i.e., Reservoir predominant direction and No. 8 wells and No. 4 well line directions are basically identical.Flow enters step 202.
In step 202, the moisture content of No. 1 oil well is 58%, and the moisture content of No. 2 oil wells is 58%, the moisture content of No. 3 oil wells It is 58%, the moisture content of No. 4 oil wells is 70%, the moisture content of No. 5 oil wells is 58%, the moisture content of No. 6 oil wells is 58%, No. 7 The moisture content of oil well is 58%, and the moisture content of No. 8 oil wells is 70%.So, the oil well of High water cut is No. 4 and No. 8 this two mouthfuls of oil Well, remaining is low aqueous well.On longitudinal direction, the oil reservoir of High water cut is No. 9 floor.
In step 203, No. 3 floor, No. 5 floor and No. 7 floor are divided into the first series of strata, No. 9 floor are divided into the second series of strata.Stream Journey enters step 204.
In step 204, for No. 4 and No. 8 oil wells, between No. 7 and No. 9 floor, high aquifer formation will be insulated under packer.It is right In water injection well, by way of " double envelope dispensings ", i.e., by under the first packer at more than No. 3 floor 3 meters, by under the second packer To between No. 7 floor and No. 9 floor, the first distributing tap is loaded onto on the oil pipe between the first and second packers, in the second packer The second distributing tap is loaded onto on following oil pipe, the depth of distributing tap is equal to the middle part depth of No. 9 floor, is divided to two sections of water fillings to realize. Flow enters step 205.
In step 205, No. 4 and No. 8 oil wells take packing high aquifer formation operation according to step 204, continue to produce No. 3 floor, First series of strata of No. 5 floor and No. 7 floor compositions;No. 9 water injection wells take " double envelope dispensings " operation according to step 204;Remaining oil well is just Often production.Produce after a period of time, when the moisture content of No. 4 and No. 8 oil wells reaches 60%, no longer insulate the High water cut of No. 9 floor Layer, using with No. 9 water injection well identical methods, take " double envelope dispensings " operation, form the adjustment well pattern such as Fig. 5.Now streamline Become, No. 2, No. 3 and No. 5 oil wells of injection current direction of No. 4 converted production wells;The injection current direction of No. 9 water injection wells No. 1, No. 2, No. 5 With No. 6 oil wells;No. 1, No. 6 and No. 7 oil well of injection current direction of No. 8 converted production wells.The swept volume of injection water is expanded, is improved Development effectiveness.

Claims (10)

1. a kind of method of adjustment of multilayer low permeability sandstone reservoir high water-cut stage rhombic inverted nini-spot well pattern, it is characterised in that the party Method comprises the following steps:
Step one:Judge the predominant direction in reservoir plane;
Step 2:In plane, high-water-cut oil-producing well is judged;On longitudinal direction, the high aquifer formation in many set oil reservoirs is judged;
Step 3:Using the waterflooding effect of oil reservoir as foundation, straticulate exploration is divided;
Step 4:For high-water-cut oil-producing well, high watercut layer is blocked;For water injection well, seperated layer water injection is carried out;
Step 5:By way of the high-water-cut oil-producing well in step 4 is changed into water injection well, rhombic inverted nini-spot well pattern knot is adjusted Structure.
2. the method for adjustment of multilayer low permeability sandstone reservoir high water-cut stage rhombic inverted nini-spot well pattern according to claim 1, Characterized in that, in above-mentioned steps one, judge the predominant direction in reservoir plane foundation include sand thickness distributed data, Reservoir permeability anisotropy data, the intrinsic fracture data of core observation, artificial fracture directional surveillance data or dynamic point Analysis data.
3. the adjustment side of multilayer low permeability sandstone reservoir high water-cut stage rhombic inverted nini-spot well pattern according to claim 1 or 2 Method, it is characterised in that in above-mentioned steps two, judges that the foundation of the high aquifer formation in many set oil reservoirs is provided including oil well liquid-producing section Material, profile-log of water injection data or Submerged Layer Logging Interpretation data.
4. the tune of the multilayer low permeability sandstone reservoir high water-cut stage rhombic inverted nini-spot well pattern according to claim any one of 1-3 Adjusting method, it is characterised in that in above-mentioned steps three, judging the data of reservoir water flooding effect includes core intersection data, infiltration Rate value data or every thickness of interlayer data.
5. the tune of the multilayer low permeability sandstone reservoir high water-cut stage rhombic inverted nini-spot well pattern according to claim any one of 1-4 Adjusting method, it is characterised in that in above-mentioned steps four, the mode of closure high watercut layer is machine plugging or chemical plugging.
6. the tune of the multilayer low permeability sandstone reservoir high water-cut stage rhombic inverted nini-spot well pattern according to claim any one of 1-5 Adjusting method, it is characterised in that in above-mentioned steps four, is to realize seperated layer water injection by way of packer card is sealed.
7. the tune of the multilayer low permeability sandstone reservoir high water-cut stage rhombic inverted nini-spot well pattern according to claim any one of 1-6 Adjusting method, it is characterised in that in above-mentioned steps five, the detailed process that high-water-cut oil-producing well is changed into water injection well includes:
(1) implement normal production to blocking the high-water-cut oil-producing well after high watercut layer in step 4, until moisture content again above High water cut boundary;
(2) and then the oil well is changed into water injection well and carries out water injection work.
8. the method for adjustment of multilayer low permeability sandstone reservoir high water-cut stage rhombic inverted nini-spot well pattern according to claim 7, Characterized in that, in above-mentioned steps (2), the water injection work is to use to carry out with the water injection well identical mode in step 4 Seperated layer water injection.
9. the multilayer low permeability sandstone reservoir high water-cut stage rhombus that a kind of method of adjustment by any one of claim 1-8 is obtained Inverted nine-spot pattern, it is characterised in that in the well pattern, at least a bite high-water-cut oil-producing well in former well pattern has been converted to existing well pattern In water injection well.
10. multilayer low permeability sandstone reservoir high water-cut stage rhombic inverted nini-spot well pattern according to claim 9, its feature exists In in the well pattern, the high-water-cut oil-producing well in former well pattern all has been converted to the water injection well in existing well pattern.
CN201710301343.5A 2017-05-02 2017-05-02 Method for adjusting rhombus inverted nine-point well pattern in high water-cut period of multilayer low-permeability sandstone oil reservoir Active CN107218024B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710301343.5A CN107218024B (en) 2017-05-02 2017-05-02 Method for adjusting rhombus inverted nine-point well pattern in high water-cut period of multilayer low-permeability sandstone oil reservoir

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710301343.5A CN107218024B (en) 2017-05-02 2017-05-02 Method for adjusting rhombus inverted nine-point well pattern in high water-cut period of multilayer low-permeability sandstone oil reservoir

Publications (2)

Publication Number Publication Date
CN107218024A true CN107218024A (en) 2017-09-29
CN107218024B CN107218024B (en) 2019-06-11

Family

ID=59943710

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710301343.5A Active CN107218024B (en) 2017-05-02 2017-05-02 Method for adjusting rhombus inverted nine-point well pattern in high water-cut period of multilayer low-permeability sandstone oil reservoir

Country Status (1)

Country Link
CN (1) CN107218024B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107869334A (en) * 2017-10-23 2018-04-03 中国石油天然气股份有限公司 Layer system recombination and exploitation method of multi-layer sandstone oil reservoir in middle and later stages of water injection development
CN108915649A (en) * 2018-07-25 2018-11-30 大庆油田有限责任公司 A kind of oil reservoir pressure is stifled to drive technology pattern preferred method
CN108952658A (en) * 2018-07-03 2018-12-07 成都北方石油勘探开发技术有限公司 Water injection well well choosing method for Fracturing Technology
CN109113732A (en) * 2018-08-09 2019-01-01 中国石油天然气股份有限公司 Reservoir heterogeneity determination method and device
CN110318719A (en) * 2018-03-28 2019-10-11 中国石油化工股份有限公司 A kind of two-way displacement method of positive rhythm thick formation
CN110454123A (en) * 2019-08-08 2019-11-15 大港油田集团有限责任公司 A kind of more wells collaboration energizations of LOW PERMEABILITY RESERVOIR are handled up method
CN111749660A (en) * 2019-03-29 2020-10-09 中国石油天然气股份有限公司 Well pattern injection and production method and device
CN111749671A (en) * 2019-03-29 2020-10-09 中国石油天然气股份有限公司 Method and device for injection-production among development layers of well pattern

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101148985A (en) * 2007-10-26 2008-03-26 大庆油田有限责任公司 Adjusting method for oil field injection and extraction system in ultra-high water-containing period
CN102146788A (en) * 2011-03-30 2011-08-10 中国石油化工股份有限公司 Method for enhancing recovery ratio through three-dimensional streamline regulation of water drive reservoir
CN102606117A (en) * 2012-04-05 2012-07-25 中国石油天然气股份有限公司 Air nitrogen alternate flooding exploitation method for middle-deep low-permeability thin oil reservoir
CN102839958A (en) * 2012-09-04 2012-12-26 中国石油天然气股份有限公司 Longitudinally-superposed-development three-layer-system oil reservoir well pattern and deployment method thereof
CN103046910A (en) * 2013-01-10 2013-04-17 中国石油天然气股份有限公司 Water drive development method for oil reservoir in ultrahigh water cut period
WO2015199799A2 (en) * 2014-05-28 2015-12-30 Exxonmobil Upstream Research Company Method of forming directionally controlled wormholes in a subterranean formation
CN205532556U (en) * 2016-03-29 2016-08-31 中国石油天然气股份有限公司 Can improve thick-layer sandstone oil reservoir water drive ripples and well pattern structure of volume

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101148985A (en) * 2007-10-26 2008-03-26 大庆油田有限责任公司 Adjusting method for oil field injection and extraction system in ultra-high water-containing period
CN102146788A (en) * 2011-03-30 2011-08-10 中国石油化工股份有限公司 Method for enhancing recovery ratio through three-dimensional streamline regulation of water drive reservoir
CN102606117A (en) * 2012-04-05 2012-07-25 中国石油天然气股份有限公司 Air nitrogen alternate flooding exploitation method for middle-deep low-permeability thin oil reservoir
CN102839958A (en) * 2012-09-04 2012-12-26 中国石油天然气股份有限公司 Longitudinally-superposed-development three-layer-system oil reservoir well pattern and deployment method thereof
CN103046910A (en) * 2013-01-10 2013-04-17 中国石油天然气股份有限公司 Water drive development method for oil reservoir in ultrahigh water cut period
WO2015199799A2 (en) * 2014-05-28 2015-12-30 Exxonmobil Upstream Research Company Method of forming directionally controlled wormholes in a subterranean formation
CN205532556U (en) * 2016-03-29 2016-08-31 中国石油天然气股份有限公司 Can improve thick-layer sandstone oil reservoir water drive ripples and well pattern structure of volume

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107869334A (en) * 2017-10-23 2018-04-03 中国石油天然气股份有限公司 Layer system recombination and exploitation method of multi-layer sandstone oil reservoir in middle and later stages of water injection development
CN107869334B (en) * 2017-10-23 2020-08-11 中国石油天然气股份有限公司 Layer system recombination and exploitation method of multi-layer sandstone oil reservoir in middle and later stages of water injection development
CN110318719A (en) * 2018-03-28 2019-10-11 中国石油化工股份有限公司 A kind of two-way displacement method of positive rhythm thick formation
CN108952658A (en) * 2018-07-03 2018-12-07 成都北方石油勘探开发技术有限公司 Water injection well well choosing method for Fracturing Technology
CN108915649A (en) * 2018-07-25 2018-11-30 大庆油田有限责任公司 A kind of oil reservoir pressure is stifled to drive technology pattern preferred method
CN108915649B (en) * 2018-07-25 2020-11-24 大庆油田有限责任公司 Oil reservoir pressure plugging and flooding process mode optimization method
CN109113732A (en) * 2018-08-09 2019-01-01 中国石油天然气股份有限公司 Reservoir heterogeneity determination method and device
CN111749660A (en) * 2019-03-29 2020-10-09 中国石油天然气股份有限公司 Well pattern injection and production method and device
CN111749671A (en) * 2019-03-29 2020-10-09 中国石油天然气股份有限公司 Method and device for injection-production among development layers of well pattern
CN111749671B (en) * 2019-03-29 2022-05-06 中国石油天然气股份有限公司 Method and device for injection-production between development layers of well pattern
CN110454123A (en) * 2019-08-08 2019-11-15 大港油田集团有限责任公司 A kind of more wells collaboration energizations of LOW PERMEABILITY RESERVOIR are handled up method

Also Published As

Publication number Publication date
CN107218024B (en) 2019-06-11

Similar Documents

Publication Publication Date Title
CN107218024B (en) Method for adjusting rhombus inverted nine-point well pattern in high water-cut period of multilayer low-permeability sandstone oil reservoir
CN105888630B (en) Method for improving recovery efficiency by huff-puff oil recovery of tight oil fracturing horizontal well
CN105114048B (en) A kind of staged fracturing of horizontal well single-well injection-production oil production method
CN103993862B (en) Layering development method for complex fault block thin oil reservoir
CN104989403B (en) Method for reconstructing floor limestone aquifer into natural-artificial composite integrated aquiclude
CN101876241B (en) Method for improving water drive recovery ratio of positive rhythm thick oil layer
CN102777157B (en) CO2 drive oil-gas-water separate well injecting oil reservoir mixing drive development method
CN104234677B (en) Method for improving condensate recovery ratio of condensate gas reservoir through gas injection vertical displacement
CN109958411B (en) Horizontal well cluster perforation staged fracturing method
CN103628850B (en) A kind of waterflooding oil field integral profile control water blockoff decision-making technique
CN104963671B (en) A kind of fracturing reform method of High angle from formula well reservoir
CN105822269B (en) Remaining oil distribution pattern and modification scenario method after stratified reservoir binary is driven
CN106761606B (en) The asynchronous note CO of different well of symmetrical cloth seam2Oil production method
CN104632157A (en) Low permeability reservoir equilibrium displacement method
CN106437674A (en) Imitation horizontal well waterflooding well pattern adapting method
CN106761612B (en) The asynchronous water injection oil extraction method of double different wells of pressure break horizontal well of zip mode cloth seam
CN108825177A (en) A kind of horizontal well transfer drive technique
CN106437642A (en) Injection-production asynchronous mining method for horizontal well of fractured reservoir
CN110306965A (en) A kind of method for increasing for coal bed gas low yield wellblock
CN104929597B (en) Chemical flooding exploitation method for horizontal well
CN104594869A (en) reservoir reconstruction method
CN105587300B (en) Oil recovery method for horizontal well
CN106869888B (en) Improve the method for low-permeability oil deposit waterflooding effect
CN110259421A (en) Fractured compact oil reservoir water injection energy supplementing method
CN110529089A (en) A kind of open-hole horizontal well refracturing method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant