[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN107217999A - Drilling at the sea riser upper attachment means - Google Patents

Drilling at the sea riser upper attachment means Download PDF

Info

Publication number
CN107217999A
CN107217999A CN201710570589.2A CN201710570589A CN107217999A CN 107217999 A CN107217999 A CN 107217999A CN 201710570589 A CN201710570589 A CN 201710570589A CN 107217999 A CN107217999 A CN 107217999A
Authority
CN
China
Prior art keywords
poppet
drilling
fore
attachment means
stock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710570589.2A
Other languages
Chinese (zh)
Other versions
CN107217999B (en
Inventor
朱刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pera Corp Ltd
Original Assignee
Pera Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pera Corp Ltd filed Critical Pera Corp Ltd
Priority to CN201710570589.2A priority Critical patent/CN107217999B/en
Publication of CN107217999A publication Critical patent/CN107217999A/en
Application granted granted Critical
Publication of CN107217999B publication Critical patent/CN107217999B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/002Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables specially adapted for underwater drilling
    • E21B19/004Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables specially adapted for underwater drilling supporting a riser from a drilling or production platform

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

The invention provides drilling at the sea riser upper attachment means, including the fore-stock being obliquely installed and the after-poppet being vertically arranged, the both sides of the fore-stock are respectively fixedly connected by a side stand with the after-poppet respectively;The upper end of the after-poppet is provided with female container joint unit;Coiled tubing supporting construction is installed on the after-poppet;The side of the remote after-poppet of the fore-stock from top to bottom is provided with underwater connector interface unit and suspension platform.In the above-mentioned technical solutions, fore-stock and after-poppet connect and form a trapezium structure layout, the layout of rectangular frame structure of the prior art is abandoned, and pass through finite element analysis simulating, verifying, the design requirements such as intensity, fatigue under various working conditions can be met comprehensively, therefore, integrally-built weight can not only be mitigated significantly, and due to the simplification of structure, production and transport installation and the maintenance in later stage etc. is all greatly simplified, therefore significantly save manufacture and installation and transportation cost.

Description

Drilling at the sea riser upper attachment means
Technical field
The present invention relates to drilling at the sea technical field, more particularly to a kind of drilling at the sea riser upper attachment means.
Background technology
In deep-sea oil project, the connection of standpipe and standpipe and FPSO oil tankers is most important.Wherein, marine riser top Connection component is critical component.
The design of marine riser top connection component involves the dynamic of the dynamic loading, the dynamic loading of standpipe, oil tanker of suspension cylinder Load and the dynamic loading of various connecting lines transmission, thus it is extremely complex.The size of marine riser top connection component is general Up to more than ten meter, design weight is generally at more than 100 tons.In addition, different according to the purposes of standpipe, each marine riser top connects The design of connected components has certain difference.
Although marine riser top of the prior art connection component meets all working condition requirements, but complicated, manufacture It is all very high with installation cost.Especially deep-sea drilling ship operation, cost is extremely expensive, and the time length of installation is to cost impact Greatly.
The content of the invention
It is an object of the invention to provide a kind of drilling at the sea riser upper attachment means, with solve manufacture in the prior art and The problem of installation cost is high.
In order to solve the above technical problems, the invention provides a kind of drilling at the sea riser upper attachment means, including tilt The fore-stock of setting and the after-poppet being vertically arranged, the both sides of the fore-stock respectively pass through a side stand and the rear branch respectively Frame is fixedly connected;The upper end of the after-poppet is provided with female container joint unit;Coiled tubing branch is installed on the after-poppet Support structure;The side of the remote after-poppet of the fore-stock from top to bottom is provided with underwater connector interface unit and outstanding Hang platform.
Preferably, the after-poppet includes two main stay tubes be arrangeding in parallel, the upper end peace of described two main stay tubes Equipped with suspension stake, the lower end of described two main stay tubes is connected by chamfering link interface unit.
Preferably, the upper end of the main stay tube is provided with main lifting backing plate, the main lifting backing plate and is formed with main hang Fill hole.
Preferably, it is provided with lifting gudgeon in the middle part of the main stay tube.
Preferably, the fore-stock includes two oblique branch pipes be arrangeding in parallel.
Preferably, it is provided with reverse gudgeon in the middle part of the oblique branch pipe.
Preferably, the lower end of the oblique branch pipe is provided with transport hanger.
Preferably, it is also equipped with counter-bending booster on the fore-stock.
Preferably, the counter-bending booster is located between the underwater connector interface unit and the suspension platform Position.
Preferably, the fore-stock, the after-poppet, the side stand and the coiled tubing supporting construction are using envelope The hollow pipe fitting closed is made, and female container joint unit, the suspension platform and suspension stake use open pipe fitting It is made.
In the above-mentioned technical solutions, fore-stock and after-poppet connect and form a trapezium structure layout, have abandoned existing The layout of rectangular frame structure in technology, and pass through finite element analysis simulating, verifying, various working conditions can be met comprehensively Under the design requirement such as intensity, fatigue, therefore, can not only mitigate integrally-built weight significantly, and due to the letter of structure Change, production and transport installation and the maintenance in later stage etc. is all greatly simplified, therefore significantly save manufacture and installation and transportation Cost.For traditional box-structure, the present invention has low, intensity fatigue life height of lightweight, manufacturing cost etc. aobvious Write advantage.
In addition to objects, features and advantages described above, the present invention also has other objects, features and advantages. The present invention is further detailed explanation below.
Brief description of the drawings
The Figure of description for constituting the part of the present invention is used for providing a further understanding of the present invention, and of the invention shows Meaning property embodiment and its illustrate be used for explain the present invention, do not constitute inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the stereogram of the present invention;
Fig. 2 is another stereogram of the present invention;
Fig. 3 is the another stereogram of the present invention.
Reference in figure:1st, side stand;2nd, female container joint unit;3rd, coiled tubing supporting construction;4th, connect under water Device interface unit;5th, suspension platform;6th, main stay tube;7th, stake is hung;8th, chamfering link interface unit;9th, main lifting backing plate;10、 Lift gudgeon;11st, oblique branch pipe;12nd, gudgeon is overturned;13rd, hanger is transported;14th, counter-bending booster.
Embodiment
It should be noted that in the case where not conflicting, the embodiment in the present invention and the feature in embodiment can phases Mutually combination.The present invention is described in detail with reference to embodiment.
In order that those skilled in the art more fully understand the present invention program, below by the skill in the embodiment of the present invention Art scheme is clearly and completely described, it is clear that described embodiment is only the embodiment of a part of the invention, without It is whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art are not before creative work is made The every other embodiment obtained is put, should all belong to the scope of protection of the invention.
Deep-sea oil production technique is the weakness of China, and China is used as an energy demand big country, following marine stone Oil exploitation has huge demand and prospect.
The invention provides a kind of drilling at the sea riser upper attachment means, including the fore-stock being obliquely installed and set vertically The after-poppet put, the both sides of the fore-stock are respectively fixedly connected by a side stand 1 with the after-poppet respectively;Propped up after described The upper end of frame is provided with female container joint unit 2;Coiled tubing supporting construction 3 is installed on the after-poppet;The fore-stock The side of the remote after-poppet underwater connector interface unit 4 and suspension platform 5 from top to bottom are installed.
In the above-mentioned technical solutions, fore-stock and after-poppet connect and form a trapezium structure layout, have abandoned existing The layout of rectangular frame structure in technology, and pass through finite element analysis simulating, verifying, various working conditions can be met comprehensively Under the design requirement such as intensity, fatigue, therefore, can not only mitigate integrally-built weight significantly, and due to the letter of structure Change, production and transport installation and the maintenance in later stage etc. is all greatly simplified, therefore significantly save manufacture and installation and transportation Cost.For traditional box-structure, the present invention has low, intensity fatigue life height of lightweight, manufacturing cost etc. aobvious Write advantage.
The present invention is laid out the structural framing for changing symmetric form of the prior art by above-mentioned trapezium structure, takes into full account The serious asymmetry of load in standpipe connection, can make the direction of structure and load basically identical, give full play to structure Potentiality.
Present invention could apply in the connection of the various standpipes of deepwater oilfield, being not limited only to SLHR, (single line is combined Standpipe) standpipe, to production riser, service standpipe, water filling standpipe, gas transmission standpipe etc. are also suitable.Total is divided into by function Several minor structures, production and detection after installing and installing are relatively succinct.
Preferably, the after-poppet includes two main stay tubes 6 be arrangeding in parallel, the upper end of described two main stay tubes 6 Suspension stake 7 is installed, the lower end of described two main stay tubes 6 is connected by chamfering link interface unit 8.Preferably, before described Support includes two oblique branch pipes 11 be arrangeding in parallel.
Preferably, the upper end of the main stay tube 6 is provided with main lifting backing plate 9, the main lifting backing plate 9 and is formed with master Hole for hoist.
Preferably, the middle part of the main stay tube 6 is provided with lifting gudgeon 10.Preferably, the middle part of the oblique branch pipe 11 It is provided with reverse gudgeon 12.Preferably, the lower end of the oblique branch pipe 11 is provided with transport hanger 13.Transporting and hoisting is actual installation During unusual the key link, among trapezium structure layout designs, by above-described embodiment, devise rational lifting knot Structure is to meet actual installation needs.
Preferably, counter-bending booster 14 is also equipped with the fore-stock.Preferably, the counter-bending booster 14 Position between the underwater connector interface unit 4 and the suspension platform 5.
Preferably, the fore-stock, the after-poppet, the side stand and the coiled tubing supporting construction 3 are used The hollow pipe fitting of closing is made, and female container joint unit 2, the suspension platform 5 and the suspension stake 7 are using open Pipe fitting is made.Using the form of hollow pipe fitting and the open pipe fitting phase structure of this closing, enable part close from And the buoyancy of system is improved, can make that weight of the whole system in water is weight in the air about 2/3rds.
The unsymmetric structure that trapezium structure is laid out in the present invention is for symmetrical structure of the prior art, fully The settling position of structure barycenter is considered, ensure that the position of structure barycenter is constant when designing each sub-unit.In addition, setting When counting trapezium structure layout, the present invention can complete total using 10 kinds of different size tubulars, thus can use as far as possible few Various sizes of part, reduces the expense for ordering material and welding processing.Finally, present invention design has taken into full account all set Operating mode is counted, designs and is designed in strict accordance with the serial international standard of Offshore Engineering.
Each part dimension of the present invention is relatively fixed, and can be adjusted according to purposes difference.Because the particularity of ocean engineering, The environmental load that the standpipe of different purposes is born is entirely different, therefore URA structures must also be adjusted according to different purposes.This The characteristics of inventing trapezoidal layout is that the size of most of part is relatively fixed, and other parts part can be carried out suitably according to purposes Adjustment.For example, to nonproductive URA and water filling URA, basic structure is constant, merely transversely spacing needs to do certain adjustment.
It is connected with the drilling at the sea riser upper in most close BP Angola Block 31 (31 plate) project Device is compared, it is an advantage of the invention that structure significantly simplifies, and more rationally, intensity fatigue life significantly improves.In system Cost can be greatly reduced in making and installing.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made any repaiies Change, equivalent substitution, improvement etc., should be included in the scope of the protection.

Claims (10)

1. a kind of drilling at the sea riser upper attachment means, it is characterised in that including the fore-stock being obliquely installed and be vertically arranged After-poppet, the both sides of the fore-stock are respectively fixedly connected by a side stand (1) with the after-poppet respectively;
The upper end of the after-poppet is provided with female container joint unit (2);
Coiled tubing supporting construction (3) is installed on the after-poppet;
The side of the remote after-poppet of the fore-stock from top to bottom is provided with underwater connector interface unit (4) and outstanding Hang platform (5).
2. drilling at the sea riser upper attachment means according to claim 1, it is characterised in that the after-poppet includes two The individual main stay tube (6) be arrangeding in parallel, the upper end of described two main stay tubes (6) is provided with suspension stake (7), described two main branch The lower end of stay tube (6) is connected by chamfering link interface unit (8).
3. drilling at the sea riser upper attachment means according to claim 2, it is characterised in that the main stay tube (6) Upper end be provided with main lifting backing plate (9), main lifting backing plate (9) and be formed with main hole for hoist.
4. drilling at the sea riser upper attachment means according to claim 3, it is characterised in that the main stay tube (6) Middle part be provided with lifting gudgeon (10).
5. drilling at the sea riser upper attachment means according to claim 4, it is characterised in that the fore-stock includes two The individual oblique branch pipe (11) be arrangeding in parallel.
6. drilling at the sea riser upper attachment means according to claim 5, it is characterised in that the oblique branch pipe (11) Middle part is provided with reverse gudgeon (12).
7. drilling at the sea riser upper attachment means according to claim 6, it is characterised in that the oblique branch pipe (11) Lower end is provided with transport hanger (13).
8. drilling at the sea riser upper attachment means according to claim 3, it is characterised in that also pacify on the fore-stock Equipped with counter-bending booster (14).
9. drilling at the sea riser upper attachment means according to claim 8, it is characterised in that the counter-bending booster (14) it is located at the position between the underwater connector interface unit (4) and the suspension platform (5).
10. drilling at the sea riser upper attachment means according to claim 6, it is characterised in that the fore-stock, described After-poppet, the side stand and the coiled tubing supporting construction (3) are made of the hollow pipe fitting of closing, female container Interface unit (2), the suspension platform (5) and the suspension stake (7) are made of open pipe fitting.
CN201710570589.2A 2017-07-13 2017-07-13 Upper connecting device of marine drilling riser Active CN107217999B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710570589.2A CN107217999B (en) 2017-07-13 2017-07-13 Upper connecting device of marine drilling riser

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710570589.2A CN107217999B (en) 2017-07-13 2017-07-13 Upper connecting device of marine drilling riser

Publications (2)

Publication Number Publication Date
CN107217999A true CN107217999A (en) 2017-09-29
CN107217999B CN107217999B (en) 2024-05-14

Family

ID=59952467

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710570589.2A Active CN107217999B (en) 2017-07-13 2017-07-13 Upper connecting device of marine drilling riser

Country Status (1)

Country Link
CN (1) CN107217999B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111654681A (en) * 2019-03-04 2020-09-11 安世亚太科技股份有限公司 Projection splicing method of DLP optical machine
CN111654680A (en) * 2019-03-04 2020-09-11 安世亚太科技股份有限公司 Projection splicing method and device of digital light processing optical machine

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6461083B1 (en) * 1999-02-19 2002-10-08 Bouygues Offshore Method and device for linking surface to the seabed for a submarine pipeline installed at great depth
US20030161690A1 (en) * 2000-07-20 2003-08-28 Breivik Kare G. Offshore loading or production system for dynamically positioned ships
CN1720165A (en) * 2002-10-16 2006-01-11 辛格尔浮筒系船公司 Riser installation vessel and method of using the same
CN201260047Y (en) * 2008-09-10 2009-06-17 中国电力科学研究院 Asymmetric line discharging tackle
US20120085544A1 (en) * 2010-10-12 2012-04-12 Bp Exploration Operating Company Limited Marine subsea free-standing riser systems and methods
CN102434129A (en) * 2011-12-24 2012-05-02 大连理工大学 Ultra-deep water ocean oil and gas engineering development system and installation method thereof
CN104265228A (en) * 2014-10-09 2015-01-07 中国海洋石油总公司 Free standing type stand pipe top connection structure
CN105525888A (en) * 2014-09-28 2016-04-27 中国海洋石油总公司 Terminal connector of deep water free standing type vertical pipe system
US20160115667A1 (en) * 2013-05-13 2016-04-28 Saipem S.A. Device For Anchoring A Raceway Mounting Of A Seabed-To-Surface Facility
CN207110998U (en) * 2017-07-13 2018-03-16 安世亚太科技股份有限公司 Drilling at the sea riser upper attachment means

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6461083B1 (en) * 1999-02-19 2002-10-08 Bouygues Offshore Method and device for linking surface to the seabed for a submarine pipeline installed at great depth
US20030161690A1 (en) * 2000-07-20 2003-08-28 Breivik Kare G. Offshore loading or production system for dynamically positioned ships
CN1720165A (en) * 2002-10-16 2006-01-11 辛格尔浮筒系船公司 Riser installation vessel and method of using the same
CN201260047Y (en) * 2008-09-10 2009-06-17 中国电力科学研究院 Asymmetric line discharging tackle
US20120085544A1 (en) * 2010-10-12 2012-04-12 Bp Exploration Operating Company Limited Marine subsea free-standing riser systems and methods
CN102434129A (en) * 2011-12-24 2012-05-02 大连理工大学 Ultra-deep water ocean oil and gas engineering development system and installation method thereof
US20160115667A1 (en) * 2013-05-13 2016-04-28 Saipem S.A. Device For Anchoring A Raceway Mounting Of A Seabed-To-Surface Facility
CN105525888A (en) * 2014-09-28 2016-04-27 中国海洋石油总公司 Terminal connector of deep water free standing type vertical pipe system
CN104265228A (en) * 2014-10-09 2015-01-07 中国海洋石油总公司 Free standing type stand pipe top connection structure
CN207110998U (en) * 2017-07-13 2018-03-16 安世亚太科技股份有限公司 Drilling at the sea riser upper attachment means

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
康庄,等, vol. 40, no. 5, pages 174 - 179 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111654681A (en) * 2019-03-04 2020-09-11 安世亚太科技股份有限公司 Projection splicing method of DLP optical machine
CN111654680A (en) * 2019-03-04 2020-09-11 安世亚太科技股份有限公司 Projection splicing method and device of digital light processing optical machine
CN111654681B (en) * 2019-03-04 2024-04-19 北京谦恒德科技有限公司 Projection splicing method of DLP optical machine

Also Published As

Publication number Publication date
CN107217999B (en) 2024-05-14

Similar Documents

Publication Publication Date Title
CN101980917B (en) Liquid storing and offloading device and drilling and production installations on sea based thereon
US8403058B2 (en) Offshore unit and method of installing wellhead platform using the offshore unit
AU2007319011B2 (en) Hybrid riser tower and methods of installing same
CN104527940B (en) Ocean platform block offshore double-boat integral migration method
CN105064958A (en) Vertical multi-joint fishing net protection underground pipe manifold
BRPI1012886B1 (en) MODULAR SURFACE INSTALLATION, SYSTEM, AND, METHOD FOR INSTALLING A SURFACE INSTALLATION IN A STRUCTURE OUTSIDE THE COAST
CN107217999A (en) Drilling at the sea riser upper attachment means
CN104060971A (en) Assembly type underwater manifold structure
CN203258184U (en) Folding type deepwater subsea pipeline terminal
CN207110998U (en) Drilling at the sea riser upper attachment means
CN106585872B (en) The method of the upper layer module integrated operations of floating type production, storage and offloading device
CN201615337U (en) Submarine pipeline oil catcher
CN105752861A (en) Method for mounting deep sea underwater heavy facility by using buoyancy blocks and hoisting and guiding dual-use cable
CN108590547B (en) Standpipe installation method
CN100430292C (en) Water intake riser
CN105525888A (en) Terminal connector of deep water free standing type vertical pipe system
CN103662383A (en) Oil pipeline clamping fixture
CN203048399U (en) Special lifting bracket for lifting drilling modules of deepwater drilling ship
CN206429226U (en) It is a kind of to prevent the oil-collecting device of deepwater oilfield drilling well mouthful oil leak
CN203497865U (en) Off-centering underwater casing head hoisting frame
CN106115508A (en) A kind of combination type pontoon hangs
CN105775074B (en) Gradually the heavy erection of equipment method in deep-sea of buoyant mass is freely discharged
CN201952095U (en) Shackle-free connected hanging bar
Karunakaran et al. Steel Lazy Wave Riser with Tether for FPSO with Dis-Connectable Turret for Iceberg Conditions
CN114348208A (en) Hanging scaffold and corresponding tooling

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant