A kind of tool-type tower crane attached wall installation operation platform Download PDFInfo
- Publication number
- CN107119896A CN107119896A CN201710451447.4A CN201710451447A CN107119896A CN 107119896 A CN107119896 A CN 107119896A CN 201710451447 A CN201710451447 A CN 201710451447A CN 107119896 A CN107119896 A CN 107119896A
- Authority
- CN
- China
- Prior art keywords
- tower crane
- tool
- rectangular base
- operation platform
- installation operation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/24—Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons
- E04G3/243—Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons following the outside contour of a building
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Jib Cranes (AREA)
Abstract
The invention discloses a kind of tool-type tower crane attached wall installation operation platform, including fence, Men Lan, rectangular base, returning face plate and bracket, three pieces of fences are corresponded to respectively to be fixed on three adjacent sides of rectangular base, two columns are fixed on another side of rectangular base, installing port is provided with rectangular base, returning face plate is articulated with installing port, and rectangular base is fixed on the tower crane by bracket.Easy installation and removal of the present invention, handling speed is fast, and practicality is high, and time processing can be used for polytype tower crane, saves material, saves artificial, shortens the duration, can effectively ensure construction safety.
Description
Technical field:
The present invention relates to a kind of tool-type tower crane attached wall installation operation platform.
Background technology:
Skyscraper needs to set multiple tracks attached wall in construction according to the model difference of tower crane, in order to which the installation to tower crane attached wall is carried
Attached wall installation operation platform must be set up for safety guarantee.Conventional steel tube fastener formula and channel-section steel, the operation of square steel assembly type are put down at present
Setting up with work high above the ground for platform, takes and tears difficulty open, falling from high altitude and falling object from high altitude equivalent risk easily occurs.
The content of the invention:
The present invention is to provide a kind of tool-type tower crane attached wall installation operation in order to solve the problem of above-mentioned prior art is present to put down
Platform.
The technical solution adopted in the present invention has:A kind of tool-type tower crane attached wall installation operation platform, including fence, door
Column, rectangular base, returning face plate and bracket, three pieces of fences are corresponded to respectively to be fixed on three adjacent sides of rectangular base, two
Column is fixed on another side of rectangular base, and installing port is provided with rectangular base, and returning face plate is articulated with installing port, rectangle
Base is fixed on the tower crane by bracket.
Further, the bracket includes U-shaped piece, mounting pin and lock-screw, and U-shaped piece interfixes described in two, and two U
U-lag on type block is mutually perpendicular to, and two mounting pins are plugged on two U-shaped pieces respectively, and two mounting pin is mutually perpendicular to, two lockings
Screw is threaded in two mounting pins respectively.
Further, the rectangular base includes keel shoe and regulating base board, and slot, regulating base board are provided with keel shoe
It is plugged in the slot;The keel shoe is provided with installing port.
Further, installing port side wall is provided with the hinge for being used for being hinged returning face plate.
Further, the keel shoe is provided with suspension ring.
Further, four edges of the rectangular base are provided with column.
Further, the door column includes gear frame and folding frame, and the folding frame is articulated with gear frame.
Further, the upper end of the folding frame is provided with bayonet lock, and lower end is provided with position-limiting ear.
Further, it is equipped with skirting board on fence and the door column.
The present invention has the advantages that:
Easy installation and removal of the present invention, handling speed is fast, and practicality is high, and time processing can be used for polytype tower crane, saves material
Material, saves artificial, shortens the duration, can effectively ensure construction safety.
Brief description of the drawings:
Fig. 1 is structure chart of the present invention.
Structure charts of the Fig. 2 for the present invention on tower crane.
Fig. 3 is the structure chart of bracket in the present invention.
Fig. 4 is the mounting structure figure of Fig. 3 brackets.
Fig. 5 and Fig. 6 is the structure chart of rectangular base in the present invention.
Fig. 7 is the structure chart on Zhong Men columns of the present invention.
Embodiment:
The present invention is further illustrated below in conjunction with the accompanying drawings.
Such as Fig. 1 and Fig. 2, a kind of tool-type tower crane attached wall installation operation platform of the invention, including fence 1, door column 2, rectangle
Base 3, returning face plate 4 and bracket 5, three pieces of fences 1 correspond to be perpendicularly fixed on three adjacent sides of rectangular base 3 respectively, and two
Door column 2 is perpendicularly fixed on another side of rectangular base 3, and installing port 30 is provided with rectangular base 3, and returning face plate 4 is articulated with
At installing port 30, rectangular base 3 is fixed on tower crane by bracket 5.
With reference to Fig. 3 and Fig. 4, bracket 5 includes U-shaped piece 51, mounting pin 52 and lock-screw 53, two pieces U-shaped piece 51 of base
It is welded and fixed, and the U-lag on two U-shaped pieces 51 is mutually perpendicular to, two mounting pins 52 are plugged on two U-shaped pieces 51 of side respectively,
And two mounting pin 52 is mutually perpendicular to, two lock-screws 53 are threaded in two mounting pins 52 respectively.
Such as Fig. 5 and Fig. 6, rectangular base 3 includes keel shoe 31 and regulating base board 32, and slot 33 is provided with keel shoe 31,
Regulating base board 32 is plugged in the slot 33, and one end of regulating base board 32 is stretched in installing port 30.Installing port 30 is arranged on dragon
On skeleton 31.
For ease of returning face plate 4 is articulated with rectangular base 3, being provided with the side wall of installing port 30 is used to be hinged returning face plate 4
Hinge 34.
It is connected to for ease of rectangular base 3 is hung on tower crane, suspension ring 35 is provided with keel shoe 31.
The present invention is the structural stability of increase operating platform, and column 6 is equipped with four edges of rectangular base 3,
Fence 1 and the correspondence of door column 2 are fixedly connected with column 6.
Such as Fig. 7, door column 2 includes gear frame 21 and folding frame 22, and folding frame 22 is articulated with gear frame 21, in the upper of folding frame 22
End is provided with bayonet lock 23, and lower end is provided with position-limiting ear 24.When two folding frames 22 are closed, the clamp of clamping one on bayonet lock 23, two
The limiting lock for connecing U-shape is worn in position-limiting ear 24.
Skirting board 7 is equipped with fence 1 and door column 2.
When operating platform of the present invention is arranged on tower crane, rectangular base is connected to by one in mounting bracket 5 U-shaped piece 51
On keel shoe 31 on seat 3, in the support beam that another in mounting bracket 5 is connected on tower crane for U-shaped piece 51, lock is then tightened
Tight screw 53, is fastened two U-shaped pieces 51 by lock-screw 53.Connecting steel wire ropes, steel wire on suspension ring 35 in rectangular base 3
The other end of rope is connected on tower crane.Returning face plate 4 is overturn, and causes the level of returning face plate 4 to be layered on the keel shoe 31 of rectangular base 3
On.When setting up tower crane, workman can stand on returning face plate 4.The big of installing port 30 is adjusted by adjusting regulating base board 32
It is small, to set up installation suitable for different size tower cranes.
Described above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
For member, some improvement can also be made under the premise without departing from the principles of the invention, and these improvement also should be regarded as the present invention's
Protection domain.
Claims (9)
1. a kind of tool-type tower crane attached wall installation operation platform, it is characterised in that:Including fence(1), door column(2), rectangular base
(3), returning face plate(4)And bracket(5), three pieces of fences(1)Correspond to respectively and be fixed on rectangular base(3)On three adjacent sides,
Two columns(2)It is fixed on rectangular base(3)Another side on, in rectangular base(3)It is provided with installing port(30), returning face plate
(4)It is articulated with installing port(30)Place, rectangular base(3)Pass through bracket(5)It is fixed on the tower crane.
2. tool-type tower crane attached wall installation operation platform as claimed in claim 1, it is characterised in that:The bracket(5)Including U
Type block(51), mounting pin(52)And lock-screw(53), U-shaped piece described in two(51)Interfix, and two U-shaped pieces(51)On U
Shape groove is mutually perpendicular to, two mounting pins(52)Two U-shaped pieces are plugged on respectively(51)On, and two mounting pin(52)It is mutually perpendicular to, two
Lock-screw(53)Two mounting pins are threaded in respectively(52)On.
3. tool-type tower crane attached wall installation operation platform as claimed in claim 1, it is characterised in that:The rectangular base(3)
Including keel shoe(31)And regulating base board(32), in keel shoe(31)It is provided with slot(33), regulating base board(32)It is plugged in this
Slot(33)It is interior;The keel shoe(31)It is provided with installing port(30).
4. tool-type tower crane attached wall installation operation platform as claimed in claim 3, it is characterised in that:The installing port(30)Side
Wall, which is provided with, to be used to be hinged returning face plate(4)Hinge(34).
5. tool-type tower crane attached wall installation operation platform as claimed in claim 3, it is characterised in that:The keel shoe(31)On
Provided with suspension ring(35).
6. tool-type tower crane attached wall installation operation platform as claimed in claim 1, it is characterised in that:The rectangular base(3)
Four edges be provided with column(6).
7. tool-type tower crane attached wall installation operation platform as claimed in claim 1, it is characterised in that:The door column(2)Including
Keep off frame(21)With folding frame(22), the folding frame(22)It is articulated with gear frame(21)On.
8. tool-type tower crane attached wall installation operation platform as claimed in claim 7, it is characterised in that:The folding frame(22)'s
Upper end is provided with bayonet lock(23), lower end is provided with position-limiting ear(24).
9. tool-type tower crane attached wall installation operation platform as claimed in claim 1, it is characterised in that:The fence(1)And door
Column(2)On be equipped with skirting board(7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710451447.4A CN107119896A (en) | 2017-06-15 | 2017-06-15 | A kind of tool-type tower crane attached wall installation operation platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710451447.4A CN107119896A (en) | 2017-06-15 | 2017-06-15 | A kind of tool-type tower crane attached wall installation operation platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107119896A true CN107119896A (en) | 2017-09-01 |
Family
ID=59718440
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710451447.4A Pending CN107119896A (en) | 2017-06-15 | 2017-06-15 | A kind of tool-type tower crane attached wall installation operation platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107119896A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110065892A (en) * | 2019-05-29 | 2019-07-30 | 南通四建集团有限公司 | A kind of hoisting apparatus and its hoisting method for Prefabricated composite pipeline indoor hoisting |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100175951A1 (en) * | 2008-02-11 | 2010-07-15 | Watercare Services Limited | Access apparatus |
CN202944998U (en) * | 2012-12-11 | 2013-05-22 | 中建四局第三建筑工程有限公司 | Attached installation and maintenance platform of calibrated tower crane |
CN203497960U (en) * | 2013-09-07 | 2014-03-26 | 中建八局大连建设工程有限公司 | Plate overturning device for tower crane auxiliary arm |
CN204435816U (en) * | 2014-12-10 | 2015-07-01 | 中国建筑第八工程局有限公司 | Telescopic steel post operation platform |
CN104831922A (en) * | 2015-04-10 | 2015-08-12 | 广州市第一建筑工程有限公司 | Adjustable square column steel formwork |
CN204940851U (en) * | 2015-07-14 | 2016-01-06 | 中建钢构有限公司 | A kind of sideslip type operating platform |
CN205088933U (en) * | 2015-10-29 | 2016-03-16 | 保定市裕升建筑安装股份有限公司 | Tower crane inserted lift scaffold's operation protection platform |
CN105926916A (en) * | 2016-05-24 | 2016-09-07 | 杭州江润科技有限公司 | Cable-stayed suspended combined supporting system and construction method based on intelligent monitoring |
CN206815796U (en) * | 2017-06-15 | 2017-12-29 | 南通四建集团有限公司 | A kind of tool-type tower crane attached wall installs the operating platform |
-
2017
- 2017-06-15 CN CN201710451447.4A patent/CN107119896A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100175951A1 (en) * | 2008-02-11 | 2010-07-15 | Watercare Services Limited | Access apparatus |
CN202944998U (en) * | 2012-12-11 | 2013-05-22 | 中建四局第三建筑工程有限公司 | Attached installation and maintenance platform of calibrated tower crane |
CN203497960U (en) * | 2013-09-07 | 2014-03-26 | 中建八局大连建设工程有限公司 | Plate overturning device for tower crane auxiliary arm |
CN204435816U (en) * | 2014-12-10 | 2015-07-01 | 中国建筑第八工程局有限公司 | Telescopic steel post operation platform |
CN104831922A (en) * | 2015-04-10 | 2015-08-12 | 广州市第一建筑工程有限公司 | Adjustable square column steel formwork |
CN204940851U (en) * | 2015-07-14 | 2016-01-06 | 中建钢构有限公司 | A kind of sideslip type operating platform |
CN205088933U (en) * | 2015-10-29 | 2016-03-16 | 保定市裕升建筑安装股份有限公司 | Tower crane inserted lift scaffold's operation protection platform |
CN105926916A (en) * | 2016-05-24 | 2016-09-07 | 杭州江润科技有限公司 | Cable-stayed suspended combined supporting system and construction method based on intelligent monitoring |
CN206815796U (en) * | 2017-06-15 | 2017-12-29 | 南通四建集团有限公司 | A kind of tool-type tower crane attached wall installs the operating platform |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110065892A (en) * | 2019-05-29 | 2019-07-30 | 南通四建集团有限公司 | A kind of hoisting apparatus and its hoisting method for Prefabricated composite pipeline indoor hoisting |
CN110065892B (en) * | 2019-05-29 | 2024-02-20 | 南通四建集团有限公司 | Hoisting device and hoisting method for indoor hoisting of prefabricated combined pipeline |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN214091279U (en) | Electric pole correction device for electric power engineering | |
CN205840761U (en) | A kind of packaged type construction raises ladder | |
CN206815796U (en) | A kind of tool-type tower crane attached wall installs the operating platform | |
CN107119896A (en) | A kind of tool-type tower crane attached wall installation operation platform | |
CN205892588U (en) | Hoisting equipment | |
CN110805249A (en) | Indoor scaffold with protection structure | |
CN208347293U (en) | A kind of novel rapid-installation scaffold combination ladder | |
CN108298477A (en) | A kind of repair car of electric power | |
CN209896574U (en) | High-altitude line sliding operation platform | |
CN215803104U (en) | Wall-riding type hanging basket frame | |
CN207559422U (en) | The protection top of Inflatable full insulated ring main unit | |
CN214834519U (en) | Light lifting overhanging type mobile operation platform | |
CN211873902U (en) | Collapsible material protector that connects | |
CN211899720U (en) | Building construction overhanging type mobile blanking platform | |
CN215907351U (en) | Hanging basket suspension mechanism | |
CN219409197U (en) | Aerial working vehicle protection platform | |
CN209942207U (en) | Protection that inserted scaffold frame was used turns over board | |
CN215174860U (en) | High altitude lamps and lanterns installing support | |
CN220336431U (en) | Protective platform opening and closing pavement plate for building construction | |
CN220395140U (en) | Structure is turned over to climbing frame tower crane attaches arm position | |
CN109555301A (en) | A kind of multi-functional mounting platform of high voltage power cable | |
CN205802911U (en) | A kind of intelligent sound automatic control aerial ladder | |
CN210944602U (en) | Segmentation hoist device based on large-span steel truss | |
CN208673619U (en) | A kind of safety nameplate fixed frame | |
CN207827818U (en) | A kind of aerial lift device for ultra-high-tension power transmission line repair |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |