CN107100655A - Weak surrounding rock locally changes the simple temporary support system of arch and its applies method - Google Patents

Weak surrounding rock locally changes the simple temporary support system of arch and its applies method Download PDF

Info

Publication number
CN107100655A
CN107100655A CN201710400883.9A CN201710400883A CN107100655A CN 107100655 A CN107100655 A CN 107100655A CN 201710400883 A CN201710400883 A CN 201710400883A CN 107100655 A CN107100655 A CN 107100655A
Authority
CN
China
Prior art keywords
temporary support
crossbeam
row
front side
support crossbeam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710400883.9A
Other languages
Chinese (zh)
Inventor
邢发红
张忠德
刘金元
王亮
郝晓朋
邹卫东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Original Assignee
Sixth Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sixth Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd filed Critical Sixth Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Priority to CN201710400883.9A priority Critical patent/CN107100655A/en
Publication of CN107100655A publication Critical patent/CN107100655A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D19/00Provisional protective covers for working space
    • E21D19/04Provisional protective covers for working space for use in drifting galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The simple temporary support system of arch is locally changed the invention discloses a kind of weak surrounding rock and its applies method, the problem of whole Pin bow members of branch carry out easily occurring cave-in accident when changing arch processing at the beginning of solving tunnel.In local deformation bow member part(9)Front side vault at be provided with front side temporary support row's arc bow members(3), in front side, the inner top side of temporary support row's arc bow members is provided with forward upper temporary support crossbeam(4), forward upper temporary support diagonal brace is provided between forward upper temporary support crossbeam and front side temporary support row's arc bow members(5), in front side, the inside lower end of temporary support row's arc bow members is provided with lower front temporary support crossbeam(6), in lower front temporary support crossbeam and inverted arch(2)Between be provided with lower front temporary support diagonal brace(7), in forward upper temporary support crossbeam(4)With upper back temporary support crossbeam(12)Between be provided with the longitudinally connected reinforcing bar in top(16).Easy disassembling, it is reusable.

Description

Weak surrounding rock locally changes the simple temporary support system of arch and its applies method
Technical field
The present invention relates to a kind of support of tunnel system, more particularly to a kind of weak surrounding rock locally changes the simple temporary support system of arch Unite and its apply method.
Background technology
During constructing tunnel, after the completion of being propped up at the beginning of weak surrounding rock, tunnel are run into sometimes, weak surrounding rock can be to first branch knot Extruding is configured to, just branch bow member local subsidence and convergent deformation are often caused, when this occurs, it is necessary to after to deformation The whole Pin bow members of first branch carry out changing arch processing, during arch is changed, due to needing to remove whole Pin bow members, former bow member can be changed Distribution of force, easily occurs cave-in accident, while also existing, cost is high, investment is big, the cycle is long.
The content of the invention
The simple temporary support system of arch is locally changed the invention provides a kind of weak surrounding rock and its method is applied, and solves tunnel The technical problem of cave-in accident easily occurs when the whole Pin bow members of branch change arch processing at the beginning of road.
The present invention is to solve above-mentioned technical problem by the following technical programs:
A kind of weak surrounding rock locally changes the simple temporary support system of arch, including Tunnel body, is provided with Tunnel body first Lining cutting bow member and inverted arch, are formed with local deformation bow member part on first lining cutting bow member, before local deformation bow member part Front side temporary support row's arc bow members are provided with the vault of side, before the inner top side of front side temporary support row's arc bow members is provided with Upper lateral part temporary support crossbeam, is provided with front side between forward upper temporary support crossbeam and front side temporary support row's arc bow members Top temporary support diagonal brace, in front side, the inside lower end of temporary support row's arc bow members is provided with lower front temporary support crossbeam, Lower front temporary support diagonal brace is provided between lower front temporary support crossbeam and inverted arch;In local deformation bow member part Rear side vault at be provided with rear side temporary support row's arc bow members, rear side temporary support row's arc bow members inner top side set There is upper back temporary support crossbeam, be provided between upper back temporary support crossbeam and rear side temporary support row's arc bow members Upper back temporary support diagonal brace, is provided with back lower temporary support horizontal in the inside lower end of rear side temporary support row's arc bow members Beam, is provided with back lower temporary support diagonal brace between back lower temporary support crossbeam and inverted arch;It is interim in forward upper The longitudinally connected reinforcing bar in top, lower front temporary support crossbeam are provided between support beam and upper back temporary support crossbeam The longitudinally connected reinforcing bar in bottom is provided between back lower temporary support crossbeam.
Radial grouting anchor tube is provided with local deformation bow member part.
What a kind of weak surrounding rock locally changed the simple temporary support system of arch applies method, comprises the following steps:
The first step, set at the vault of the front side of local deformation bow member part on front side of temporary support row's arc bow members, face in front side When support row's arc bow members inner top side set forward upper temporary support crossbeam, in forward upper temporary support crossbeam and front side Forward upper temporary support diagonal brace is set between temporary support row's arc bow members, in the inside lower end of front side temporary support row's arc bow members Lower front temporary support crossbeam is set, lower front temporary support is set between lower front temporary support crossbeam and inverted arch Diagonal brace;Temporary support row's arc bow members on rear side of being set at the vault of the rear side of local deformation bow member part, in rear side temporary support The inner top side of row's arc bow members sets upper back temporary support crossbeam, is propped up temporarily with rear side in upper back temporary support crossbeam Setting upper back temporary support diagonal brace between row's arc bow members is supportted, after the inside lower end of rear side temporary support row's arc bow members is set Side lower part temporary support crossbeam, sets back lower temporary support diagonal brace between back lower temporary support crossbeam and inverted arch; The longitudinally connected reinforcing bar in top, lower front are set between forward upper temporary support crossbeam and upper back temporary support crossbeam The longitudinally connected reinforcing bar in bottom is set between temporary support crossbeam and back lower temporary support crossbeam;
Second step, radial direction anchor tube is installed at local deformation bow member part and slip casting is carried out;、
3rd step, the local bow member of prefabricated replacement local deformation bow member part;
4th step, the local deformation bow member part of first lining cutting bow member removed by gas welding, by the replacement that the 3rd step is prefabricated Local bow member is installed at the local deformation bow member part cut off;
5th step, after first lining arch frame is stable and no longer deforms, front side and rear side set by the dismounting first step Temporary support support body.
The present invention replaces entirety to change arch by the local arch that changes, and reduces the construction risk changed in arch engineering, temporary support arch Setting up for frame is simple, the effect that support collapses vault is served well, vault support and stull are using I-steel splicing Into using steel plate and adding bolt connection at node, easy disassembling is reusable, reduces cost, has saved the duration.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention.
Embodiment
The present invention is described in detail below in conjunction with the accompanying drawings:
A kind of weak surrounding rock locally changes the simple temporary support system of arch, including Tunnel body 8, is provided with Tunnel body 8 just Secondary lining cutting bow member 1 and inverted arch 2, are formed with local deformation bow member part 9 on first lining cutting bow member 1, in local deformation bow member portion Front side temporary support row's arc bow members 3 are provided with the vault of points 9 front side, on the inner side of front side temporary support row's arc bow members 3 End is provided with forward upper temporary support crossbeam 4, in forward upper temporary support crossbeam 4 and front side temporary support row's arc bow members 3 Between be provided with forward upper temporary support diagonal brace 5, front side temporary support row's arc bow members 3 inside lower end be provided with front side under Portion's temporary support crossbeam 6, is provided with lower front temporary support diagonal brace between lower front temporary support crossbeam 6 and inverted arch 2 7;Rear side temporary support row's arc bow members 11 are provided with the vault of the rear side of local deformation bow member part 9, are propped up temporarily in rear side Support row's arc bow members 11 inner top side be provided with upper back temporary support crossbeam 12, upper back temporary support crossbeam 12 with Upper back temporary support diagonal brace 13 is provided between rear side temporary support row's arc bow members 11, in rear side temporary support row's arc bow members 11 inside lower end is provided with back lower temporary support crossbeam 14, between back lower temporary support crossbeam 14 and inverted arch 2 It is provided with back lower temporary support diagonal brace 15;In forward upper temporary support crossbeam 4 and upper back temporary support crossbeam 12 Between be provided with the longitudinally connected reinforcing bar 16 in top, lower front temporary support crossbeam 6 and back lower temporary support crossbeam 14 it Between be provided with the longitudinally connected reinforcing bar 17 in bottom.
Radial grouting anchor tube 10 is provided with local deformation bow member part 9.
What a kind of weak surrounding rock locally changed the simple temporary support system of arch applies method, comprises the following steps:
The first step, set at the vault of the front side of local deformation bow member part 9 on front side of temporary support row's arc bow members 3, in front side The inner top side of temporary support row's arc bow members 3 sets forward upper temporary support crossbeam 4, in forward upper temporary support crossbeam 4 Forward upper temporary support diagonal brace 5, the temporary support row's arc bow members 3 in front side are set between front side temporary support row's arc bow members 3 Inside lower end lower front temporary support crossbeam 6 is set, before being set between lower front temporary support crossbeam 6 and inverted arch 2 Side lower part temporary support diagonal brace 7;Temporary support row's arc bow members on rear side of being set at the vault of the rear side of local deformation bow member part 9 11, upper back temporary support crossbeam 12 is set in the inner top side of rear side temporary support row's arc bow members 11, faced in upper back When support beam 12 and rear side temporary support row's arc bow members 11 between upper back temporary support diagonal brace 13 is set, it is interim in rear side Support the inside lower end of row's arc bow members 11 that back lower temporary support crossbeam 14 is set, back lower temporary support crossbeam 14 with Back lower temporary support diagonal brace 15 is set between inverted arch 2;In forward upper temporary support crossbeam 4 and upper back temporary support The longitudinally connected reinforcing bar 16 in top, lower front temporary support crossbeam 6 and back lower temporary support crossbeam are set between crossbeam 12 The longitudinally connected reinforcing bar 17 in bottom is set between 14;
Second step, radial direction anchor tube 10 is installed at local deformation bow member part 9 and slip casting is carried out;、
3rd step, the local bow member of prefabricated replacement local deformation bow member part 9;
4th step, the local deformation bow member part 9 of first lining cutting bow member 1 removed by gas welding, replaced the 3rd step is prefabricated In generation, local bow member was installed at the local deformation bow member part 9 cut off;
5th step, after first lining arch frame 1 is stable and no longer deforms, front side and rear side set by the dismounting first step Temporary support support body.

Claims (3)

1. a kind of weak surrounding rock locally changes the simple temporary support system of arch, including Tunnel body(8), in Tunnel body(8 )In set It is equipped with first lining cutting bow member(1)And inverted arch(2), in first lining cutting bow member(1)On be formed with local deformation bow member part(9), its It is characterised by, in local deformation bow member part(9)Front side vault at be provided with front side temporary support row's arc bow members(3), Front side temporary support row's arc bow members(3)Inner top side be provided with forward upper temporary support crossbeam(4), it is interim in forward upper Support beam(4)With front side temporary support row's arc bow members(3)Between be provided with forward upper temporary support diagonal brace(5), in front side Temporary support row's arc bow members(3)Inside lower end be provided with lower front temporary support crossbeam(6), in lower front temporary support Crossbeam(6)With inverted arch(2)Between be provided with lower front temporary support diagonal brace(7);In local deformation bow member part(9)Rear side Vault at be provided with rear side temporary support row's arc bow members(11), in rear side temporary support row's arc bow members(11)Inner top side set It is equipped with upper back temporary support crossbeam(12), in upper back temporary support crossbeam(12)With rear side temporary support row's arc bow members (11)Between be provided with upper back temporary support diagonal brace(13), in rear side temporary support row's arc bow members(11)Inside lower end set It is equipped with back lower temporary support crossbeam(14), in back lower temporary support crossbeam(14)With inverted arch(2)Between be provided with after Side lower part temporary support diagonal brace(15);In forward upper temporary support crossbeam(4)With upper back temporary support crossbeam(12)It Between be provided with the longitudinally connected reinforcing bar in top(16), lower front temporary support crossbeam(6)With back lower temporary support crossbeam (14)Between be provided with the longitudinally connected reinforcing bar in bottom(17).
2. a kind of weak surrounding rock according to claim 1 locally changes the simple temporary support system of arch, it is characterised in that in office Portion deformation bow member part(9)Place is provided with radial grouting anchor tube(10).
3. what a kind of weak surrounding rock locally changed the simple temporary support system of arch applies method, comprise the following steps:
The first step, in local deformation bow member part(9)Front side vault at set front side temporary support row's arc bow members(3), Front side temporary support row's arc bow members(3)Inner top side set forward upper temporary support crossbeam(4), propped up temporarily in forward upper Support crossbeam(4)With front side temporary support row's arc bow members(3)Between set forward upper temporary support diagonal brace(5), it is interim in front side Support row's arc bow members(3)Inside lower end set lower front temporary support crossbeam(6), in lower front temporary support crossbeam (6)With inverted arch(2)Between set lower front temporary support diagonal brace(7);In local deformation bow member part(9)Rear side vault Place sets rear side temporary support row's arc bow members(11), in rear side temporary support row's arc bow members(11)Inner top side set rear side on Portion's temporary support crossbeam(12), in upper back temporary support crossbeam(12)With rear side temporary support row's arc bow members(11)Between set Postpone upper lateral part temporary support diagonal brace(13), in rear side temporary support row's arc bow members(11)Inside lower end set back lower face When support beam(14), in back lower temporary support crossbeam(14)With inverted arch(2)Between set back lower temporary support it is oblique Support(15);In forward upper temporary support crossbeam(4)With upper back temporary support crossbeam(12)Between set top longitudinally connect Connect reinforcing bar(16), lower front temporary support crossbeam(6)With back lower temporary support crossbeam(14)Between set bottom longitudinal direction Connect reinforcing bar(17);
Second step, in local deformation bow member part(9)Place is installed by radial direction anchor tube(10)And carry out slip casting;、
3rd step, prefabricated replacement local deformation bow member part(9)Local bow member;
4th step, by first lining cutting bow member(1)Local deformation bow member part(9)Removed by gas welding, the 3rd step is prefabricated The local bow member of replacement be installed to the local deformation bow member part cut off(9)Place;
5th step, when first lining arch frame(1)After stablizing and no longer deforming, the front side set by the first step and rear side are removed Temporary support support body.
CN201710400883.9A 2017-05-31 2017-05-31 Weak surrounding rock locally changes the simple temporary support system of arch and its applies method Pending CN107100655A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710400883.9A CN107100655A (en) 2017-05-31 2017-05-31 Weak surrounding rock locally changes the simple temporary support system of arch and its applies method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710400883.9A CN107100655A (en) 2017-05-31 2017-05-31 Weak surrounding rock locally changes the simple temporary support system of arch and its applies method

Publications (1)

Publication Number Publication Date
CN107100655A true CN107100655A (en) 2017-08-29

Family

ID=59660804

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710400883.9A Pending CN107100655A (en) 2017-05-31 2017-05-31 Weak surrounding rock locally changes the simple temporary support system of arch and its applies method

Country Status (1)

Country Link
CN (1) CN107100655A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110617071A (en) * 2019-10-25 2019-12-27 中国水利水电第七工程局成都水电建设工程有限公司 Tunnel expansion rock section arch-changing expanding excavation construction method
CN110966019A (en) * 2019-11-22 2020-04-07 中国铁建重工集团股份有限公司 Single-track railway tunnel half-side soft rock primary support deformation trident arch center treatment method
CN111779510A (en) * 2020-08-05 2020-10-16 湖南科技大学 Primary support invasion limit arch changing method for high liquid limit red clay surrounding rock tunnel
CN116446887A (en) * 2023-06-20 2023-07-18 湖南省交通规划勘察设计院有限公司 Tunnel construction method for existing partial collapse position of primary support section

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005009182A (en) * 2003-06-19 2005-01-13 Shimizu Corp Tunnel supporting structure
JP2005016167A (en) * 2003-06-26 2005-01-20 Shimizu Corp Tunnel timbering structure and tunnel timbering method
CN102733827A (en) * 2012-06-29 2012-10-17 湖南省交通规划勘察设计院 Tunnel arch exchanging construction method and construction structure in tunnel arch exchanging construction
CN103032080A (en) * 2012-12-21 2013-04-10 江苏建筑职业技术学院 Support method of weak and broken surrounding rock tunnel
CN103195432A (en) * 2013-03-08 2013-07-10 中铁二十二局集团第一工程有限公司 Weak surrounding rock, tunnel intersection and arc-shaped pilot tunnel construction method
CN103603679A (en) * 2013-09-17 2014-02-26 中国神华能源股份有限公司 Vault steel frame for support tunnel arch and tunnel construction method
CN105781571A (en) * 2016-03-11 2016-07-20 中交第二公路工程局有限公司 Construction method for soft rock deformation tunnel lining support dismantling-replacing arch
CN105822311A (en) * 2016-05-17 2016-08-03 中铁十五局集团有限公司 In-situ extension construction structure and construction method for extra-large section tunnel with internal opening for increasing working area
CN106401614A (en) * 2016-10-17 2017-02-15 中铁五局集团第五工程有限责任公司 Supporting structure for large-section weak surrounding rock tunnel construction and construction method thereof
CN106640126A (en) * 2016-10-11 2017-05-10 中铁隧道集团有限公司 Processing method for extremely-high geostress soft rock tunnel arch wall lining cracking damage
CN207437103U (en) * 2017-05-31 2018-06-01 中铁二十一局集团第六工程有限公司 Weak surrounding rock locally changes the simple temporary support system of arch

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005009182A (en) * 2003-06-19 2005-01-13 Shimizu Corp Tunnel supporting structure
JP2005016167A (en) * 2003-06-26 2005-01-20 Shimizu Corp Tunnel timbering structure and tunnel timbering method
CN102733827A (en) * 2012-06-29 2012-10-17 湖南省交通规划勘察设计院 Tunnel arch exchanging construction method and construction structure in tunnel arch exchanging construction
CN103032080A (en) * 2012-12-21 2013-04-10 江苏建筑职业技术学院 Support method of weak and broken surrounding rock tunnel
CN103195432A (en) * 2013-03-08 2013-07-10 中铁二十二局集团第一工程有限公司 Weak surrounding rock, tunnel intersection and arc-shaped pilot tunnel construction method
CN103603679A (en) * 2013-09-17 2014-02-26 中国神华能源股份有限公司 Vault steel frame for support tunnel arch and tunnel construction method
CN105781571A (en) * 2016-03-11 2016-07-20 中交第二公路工程局有限公司 Construction method for soft rock deformation tunnel lining support dismantling-replacing arch
CN105822311A (en) * 2016-05-17 2016-08-03 中铁十五局集团有限公司 In-situ extension construction structure and construction method for extra-large section tunnel with internal opening for increasing working area
CN106640126A (en) * 2016-10-11 2017-05-10 中铁隧道集团有限公司 Processing method for extremely-high geostress soft rock tunnel arch wall lining cracking damage
CN106401614A (en) * 2016-10-17 2017-02-15 中铁五局集团第五工程有限责任公司 Supporting structure for large-section weak surrounding rock tunnel construction and construction method thereof
CN207437103U (en) * 2017-05-31 2018-06-01 中铁二十一局集团第六工程有限公司 Weak surrounding rock locally changes the simple temporary support system of arch

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110617071A (en) * 2019-10-25 2019-12-27 中国水利水电第七工程局成都水电建设工程有限公司 Tunnel expansion rock section arch-changing expanding excavation construction method
CN110966019A (en) * 2019-11-22 2020-04-07 中国铁建重工集团股份有限公司 Single-track railway tunnel half-side soft rock primary support deformation trident arch center treatment method
CN110966019B (en) * 2019-11-22 2021-07-02 中铁十八局集团有限公司 Single-track railway tunnel half-side soft rock primary support deformation trident arch center treatment method
CN111779510A (en) * 2020-08-05 2020-10-16 湖南科技大学 Primary support invasion limit arch changing method for high liquid limit red clay surrounding rock tunnel
CN116446887A (en) * 2023-06-20 2023-07-18 湖南省交通规划勘察设计院有限公司 Tunnel construction method for existing partial collapse position of primary support section
CN116446887B (en) * 2023-06-20 2023-09-01 湖南省交通规划勘察设计院有限公司 Tunnel construction method for existing partial collapse position of primary support section

Similar Documents

Publication Publication Date Title
CN107100655A (en) Weak surrounding rock locally changes the simple temporary support system of arch and its applies method
CN103075163B (en) Support change process of second liner construction of large-cross-section tunnel
CN108678771B (en) Primary support and middle partition wall reinforcing support device for tunnel penetrating fault fracture zone
CN108868834B (en) Temporary support device for tunnel arch wall primary support intrusion limit arch changing construction
CN106014446B (en) A kind of reinforcement means of enhancing high ground stress soft rock stress tunnel inverted arch structural stability
CN208502796U (en) Tunnel arch wall preliminary bracing invades limit and changes arch construction gantry type support construction
CN104533450B (en) One-time-concreting construction method of inverted arch low wall of single-track tunnel
CN104847380A (en) Tunnel lining structure internal force reducing structure and construction method thereof
CN104929649A (en) Tunnel transverse cave-to-master cave top brushing construction method and top brushing structure
KR101303448B1 (en) Leading pipe propulsion device and non-open cut pipe installation method of underground structures using the same
CN109139049A (en) A kind of lining of Underground Subway Station two button arch construction method
CN203742611U (en) Strengthening supporting structure for opening ingate on side wall of tunnel under preliminary supporting condition
CN105863677A (en) Strengthening method for preliminary tunnel support
CN108222953B (en) Construction method for U-shaped open shield tunneling machine to pass through nonstandard section of pipe gallery
CN103603997A (en) Construction method of correction by retraction of jack pipes
CN204703922U (en) A kind ofly process the construction corollary equipment that Tunnel invades limit
JP4661937B2 (en) Segment reinforcing method and segment reinforcing structure
CN207437103U (en) Weak surrounding rock locally changes the simple temporary support system of arch
KR100815568B1 (en) The tunel execution method and the using fabric
JP7225356B2 (en) Press bars and struts for open shield construction
CN206477855U (en) A kind of counter-force for pushing away stepping for TBM Quick airs provides device
KR20140082343A (en) Method for constructing tunnel by using pipe
CN110966009B (en) Construction method of bifurcated tunnel
CN106001954B (en) A kind of rail crossbeam manufacture craft partially
CN102562098A (en) Tunnel steel temporary inverted arch with rapid assembly and disassembly

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170829