CN107090980B - A kind of construction slurry hangs connection device - Google Patents
A kind of construction slurry hangs connection device Download PDFInfo
- Publication number
- CN107090980B CN107090980B CN201611247566.XA CN201611247566A CN107090980B CN 107090980 B CN107090980 B CN 107090980B CN 201611247566 A CN201611247566 A CN 201611247566A CN 107090980 B CN107090980 B CN 107090980B
- Authority
- CN
- China
- Prior art keywords
- sleeve pipe
- described sleeve
- rope
- pillar
- outside
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 18
- 239000002002 slurry Substances 0.000 title claims abstract description 10
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims abstract description 16
- 230000007423 decrease Effects 0.000 abstract description 5
- 238000010586 diagram Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000001125 extrusion Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 239000000725 suspension Substances 0.000 description 2
- 238000009435 building construction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
- E04G21/04—Devices for both conveying and distributing
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
- E04G21/04—Devices for both conveying and distributing
- E04G21/0418—Devices for both conveying and distributing with distribution hose
- E04G21/0427—Devices for both conveying and distributing with distribution hose on a static support, e.g. crane
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Tents Or Canopies (AREA)
- Underground Or Underwater Handling Of Building Materials (AREA)
Abstract
The invention discloses a kind of construction slurries to hang connection device, including casing, interconnecting piece is provided at the bottom end die of described sleeve pipe, pillar is combined in the interconnecting piece, pedestal is provided with below the pillar, there are two slippage slots for well-balanced setting on the outside of described sleeve pipe, sliding, which is provided with, in described sleeve pipe hangs extension bar, there are two scimitar portions for well-balanced setting on the outside for hanging extension bar, intert the slippage slot and extend into the outside of described sleeve pipe in the scimitar portion, the outside of described sleeve pipe and a tensioning member is connected between two scimitar portions, the present apparatus to hang extension bar sliding up and down by tensing payout, the decline of mud tank can be realized, it is simple to operate, the adjustable height of mud tank can be adjusted according to different construction requirements and is able to achieve synchronizes fixation, the structure of the present apparatus is relatively simple, cost is more cheap, it is suitable It closes and promotes the use of.
Description
Technical field
The present invention relates to the realm of building construction, in particular to a kind of construction slurry hangs connection device.
Background technique
Mud is commonly used in construction, and mud is elongated on the relatively complete large-scale building site of some auxiliary facilities is
It is transported on floor by Cargo Lift, however is all often logical on the relatively incomplete building site of some small-sized building sites or auxiliary facility
Manpower self carrying is crossed, process not only takes time and effort, but also working efficiency and its low, and also have much makes in the prior art
Mud is conveyed with pulley instrument, but it is not able to satisfy construction personnel and synchronizes fixation for mud tank in external wall construction
Demand, and install it is excessively cumbersome, safety guarantee is not high, and use cost is excessively high.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of construction slurries to hang connection device.
To solve the above problems, the present invention adopts the following technical scheme:
A kind of construction slurry hangs connection device, including casing, interconnecting piece is provided at the bottom end die of described sleeve pipe, described
It is combined with pillar in interconnecting piece, pedestal is provided with below the pillar, there are two sliding for well-balanced setting on the outside of described sleeve pipe
Slot is moved, sliding, which is provided with, in described sleeve pipe hangs extension bar, and there are two scimitar portions for well-balanced setting on the outside for hanging extension bar, described
Scimitar portion interts the slippage slot and extends into the outside of described sleeve pipe, the outside of described sleeve pipe and connects between two scimitar portions
It is connected to a tensioning member, the head of the tensioning member is connected with rope, and the head of described sleeve pipe is provided with mounting groove, in the placement
It is provided with pulley in slot, axle portion is combined between the pulley and the inner sidewall of the mounting groove, the pulley is equipped with annular groove,
The rope leaves the excessively described annular groove of a side hanging of the tensioning member, and bottom end is provided with through slot on the pillar, described
Rope interts the through slot after leaving the excessively described annular groove of a side hanging of the tensioning member, and the rope interts that of the through slot
It is provided with clamping portion on side, the clamping portion is elastic card socket part, is provided in the clamping portion and interts as the rope
Inserting hole, the clamping portion are movably set on the rope, when the through slot is inserted into the clamping portion, so that described
Clamping portion is squeezed and deformed, and the rope is fixedly clamped by the extrusion deformation of the clamping portion, can on the top surface of the pedestal
One is operably provided with around part, it is described around part to will be interspersed with inserting hole the part rope solderless wrapped connection described on part,
To preventing the in disorder stacking of the part for the being interspersed with inserting hole rope, cause the generation of the rope knotting problem, influence with
The use of the rope afterwards.
Preferably, No.1 bolt is combined between the interconnecting piece and the pillar, between the pedestal and the pillar
No. two bolts are combined with, the left and right ends of the pedestal are movable to be equipped with clump weight, the inside of the axle portion and the mounting groove
Wall is fixedly connected, and the midpoint of the axle portion is operably arranged in the pulley.
Preferably, described hang slides cooperation between extension bar and described sleeve pipe, is provided in described sleeve pipe and connects as described hang
The slid chamber that bar slides up and down, the clamping portion have shrinkage.
The beneficial effects of the present invention are: realize the suspension of mud tank by two scimitar portions, then by the pulling of rope,
The upper and lower position in two scimitar portions is changed, extension bar sliding up and down in slid chamber is hung, when needing to rise, rope is pulled to make
It hangs extension bar to slide upwards, then drives and rise, to complete the conveying for mud;It is such as needed in external wall construction to mud tank reality
The position for synchronizing fixed clamping portion mobile after the completion of height adjustment on rope is applied, through slot is inserted into clamping portion, so that clamping
Portion occurs to be squeezed and deformed and clamp rope, so that rope not stretchy, two scimitar portions are fixed on the height of needs at this time
Degree, while mud tank is also suspended in the height of needs, when needing to decline, it is only necessary to extract clamping portion, then move clamping portion
Position on rope is made to hang extension bar downslide by payout, the decline of mud tank can be realized, simple to operate,
The adjustable height of mud tank can be adjusted according to different construction requirements and is able to achieve and synchronizes fixation, and the structure of the present apparatus is more
Simply, cost is more cheap, is suitble to promote the use of.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with
It obtains other drawings based on these drawings.
Fig. 1 is the overall structure diagram that construction slurry of the present invention hangs connection device;
Fig. 2 is the partial enlarged view in Fig. 1 at A;
Fig. 3 is the structural schematic diagram of clamping portion and rope in the present invention.
Fig. 4 is the enlarged diagram of interconnecting piece.
Specific embodiment
The preferred embodiment of the present invention is described in detail with reference to the accompanying drawing, so that advantages and features of the invention energy
It is easier to be readily appreciated by one skilled in the art, so as to make a clearer definition of the protection scope of the present invention.
A kind of construction slurry shown in -4 hangs connection device, including casing 1 refering to fig. 1, sets at the bottom end die of described sleeve pipe 1
It is equipped with interconnecting piece 2, pillar 3 is combined in the interconnecting piece 2, the lower section of the pillar 3 is provided with pedestal 4, described sleeve pipe 1
There are two slippage slots 101 for well-balanced setting on outside, and sliding, which is provided with, in described sleeve pipe 1 hangs extension bar 5, described to hang the outer of extension bar 5
The well-balanced setting in face there are two scimitar portion 501, intert the slippage slot 101 and extend into the outer of described sleeve pipe 1 by the scimitar portion 501
Face, the outside of described sleeve pipe 1 and is connected with a tensioning member 502, the head of the tensioning member 502 between two scimitar portions 501
It is connected with rope 6, the head of described sleeve pipe 1 is provided with mounting groove 102, and pulley 7 is provided in the mounting groove 102, described
Axle portion 103 is combined between pulley 7 and the inner sidewall of the mounting groove 102, the pulley 7 is equipped with annular groove 701, the rope
6 leave the excessively described annular groove 701 of a side hanging of the tensioning member 502, and bottom end is provided with through slot 311, institute on the pillar 3
It states after rope 6 leaves the excessively described annular groove 701 of a side hanging of the tensioning member 502 and interts the through slot 311, the rope 6 is interspersed
Clamping portion 8 is provided on that side of the through slot 311, the clamping portion 8 is elastic card socket part, is arranged in the clamping portion 8
Have and be used as the inserting hole that the rope 6 interts, the clamping portion 8 is movably set on the rope 6, when the clamping portion
8 be inserted into the through slot 311 when so that the clamping portion 8 be squeezed and deformed, the rope 6 by the extrusion deformation of the clamping portion 8 and
It is fixedly clamped, the setting of the inserting hole increases the clamping force between the rope 6 and the clamping portion 8, so that institute
The clamping that clamping portion 8 can the be more preferably more steady rope 6 is stated, one is operably provided on the top surface of the pedestal 4 around part
91, it is described around part 91 to will be interspersed with inserting hole part 6 solderless wrapped connection of rope described on part 91, to prevent from interting
The in disorder stacking of the part of the inserting hole rope 6 out causes the generation of the 6 knotting problem of rope, the rope 6 after influencing
Use.
A preferred embodiment in the present invention is combined with No.1 bolt 201 between the interconnecting piece 2 and the pillar 3,
No. two bolts 401 are combined between the pedestal 4 and the pillar 3, the left and right ends of the pedestal 4 are movable to be equipped with clump weight
402, it is by No.1 bolt 201 that the interconnecting piece 2 is fixed with the pillar 3, by No. two bolts 401 by the pedestal 4 with
The pillar 3 is fixed, can be matched according to practical operation situation by the clump weight 402 of the activity setting on pedestal 4
Weight, to keep the pedestal more firm, the axle portion 103 is fixedly connected with the inner sidewall of the mounting groove 102, the pulley
7 are operably arranged in the midpoint of the axle portion 103, to facilitate the rope 6 that the tensioning member 502 is pulled to go up and down.
A preferred embodiment in the present invention, described hang slide cooperation, described sleeve pipe 1 between extension bar 5 and described sleeve pipe 1
Inside be provided with and be used as the slid chamber 503 hanging about 5 extension bar and sliding, in order to it is described hang extension bar 5 in described sleeve pipe 1 on
To drive two scimitar portions 501 to move up and down, the clamping portion 8 has shrinkage for lower sliding, can preferably be squeezed change
Shape is also convenient for being replaced so that the rope 6 is fixed after the damage of the clamping portion 8.
The beneficial effects of the present invention are: realize the suspension of mud tank by two scimitar portions, then by the pulling of rope,
The upper and lower position in two scimitar portions is changed, extension bar sliding up and down in slid chamber is hung, when needing to rise, rope is pulled to make
It hangs extension bar to slide upwards, then drives and rise, to complete the conveying for mud;It is such as needed in external wall construction to mud tank reality
The position for synchronizing fixed clamping portion mobile after the completion of height adjustment on rope is applied, through slot is inserted into clamping portion, so that clamping
Portion occurs to be squeezed and deformed and clamp rope, so that rope not stretchy, two scimitar portions are fixed on the height of needs at this time
Degree, while mud tank is also suspended in the height of needs, when needing to decline, it is only necessary to extract clamping portion, then move clamping portion
Position on rope is made to hang extension bar downslide by payout, the decline of mud tank can be realized, simple to operate,
The adjustable height of mud tank can be adjusted according to different construction requirements and is able to achieve and synchronizes fixation, and the structure of the present apparatus is more
Simply, cost is more cheap, is suitble to promote the use of.
The basic principles, main features and advantages of the present invention have been shown and described above.The technology of the industry
Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this
The principle of invention, various changes and improvements may be made to the invention without departing from the spirit and scope of the present invention, these changes
Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its
Equivalent defines.
Claims (2)
1. a kind of construction slurry hangs connection device, it is characterised in that: including casing, be provided with connection at the bottom end die of described sleeve pipe
Portion is combined with pillar in the interconnecting piece, and pedestal, well-balanced setting on the outside of described sleeve pipe are provided with below the pillar
There are two slippage slots, and sliding, which is provided with, in described sleeve pipe hangs extension bar, and there are two hooks for well-balanced setting on the outside for hanging extension bar
Sickle portion, the scimitar portion intert the slippage slot and extend into the outside of described sleeve pipe, the outside of described sleeve pipe and in two hooks
A tensioning member is connected between sickle portion, the head of the tensioning member is connected with rope, and the head of described sleeve pipe is provided with mounting groove,
It is provided with pulley in the mounting groove, axle portion, the pulley are combined between the pulley and the inner sidewall of the mounting groove
It is equipped with annular groove, the rope leaves the excessively described annular groove of a side hanging of the tensioning member, is arranged on the pillar close to bottom end
There is a through slot, the rope interts the through slot after leaving the excessively described annular groove of a side hanging of the tensioning member, and the rope interts institute
It states and is provided with clamping portion on that side of through slot, the inserting hole interted as the rope is provided in the clamping portion, in institute
State and be operably provided with one on the top surface of pedestal around part, it is described around part to the part rope that will be interspersed with inserting hole around
It connects described on part;Described hang slides cooperation between extension bar and described sleeve pipe, be provided in described sleeve pipe and connect as described hang
The slid chamber that bar slides up and down, the clamping portion have shrinkage.
2. construction slurry according to claim 1 hangs connection device, it is characterised in that: between the interconnecting piece and the pillar
It is combined with No.1 bolt, No. two bolts are combined between the pedestal and the pillar, the left and right ends of the pedestal are movable
Equipped with clump weight, the axle portion is fixedly connected with the inner sidewall of the mounting groove, and the axis is operably arranged in the pulley
The midpoint in portion.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611247566.XA CN107090980B (en) | 2016-12-29 | 2016-12-29 | A kind of construction slurry hangs connection device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611247566.XA CN107090980B (en) | 2016-12-29 | 2016-12-29 | A kind of construction slurry hangs connection device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107090980A CN107090980A (en) | 2017-08-25 |
CN107090980B true CN107090980B (en) | 2019-05-24 |
Family
ID=59646402
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611247566.XA Active CN107090980B (en) | 2016-12-29 | 2016-12-29 | A kind of construction slurry hangs connection device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107090980B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108487639A (en) * | 2018-04-09 | 2018-09-04 | 陈云珍 | A kind of construction slurry hangs connection device |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000064613A (en) * | 1998-08-25 | 2000-02-29 | Asuku Techno Koji Kk | Spray-coating refractory cement feeder |
CN201062777Y (en) * | 2007-07-17 | 2008-05-21 | 中国二十冶建设有限公司 | Height-adjustable lighting lamp stand for building site |
CN101866595A (en) * | 2010-02-05 | 2010-10-20 | 成都市宇中梅科技有限责任公司 | Liftable slogan bracket |
CN204702430U (en) * | 2015-01-12 | 2015-10-14 | 北京汽车研究总院有限公司 | A kind of hoisting fixture |
CN105257018A (en) * | 2015-10-19 | 2016-01-20 | 陆霞芸 | Support frame capable of being conveniently moved and placed for construction site |
CN105251076A (en) * | 2015-11-17 | 2016-01-20 | 任巧凤 | Infusion hanging device for hospital |
CN205502590U (en) * | 2016-04-20 | 2016-08-24 | 周建南 | Low -noise building material lifting device |
-
2016
- 2016-12-29 CN CN201611247566.XA patent/CN107090980B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000064613A (en) * | 1998-08-25 | 2000-02-29 | Asuku Techno Koji Kk | Spray-coating refractory cement feeder |
CN201062777Y (en) * | 2007-07-17 | 2008-05-21 | 中国二十冶建设有限公司 | Height-adjustable lighting lamp stand for building site |
CN101866595A (en) * | 2010-02-05 | 2010-10-20 | 成都市宇中梅科技有限责任公司 | Liftable slogan bracket |
CN204702430U (en) * | 2015-01-12 | 2015-10-14 | 北京汽车研究总院有限公司 | A kind of hoisting fixture |
CN105257018A (en) * | 2015-10-19 | 2016-01-20 | 陆霞芸 | Support frame capable of being conveniently moved and placed for construction site |
CN105251076A (en) * | 2015-11-17 | 2016-01-20 | 任巧凤 | Infusion hanging device for hospital |
CN205502590U (en) * | 2016-04-20 | 2016-08-24 | 周建南 | Low -noise building material lifting device |
Also Published As
Publication number | Publication date |
---|---|
CN107090980A (en) | 2017-08-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103029099A (en) | Quick dismounting tool for cylinder sleeve of internal combustion engine and realization method thereof | |
CN107090980B (en) | A kind of construction slurry hangs connection device | |
CN103449314A (en) | Telescopic high-rise hoisting machine | |
CN208777679U (en) | A kind of novel building engineering means for fastening scaffolding | |
CN107089583B (en) | A kind of construction slurry hangs connection device | |
CN209047559U (en) | A kind of new teaching dais with expansion function | |
CN106836813B (en) | A kind of construction hangs connection device with mud | |
CN107090979B (en) | A kind of durable building construction slurry hangs connection device | |
CN107090978B (en) | A kind of construction hangs connection device with displaceable mud | |
CN204597384U (en) | Aluminium hydraulic pressed connecting pipe adjuster | |
CN209724201U (en) | A kind of brick-clamping device convenient to overhaul | |
CN204675726U (en) | Purlin lifting auxiliary device | |
CN104456025A (en) | Sling wall-hanging support | |
CN102182406A (en) | Device for replacing and lifting hair plait of oil pumping unit | |
CN201358764Y (en) | Balance weight structure of vertical oil extractor | |
CN106049971B (en) | The installation method of the towering contactless suspender of noble metal tower mast | |
CN203333145U (en) | Self-separation type special lifting tool for cylinder-shaped proximate matter | |
CN208792732U (en) | A kind of limited block for building | |
CN107087947B (en) | A kind of bracketplant bar | |
CN107087949B (en) | A kind of removable bracketplant bar | |
CN106798446B (en) | A kind of simple type bracketplant bar | |
CN210461961U (en) | Pipeline connection construction supporting device | |
CN204607377U (en) | Equalizing bar | |
CN106049970B (en) | The installation method of the towering contactless sling system of noble metal tower mast | |
CN205087792U (en) | Prevent hanging instrument hoisting accessory who bumps |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20190422 Address after: 610500 No. 88 Xindu Street, Xindu Town, Chengdu City, Sichuan Province Applicant after: ZINING CONSTRUCTION GROUP Co.,Ltd. Address before: 510000 B5 building, No. 6, No. 6, Ying Long Road, Tianhe District, Guangzhou, Guangdong (Part 6, floor) Applicant before: GUANGZHOU TUOXUN SECURITY TECHNOLOGY CO.,LTD. |
|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PP01 | Preservation of patent right | ||
PP01 | Preservation of patent right |
Effective date of registration: 20240410 Granted publication date: 20190524 |