CN107090980B - A kind of construction slurry hangs connection device - Google Patents

A kind of construction slurry hangs connection device Download PDF

Info

Publication number
CN107090980B
CN107090980B CN201611247566.XA CN201611247566A CN107090980B CN 107090980 B CN107090980 B CN 107090980B CN 201611247566 A CN201611247566 A CN 201611247566A CN 107090980 B CN107090980 B CN 107090980B
Authority
CN
China
Prior art keywords
sleeve pipe
described sleeve
rope
pillar
outside
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611247566.XA
Other languages
Chinese (zh)
Other versions
CN107090980A (en
Inventor
施洲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zining Construction Group Co ltd
Original Assignee
Zining Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zining Construction Group Co Ltd filed Critical Zining Construction Group Co Ltd
Priority to CN201611247566.XA priority Critical patent/CN107090980B/en
Publication of CN107090980A publication Critical patent/CN107090980A/en
Application granted granted Critical
Publication of CN107090980B publication Critical patent/CN107090980B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • E04G21/04Devices for both conveying and distributing
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • E04G21/04Devices for both conveying and distributing
    • E04G21/0418Devices for both conveying and distributing with distribution hose
    • E04G21/0427Devices for both conveying and distributing with distribution hose on a static support, e.g. crane

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Tents Or Canopies (AREA)
  • Underground Or Underwater Handling Of Building Materials (AREA)

Abstract

The invention discloses a kind of construction slurries to hang connection device, including casing, interconnecting piece is provided at the bottom end die of described sleeve pipe, pillar is combined in the interconnecting piece, pedestal is provided with below the pillar, there are two slippage slots for well-balanced setting on the outside of described sleeve pipe, sliding, which is provided with, in described sleeve pipe hangs extension bar, there are two scimitar portions for well-balanced setting on the outside for hanging extension bar, intert the slippage slot and extend into the outside of described sleeve pipe in the scimitar portion, the outside of described sleeve pipe and a tensioning member is connected between two scimitar portions, the present apparatus to hang extension bar sliding up and down by tensing payout, the decline of mud tank can be realized, it is simple to operate, the adjustable height of mud tank can be adjusted according to different construction requirements and is able to achieve synchronizes fixation, the structure of the present apparatus is relatively simple, cost is more cheap, it is suitable It closes and promotes the use of.

Description

A kind of construction slurry hangs connection device
Technical field
The present invention relates to the realm of building construction, in particular to a kind of construction slurry hangs connection device.
Background technique
Mud is commonly used in construction, and mud is elongated on the relatively complete large-scale building site of some auxiliary facilities is It is transported on floor by Cargo Lift, however is all often logical on the relatively incomplete building site of some small-sized building sites or auxiliary facility Manpower self carrying is crossed, process not only takes time and effort, but also working efficiency and its low, and also have much makes in the prior art Mud is conveyed with pulley instrument, but it is not able to satisfy construction personnel and synchronizes fixation for mud tank in external wall construction Demand, and install it is excessively cumbersome, safety guarantee is not high, and use cost is excessively high.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of construction slurries to hang connection device.
To solve the above problems, the present invention adopts the following technical scheme:
A kind of construction slurry hangs connection device, including casing, interconnecting piece is provided at the bottom end die of described sleeve pipe, described It is combined with pillar in interconnecting piece, pedestal is provided with below the pillar, there are two sliding for well-balanced setting on the outside of described sleeve pipe Slot is moved, sliding, which is provided with, in described sleeve pipe hangs extension bar, and there are two scimitar portions for well-balanced setting on the outside for hanging extension bar, described Scimitar portion interts the slippage slot and extends into the outside of described sleeve pipe, the outside of described sleeve pipe and connects between two scimitar portions It is connected to a tensioning member, the head of the tensioning member is connected with rope, and the head of described sleeve pipe is provided with mounting groove, in the placement It is provided with pulley in slot, axle portion is combined between the pulley and the inner sidewall of the mounting groove, the pulley is equipped with annular groove, The rope leaves the excessively described annular groove of a side hanging of the tensioning member, and bottom end is provided with through slot on the pillar, described Rope interts the through slot after leaving the excessively described annular groove of a side hanging of the tensioning member, and the rope interts that of the through slot It is provided with clamping portion on side, the clamping portion is elastic card socket part, is provided in the clamping portion and interts as the rope Inserting hole, the clamping portion are movably set on the rope, when the through slot is inserted into the clamping portion, so that described Clamping portion is squeezed and deformed, and the rope is fixedly clamped by the extrusion deformation of the clamping portion, can on the top surface of the pedestal One is operably provided with around part, it is described around part to will be interspersed with inserting hole the part rope solderless wrapped connection described on part, To preventing the in disorder stacking of the part for the being interspersed with inserting hole rope, cause the generation of the rope knotting problem, influence with The use of the rope afterwards.
Preferably, No.1 bolt is combined between the interconnecting piece and the pillar, between the pedestal and the pillar No. two bolts are combined with, the left and right ends of the pedestal are movable to be equipped with clump weight, the inside of the axle portion and the mounting groove Wall is fixedly connected, and the midpoint of the axle portion is operably arranged in the pulley.
Preferably, described hang slides cooperation between extension bar and described sleeve pipe, is provided in described sleeve pipe and connects as described hang The slid chamber that bar slides up and down, the clamping portion have shrinkage.
The beneficial effects of the present invention are: realize the suspension of mud tank by two scimitar portions, then by the pulling of rope, The upper and lower position in two scimitar portions is changed, extension bar sliding up and down in slid chamber is hung, when needing to rise, rope is pulled to make It hangs extension bar to slide upwards, then drives and rise, to complete the conveying for mud;It is such as needed in external wall construction to mud tank reality The position for synchronizing fixed clamping portion mobile after the completion of height adjustment on rope is applied, through slot is inserted into clamping portion, so that clamping Portion occurs to be squeezed and deformed and clamp rope, so that rope not stretchy, two scimitar portions are fixed on the height of needs at this time Degree, while mud tank is also suspended in the height of needs, when needing to decline, it is only necessary to extract clamping portion, then move clamping portion Position on rope is made to hang extension bar downslide by payout, the decline of mud tank can be realized, simple to operate, The adjustable height of mud tank can be adjusted according to different construction requirements and is able to achieve and synchronizes fixation, and the structure of the present apparatus is more Simply, cost is more cheap, is suitble to promote the use of.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is the overall structure diagram that construction slurry of the present invention hangs connection device;
Fig. 2 is the partial enlarged view in Fig. 1 at A;
Fig. 3 is the structural schematic diagram of clamping portion and rope in the present invention.
Fig. 4 is the enlarged diagram of interconnecting piece.
Specific embodiment
The preferred embodiment of the present invention is described in detail with reference to the accompanying drawing, so that advantages and features of the invention energy It is easier to be readily appreciated by one skilled in the art, so as to make a clearer definition of the protection scope of the present invention.
A kind of construction slurry shown in -4 hangs connection device, including casing 1 refering to fig. 1, sets at the bottom end die of described sleeve pipe 1 It is equipped with interconnecting piece 2, pillar 3 is combined in the interconnecting piece 2, the lower section of the pillar 3 is provided with pedestal 4, described sleeve pipe 1 There are two slippage slots 101 for well-balanced setting on outside, and sliding, which is provided with, in described sleeve pipe 1 hangs extension bar 5, described to hang the outer of extension bar 5 The well-balanced setting in face there are two scimitar portion 501, intert the slippage slot 101 and extend into the outer of described sleeve pipe 1 by the scimitar portion 501 Face, the outside of described sleeve pipe 1 and is connected with a tensioning member 502, the head of the tensioning member 502 between two scimitar portions 501 It is connected with rope 6, the head of described sleeve pipe 1 is provided with mounting groove 102, and pulley 7 is provided in the mounting groove 102, described Axle portion 103 is combined between pulley 7 and the inner sidewall of the mounting groove 102, the pulley 7 is equipped with annular groove 701, the rope 6 leave the excessively described annular groove 701 of a side hanging of the tensioning member 502, and bottom end is provided with through slot 311, institute on the pillar 3 It states after rope 6 leaves the excessively described annular groove 701 of a side hanging of the tensioning member 502 and interts the through slot 311, the rope 6 is interspersed Clamping portion 8 is provided on that side of the through slot 311, the clamping portion 8 is elastic card socket part, is arranged in the clamping portion 8 Have and be used as the inserting hole that the rope 6 interts, the clamping portion 8 is movably set on the rope 6, when the clamping portion 8 be inserted into the through slot 311 when so that the clamping portion 8 be squeezed and deformed, the rope 6 by the extrusion deformation of the clamping portion 8 and It is fixedly clamped, the setting of the inserting hole increases the clamping force between the rope 6 and the clamping portion 8, so that institute The clamping that clamping portion 8 can the be more preferably more steady rope 6 is stated, one is operably provided on the top surface of the pedestal 4 around part 91, it is described around part 91 to will be interspersed with inserting hole part 6 solderless wrapped connection of rope described on part 91, to prevent from interting The in disorder stacking of the part of the inserting hole rope 6 out causes the generation of the 6 knotting problem of rope, the rope 6 after influencing Use.
A preferred embodiment in the present invention is combined with No.1 bolt 201 between the interconnecting piece 2 and the pillar 3, No. two bolts 401 are combined between the pedestal 4 and the pillar 3, the left and right ends of the pedestal 4 are movable to be equipped with clump weight 402, it is by No.1 bolt 201 that the interconnecting piece 2 is fixed with the pillar 3, by No. two bolts 401 by the pedestal 4 with The pillar 3 is fixed, can be matched according to practical operation situation by the clump weight 402 of the activity setting on pedestal 4 Weight, to keep the pedestal more firm, the axle portion 103 is fixedly connected with the inner sidewall of the mounting groove 102, the pulley 7 are operably arranged in the midpoint of the axle portion 103, to facilitate the rope 6 that the tensioning member 502 is pulled to go up and down.
A preferred embodiment in the present invention, described hang slide cooperation, described sleeve pipe 1 between extension bar 5 and described sleeve pipe 1 Inside be provided with and be used as the slid chamber 503 hanging about 5 extension bar and sliding, in order to it is described hang extension bar 5 in described sleeve pipe 1 on To drive two scimitar portions 501 to move up and down, the clamping portion 8 has shrinkage for lower sliding, can preferably be squeezed change Shape is also convenient for being replaced so that the rope 6 is fixed after the damage of the clamping portion 8.
The beneficial effects of the present invention are: realize the suspension of mud tank by two scimitar portions, then by the pulling of rope, The upper and lower position in two scimitar portions is changed, extension bar sliding up and down in slid chamber is hung, when needing to rise, rope is pulled to make It hangs extension bar to slide upwards, then drives and rise, to complete the conveying for mud;It is such as needed in external wall construction to mud tank reality The position for synchronizing fixed clamping portion mobile after the completion of height adjustment on rope is applied, through slot is inserted into clamping portion, so that clamping Portion occurs to be squeezed and deformed and clamp rope, so that rope not stretchy, two scimitar portions are fixed on the height of needs at this time Degree, while mud tank is also suspended in the height of needs, when needing to decline, it is only necessary to extract clamping portion, then move clamping portion Position on rope is made to hang extension bar downslide by payout, the decline of mud tank can be realized, simple to operate, The adjustable height of mud tank can be adjusted according to different construction requirements and is able to achieve and synchronizes fixation, and the structure of the present apparatus is more Simply, cost is more cheap, is suitble to promote the use of.
The basic principles, main features and advantages of the present invention have been shown and described above.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this The principle of invention, various changes and improvements may be made to the invention without departing from the spirit and scope of the present invention, these changes Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its Equivalent defines.

Claims (2)

1. a kind of construction slurry hangs connection device, it is characterised in that: including casing, be provided with connection at the bottom end die of described sleeve pipe Portion is combined with pillar in the interconnecting piece, and pedestal, well-balanced setting on the outside of described sleeve pipe are provided with below the pillar There are two slippage slots, and sliding, which is provided with, in described sleeve pipe hangs extension bar, and there are two hooks for well-balanced setting on the outside for hanging extension bar Sickle portion, the scimitar portion intert the slippage slot and extend into the outside of described sleeve pipe, the outside of described sleeve pipe and in two hooks A tensioning member is connected between sickle portion, the head of the tensioning member is connected with rope, and the head of described sleeve pipe is provided with mounting groove, It is provided with pulley in the mounting groove, axle portion, the pulley are combined between the pulley and the inner sidewall of the mounting groove It is equipped with annular groove, the rope leaves the excessively described annular groove of a side hanging of the tensioning member, is arranged on the pillar close to bottom end There is a through slot, the rope interts the through slot after leaving the excessively described annular groove of a side hanging of the tensioning member, and the rope interts institute It states and is provided with clamping portion on that side of through slot, the inserting hole interted as the rope is provided in the clamping portion, in institute State and be operably provided with one on the top surface of pedestal around part, it is described around part to the part rope that will be interspersed with inserting hole around It connects described on part;Described hang slides cooperation between extension bar and described sleeve pipe, be provided in described sleeve pipe and connect as described hang The slid chamber that bar slides up and down, the clamping portion have shrinkage.
2. construction slurry according to claim 1 hangs connection device, it is characterised in that: between the interconnecting piece and the pillar It is combined with No.1 bolt, No. two bolts are combined between the pedestal and the pillar, the left and right ends of the pedestal are movable Equipped with clump weight, the axle portion is fixedly connected with the inner sidewall of the mounting groove, and the axis is operably arranged in the pulley The midpoint in portion.
CN201611247566.XA 2016-12-29 2016-12-29 A kind of construction slurry hangs connection device Active CN107090980B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611247566.XA CN107090980B (en) 2016-12-29 2016-12-29 A kind of construction slurry hangs connection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611247566.XA CN107090980B (en) 2016-12-29 2016-12-29 A kind of construction slurry hangs connection device

Publications (2)

Publication Number Publication Date
CN107090980A CN107090980A (en) 2017-08-25
CN107090980B true CN107090980B (en) 2019-05-24

Family

ID=59646402

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611247566.XA Active CN107090980B (en) 2016-12-29 2016-12-29 A kind of construction slurry hangs connection device

Country Status (1)

Country Link
CN (1) CN107090980B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108487639A (en) * 2018-04-09 2018-09-04 陈云珍 A kind of construction slurry hangs connection device

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000064613A (en) * 1998-08-25 2000-02-29 Asuku Techno Koji Kk Spray-coating refractory cement feeder
CN201062777Y (en) * 2007-07-17 2008-05-21 中国二十冶建设有限公司 Height-adjustable lighting lamp stand for building site
CN101866595A (en) * 2010-02-05 2010-10-20 成都市宇中梅科技有限责任公司 Liftable slogan bracket
CN204702430U (en) * 2015-01-12 2015-10-14 北京汽车研究总院有限公司 A kind of hoisting fixture
CN105257018A (en) * 2015-10-19 2016-01-20 陆霞芸 Support frame capable of being conveniently moved and placed for construction site
CN105251076A (en) * 2015-11-17 2016-01-20 任巧凤 Infusion hanging device for hospital
CN205502590U (en) * 2016-04-20 2016-08-24 周建南 Low -noise building material lifting device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000064613A (en) * 1998-08-25 2000-02-29 Asuku Techno Koji Kk Spray-coating refractory cement feeder
CN201062777Y (en) * 2007-07-17 2008-05-21 中国二十冶建设有限公司 Height-adjustable lighting lamp stand for building site
CN101866595A (en) * 2010-02-05 2010-10-20 成都市宇中梅科技有限责任公司 Liftable slogan bracket
CN204702430U (en) * 2015-01-12 2015-10-14 北京汽车研究总院有限公司 A kind of hoisting fixture
CN105257018A (en) * 2015-10-19 2016-01-20 陆霞芸 Support frame capable of being conveniently moved and placed for construction site
CN105251076A (en) * 2015-11-17 2016-01-20 任巧凤 Infusion hanging device for hospital
CN205502590U (en) * 2016-04-20 2016-08-24 周建南 Low -noise building material lifting device

Also Published As

Publication number Publication date
CN107090980A (en) 2017-08-25

Similar Documents

Publication Publication Date Title
CN103029099A (en) Quick dismounting tool for cylinder sleeve of internal combustion engine and realization method thereof
CN107090980B (en) A kind of construction slurry hangs connection device
CN103449314A (en) Telescopic high-rise hoisting machine
CN208777679U (en) A kind of novel building engineering means for fastening scaffolding
CN107089583B (en) A kind of construction slurry hangs connection device
CN209047559U (en) A kind of new teaching dais with expansion function
CN106836813B (en) A kind of construction hangs connection device with mud
CN107090979B (en) A kind of durable building construction slurry hangs connection device
CN107090978B (en) A kind of construction hangs connection device with displaceable mud
CN204597384U (en) Aluminium hydraulic pressed connecting pipe adjuster
CN209724201U (en) A kind of brick-clamping device convenient to overhaul
CN204675726U (en) Purlin lifting auxiliary device
CN104456025A (en) Sling wall-hanging support
CN102182406A (en) Device for replacing and lifting hair plait of oil pumping unit
CN201358764Y (en) Balance weight structure of vertical oil extractor
CN106049971B (en) The installation method of the towering contactless suspender of noble metal tower mast
CN203333145U (en) Self-separation type special lifting tool for cylinder-shaped proximate matter
CN208792732U (en) A kind of limited block for building
CN107087947B (en) A kind of bracketplant bar
CN107087949B (en) A kind of removable bracketplant bar
CN106798446B (en) A kind of simple type bracketplant bar
CN210461961U (en) Pipeline connection construction supporting device
CN204607377U (en) Equalizing bar
CN106049970B (en) The installation method of the towering contactless sling system of noble metal tower mast
CN205087792U (en) Prevent hanging instrument hoisting accessory who bumps

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190422

Address after: 610500 No. 88 Xindu Street, Xindu Town, Chengdu City, Sichuan Province

Applicant after: ZINING CONSTRUCTION GROUP Co.,Ltd.

Address before: 510000 B5 building, No. 6, No. 6, Ying Long Road, Tianhe District, Guangzhou, Guangdong (Part 6, floor)

Applicant before: GUANGZHOU TUOXUN SECURITY TECHNOLOGY CO.,LTD.

GR01 Patent grant
GR01 Patent grant
PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20240410

Granted publication date: 20190524