CN106979747B - Slurry shield earthwork measuring management method - Google Patents

Slurry shield earthwork measuring management method Download PDF

Info

Publication number
CN106979747B
CN106979747B CN201710100205.0A CN201710100205A CN106979747B CN 106979747 B CN106979747 B CN 106979747B CN 201710100205 A CN201710100205 A CN 201710100205A CN 106979747 B CN106979747 B CN 106979747B
Authority
CN
China
Prior art keywords
mud
dregs
earthwork
management method
shield
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710100205.0A
Other languages
Chinese (zh)
Other versions
CN106979747A (en
Inventor
殷红伟
汪星
唐朝恩
赵小浪
魏海澄
朱广文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Municipal Engineering Group Co Ltd
Original Assignee
Guangzhou Municipal Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Municipal Engineering Group Co Ltd filed Critical Guangzhou Municipal Engineering Group Co Ltd
Priority to CN201710100205.0A priority Critical patent/CN106979747B/en
Publication of CN106979747A publication Critical patent/CN106979747A/en
Application granted granted Critical
Publication of CN106979747B publication Critical patent/CN106979747B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B11/00Measuring arrangements characterised by the use of optical techniques
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N9/00Investigating density or specific gravity of materials; Analysing materials by determining density or specific gravity
    • G01N9/02Investigating density or specific gravity of materials; Analysing materials by determining density or specific gravity by measuring weight of a known volume
    • G01N9/04Investigating density or specific gravity of materials; Analysing materials by determining density or specific gravity by measuring weight of a known volume of fluids

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a kind of slurry shield earthwork measuring management methods, this method analyzes dregs volume by 3D laser scanner, the mud volume and specific gravity variation of separation equipment discharge are measured by mud measuring system, by mathematical conversion, soil discharge quantity is obtained in the case where avoiding using nuclear radiation densimeter, solve the quagmire big using difficulty by national regulatory because of special installation, the useful supplement of the measuring management method as shield-tunneling construction monitoring system simultaneously, the automatic monitoring and measurement result real-time display of height, the unearthed situation of shield-tunneling construction is efficiently managed convenient for operator.The present invention is used for constructing metro tunnel field.

Description

Slurry shield earthwork measuring management method
Technical field
The present invention relates to constructing metro tunnel fields, more particularly to a kind of measuring management side of slurry shield soil discharge quantity Method.
Background technique
Shield method is the mainstream construction method of current city constructing metro tunnel, and the Suporting structure generallyd use is divided into soil pressure Balanced shield machine and two kinds of slurry-water balance type shield machine.In shield-tunneling construction, soil discharge quantity is to judge whether to backbreak, and monitoring is opened Whether digging face is one of the important means of stable.
In earth pressure balanced shield, EPBS, the dregs that shield tunneling goes out is put into slag-soil truck by screw machine, through belt conveyor, by Measurement is easy in the volume of slag-soil truck and volume is fixed, so soil discharge quantity data can pass through system in balancing earth-pressure shielding machine construction Counting out navy barrow number can obtain.And slurry-water balance type shield, it is supported and is excavated using mud, the dregs excavated out is mixed with mud The mud and water separating equipment on ground is delivered directly to by pipeline afterwards, point of dregs and mud is realized after mud and water separating equipment is handled From.The dregs that wherein slurry shield excavates out consists of two parts, and a part is the dregs isolated through mud and water separating equipment, separately A part is the particle for continuing to stay in mud.
The soil discharge quantity of usual slurry shield be will according on soil test result, sludge pipe flow instrument and the side such as densitometer Interior flow and density are managed in case measurement, and then find out soil discharge quantity, but since the densitometer being installed on the pipeline generallys use nuclear radiation Densitometer, using needing to handle complicated formality, while country is stringent to the keeping of radiation, the regulatory requirements used, so The device is not configured in most slurry shield equipment.So being badly in need of the new method of one kind to slurry shield construction to realize to row The measuring management of soil amount.
Summary of the invention
The purpose of the present invention is to provide a kind of easy, efficient slurry shield earthwork measuring management methods.
The technical solution used in the present invention is:
Slurry shield earthwork measuring management method, comprising the following steps:
1) by pipeline to surface separation after, the earthwork that Suporting structure is dug out in slurry shield construction is mixed with mud Equipment,
The earthwork is separated into dregs and mud by separation equipment, and dregs is stored in ground place, mud emission to mud pit;
2) the mud volume and specific gravity that, the measurement of mud measuring system is discharged from separation equipment;
3), the volume of 3D laser scanner measurement dregs;
4), mud measuring system and 3D laser scanner are in real time by data transfer to computer;
5), the volume of computer analysis dregs show that weight, the original density of analysis mud volume, specific gravity and mud obtain It is mixed into
The weight of dregs in mud, dregs are added with the dregs in mud and obtain practical soil discharge quantity.
As an improvement of the above scheme, it is excavated simultaneously in step 1) using several Suporting structures, dregs is separately stored, respectively Enclosing is set between heap dregs and sets the scanning range of 3D laser scanner in a computer.
As an improvement of the above scheme, mud measuring system is used using the volume of liquidometer measurement mud in step 2) The specific gravity of electronic hydrometer measurement mud.
As an improvement of the above scheme, the distance between 3D laser scanning surface instrument and dregs are 30~50 meters in step 3), are swashed Photoscanner height is 6~10 meters.
As an improvement of the above scheme, the obstruction sight-line object between 3D laser scanner and dregs is removed.
As an improvement of the above scheme, when Suporting structure excavates in step 1) to the earthwork on locating stratum by Geotechnical properties into Row number.
As an improvement of the above scheme, computer collects earthwork number, acquisition time, ultimately produces and believes including Different Strata The report of breath and soil discharge quantity.
As an improvement of the above scheme, dregs stockyard uses reinforced concrete structure hardened ground field before tunnel excavation Ground.
Beneficial effects of the present invention: this slurry shield earthwork measuring management method analyzes dregs body by 3D laser scanner Product measures the mud volume of separation equipment discharge by mud measuring system and specific gravity changes, by mathematical conversion, avoiding making With soil discharge quantity is obtained in the case where nuclear radiation densimeter, solves and used big tired of difficulty by national regulatory because of special installation Office, while the useful supplement of the measuring management method as shield-tunneling construction monitoring system, the automatic monitoring and measurement knot of height Fruit real-time display efficiently manages the unearthed situation of shield-tunneling construction convenient for operator.
Detailed description of the invention
The present invention will be further explained below with reference to the attached drawings:
Fig. 1 is the ground place distribution schematic diagram of the present embodiment.
Specific embodiment
Referring to figure, the present invention is slurry shield earthwork measuring management method, comprising the following steps:
1) by pipeline to surface separation after, the earthwork that Suporting structure is dug out in slurry shield construction is mixed with mud Equipment,
The earthwork is separated into dregs 2 and mud by separation equipment, and dregs 2 is stored in ground place, mud emission to mud pit;
2) the mud volume and specific gravity that, the measurement of mud measuring system is discharged from separation equipment;
3), 3D laser scanner 3 measures the volume of dregs 2;
4), mud measuring system and 3D laser scanner 3 are in real time by data transfer to computer;
5), the volume of computer analysis dregs 2 show that weight, the original density of analysis mud volume, specific gravity and mud obtain It mixes out
Enter the weight of dregs in mud, dregs 2 is added with the dregs in mud and obtains practical soil discharge quantity.
Separation equipment operating condition is constant, and 2 density constant of dregs isolated is constant, when debugging separation equipment, dregs 2 it is close Degree can take sample measurement, and use for long-term measurement;Original mud density can consult relevant " construction hand in shield-tunneling construction Volume ".
By this cubic metre of earth of measurement method, obtain soil discharge quantity in the case where avoiding using nuclear radiation densimeter, solve because The special installation quagmire big using difficulty by national regulatory, while this cubic metre of earth of management system can be used as shield-tunneling construction monitoring system Useful supplement, the automatic monitoring and measurement result real-time display of height efficiently manage shield-tunneling construction convenient for operator and are unearthed Situation.
In the present embodiment, Suporting structure has two, is each responsible for uplink and downlink two lines.Then the earthwork difference dug out Two separation equipment processing are needed, the dregs 2 that separation equipment is isolated is divided to two heaps to store, and the slag notch of separation equipment is arranged on ground Face place edge, it is desirable that its dregs 2 being discharged is capable of the enclosure wall in closely ground place, forms slope storage, sweeps convenient for 3D laser 3 accurate scanning dregs of instrument, 2 volume is retouched, 2 median rise of dregs is avoided, forms dead angle in the side away from 3D laser scanner 3.
Scan position is set on 3D laser scanner 3, just can reflect 2 volume change of dregs of different heaps.As preferred Embodiment improve the accuracy of measurement to prevent the dregs 2 between different heaps from mixing, set between the dregs 2 of different heaps Set 2 meters high of enclosing 4.Reinforced concrete structure or structure steel fabrication can be used in enclosing 2.
The size in ground place can be adjusted according to specific requirements.In this implementation, ground place be about 45 meters, it is about 35 meters wide, 3D laser scanner 3 is mounted on the about 30 meters of 7 meters of remote high mounting racks of dregs 2, and 3D laser scanner 3 is placed in two slags On line of demarcation among soil 2, guarantee 3D scanner sighting distance to two heap dregs 2 apart from approximately equal;Remove 3D laser scanner 3 with Obstruction sight-line object between dregs 2 guarantees that 3D laser scanner 3 can look down entire ground place.
As preferred embodiment, mud measuring system includes the slurry body using liquidometer measurement discharge in step 2) Product, the specific gravity that mud is measured using electronic hydrometer.
As preferred embodiment, when Suporting structure excavates in step 1) to the earthwork on locating stratum by Geotechnical properties into Row number, computer ultimately produce the report including Different Strata information and corresponding stratum soil discharge quantity etc. information.Above-mentioned report Table is analyzed for shield scientific research and is used.
Can find whether tunnel excavation occurs backbreaking, judges to open in time by real-time monitoring result and notional result comparison Whether digging face is stable, provides decision-making foundation for adjustment boring parameter.It backbreaks especially by the abnormal discovery in time of soil discharge quantity, in time It adopts remedial measures, to reduce and avoid ground that biggish sedimentation occurs.
As preferred embodiment, dregs stockyard uses reinforced concrete structure hardened ground field before tunnel excavation Ground had both prevented ground place sedimentation and deformation, and had influenced the measurement result of 3D laser scanner;It is walked again convenient for vehicle and carries dregs 2.
Certainly, the design creation is not limited to above embodiment, and the combination of the various embodiments described above different characteristic can also To reach good effect.Those skilled in the art can also make equivalent change on the premise of without prejudice to spirit of the invention Shape or replacement, these equivalent variation or replacement are all included in the scope defined by the claims of the present application.

Claims (8)

1. slurry shield earthwork measuring management method, it is characterised in that the following steps are included:
1), the earthwork that Suporting structure is dug out in slurry shield construction is set after mixing with mud by pipeline to surface separation Standby, the earthwork is separated into dregs (2) and mud by the separation equipment, and the dregs (2) is stored in ground place, the mud row It puts to mud pit (1);
2) the mud volume and specific gravity that, the measurement of mud measuring system is discharged from separation equipment;
3), 3D laser scanner (3) measures the volume of the dregs (2);
4), the mud measuring system and 3D laser scanner (3) are in real time by data transfer to computer;
5), the volume of computer analysis dregs (2) obtains weight, analyzes mud volume, the original density of specific gravity and mud Obtain the weight for being mixed into dregs in mud, the dregs (2) is added with the dregs in mud obtains practical soil discharge quantity.
2. slurry shield earthwork measuring management method according to claim 1, it is characterised in that: using several in step 1) A Suporting structure excavates simultaneously, and the dregs (2) is separately stored, and enclosing (4) are arranged between dregs (2) described in each heap and are calculating The scanning range of 3D laser scanner (3) is set in machine.
3. slurry shield earthwork measuring management method according to claim 1 or 2, it is characterised in that: described in step 2) Mud measuring system measures the specific gravity of mud using electronic hydrometer using the volume of liquidometer measurement mud.
4. slurry shield earthwork measuring management method according to claim 1, it is characterised in that: 3D described in step 3) swashs The distance between light surface sweeping instrument and dregs (2) are 30~50 meters, and the laser scanner height is 6~10 meters.
5. slurry shield earthwork measuring management method according to claim 4, it is characterised in that: remove the 3D laser and sweep Retouch the obstruction sight-line object between instrument (3) and dregs (2).
6. slurry shield earthwork measuring management method according to claim 1, it is characterised in that: shield described in step 1) The earthwork on locating stratum is numbered by Geotechnical properties when excavating for equipment.
7. slurry shield earthwork measuring management method according to claim 6, it is characterised in that: the computer collects soil Side's number, acquisition time, ultimately produce the report including Different Strata information and soil discharge quantity.
8. slurry shield earthwork measuring management method according to claim 1, it is characterised in that: the dregs before tunnel excavation Stockyard the ground place is hardened using reinforced concrete structure.
CN201710100205.0A 2017-02-23 2017-02-23 Slurry shield earthwork measuring management method Active CN106979747B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710100205.0A CN106979747B (en) 2017-02-23 2017-02-23 Slurry shield earthwork measuring management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710100205.0A CN106979747B (en) 2017-02-23 2017-02-23 Slurry shield earthwork measuring management method

Publications (2)

Publication Number Publication Date
CN106979747A CN106979747A (en) 2017-07-25
CN106979747B true CN106979747B (en) 2019-04-02

Family

ID=59338710

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710100205.0A Active CN106979747B (en) 2017-02-23 2017-02-23 Slurry shield earthwork measuring management method

Country Status (1)

Country Link
CN (1) CN106979747B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109184709B (en) * 2018-10-29 2020-10-09 中铁电气化局集团有限公司 Shield equipment construction slag discharge monitoring and management system and method
CN110443980B (en) * 2019-07-22 2020-12-01 广州海洋地质调查局 Geological disaster monitoring device based on Internet of things
CN112211672B (en) * 2020-09-24 2023-02-17 广东欣龙隧道装备股份有限公司 Method, system and medium for measuring amount of discharged soil of shield machine
CN113653496B (en) * 2021-08-18 2022-06-07 同济大学 Method for stabilizing whole process of slurry shield tunneling
CN114252140A (en) * 2021-12-24 2022-03-29 西安建筑科技大学 Slurry shield muck metering system and method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1108349A (en) * 1994-03-07 1995-09-13 藤田株式会社 Suporting structure
JP2002004765A (en) * 2000-06-23 2002-01-09 Tokyo Electric Power Co Inc:The Shield pipe jacking system and shield pipe jacking method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1108349A (en) * 1994-03-07 1995-09-13 藤田株式会社 Suporting structure
JP2002004765A (en) * 2000-06-23 2002-01-09 Tokyo Electric Power Co Inc:The Shield pipe jacking system and shield pipe jacking method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
三维激光扫描在土方计算中的应用;胡奎;《矿山测量》;20130228(第1期);70-72
盾构掘进排土量管理技术;陈建;《隧道建设》;20050630;第25卷(第6期);69-71

Also Published As

Publication number Publication date
CN106979747A (en) 2017-07-25

Similar Documents

Publication Publication Date Title
CN106979747B (en) Slurry shield earthwork measuring management method
Walling et al. Use of 137Cs measurements to investigate soil erosion on arable fields in the UK: potential applications and limitations
Bristow et al. Combining ground penetrating radar surveys and optical dating to determine dune migration in Namibia
CN111895979B (en) River stock calculation method based on GF-1 image and height finding satellite
CN104897520A (en) Bicircle shield soil chamber residue soil flow characteristic visual observational experiment system and method
CN101105489B (en) Soil infiltration performance real-time automatic measuring system
CN103543095A (en) Mining spoil heap rainfall infiltration experimental apparatus and method
Hapich et al. Prospective methods for determining water losses from irrigation systems to ensure food and water security of Ukraine
CN116429070A (en) Water resource investigation method and system for coal mining subsidence water accumulation area
Mauri et al. Constraints on density changes in the funnel-shaped caldera inferred from gravity monitoring of the Lusi mud eruption
Fang et al. Assessment of soil redistribution and spatial pattern for a small catchment in the black soil region, Northeastern China: Using fallout 210Pbex
CN204855311U (en) Grain grading detecting system of cubic metre of earth and stone material
CN209028213U (en) A kind of cut and cover method deep basal pit inner lining concrete side wall integration automated watch-keeping facility
CN105717276A (en) Field piece scale slope cropland water and soil loss monitoring system and monitoring method thereof
CN109006315A (en) One kind is for monitoring the dynamic method of sugarcane root growth
Depeng et al. Monitoring slope deformation using a 3-D laser image scanning system: a case study
CN109542995B (en) Method for analyzing landslide of reservoir area
CN111809597A (en) Simple compaction degree self-checking method
Zhan et al. An instrument with constant volume approach for in situ measurement of surface runoff and suspended sediment concentration
Różański et al. Testing the in situ Bulk Density of Mining Waste Stored in Dumping Grounds.
Sai et al. Field hydraulic conductivity tests for compacted soil liners
CN113836629B (en) Pit repairing method, system and storage medium based on solid waste recycling
CN108981659A (en) A kind of measurement method of full-automatic GPS displacement observation equipment
Jakab et al. A review on sheet erosion measurements in Hungary
Schläger et al. Radon exhalation of the uranium tailings dump Digmai, Tajikistan

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant