CN106965300A - The prefabricated edges of boards mould of zigzag - Google Patents
The prefabricated edges of boards mould of zigzag Download PDFInfo
- Publication number
- CN106965300A CN106965300A CN201710353044.6A CN201710353044A CN106965300A CN 106965300 A CN106965300 A CN 106965300A CN 201710353044 A CN201710353044 A CN 201710353044A CN 106965300 A CN106965300 A CN 106965300A
- Authority
- CN
- China
- Prior art keywords
- board
- boss
- cheek board
- prefabricated
- cheek
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/0002—Auxiliary parts or elements of the mould
- B28B7/0014—Fastening means for mould parts, e.g. for attaching mould walls on mould tables; Mould clamps
- B28B7/002—Fastening means for mould parts, e.g. for attaching mould walls on mould tables; Mould clamps using magnets
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/0029—Moulds or moulding surfaces not covered by B28B7/0058 - B28B7/36 and B28B7/40 - B28B7/465, e.g. moulds assembled from several parts
- B28B7/0035—Moulds characterised by the way in which the sidewalls of the mould and the moulded article move with respect to each other during demoulding
- B28B7/0041—Moulds characterised by the way in which the sidewalls of the mould and the moulded article move with respect to each other during demoulding the sidewalls of the mould being moved only parallelly away from the sidewalls of the moulded article
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/0029—Moulds or moulding surfaces not covered by B28B7/0058 - B28B7/36 and B28B7/40 - B28B7/465, e.g. moulds assembled from several parts
- B28B7/0055—Mould pallets; Mould panels
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Moulds, Cores, Or Mandrels (AREA)
Abstract
The present invention relates to a kind of prefabricated edges of boards mould of zigzag, including cheek board, some boss are arranged at intervals with the medial surface of cheek board, the width of the boss is gradually reduced from the connection end on the inside of cheek board to the free end stretched out;Some screwed holes are provided with the cheek board for connecting bolt when being stripped;The boss is to be detachably connected with cheek board;The screwed hole is disposed between boss, and at least one screwed hole is set between two boss;Some stiffener plates are connected between being provided with the outside of the cheek board on the outside of level board, the level board and cheek board;The reserved steel bar that groove is arranged at intervals with the cheek board for prefabricated board passes through.The zigzag side mould bases of the present invention is set conveniently, realizes the overall demoulding, easily and fast, the integrality of prefabricated board has been effectively ensured in stripping operation.
Description
Technical field
The invention belongs to the pattern technical field of building prefabricated components, and in particular to a kind of prefabricated edges of boards mould of zigzag.
Background technology
Pipe gallery, also referred to as " common trench ", " Common Ducts ", i.e., Urban Underground construction one tunnel space, by electric power,
The various utilities pipelines such as communication, combustion gas, heat supply, plumbing are integrated in one, and implement unified planning.
Due in monolithic reinforced concrete structure work progress make many, wet trade more than, it is necessary to largely form work engineering,
The intermediate links such as scaffolding work, waste of resource, the reason such as production environment difference, present pipe gallery is generally first using prefabricated
Double-layered wallboard, upper cover plate build piping lane framework, to substitute segment template engineering, scaffolding work, then again in double-layer overlapped
Close between wallboard, above upper cover plate etc. position cast-in-place concrete to form overall comprehensive pipe gallery structure.Because the later stage also needs to
There are many reserved reinforcing bars outside on cast-in-place operation, prefabricated double-layered wallboard, upper cover plate, it is adjacent that upper cover plate is overlapped on two
When on wallboard, due to being also reserved with longitudinal reinforcement side by side above wallboard, so the corresponding overlap edge edge of upper cover plate need to be prefabricated into
Longitudinal reinforcement above zigzag, wallboard is placed in the concave position at upper cover plate zigzag edge, the zigzag of upper cover plate overlap edge
Depth is identical with the thickness of wallboard, thus considerably increases overlapping area, it is ensured that prefabricated upper cover plate and wallboard upper surface
Amount of lap, it is to avoid the major safety risks inadvertently fallen off due to the few upper cover plate of amount of lap.Current prefabricated upper cover plate serrated edge
The method on edge is to place flitch in cheek board clear width, pushes down flitch with weight when pouring and avoids flitch from moving, first during the demoulding
Cheek board is removed, then removes flitch one by one.There are the following problems for the process of current prefabricated zigzag prefabricated board:
1st, ranging Interval is needed to place flitch every time, it is time-consuming;
Flitch is easily moved when the 2nd, pouring, and causes concave position to change, influence assembling;
3rd, the process for removing flitch one by one takes, and operating difficulties is typically the flitch that hits with a hammer, prefabricated board is easily knocked by mistake,
Influence prefabricated board integrality;
When the 4th, tapping dismounting flitch, flitch cracky, damaged flitch can not be reused.
The content of the invention
For the above-mentioned deficiency of prior art, the purpose of the present invention be by providing a kind of zigzag prefabricated edges of boards mould, with
The solution prefabricated edges of boards mould bases of zigzag, which is set, wastes time and energy, not the technical problem of easy mold release.
The technical proposal of the invention is realized in this way:
Some boss are arranged at intervals with a kind of prefabricated edges of boards mould of zigzag, including cheek board, the medial surface of cheek board, it is described convex
The width of platform, is gradually reduced from the connection end on the inside of cheek board to the free end stretched out;It is provided with the cheek board
Connecting bolt when some screwed holes are used to be stripped.
Above-mentioned technical proposal is further improved, the boss is to be detachably connected with cheek board.
Further, the screwed hole is disposed between boss, and at least one screwed hole is set between two boss.
Further, the ladder that the boss is oppositely arranged in parallel at the rectangular base plate two ends including rectangular base plate, two
Shape end plate, two backs being connected between described two trapezoidal end plates and upper plate;The bottom of the trapezoidal end plate with it is described
Rectangular base plate is connected;The link position of described two backs and upper plate between described two trapezoidal end plates is terraced with described two respectively
The waist of shape end plate is corresponding with upper bottom edge.
Further, it is provided with screwed hole in the rectangular base plate of the boss, the boss is by through right on cheek board
The bolt of via and rectangular base plate upper screwed hole is answered to be detachably connected on the inside of cheek board.
Further, it is connected between being provided with the outside of the cheek board on the outside of level board, the level board and cheek board
Some stiffener plates.
Further, the reserved steel bar that groove is arranged at intervals with the cheek board for prefabricated board passes through.
Compared with prior art, the present invention has the advantages that:
1st, form zigzag boss and install quick, connection positioning is reliable;
2nd, realize cheek board and boss is integrally stripped, easily and fast, the integrality of prefabricated board has been effectively ensured in stripping operation;
3rd, form zigzag boss and cheek board is detachably connected, it is reusable.
Brief description of the drawings
Fig. 1-front view of the embodiment of the present invention;
Fig. 2-top view of the embodiment of the present invention;
Fig. 3-right view of the embodiment of the present invention;
The structural representation of boss in Fig. 4-embodiment of the present invention;
Fig. 5-prefabricated board the schematic diagram with serrated edge edge.
Wherein, 1- cheek boards, 2- boss, 3- screwed holes, 4- rectangular base plates, the trapezoidal end plates of 5-, 6- shaped steel plates, 7- spiral shells
Bolt, 8- levels version, 9- stiffener plates, 10- grooves, 11- reserved steel bars, 12- inner groovies.
Embodiment
The embodiment to the present invention is described in further detail below in conjunction with the accompanying drawings.
Referring to Fig. 1, Fig. 2, the present invention includes being arranged at intervals with some boss 2 on cheek board 1, the medial surface of cheek board 1, convex
The width of platform 2 is diminishing, is gradually reduced, is formed to the free end stretched out from the connection end with the inner side of cheek board 1
Draw taper, is easy to the demoulding;Some screwed holes 3 are provided with cheek board 1 for connecting bolt when being stripped.
Referring to Fig. 4, Fig. 5, the boss 2 include rectangular base plate 4, two parallel relative be weldingly fixed on the two ends of rectangular base plate 4
Trapezoidal end plate 5, two backs and upper plate being connected between two trapezoidal end plates 5;The bottom of trapezoidal end plate 5 and rectangular base plate
4 welding;The link position of two backs and upper plate between two trapezoidal end plates 5 waist respectively with two trapezoidal end plates 5 and upper bottom
Side correspondence, two backs and upper plate are formed by one block of steel plate by bending, the shaped steel plate 6 as an entirety, into shaped steel
Plate 6 is corresponding with the trapezoidal profile of end plate 5, is weldingly fixed between two trapezoidal end plates 5, shaped steel plate 6 is connected with rectangular base plate 4
While also by being welded and fixed, forming a complete cavity.Boss 2 is used for the inner groovy 12 for forming prefabricated board side, each convex
After platform 2 is stripped, an inner groovy 12 is each correspondingly formed, the formation serrated edge of whole inner groovies 12 on prefabricated board side
Edge.
It is provided with two screwed holes in the rectangular base plate 4 of boss 2, boss 2 is by through correspondence via and square on cheek board 1
The spacing that the bolt 7 of the upper screwed hole of shape bottom plate 4 is fixedly connected between the inner side of cheek board 1, boss 2 depends on overlapping with prefabricated board
Wallboard above reserved longitudinal reinforcement spacing.
Referring to Fig. 1, screwed hole 3 is disposed between boss 2, and a screwed hole 3, side are provided between two boss 2
The outside of the boss 2 at the two ends of template 1 is also respectively arranged a screwed hole 3.
The reserved steel bar 11 that be spaced apart referring to Fig. 1, Fig. 5, on cheek board 1 is used for prefabricated board provided with groove 10 passes through, groove
Spacing between 10 depends on the spacing of prefabricated board reserved steel bar 11.
Referring to Fig. 2, Fig. 3, for more preferable resistance to overturning and fixed position, the outside lower end of cheek board 1 is welded with
Level board 8, some stiffener plates 9 are welded between level board 8 and the outside of cheek board 1.
In use, the either end on the prefabricated serrated edge edge of needs can set up Ben Bianmo.It is specific as follows:
1), set up on production platform each template of prefabricated board, needing the one end on prefabricated serrated edge edge to set up cheek board 1,
Cheek board 1 is pushed down level board 8 by high intensity magnetic holder and is fixed on production platform, and the two ends of cheek board 1 are overlapped with other templates.
2), mounting boss 2, will through corresponding via on cheek board 1 and the upper screwed hole of rectangular base plate 4 with two bolts 7
Boss 2 is fixedly connected on the inner side of cheek board 1;The wallboard top that spacing between boss 2 depends on overlapping with prefabricated board is reserved vertical
To the spacing of reinforcing bar, the via of connection boss 2 is opened up by corresponding spacing on cheek board 1 in advance.
3), laying prefabricated board embedded bar is, it is necessary to what reserved reserved steel bar 11 outside was opened up through correspondence on cheek board 1
Groove 10.
4), with rubber by groove 10 pass through reserved steel bar 11 after other spaces fill up, it is to avoid when pouring concrete slurry outflow.
5), be more than with useful thread the bolt of the thickness of cheek board 1, each on cheek board 1 is assembled to from outside to inside
In screwed hole 3, flush or slightly protruding medial surface, be ready for the demoulding, while when also avoiding pouring with the medial surface of cheek board 1
Concrete slurry flows out from screwed hole 3.
6), complete prefabricated board and pour, after concrete reaches expected intensity, high intensity of dismantling magnetic holder, with spanner by side mould
Bolt in the upper screwed hole 3 of plate 1 continues to screw in, and bolt front end withstands concrete, forces cheek board 1 and the boss being fixedly connected 2
Disengaged with concrete, the visual Duan Bianmo has been disengaged with concrete, without being further continued for precession;The remaining bolt of precession one by one,
The overall demoulding of side mould is completed, the integrality of prefabricated board is effectively ensured.
Finally it should be noted that the above embodiment of the present invention is only example, but originally to illustrate the invention
Invention is not limited to above-mentioned specific embodiment, and above-mentioned specific embodiment is only illustrative, rather than restricted, for affiliated neck
For the those of ordinary skill in domain, herein on can also make other various forms of changes and variation, can not give here poor
Lift, it is every to belong to obvious changes or variations that technical scheme amplifies out still in protection model of the invention
The row enclosed.
Claims (7)
1. a kind of prefabricated edges of boards mould of zigzag, including cheek board, it is characterised in that:If being arranged at intervals with the medial surface of cheek board
Dry boss, the width of the boss is gradually reduced from the connection end on the inside of cheek board to the free end stretched out;The side
Some screwed holes are provided with template for connecting bolt when being stripped.
2. the prefabricated edges of boards mould of zigzag according to claim 1, it is characterised in that:The boss and cheek board are detachable
Connection.
3. the prefabricated edges of boards mould of zigzag according to claim 1, it is characterised in that:The screwed hole is disposed on boss
Between, at least one screwed hole is set between two boss.
4. the prefabricated edges of boards mould of zigzag according to claim 1, it is characterised in that:The boss includes rectangular base plate, two
The individual trapezoidal end plate being oppositely arranged in parallel at the rectangular base plate two ends, two backs being connected between described two trapezoidal end plates
And upper plate;The bottom of the trapezoidal end plate is connected with the rectangular base plate;Described two backs and upper plate are described two
Link position between trapezoidal end plate is corresponding with the waist of described two trapezoidal end plates and upper bottom edge respectively.
5. the prefabricated edges of boards mould of zigzag according to claim 4, it is characterised in that:Set in the rectangular base plate of the boss
There is screwed hole, the boss is detachably connected on by the bolt through correspondence via and rectangular base plate upper screwed hole on cheek board
On the inside of cheek board.
6. the prefabricated edges of boards mould of zigzag according to claim 1, it is characterised in that:Level is provided with the outside of the cheek board
Some stiffener plates are connected between on the outside of plate, the level board and cheek board.
7. the prefabricated edges of boards mould of zigzag according to claim 1, it is characterised in that:It is arranged at intervals with the cheek board logical
The reserved steel bar that groove is used for prefabricated board passes through.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710353044.6A CN106965300A (en) | 2017-05-18 | 2017-05-18 | The prefabricated edges of boards mould of zigzag |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710353044.6A CN106965300A (en) | 2017-05-18 | 2017-05-18 | The prefabricated edges of boards mould of zigzag |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106965300A true CN106965300A (en) | 2017-07-21 |
Family
ID=59326146
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710353044.6A Pending CN106965300A (en) | 2017-05-18 | 2017-05-18 | The prefabricated edges of boards mould of zigzag |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106965300A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107030859A (en) * | 2017-05-15 | 2017-08-11 | 中冶建工集团有限公司 | Structure of steel die |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002210721A (en) * | 2001-01-24 | 2002-07-30 | Sekisui House Ltd | Form apparatus for molding concrete block |
CN2621898Y (en) * | 2003-09-16 | 2004-06-30 | 北京凯润天业科技开发有限公司 | Mould for mfg. hollow wall plate |
CN2623435Y (en) * | 2003-09-16 | 2004-07-07 | 北京凯润天业科技开发有限公司 | Mould for producing composite wall panels |
CN2693444Y (en) * | 2004-05-25 | 2005-04-20 | 四川锐视科技开发有限公司 | Adjustable die capable of manufacturing hollow light partition panel of any length |
CN206015525U (en) * | 2016-06-28 | 2017-03-15 | 山东省路桥集团有限公司 | A kind of integral mold plate |
CN206748695U (en) * | 2017-05-18 | 2017-12-15 | 中冶建工集团有限公司 | The prefabricated edges of boards mould of zigzag |
-
2017
- 2017-05-18 CN CN201710353044.6A patent/CN106965300A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002210721A (en) * | 2001-01-24 | 2002-07-30 | Sekisui House Ltd | Form apparatus for molding concrete block |
CN2621898Y (en) * | 2003-09-16 | 2004-06-30 | 北京凯润天业科技开发有限公司 | Mould for mfg. hollow wall plate |
CN2623435Y (en) * | 2003-09-16 | 2004-07-07 | 北京凯润天业科技开发有限公司 | Mould for producing composite wall panels |
CN2693444Y (en) * | 2004-05-25 | 2005-04-20 | 四川锐视科技开发有限公司 | Adjustable die capable of manufacturing hollow light partition panel of any length |
CN206015525U (en) * | 2016-06-28 | 2017-03-15 | 山东省路桥集团有限公司 | A kind of integral mold plate |
CN206748695U (en) * | 2017-05-18 | 2017-12-15 | 中冶建工集团有限公司 | The prefabricated edges of boards mould of zigzag |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107030859A (en) * | 2017-05-15 | 2017-08-11 | 中冶建工集团有限公司 | Structure of steel die |
CN107030859B (en) * | 2017-05-15 | 2019-02-19 | 中冶建工集团有限公司 | Structure of steel die |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206748695U (en) | The prefabricated edges of boards mould of zigzag | |
CN104895318B (en) | Aluminum alloy template system and construction method of same | |
CN106284089B (en) | A kind of steel trestle rapid constructing method | |
CN109252875B (en) | Existing tunnel lining reinforcing structure and reinforcing method | |
CN103016029B (en) | Grouped second liner construction method for large cross-section tunnel | |
CN103075163B (en) | Support change process of second liner construction of large-cross-section tunnel | |
CN103161126A (en) | Road bridge variable section hollow high pier slip-form construction method | |
CN107387117A (en) | A kind of prefabricated assembled tunnel structure in tunnel bottom and its construction method | |
CN104109999A (en) | Construction method for bridge tower transverse beams | |
CN103696359A (en) | Prefabricated and cast-in-place bridge pier structure and construction method | |
CN104153508A (en) | Floor construction structure and method | |
WO2023061002A1 (en) | Large-section tunnel construction method and supporting structure | |
CN104831736A (en) | Support changing method and support changing structure of middle wall of foundation trench | |
CN107191006B (en) | Dismantling and repairing method for refractory concrete layer of diversion trench | |
CN202688844U (en) | Superposed beam stiff skeleton hanging mold integral structure | |
JP7225356B2 (en) | Press bars and struts for open shield construction | |
CN106965300A (en) | The prefabricated edges of boards mould of zigzag | |
CN104453235B (en) | Current conversion station fire wall construction technology | |
CN113738157B (en) | Temporary supports on two sides of post-cast strip of building and method for constructing constructional column by using temporary supports | |
CN212175859U (en) | Fixing device for embedded part on side wall of concrete pipe gallery | |
CN210738077U (en) | Waterproof reverse-edge aluminum alloy hanging die | |
CN103075164B (en) | Double-hole and two-liner sequential isochronous propelling construction process | |
CN114352002A (en) | Handling method for placing scaffold cantilever beam on shear wall | |
CN113339003A (en) | Construction method of tunnel integrated arch sheathing trolley | |
KR100557446B1 (en) | Repair method of bridge bridge system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170721 |
|
RJ01 | Rejection of invention patent application after publication |