CN106958176A - Quick prefabricated pin-connected panel soft base processing method - Google Patents

Quick prefabricated pin-connected panel soft base processing method Download PDF

Info

Publication number
CN106958176A
CN106958176A CN201710056594.1A CN201710056594A CN106958176A CN 106958176 A CN106958176 A CN 106958176A CN 201710056594 A CN201710056594 A CN 201710056594A CN 106958176 A CN106958176 A CN 106958176A
Authority
CN
China
Prior art keywords
processing method
connected panel
soft base
stake
base processing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710056594.1A
Other languages
Chinese (zh)
Inventor
张雁
陈巧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jianhua Building Materials (jiangsu) Co Ltd
Original Assignee
Jianhua Building Materials (jiangsu) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jianhua Building Materials (jiangsu) Co Ltd filed Critical Jianhua Building Materials (jiangsu) Co Ltd
Priority to CN201710056594.1A priority Critical patent/CN106958176A/en
Publication of CN106958176A publication Critical patent/CN106958176A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/04Foundations produced by soil stabilisation
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/10Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure
    • E02D31/12Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure against upward hydraulic pressure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/30Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Architecture (AREA)
  • Road Paving Structures (AREA)

Abstract

A kind of quick prefabricated pin-connected panel soft base processing method, its step includes:Preformed rigid pile driving construction is entered into ground to be onstructed;The stake top periphery soil of preformed rigid stake is flattened, the absolute altitude of periphery soil is less than the absolute altitude of stake top;Prefabricated pile cover is installed in preformed rigid stake, backfill and is somewhat compacted afterwards, makes the absolute altitude of pile cover equal to the soil body absolute altitude after backfill;GSZ is arranged on the foundation surface that the soil body and pile cover are formed, GSZ is paved with whole foundation surface;Construct and fill stratum and be compacted on GSZ;Constructed on the fill stratum constructed embankment fill material, quick prefabricated pin-connected panel treatment of soft foundation is completed after height to the specified altitude for making embankment fill material.Soft soil foundation after the quick prefabricated pin-connected panel soft base processing method processing of the present invention has the reliable advantage of high capacity, intensity, the generation of excess pore water, construct convenient, efficiency high, low engineering cost, stacking and convenient transportation can be effectively eliminated, engineering is handled available for ultra-deep thick-soft base.

Description

Quick prefabricated pin-connected panel soft base processing method
Technical field
The present invention relates to highway subgrade construction project technical field, more particularly to it is a kind of for the quick prefabricated of highway Pin-connected panel soft base processing method.
Background technology
China is dispersed with substantial amounts of weak soil, therefore basement process is frequently problem in civil engineering.In recent decades, Developed rapidly for Soft Soil Subgrade Treatment Techniques, wherein composite foundation technology is most widely used.Typically by matrix(My god Right foundation soil body or the modified subsoil soil body)With reinforcement artificial foundation dimerous.Under load action, base Body and reinforcement shared the effect of load.Composite foundation is divided into vertical reinforcement composite foundation and geosynthetic-reinforced mattress is multiple The class of ground two is closed, and vertical reinforcement composite foundation is divided into discrete material pile(Such as sand pile and broken stone pile)Composite foundation, flexibility Stake(Such as cement mixing method)Composite foundation and rigid pile(Such as prefabricated pile)Three kinds of composite foundation.Wherein:
Discrete material pile has water penetration, low cost and other advantages, can effectively accelerate ground consolidation rate and reduce sand or The liquefaction potential of silt foundation, but have that foundation bearing capacity increase rate is limited, settlement after construction big, the shallow-layer under additional stress effect The problems such as pile body easily expands destruction, the antidetonation for not being suitable for deep liquefied foundation.
Flexible pile has that the construction period is short, low cost, the advantages of larger to the increase rate of foundation bearing capacity, but there is stake Body low intensity(Below 1MPa), the shortcomings of anti-horizontal bearing capacity is poor, pile quality is general, be not suitable for the place of deep soft soil foundation Reason.
Rigid pile(Such as prefabricated pile, cast-in-situ bored pile)It is long with effective length, deform it is small, can give full play to inter-pile soil and It is the features such as bearing capacity of pile-end soil, maximum to the increase rate of foundation bearing capacity.But there is cost height, quality control in cast-in-situ bored pile Difficulty processed is big, work progress can produce substantial amounts of mud rubbish, it is high to environmental requirement the shortcomings of;Although and prefabricated pile pile quality Good, cost is less than cast-in-situ bored pile, but when deep soft soil is constructed, due to the effect for the excess pore water that soil compaction is produced, often goes out The construction quality problem such as pile body floating after the completion of existing construction of prefabricated piles.
The content of the invention
It is an object of the invention to provide a kind of quick prefabricated pin-connected panel soft base processing method, the soft soil foundation after its processing With high capacity, the reliable advantage of intensity, the generation of excess pore water, construct convenient, efficiency high, construction costs can be effectively eliminated Low, stacking and convenient transportation, engineering is handled available for ultra-deep thick-soft base.
To achieve these goals, the present invention provides a kind of quick prefabricated pin-connected panel soft base processing method, and it includes as follows Step:
(1)Preformed rigid pile driving construction is entered into ground to be onstructed;
(2)The stake top periphery soil of preformed rigid stake is flattened, the absolute altitude of periphery soil is less than the absolute altitude of stake top;
(3)Prefabricated pile cover is installed in preformed rigid stake, backfill and is somewhat compacted afterwards, is equal to back the absolute altitude of prefabricated pile cover Soil body absolute altitude after banketing;
(4)GSZ is arranged on the foundation surface that the soil body and prefabricated pile cover are formed, GSZ is paved with whole ground Surface;
(5)Construct and fill stratum and be compacted on GSZ;
(6)Constructed on the fill stratum constructed embankment fill material, make to complete quick after height to the specified altitude of embankment fill material Precast splice type treatment of soft foundation.
Preferably, the step(1)In preformed rigid stake include the matrix that is made up of high-strength concrete and by pervious material Expect the seepy material body being made, the center of described matrix is provided with through the inner chamber of its upper and lower end, and the seepy material body is arranged at The outer surface of matrix or internal chamber wall.
Preferably, the seepy material body runs through the upper and lower end of described matrix.
Preferably, the seepy material body is set to multiple, and multiple seepy material bodies are along outer surface of matrix or inner chamber Wall is circumferentially uniformly distributed.
Preferably, the strength grade of the high-strength concrete is not less than C80.
Preferably, the step(3)In the stake of prefabricated pile cover and the preformed rigid be articulated and connected.
Preferably, the T-shaped structure that card body of the prefabricated pile cover by superposed cap body and positioned at bottom is constituted, it is described Prefabricated pile cover is plugged in the inner chamber upper end of preformed rigid stake by the card body of bottom.
Preferably, the step(5)In fill stratum be made up of multiple filling layers, the thickness of every layer of filler and preformed rigid stake Diameter or the length of side ratio be 1:1.0~2.0.
Preferably, be provided with GSZ between multiple filling layers, the longitudinal pitch of the adjacent GSZ with it is prefabricated just Property stake diameter or the length of side ratio be 1:1.0~3.0.
Preferably, described filler layer is set to 2-15 layers, is made up of earth rock material, chisley soil, sand, industrial residue.
After such scheme, quick prefabricated pin-connected panel soft base processing method of the invention has following excellent beneficial effect:
1st, preformed rigid stake uses prestressing force water penetration pile in quick prefabricated pin-connected panel soft base processing method of the invention, and it is by high-strength mixed The matrix that solidifying soil is made can effectively penetrate the closely knit interlayer in part in soft soil foundation, due to the pervious material being made up of seepy material Material body is the elongated setting in longitudinal direction along matrix, in construction, and vertically downward, the pore water in soil is in longitudinal force for preformed rigid stake Under extruding, longitudinally upward discharged along the seepy material body of preformed rigid stake, it is to avoid preformed rigid stake after the completion of the construction on It is floating;
2nd, in quick prefabricated pin-connected panel soft base processing method of the invention by using GSZ and prefabricated pile cover collective effect, The soil arching effect effect between prefabricated pile cover is substantially increased, soft soil foundation is obtained higher bearing capacity;
3rd, formed in quick prefabricated pin-connected panel soft base processing method of the invention using prefabricated pile cover and preformed rigid stake direct splicing Be articulated and connected, change it is conventional be rigidly connected, while after splicing need not casting concrete again, installation strength is low, install more Facilitate efficiency high, influenceed small by the factor such as weather, site operation environment, artificial, be effectively guaranteed the quality of engineering;
4th, it is high with foundation bearing capacity after using quick prefabricated pin-connected panel soft base processing method soft soil foundation of the invention, resist Horizontal bearing capacity is excellent, low cost, construct it is simple, convenient, economic and environment-friendly the characteristics of.
Brief description of the drawings
Fig. 1 is the structural representation after being constructed with quick prefabricated pin-connected panel soft base processing method embodiment one of the invention;
Fig. 2 for Fig. 1 A-A to cross section structure diagram;
Fig. 3 is the prefabricated pile cap schematic diagram of quick prefabricated pin-connected panel soft base processing method embodiment one of the invention;
Fig. 4 is the fill stratum structural representation of quick prefabricated pin-connected panel soft base processing method embodiment one of the invention;
Fig. 5 illustrates for the cross-sectional structure of the preformed rigid stake of quick prefabricated pin-connected panel soft base processing method embodiment two of the invention Figure;
Fig. 6 is the fill stratum structural representation of quick prefabricated pin-connected panel soft base processing method embodiment two of the invention;
Fig. 7 is the fill stratum structural representation of quick prefabricated pin-connected panel soft base processing method embodiment three of the invention.
Embodiment
The present invention is illustrated below according to accompanying drawing illustrated embodiment.This time disclosed embodiment can consider in all sides Face is illustration, without limitation.The scope of the present invention is not limited by the explanation of implementation below, only by claims Shown in scope, and including having all deformations in the same meaning and right with right.
Quick prefabricated pin-connected panel soft base processing method of the invention is illustrated with reference to specific embodiment.
Embodiment 1
With reference to shown in Fig. 1, quick prefabricated pin-connected panel soft base processing method embodiment one of the invention comprises the following steps:
(1)Multiple preformed rigids stake 1 is entered into ground to be onstructed by construction equipment construction, with reference to shown in Fig. 2, preformed rigid stake 1 includes matrix 2 and the multiple seepy material bodies 3 being made up of seepy material, and the cross section of the preformed rigid stake 1 of the present embodiment is circle Shape, its shape of cross section can also be the shapes such as polygon, belong to the scope of protection of the invention.The center of matrix 2 is provided with and passed through The inner chamber 4 of its upper and lower end is worn, matrix 2 is made up of high-strength concrete, and the strength grade of the high-strength concrete material is not less than C80, The outer surface of matrix 2 is provided with multiple open slots 5 through its upper and lower end, and multiple open slots 5 are respectively along the outer surface of matrix 2 Circumferentially it is uniformly distributed, multiple seepy material bodies 3 are respectively arranged in multiple open slots 5 of the outer surface of matrix 2.Opened in the present embodiment Mouth groove 5 is arranged at the outer surface left and right side of matrix 2, and it is two to set quantity, and seepy material body 3 is correspondingly arranged two.Open slot 5 and seepy material body 3 quantity it can also be provided that more than three, be the scope of protection of the invention.The cross section of open slot 5 Circular arc is shaped as, the cross-sectional area of open slot 5 is more than or equal to the cross-sectional area of seepy material body 3.The present embodiment In, the shape of cross section of seepy material body 3 is fusiformis, and it can also be the shapes such as circle, sector, rectangle, ellipse, be this Invent the scope of protection;
(2)To step(1)In the stake top periphery soil of preformed rigid stake 1 flattened, the absolute altitude of periphery soil is less than stake top Absolute altitude;
(3)Prefabricated pile cover 6 is installed in preformed rigid stake 1, prefabricated pile cover 6 is articulated and connected with preformed rigid stake 1, with reference to Fig. 3 It is shown, the T-shaped structure that card body 8 of the prefabricated pile cover 6 by superposed cap body 7 and positioned at bottom is constituted, prefabricated pile cover 6 is under The card body 8 in portion is plugged in the upper end of the inner chamber 4 of preformed rigid stake 1, backfill and is somewhat compacted afterwards, makes the mark of pre- cap pile cover 6 It is high in the soil body absolute altitude after backfill;
(4)One layer of GSZ 9 is arranged on the foundation surface that the soil body and prefabricated pile cover 6 are formed, is paved with GSZ 9 whole Individual foundation surface;
(5)Construct and fill stratum 10 and be compacted on GSZ 9, wherein fill stratum 10 is made up of multiple filling layers, preferably 2-15 layers Filler is constituted, and thickness and the ratio of the external diameter of preformed rigid stake 1 of every layer of filler are 1:1.0~2.0, with reference to shown in Fig. 4, this reality Example is applied using four layers of filler, first layer filler 11 is earth rock material from top to bottom, and second layer filler 12 is broken(Gravel)Stone soil, the 3rd Layer filler 13 is sand, and the 4th layer of filler 14 is industrial residue;
(6)In step(5)Constructed on the fill stratum 10 constructed embankment fill material 15, make the height of embankment fill material 15 to specified altitude Complete quick prefabricated pin-connected panel treatment of soft foundation afterwards.
Using the comparison such as table of quick prefabricated pin-connected panel soft base processing method of the invention and traditional soft base processing method:
Sequence number Item compared Quick prefabricated pin-connected panel treatment of soft foundation Traditional treatment of soft foundation
1 Duration(My god) 1 1.5
2 Cost(Member/m2 1 1.5
3 Consolidation effect It is good Typically
4 Environmental benefit Neatly, it is environmentally friendly There is certain environmental pollution
Embodiment 2
With reference to shown in Fig. 1, quick prefabricated pin-connected panel soft base processing method embodiment two of the invention comprises the following steps:
(1)Multiple preformed rigids stake 1 is entered into ground to be onstructed by construction equipment construction, with reference to shown in Fig. 5, preformed rigid stake 1 includes matrix 2 and the multiple seepy material bodies 3 being made up of seepy material, and the cross section of the preformed rigid stake 1 of the present embodiment is circle Shape, its shape of cross section can also be the shapes such as polygon, belong to the scope of protection of the invention.The center of matrix 2 is provided with and passed through The inner chamber 4 of its upper and lower end is worn, matrix 2 is made up of high-strength concrete, and the strength grade of the high-strength concrete material is not less than C80, Multiple open slots 5 through its upper and lower end are provided with the internal chamber wall of matrix 2, multiple open slots 5 are respectively along the inner chamber of matrix 2 Wall is circumferentially uniformly distributed, and multiple seepy material bodies 3 are respectively arranged in multiple open slots 5 of the internal chamber wall of matrix 2.In the present embodiment Open slot 5 is arranged at the internal chamber wall left and right side of matrix 2, and it is two to set quantity, and seepy material body 3 is correspondingly arranged two.Opening The quantity of groove 5 and seepy material body 3 is the scope of protection of the invention it can also be provided that more than three.Open slot 5 it is transversal Face is shaped as circular arc, and the cross-sectional area of open slot 5 is more than or equal to the cross-sectional area of seepy material body 3.This implementation In example, the shape of cross section of seepy material body 3 is sector, and it can also be the shapes such as circle, fusiformis, rectangle, ellipse, be The scope of protection of the invention;
(2)To step(1)In the stake top periphery soil of preformed rigid stake 1 flattened, the absolute altitude of periphery soil is less than stake top Absolute altitude;
(3)Prefabricated pile cover 6 is installed in preformed rigid stake 1, prefabricated pile cover 6 is articulated and connected with preformed rigid stake 1, with reference to Fig. 3 It is shown, the T-shaped structure that card body 8 of the prefabricated pile cover 6 by superposed cap body 7 and positioned at bottom is constituted, prefabricated pile cover 6 is under The card body 8 in portion is plugged in the upper end of the inner chamber 4 of preformed rigid stake 1, backfill and is somewhat compacted afterwards, makes the mark of pre- cap pile cover 6 It is high in the soil body absolute altitude after backfill;
(4)One layer of GSZ 9 is arranged on the foundation surface that the soil body and prefabricated pile cover 6 are formed, is paved with GSZ 9 whole Individual foundation surface;
(5)Construct and fill stratum 10 and be compacted on GSZ 9, wherein fill stratum 10 is made up of multiple filling layers, preferably 2-15 layers Filler is constituted, and thickness and the ratio of the external diameter of preformed rigid stake 1 of every layer of filler are 1:1.0~2.0, with reference to shown in Fig. 6, this reality Example is applied using six layers of filler, first layer filler 11 is industrial residue from top to bottom, and second layer filler 12 is broken(Gravel)Stone soil, the 3rd Layer filler 13 is earth rock material, and the 4th layer of filler 14 is gravelly soil, and layer 5 filler 15 is sand, and layer 6 filler 16 is industry Waste residue, layer 7 filler 17 is earth rock material;
(6)In step(5)Constructed on the fill stratum 10 constructed embankment fill material 15, make the height of embankment fill material 15 to specified altitude Complete quick prefabricated pin-connected panel treatment of soft foundation afterwards.
Using the comparison such as table of quick prefabricated pin-connected panel soft base processing method of the invention and traditional soft base processing method:
Sequence number Item compared Quick prefabricated pin-connected panel treatment of soft foundation Traditional treatment of soft foundation
1 Duration(My god) 1 1.5
2 Cost(Member/m2 1 1.5
3 Consolidation effect It is good Typically
4 Environmental benefit Neatly, it is environmentally friendly There is certain environmental pollution
Embodiment 3
With reference to shown in Fig. 1, quick prefabricated pin-connected panel soft base processing method embodiment three of the invention comprises the following steps:
(1)Multiple preformed rigids stake 1 is entered into ground to be onstructed by construction equipment construction, with reference to shown in Fig. 2, preformed rigid stake 1 includes matrix 2 and the multiple seepy material bodies 3 being made up of seepy material, and the cross section of the preformed rigid stake 1 of the present embodiment is circle Shape, its shape of cross section can also be the shapes such as polygon, belong to the scope of protection of the invention.The center of matrix 2 is provided with and passed through The inner chamber 4 of its upper and lower end is worn, matrix 2 is made up of high-strength concrete, and the strength grade of the high-strength concrete material is not less than C80, The outer surface of matrix 2 is provided with multiple open slots 5 through its upper and lower end, and multiple open slots 5 are respectively along the outer surface of matrix 2 Circumferentially it is uniformly distributed, multiple seepy material bodies 3 are respectively arranged in multiple open slots 5 of the outer surface of matrix 2.Opened in the present embodiment Mouth groove 5 is arranged at the outer surface left and right side of matrix 2, and it is two to set quantity, and seepy material body 3 is correspondingly arranged two.Open slot 5 and seepy material body 3 quantity it can also be provided that more than three, be the scope of protection of the invention.The cross section of open slot 5 Circular arc is shaped as, the cross-sectional area of open slot 5 is more than or equal to the cross-sectional area of seepy material body 3.The present embodiment In, the shape of cross section of seepy material body 3 is fusiformis, and it can also be the shapes such as circle, fusiformis, rectangle, ellipse, be this Invent the scope of protection;
(2)To step(1)In the stake top periphery soil of preformed rigid stake 1 flattened, the absolute altitude of periphery soil is less than stake top Absolute altitude;
(3)Prefabricated pile cover 6 is installed in preformed rigid stake 1, prefabricated pile cover 6 is articulated and connected with preformed rigid stake 1, with reference to Fig. 3 It is shown, the T-shaped structure that card body 8 of the prefabricated pile cover 6 by superposed cap body 7 and positioned at bottom is constituted, prefabricated pile cover 6 is under The card body 8 in portion is plugged in the upper end of the inner chamber 4 of preformed rigid stake 1, backfill and is somewhat compacted afterwards, makes the mark of pre- cap pile cover 6 It is high in the soil body absolute altitude after backfill;
(4)Arrangement first floor GSZ 9, is paved with GSZ 9 whole on the foundation surface that the soil body and prefabricated pile cover 6 are formed Individual foundation surface;
(5)Construct and fill stratum 10 and be compacted on GSZ 9, wherein fill stratum 10 is made up of multiple filling layers, preferably 2-15 layers Filler is constituted, and thickness and the ratio of the external diameter of preformed rigid stake 1 of every layer of filler are 1:1.0~2.0, with reference to shown in Fig. 7, this reality Example is applied using five layers of filler, first layer filler 11 is broken from top to bottom(Gravel)Stone soil, second layer filler 12 is earth rock material, the 3rd Layer filler 13 is sand, and the 4th layer of filler 14 is industrial residue, and layer 5 filler 15 is earth rock material;Wherein first layer filler 11 The second GSZ 18 is provided between second layer filler 12, is provided between third layer filler 13 and the 4th layer of filler 14 The longitudinal pitch of three GSZs 19, the second GSZ 18 and the 3rd GSZ 19 and the ratio of the diameter of preformed rigid stake 1 It is worth for 1:1.0~3.0;
(6)In step(5)Construction embankment fill material 15, makes after height to the specified altitude of embankment fill material 15 on the fill stratum constructed Complete quick prefabricated pin-connected panel treatment of soft foundation.
Using the comparison such as table of quick prefabricated pin-connected panel soft base processing method of the invention and traditional soft base processing method:
Sequence number Item compared Quick prefabricated pin-connected panel treatment of soft foundation Traditional treatment of soft foundation
1 Duration(My god) 1 1.5
2 Cost(Member/m2 1 1.5
3 Consolidation effect It is good Typically
4 Environmental benefit Neatly, it is environmentally friendly There is certain environmental pollution
There is advantages below as the quick prefabricated pin-connected panel soft base processing method of the invention described by the various embodiments described above:
1st, the preformed rigid stake used in quick prefabricated pin-connected panel soft base processing method of the invention 1 for prestressing force water penetration pile, its by The matrix 2 that high-strength concrete is made can effectively penetrate the closely knit interlayer in part in soft soil foundation, due to being made up of seepy material Seepy material body 3 be along matrix 2 longitudinal direction it is elongated set, in construction, preformed rigid stake 1 vertically downward, the hole in soil Water longitudinally upward discharges under the extruding of longitudinal force along the seepy material body 3 of preformed rigid stake 1, it is to avoid preformed rigid stake 1 Floated after the completion of construction;
2nd, by using GSZ 9 and the common work of prefabricated pile cover 6 in quick prefabricated pin-connected panel soft base processing method of the invention With or using GSZ 9, the second GSZ 18, the 3rd GSZ 19 and the collective effect of prefabricated pile cover 6, greatly improve Soil arching effect effect between prefabricated pile cover 6, makes soft soil foundation obtain higher bearing capacity;
3rd, using prefabricated pile cover 6 and preformed rigid 1 direct splicing shape of stake in quick prefabricated pin-connected panel soft base processing method of the invention Into being articulated and connected, change it is conventional be rigidly connected, while after splicing need not casting concrete again, installation strength is low, install More convenient efficiency high, is influenceed small by the factor such as weather, site operation environment, artificial, is effectively guaranteed the quality of engineering;
4th, it is high with foundation bearing capacity after using quick prefabricated pin-connected panel soft base processing method soft soil foundation of the invention, resist Horizontal bearing capacity is excellent, low cost, construct it is simple, convenient, economic and environment-friendly the characteristics of.
Those skilled in the art will readily occur to its of the present invention after considering specification and putting into practice invention disclosed herein Its embodiment.The application be intended to the present invention any modification, purposes or adaptations, these modifications, purposes or Person's adaptations follow the general principle of the present invention and including undocumented common knowledge or usual in the art Technological means.Description and embodiments are considered only as exemplary, and true scope and spirit of the invention are pointed out by claim.
It should be appreciated that the invention is not limited in the embodiment method being described above, structure, and in the accompanying drawings The precision architecture shown, and various modifications and changes can be being carried out without departing from the scope.The scope of the present invention is only by appended Claim limit.

Claims (10)

1. a kind of quick prefabricated pin-connected panel soft base processing method, it is characterised in that comprise the following steps:
(1)Preformed rigid pile driving construction is entered into ground to be onstructed;
(2)The stake top periphery soil of preformed rigid stake is flattened, the absolute altitude of periphery soil is less than the absolute altitude of stake top;
(3)Prefabricated pile cover is installed in preformed rigid stake, backfill and is somewhat compacted afterwards, is equal to back the absolute altitude of prefabricated pile cover Soil body absolute altitude after banketing;
(4)GSZ is arranged on the foundation surface that the soil body and prefabricated pile cover are formed, GSZ is paved with whole ground Surface;
(5)Construct and fill stratum and be compacted on GSZ;
(6)Constructed on the fill stratum constructed embankment fill material, make to complete quick after height to the specified altitude of embankment fill material Precast splice type treatment of soft foundation.
2. quick prefabricated pin-connected panel soft base processing method according to claim 1, it is characterised in that the step(1)In Preformed rigid stake include the matrix being made up of high-strength concrete and the seepy material body being made up of seepy material, described matrix Center is provided with through the inner chamber of its upper and lower end, and the seepy material body is arranged at outer surface or the internal chamber wall of matrix.
3. quick prefabricated pin-connected panel soft base processing method according to claim 2, it is characterised in that the seepy material body Through the upper and lower end of described matrix.
4. quick prefabricated pin-connected panel soft base processing method according to claim 3, it is characterised in that the seepy material body It is set to multiple, multiple seepy material bodies are circumferentially uniformly distributed along outer surface of matrix or internal chamber wall.
5. quick prefabricated pin-connected panel soft base processing method according to claim 4, it is characterised in that the high-strength concrete Strength grade be not less than C80.
6. quick prefabricated pin-connected panel soft base processing method according to claim 2, it is characterised in that the step(3)In The stake of prefabricated pile cover and the preformed rigid be articulated and connected.
7. quick prefabricated pin-connected panel soft base processing method according to claim 6, it is characterised in that the prefabricated pile cover by The T-shaped structure that superposed cap body and card body positioned at bottom are constituted, the prefabricated pile cover is plugged in by the card body of bottom The inner chamber upper end of preformed rigid stake.
8. quick prefabricated pin-connected panel soft base processing method according to claim 1, it is characterised in that the step(5)In Fill stratum be made up of multiple filling layers, the thickness of every layer of filler is 1 with the diameter of preformed rigid stake or the ratio of the length of side:1.0 ~2.0.
9. quick prefabricated pin-connected panel soft base processing method according to claim 8, it is characterised in that set between multiple filling layers GSZ is equipped with, longitudinal pitch and the diameter of preformed rigid stake or the ratio of the length of side of the adjacent GSZ are 1: 1.0~3.0.
10. quick prefabricated pin-connected panel soft base processing method according to claim 9, it is characterised in that described filler layer is set 2-15 layers are set to, is made up of earth rock material, chisley soil, sand, industrial residue.
CN201710056594.1A 2017-01-25 2017-01-25 Quick prefabricated pin-connected panel soft base processing method Pending CN106958176A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710056594.1A CN106958176A (en) 2017-01-25 2017-01-25 Quick prefabricated pin-connected panel soft base processing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710056594.1A CN106958176A (en) 2017-01-25 2017-01-25 Quick prefabricated pin-connected panel soft base processing method

Publications (1)

Publication Number Publication Date
CN106958176A true CN106958176A (en) 2017-07-18

Family

ID=59481633

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710056594.1A Pending CN106958176A (en) 2017-01-25 2017-01-25 Quick prefabricated pin-connected panel soft base processing method

Country Status (1)

Country Link
CN (1) CN106958176A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110004918A (en) * 2019-04-25 2019-07-12 南京林业大学 A kind of rigid pile composite foundation assembled pile cover and its assemble method
CN110130304A (en) * 2019-04-09 2019-08-16 李志鹏 A kind of concrete soft base processing method
CN110965398A (en) * 2019-11-25 2020-04-07 中南大学 Expansive soil foundation structure containing ballastless track roadbed and construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101967824A (en) * 2010-09-27 2011-02-09 浙江大学 Large-diameter thin-wall cylindrical pile mesh combined structure with pile cap and construction method thereof
CN201972147U (en) * 2011-02-28 2011-09-14 武汉市政工程设计研究院有限责任公司 Draining precast pile for road soft foundation processing
CN103912004A (en) * 2013-07-18 2014-07-09 刘春原 Rivet pile
CN204780865U (en) * 2015-07-06 2015-11-18 建华建材投资有限公司 Precast concrete pile cap
CN205530223U (en) * 2016-02-16 2016-08-31 上海市城市建设设计研究总院 Self tapping steel -pipe pile

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101967824A (en) * 2010-09-27 2011-02-09 浙江大学 Large-diameter thin-wall cylindrical pile mesh combined structure with pile cap and construction method thereof
CN201972147U (en) * 2011-02-28 2011-09-14 武汉市政工程设计研究院有限责任公司 Draining precast pile for road soft foundation processing
CN103912004A (en) * 2013-07-18 2014-07-09 刘春原 Rivet pile
CN204780865U (en) * 2015-07-06 2015-11-18 建华建材投资有限公司 Precast concrete pile cap
CN205530223U (en) * 2016-02-16 2016-08-31 上海市城市建设设计研究总院 Self tapping steel -pipe pile

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130304A (en) * 2019-04-09 2019-08-16 李志鹏 A kind of concrete soft base processing method
CN110004918A (en) * 2019-04-25 2019-07-12 南京林业大学 A kind of rigid pile composite foundation assembled pile cover and its assemble method
CN110965398A (en) * 2019-11-25 2020-04-07 中南大学 Expansive soil foundation structure containing ballastless track roadbed and construction method
CN110965398B (en) * 2019-11-25 2021-04-06 中南大学 Expansive soil foundation structure containing ballastless track roadbed and construction method

Similar Documents

Publication Publication Date Title
CN204059124U (en) A kind of sand drain strong rammer grouting behind shaft or drift lining foundation reinforcing structure
CN108560542B (en) Waste tire coated building slag bidirectional reinforcement and construction method thereof
CN105625294A (en) Composite foundation and construction method thereof
CN115288162B (en) Reinforcing method for soft soil foundation filling side slope
CN103015396A (en) Construction method of soft foundation
CN104532714B (en) Roadbed structure for treating deep soft soil karst foundation
CN104060601B (en) The construction method of utilizing precast construction stake pile foundation to carry out ground processing
CN107700480A (en) A kind of concrete-pile suitable for basement process
CN106676993A (en) Roadbed reinforcing system of reinforced gravel framework structure and reinforcing method of roadbed reinforcing system
CN106958176A (en) Quick prefabricated pin-connected panel soft base processing method
CN101200888A (en) Construction method of composite foundation
CN111379253A (en) Construction method for high-speed railway expanded cement slurry post-grouting discrete material pile composite foundation
CN201339186Y (en) Soft rock concrete replacement pile composite foundation
CN102966109A (en) Method for constructing zonal deep foundation pit bottom sealing of soft soil foundation
CN104695417A (en) Post-grouting gravel pile composite foundation, post-grouting gravel pile and manufacturing method of post-grouting gravel pile
WO2017133373A1 (en) Small-diameter pile cluster used for pile foundation, and method for construction thereof
CN111005359A (en) Anti-collapse hole foundation reinforcing structure for building engineering construction and reinforcing method thereof
CN211816368U (en) Ecological environment-friendly foundation structure for reinforcing soft foundation
CN1743561A (en) Column-hammer forced tamping substitution method
CN205420939U (en) Roadbed structure of crowded native bored concrete pile stake net of bidirectional screw
CN103966997B (en) The construction method of ground processing is carried out in utilization with the perfusion engineering pile of steel bushing
CN106703024B (en) Construction process of slurry-solidified gravel composite pile
CN106337409A (en) Method for treating peat soil foundation through preloading in combination with salt piles
CN113073639A (en) Stepped loess foundation reinforcing method and built variable-rigidity combined pile composite foundation
CN104153359B (en) Construction method of prestressed concrete sparse-rebar pile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 212413 Development Zone along the Yangtze River, Shu Shu Town, Jiangsu, Jurong

Applicant after: Jianhua building materials (China) Co., Ltd.

Address before: 212003 Development Zone along the Yangtze River, Shu Shu Town, Zhenjiang, Jiangsu, Jurong

Applicant before: Jianhua building materials (Jiangsu) Co., Ltd.

CB02 Change of applicant information
RJ01 Rejection of invention patent application after publication

Application publication date: 20170718

RJ01 Rejection of invention patent application after publication