[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN106910009A - Construction manpower management system based on BIM technology and its method for manpower management of constructing - Google Patents

Construction manpower management system based on BIM technology and its method for manpower management of constructing Download PDF

Info

Publication number
CN106910009A
CN106910009A CN201710060355.3A CN201710060355A CN106910009A CN 106910009 A CN106910009 A CN 106910009A CN 201710060355 A CN201710060355 A CN 201710060355A CN 106910009 A CN106910009 A CN 106910009A
Authority
CN
China
Prior art keywords
construction
management module
labour
management
bim technology
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710060355.3A
Other languages
Chinese (zh)
Inventor
陆征宇
芦继忠
秦康
王寿昌
梁伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fifth Construction Engineering Co of Guangxi Construction Engineering Group
Original Assignee
Fifth Construction Engineering Co of Guangxi Construction Engineering Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fifth Construction Engineering Co of Guangxi Construction Engineering Group filed Critical Fifth Construction Engineering Co of Guangxi Construction Engineering Group
Priority to CN201710060355.3A priority Critical patent/CN106910009A/en
Publication of CN106910009A publication Critical patent/CN106910009A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06316Sequencing of tasks or work
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/105Human resources
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

A kind of construction manpower management system based on BIM technology, including manpower management system, the work force information of the manpower management system are associated with the BIM set up with BIM technology, constitute the construction manpower management system based on BIM technology;The manpower management system includes Workforce Planning management module, labour service contract management module, educational training management module, gate control system management module, live dynamic management module and labor cost management module;The construction manpower management method of the system is comprised the following steps:A:Create the preliminary preparation of the construction manpower management system based on BIM technology;B:Create the construction manpower management system based on BIM technology;C:The dynamic management of the construction manpower management system based on BIM technology.The present invention can allow project under construction after with the system, quickly and easily obtain manpower management key message, realize construction labour's fine-grained management.

Description

Construction manpower management system based on BIM technology and its for work solenoid of constructing The method of reason
Technical field
The present invention relates to information management technique, particularly a kind of construction manpower management system based on BIM technology and its For the method for manpower management of constructing.
Background technology
Construction labour is the directory operator of engineering construction, is also the straight of construction quality, progress, safety and civilized construction Meet guarantor.Whether reasonable the progress control and cost management to engineering of labour's configuration be most important.Therefore, work solenoid Reason is a key factor of whole engineering construction.Manpower management is more complicated, emphasis post in project management process (Project manager, security official, Project Surveillance)Using not timing mobile office pattern, normal produced problem has attendance checking difficult Degree is big, time examination data is inaccurate with the disconnection of project under construction progress msg, examination data etc..Problem above increases construction item Purpose management difficulty and legal risk, cause the waste of construction cost, constrain the development of construction enterprises.
BIM technology(BIM technology)Be based on every relevant information data of construction-engineering project, Set up the BUILDINGS MODELS of three-dimensional, the real information having by digital information analogue simulation building.BIM technology is by engineering All information and data of Life cycle, create into a database for various dimensions structuring, by treatment, integral data, Systematization, real time implementation, mobilism can be realized, report data and graph data can be on the internet management platforms based on BIM It is shared, provide data qualification to project fine-grained management and support.Manpower management information in Construction Process of Engineering Project More numerous and diverse, data discrete, communication are inaccessible, the phenomenon of existence information tomography.
Patent publication No. is " CN 102819775A ", patent name is " engineering project allocation of labor resources management system And its framework " Chinese patent include:Data inputting module, storage module, manpower resources management module, only realize work The association of journey budget, Construction of Engineering Projects is a dynamic process, cost and progress real-time change, and manpower management is also therewith Change, the configuration of labour needs to be made overall arrangements according to Construction of Engineering Projects progress;This patent cannot realize that labour teaches The function of training is educated, labour's educational training is one of most important content in job site, and it determines labour troop entirety The height of quality, safety, quality, technology etc. are all closely bound up therewith;This patent cannot realize the function of labour's salary management, Labour's wage is the sensitive information of manpower management, if without properly effectively being managed for labour's wage, gently Then engineering project progress is delayed, heavy then the engineering project is caused unnecessary legal risk.This patent is routine use Manpower management transplanting model to computer program on so that the sequencing and standardization of manpower management, it is impossible to be based on The cost of BIM is effectively associated with progress control, but cannot more realize the three-dimensional visualization of manpower management.
Patent publication No. is " CN 104200320A ", patent name is " construction industry personal information and Work attendance management system " Chinese patent include:Personnel information management module, attendance data management module, system management module, above-mentioned functions module is only It is controlled and manages for the labor service personnel and vehicle of job site, management process is not clear and definite enough, each module does not form system One entirety, has been short of in management method in addition, is not based on BIM model interactions cost and enters in Workforce Planning management aspect Degree information, it is impossible to according to the feature of project under construction, is precisely calculated Workforce Planning input amount, planning chart of exporting manpower, and increases The randomness that labour uses is added, the difficulty of manpower management of constructing still is present, the waste of the construction cost that causes to know clearly.
The content of the invention
It is an object of the invention to provide " based on BIM technology construction manpower management system and its for construct work The method of power management ", can be applied to BIM models, give full play to the construction and management advantage based on BIM technology, realize applying The overall salary strategy of work process, thoroughly changes the randomness and threshold of job site practitioner, helps to form real high-quality Labour troop, the construction labour to project effectively managed, reasonable arrangement construction team continuous productive process, by operation, Subregion, flowing water section crossed construction, realize the whole process supervision at project under construction scene, it is ensured that project under construction milestone constructing aims Completion.
The technical scheme for solving the above problems is:A kind of construction manpower management system based on BIM technology, including work Power management system, the work force information of the manpower management system is associated with the BIM set up with BIM technology, structure Into the construction manpower management system based on BIM technology.
Its further technical scheme:The manpower management system includes Workforce Planning management module, labour service contract pipe Reason module, educational training management module, gate control system management module, live dynamic management module and labor cost management module;
The Workforce Planning management module, for obtaining Workforce Planning table;
The labour service contract management module, for obtaining labour service contract information, sets up labour service contract storehouse;
The educational training management module, for obtaining academic title's certificate, professional certificate, educational training information, exports training program Table, safety education planning chart;
The gate control system management module, for obtaining the job site information that comes in and goes out, output discrepancy job site record sheet;
The live dynamic management module, the labor distribution figure for obtaining Dynamic Announce, real-time statistics labour is actual to disappear Consumption information, draws labour's actual consumption curve;
The labor cost management module, for obtaining work attendance, wage information, output attendance record table, payroll statistics table, wage Provide registration form.
Related another technical scheme is:A kind of construction manpower management method based on BIM technology, it is above-mentioned base The management method of construction labour is realized in the construction manpower management system of BIM technology, its step includes:
A:Create the preliminary preparation of the construction manpower management system based on BIM technology:
A1:According to Design of Construction Organization file, construction special scheme, Discourse of Enterprise's ration and construction Deepen Design model based on BIM Draft Workforce Planning establishment, the Workforce Planning table that generation is drafted;
A2:According to similar engineering experience, enterprise construction quota, construction schedule, Workforce Planning is balanced and is optimized; With reference to construction operation aspect product, the working face needed for one, construction simulation field workforce distribution situation, with guiding construction;
B:Create the construction manpower management system based on BIM technology:The Workforce Planning table that will be drafted in step A associate to After the work progress model that BIM technology is set up, the construction manpower management model based on BIM technology is created, constitute and be based on BIM skills The construction manpower management system of art, realizes the dynamic management of labour;
C:The dynamic management of the construction manpower management system based on BIM technology:
C1:Construction cost information, progress msg are associated into the construction manpower management system based on BIM technology, the system It is accurate calculate per diem, cost consumption situation under the moon or season schedule task, realize cost of building projects and progress monitoring Target;
C2:It is that identification code gathers labour's essential information with ID card No., project labour's database is set up, by being based on The internet management platform of BIM, typing simultaneously stores the information such as labour contract, safety education, work attendance, paying out wages, realizes work The fine-grained management of power.
The further technical scheme of the construction manpower management method based on BIM technology:The construction based on BIM technology Manpower management system includes Workforce Planning management module, labour service contract management module, educational training management module, gate inhibition system System management module, live dynamic management module and labor cost management module;
The Workforce Planning management module, for obtaining Workforce Planning table;
The labour service contract management module, for obtaining labour service contract information, sets up labour service contract storehouse;
The educational training management module, for obtaining academic title's certificate, professional certificate, educational training information, exports training program Table, safety education planning chart;
The gate control system management module, for obtaining the job site information that comes in and goes out, output discrepancy job site record sheet;
The live dynamic management module, the labor distribution figure for obtaining Dynamic Announce, real-time statistics labour is actual to disappear Consumption information, draws labour's actual consumption curve;
The labor cost management module, for obtaining work attendance, wage information, output attendance record table, payroll statistics table, wage Provide registration form.
" the construction manpower management system based on BIM technology and its method for manpower management of constructing " of the present invention Have the characteristics that and beneficial effect:
1st, the organization of labour is improved, on the basis of rational labor division and cooperation, the construction manpower management based on BIM technology System realizes that the organization of labour is scientific.
2nd, integration project reality, the construction manpower management model based on BIM technology, it is related to construction cost and progress Connection, scientifically formulates work norm and establishment staffing, according to advanced rational principle, formulates and perform the work having scientific basis Power quota, personnel quota standard;Tissue worker's being recruited and allocating, and newcomer is recruited according to comprehensive assessment, principle on the basis of competitive selection;Root According to production and requirements of one's work allotment existing staff and placement supernumerary.
3rd, in the construction manpower management system based on BIM technology, real-time statistics worker's professional skill certificate, professional skill Training situation, arranges to carry out vocational training for the workers and staff in time, and according to the policy of training all workers and staff, personnel at different levels all kinds of to enterprise carry out technology industry Business training, improves the quality of workforce.
4th, the construction manpower management system based on BIM technology can improve the randomness of conventional items construction, complete work The key messages such as power work attendance, paying out wages, personnel's adjustment, personnel's increase and decrease account, according to Information Statistics result, consolidate work and record Rule, solves, because of the unnecessary dispute that paying out wages, personnel assignment cause, to improve the examination and rewards and punishments of labour, Maintenance Significant Items Construct normal production security.
5th, the construction manpower management method based on BIM technology by spatial information and temporal information be incorporated into one it is visual 5D models(Three-dimensional building model+cost management+progress control)In, more intuitively, accurately react the construction of each construction site Technique, flow, the present invention help scientifically to organize work to implement, and save labour expenditure, excavate labour potentialities, give full play to duty The enthusiasm of work, so as to improve constantly the labor productivity and economic benefit of enterprise.
Construction manpower management system with reference to the accompanying drawings and examples to the present invention based on BIM technology and its it is used for The technical characteristic of the method for construction manpower management is described further.
Brief description of the drawings
Fig. 1 is the construction manpower management system structure diagram based on BIM technology;
Fig. 2 is the construction manpower management method flow diagram based on BIM technology.
In figure:
1- BIMs, 2- manpower management systems, 21- Workforce Planning management modules, 22- labour service contracts management mould Block, 23- educational training management modules, 24- gate control system management modules, 25- scenes dynamic management module, 26- labor cost pipes Reason module.
Specific embodiment
With reference to specific embodiment, the present invention is described in further detail.But this should not be interpreted as the present invention The scope of above-mentioned theme is only limitted to following examples, and all technologies realized based on present invention belong to model of the invention Enclose.
Embodiment one:
A kind of construction manpower management system based on BIM technology, as shown in Figure 1:The construction manpower management system includes labor Power management system 2, the work force information of the manpower management system 2 is related to the BIM 1 set up with BIM technology Connection, constitutes the construction manpower management system based on BIM technology.The manpower management system of existing static state is set to become dynamic labor Power management system.
The manpower management system 2 includes Workforce Planning management module 21, labour service contract management module 22, education training Instruction management module 23, gate control system management module 24, live dynamic management module 25 and labor cost management module 26;
The Workforce Planning management module 21, for obtaining Workforce Planning table;The Workforce Planning management module 21 is associated Construction cost and progress msg, work out Workforce Planning, planning chart of exporting manpower, Workforce Planning input amount.
The labour service contract management module 22, for obtaining labour service contract information, sets up labour service contract storehouse;Can be from labor service Contract management module 22 reads labour service contract information, and its essential information includes:Name, sex, ID card No., labour service contract are compiled Number, post technical ability card number, work post, post certificate etc., set up labour service contract storehouse.
The educational training management module 23, for obtaining academic title's certificate, professional certificate, educational training information, output training Instruction planning chart, safety education planning chart;Can be from the typing professional title of educational training management module 23, professional certificate, education training Instruction information, its essential information includes:Educational information, safe practice is forced to be told somebody what one's real intentions are information, output before three-level safety education information, class Training program table, safety education planning chart.The real-time statistics worker's professional skill certificate of educational training management module 23, professional skill Situation can be trained, arranges to carry out vocational training for the workers and staff in time, according to the policy of training all workers and staff, personnel at different levels all kinds of to enterprise carry out technology Professional training, improves the quality of workforce.
The gate control system management module 24, for obtaining the job site information that comes in and goes out, output discrepancy job site record Table;Typing can be come in and gone out job site information from gate control system management module 24, its essential information includes:Pass information, Face recognition, iris, fingerprint, output discrepancy job site record sheet.
The live dynamic management module 25, the labor distribution figure for obtaining Dynamic Announce, real-time statistics labour Actual consumption information, draws labour's actual consumption curve;Can be from the Dynamic Announce labour of live dynamic management module 25 point Butut, real-time statistics labour's actual consumption situation, its essential information includes:Field workforce is distributed and active situation, reality Consumption, work holdup number, draw labour's actual consumption curve.
The labor cost management module 26, for obtaining work attendance, wage information, output attendance record table, payroll statistics Table, paying out wages registration form.Can include from the typing work attendance of labor cost management module 26, wage information, its essential information:Examine Diligent table, paying out wages record, output attendance record table, payroll statistics table, paying out wages registration form.The labor cost management module 26 complete the key messages such as labour's work attendance, paying out wages, personnel's adjustment, personnel's increase and decrease account, according to Information Statistics result, consolidate Gu labour discipline, solves, because of the unnecessary dispute that paying out wages, personnel assignment cause, to improve the examination and rewards and punishments of labour, The normal production security of Maintenance Significant Items construction.
The work force information of manpower management system 2 and the phase of BIM 1 set up with BIM technology in the present embodiment Association, its technology for being capable of " associated " belongs to existing technology, and specific information can be associated with BIM Principle and process will not be repeated here.
Embodiment two:
A kind of construction manpower management method based on BIM technology, it is using the applying based on BIM technology described in embodiment one Work manpower management system realizes the management method of construction labour, and its step includes:
A:Create the preliminary preparation of the construction manpower management system based on BIM technology:
A1:According to Design of Construction Organization file, construction special scheme, Discourse of Enterprise's ration and construction Deepen Design model based on BIM Draft Workforce Planning establishment, the Workforce Planning table that generation is drafted.The construction Deepen Design model refers to obtain design drawing The detail design model that actual conditions are done again on the basis of design drawing is combined after paper.
A2:According to similar engineering experience, enterprise construction quota, construction schedule, Workforce Planning is balanced and Optimization;With reference to construction operation aspect product, the working face needed for one, construction simulation field workforce distribution situation, to instruct to apply Work.Specifically, the construction Deepen Design model based on BIM technology for being first depending on foundation is calculated the quantities of the project, BIM management platforms are borrowed according to the quantities of each workshop section, the artificial Extinction efficiency of input enterprise calculates the labour's meter drafted Table is drawn, the Workforce Planning table that person in charge of the technology aspect drafts according to on-site actual situations adjustment finally determines different construction operation layers The labor distribution situation in face, with guiding construction.
B:Create the construction manpower management system based on BIM technology:The Workforce Planning table association that will be drafted in step A To the work progress model set up with BIM technology(BIM 1 i.e. described in embodiment one)Afterwards, create and be based on BIM The construction manpower management model of technology, constitutes the construction manpower management system based on BIM technology, realizes the dynamic of labour Management.
C:The dynamic management of the construction manpower management system based on BIM technology:
C1:Construction cost information, progress msg are associated into the construction manpower management system based on BIM technology, the system It is accurate calculate per diem, cost consumption situation under the moon or season schedule task, realize cost of building projects and progress monitoring Target.The dynamic management of system is concretely comprised the following steps:Periodically enter row information record to the construction manpower management system based on BIM technology Enter → real-time statistics collect → balance optimizing → satisfactory after correcting is taken, obtain dynamic labour's consumption curve and dynamic construction Manpower management model(Referring to Fig. 2).Wherein:
The content of Data Enter include construction operation workshop section and quantities, scene work order collect, the day, the moon or the season that complete Progress quantities collects, construction section schedule and actual finish time.
Real-time statistics collect in have the construction quantity of labour force, work post, working time etc..
Balance optimizing refers to the construction section that balance optimizing fulfils progress and delayed schedule ahead of schedule, analyzes construction speed, If progress is advanced, the related quantity of labour force, work post are reduced, if progress is delayed, increase the quantity of labour force, work post, and accurately Control labour enters field time, it is to avoid the phenomenon of the work holdup caused by different work post forked workings occurs.
In this step, Workforce Planning management module 21 association the construction cost information and progress msg of the system, compile Workforce Planning processed, planning chart of exporting manpower, Workforce Planning input amount;The dynamic of live dynamic management module 25 of the system Display labor distribution figure, real-time statistics labour's actual consumption situation, its essential information includes:Field workforce is distributed and living Emotionally condition, actual consumption amount, work holdup number, draw labour's actual consumption curve.
C2:It is that identification code gathers labour's essential information with ID card No., project labour's database is set up, by base In the internet management platform of BIM, typing simultaneously stores the information such as labour contract, safety education, work attendance, paying out wages, realizes labor The fine-grained management of power.The information such as the labour contract, safety education, work attendance, the paying out wages that are directed to can respectively from labor Obtained in business contract management module 22, educational training management module 23, gate control system management module 24, labor cost management module 26 Take.
Spatial information and temporal information are incorporated into a visual 5D by the construction manpower management method based on BIM technology Model(Three-dimensional building model+cost management+progress control)In, more intuitively, accurately react the construction work of each construction site Skill, flow, the present invention help scientifically to organize work to implement, and save labour expenditure, excavate labour potentialities, give full play to worker Enthusiasm, so as to improve constantly the labor productivity and economic benefit of enterprise.
The present invention can allow project under construction with based on BIM technology construction manpower management system after, simple and fast Ground obtains manpower management key message, realizes construction labour's fine-grained management.

Claims (4)

1. a kind of construction manpower management system based on BIM technology, including manpower management system(2), it is characterised in that:Should Manpower management system(2)Work force information with BIM technology set up BIM(1)Associated, composition is based on The construction manpower management system of BIM technology.
2. the construction manpower management system based on BIM technology according to claim 1, it is characterised in that:The work Power management system(2)Including Workforce Planning management module(21), labour service contract management module(22), educational training management module (23), gate control system management module(24), live dynamic management module(25)With labor cost management module(26);
The Workforce Planning management module(21), for obtaining Workforce Planning table;
The labour service contract management module(22), for obtaining labour service contract information, set up labour service contract storehouse;
The educational training management module(23), for obtaining academic title's certificate, professional certificate, educational training information, output training Planning chart, safety education planning chart;
The gate control system management module(24), for obtaining the job site information that comes in and goes out, output discrepancy job site record sheet;
The live dynamic management module(25), the labor distribution figure for obtaining Dynamic Announce, real-time statistics labour's reality Border consumption information, draws labour's actual consumption curve;
The labor cost management module(26), for obtaining work attendance, wage information, output attendance record table, payroll statistics table, Paying out wages registration form.
3. a kind of construction manpower management method based on BIM technology, it is characterised in that:It is using described in claim 1 Construction manpower management system based on BIM technology realizes the management method of construction labour, and its step includes:
A:Create the preliminary preparation of the construction manpower management system based on BIM technology:
A1:According to Design of Construction Organization file, construction special scheme, Discourse of Enterprise's ration and construction Deepen Design model based on BIM Draft Workforce Planning establishment, the Workforce Planning table that generation is drafted;
A2:According to similar engineering experience, enterprise construction quota, construction schedule, Workforce Planning is balanced and is optimized; With reference to construction operation aspect product, the working face needed for one, construction simulation field workforce distribution situation, with guiding construction;
B:Create the construction manpower management system based on BIM technology:The Workforce Planning table that will be drafted in step A associate to After the work progress model that BIM technology is set up, the construction manpower management model based on BIM technology is created, constitute and be based on BIM skills The construction manpower management system of art, realizes the dynamic management of labour;
C:The dynamic management of the construction manpower management system based on BIM technology:
C1:Construction cost information, progress msg are associated into the construction manpower management system based on BIM technology, the system It is accurate calculate per diem, cost consumption situation under the moon or season schedule task, realize cost of building projects and progress monitoring Target;
C2:It is that identification code gathers labour's essential information with ID card No., project labour's database is set up, by being based on The internet management platform of BIM, typing simultaneously stores the information such as labour contract, safety education, work attendance, paying out wages, realizes work The fine-grained management of power.
4. the construction manpower management method based on BIM technology according to claim 3, it is characterised in that:It is described to be based on The construction manpower management system of BIM technology includes Workforce Planning management module(21), labour service contract management module(22), religion Educate Training Management module(23), gate control system management module(24), live dynamic management module(25)Mould is managed with labor cost Block(26);
The Workforce Planning management module(21), for obtaining Workforce Planning table;
The labour service contract management module(22), for obtaining labour service contract information, set up labour service contract storehouse;
The educational training management module(23), for obtaining academic title's certificate, professional certificate, educational training information, output training Planning chart, safety education planning chart;
The gate control system management module(24), for obtaining the job site information that comes in and goes out, output discrepancy job site record sheet;
The live dynamic management module(25), the labor distribution figure for obtaining Dynamic Announce, real-time statistics labour's reality Border consumption information, draws labour's actual consumption curve;
The labor cost management module(26), for obtaining work attendance, wage information, output attendance record table, payroll statistics table, Paying out wages registration form.
CN201710060355.3A 2017-01-24 2017-01-24 Construction manpower management system based on BIM technology and its method for manpower management of constructing Pending CN106910009A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710060355.3A CN106910009A (en) 2017-01-24 2017-01-24 Construction manpower management system based on BIM technology and its method for manpower management of constructing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710060355.3A CN106910009A (en) 2017-01-24 2017-01-24 Construction manpower management system based on BIM technology and its method for manpower management of constructing

Publications (1)

Publication Number Publication Date
CN106910009A true CN106910009A (en) 2017-06-30

Family

ID=59207686

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710060355.3A Pending CN106910009A (en) 2017-01-24 2017-01-24 Construction manpower management system based on BIM technology and its method for manpower management of constructing

Country Status (1)

Country Link
CN (1) CN106910009A (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107730203A (en) * 2017-09-30 2018-02-23 四川民工加网络科技有限公司 The management system of builder's information and the discriminating method of builder's information
CN108492075A (en) * 2018-01-31 2018-09-04 湖南建工集团有限公司 The enterprise management method of tertiary management system and the application of data cloud based on BIM
CN108681880A (en) * 2018-05-29 2018-10-19 天津中新天成建筑工程有限公司 Building trade worker's real-name management system and method is positioned based on safety cap
CN108921491A (en) * 2018-05-25 2018-11-30 诸然 A kind of agreement for construction mode of payment based on block chain technology
CN109146116A (en) * 2018-06-13 2019-01-04 浙江大学 A kind of construction method of ability to work model, its calculation method of parameters, and labour's assessment prediction device based on the model
CN109472539A (en) * 2017-09-07 2019-03-15 上海嘉实(集团)有限公司 Progress control method, system, device and the storage medium of live project
CN109472425A (en) * 2017-09-07 2019-03-15 上海嘉实(集团)有限公司 Labor Cost Management method, system, storage medium and the terminal device of live project
CN109816263A (en) * 2019-02-01 2019-05-28 南通四建集团有限公司 A method of based on Beidou GNSS, BIM construction time labor service, equipment dynamic supervision
CN111814240A (en) * 2020-07-14 2020-10-23 河南省交通规划设计研究院股份有限公司 Highway engineering agronomy worker management system based on BIM technique
CN112749878A (en) * 2020-12-16 2021-05-04 佛山抖工科技有限公司 Traceable safety education code management system
CN113052573A (en) * 2021-04-28 2021-06-29 华能新能源股份有限公司 BIM-based wind power plant digital construction management system
CN113076582A (en) * 2021-03-30 2021-07-06 贵州数智联云工程科技有限公司 Multi-party collaborative engineering management system and method based on BIM
CN114519626A (en) * 2022-01-10 2022-05-20 湖北国际物流机场有限公司 Salary management method and system based on BIM model
CN115457673A (en) * 2022-10-10 2022-12-09 中国建设基础设施有限公司 Labor attendance system based on BIM

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150063683A1 (en) * 2013-08-28 2015-03-05 Autodesk, Inc. Building datum extraction from laser scanning data
CN105260857A (en) * 2015-11-16 2016-01-20 苏州天地微易智能科技有限公司 Intelligent management system and method thereof for rural migrant workers
CN105844380A (en) * 2016-01-26 2016-08-10 湖北文理学院 BIM-based BIM project element management method and system
CN106296473A (en) * 2015-05-28 2017-01-04 上海宝冶集团有限公司 A kind of construction project progress real-time control method based on BIM technology

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150063683A1 (en) * 2013-08-28 2015-03-05 Autodesk, Inc. Building datum extraction from laser scanning data
CN106296473A (en) * 2015-05-28 2017-01-04 上海宝冶集团有限公司 A kind of construction project progress real-time control method based on BIM technology
CN105260857A (en) * 2015-11-16 2016-01-20 苏州天地微易智能科技有限公司 Intelligent management system and method thereof for rural migrant workers
CN105844380A (en) * 2016-01-26 2016-08-10 湖北文理学院 BIM-based BIM project element management method and system

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109472539A (en) * 2017-09-07 2019-03-15 上海嘉实(集团)有限公司 Progress control method, system, device and the storage medium of live project
CN109472425A (en) * 2017-09-07 2019-03-15 上海嘉实(集团)有限公司 Labor Cost Management method, system, storage medium and the terminal device of live project
CN107730203A (en) * 2017-09-30 2018-02-23 四川民工加网络科技有限公司 The management system of builder's information and the discriminating method of builder's information
CN108492075A (en) * 2018-01-31 2018-09-04 湖南建工集团有限公司 The enterprise management method of tertiary management system and the application of data cloud based on BIM
CN108921491B (en) * 2018-05-25 2021-11-30 诸然 Building contract payment method based on block chain technology
CN108921491A (en) * 2018-05-25 2018-11-30 诸然 A kind of agreement for construction mode of payment based on block chain technology
CN108681880A (en) * 2018-05-29 2018-10-19 天津中新天成建筑工程有限公司 Building trade worker's real-name management system and method is positioned based on safety cap
CN109146116A (en) * 2018-06-13 2019-01-04 浙江大学 A kind of construction method of ability to work model, its calculation method of parameters, and labour's assessment prediction device based on the model
CN109816263A (en) * 2019-02-01 2019-05-28 南通四建集团有限公司 A method of based on Beidou GNSS, BIM construction time labor service, equipment dynamic supervision
CN111814240A (en) * 2020-07-14 2020-10-23 河南省交通规划设计研究院股份有限公司 Highway engineering agronomy worker management system based on BIM technique
CN111814240B (en) * 2020-07-14 2024-04-02 河南省交通规划设计研究院股份有限公司 Highway engineering farmer management system based on BIM technology
CN112749878A (en) * 2020-12-16 2021-05-04 佛山抖工科技有限公司 Traceable safety education code management system
CN113076582A (en) * 2021-03-30 2021-07-06 贵州数智联云工程科技有限公司 Multi-party collaborative engineering management system and method based on BIM
CN113052573A (en) * 2021-04-28 2021-06-29 华能新能源股份有限公司 BIM-based wind power plant digital construction management system
CN114519626A (en) * 2022-01-10 2022-05-20 湖北国际物流机场有限公司 Salary management method and system based on BIM model
CN115457673A (en) * 2022-10-10 2022-12-09 中国建设基础设施有限公司 Labor attendance system based on BIM

Similar Documents

Publication Publication Date Title
CN106910009A (en) Construction manpower management system based on BIM technology and its method for manpower management of constructing
Garengo et al. Understanding the relationship between PMS and MIS in SMEs: An organizational life cycle perspective
CN107622355A (en) Project cluster work progress digital management system and method
CN111144836A (en) Smart building integrated collaborative big data platform
CN109784781A (en) A kind of project management system served as theme with project progress, method and storage medium
CN106372302A (en) Tower crane automatic model selection and optimization system and method based on BIM (Building Information Modeling) technology
CN111539690A (en) Construction project collaborative management method and system based on BIM
CN111582696A (en) Engineering construction scheduling management method
CN111666619A (en) BIM technology-based substation engineering implementation field digital management system
CN111105080A (en) Construction progress prediction method and system based on BIM (building information modeling)
Papadonikolaki et al. Megaprojects as niches of sociotechnical transitions: The case of digitalization in UK construction
Andersson et al. Combining Overall equipment Efficiency (OEE) and productivity measures as drivers for production improvements
CN115187200B (en) Assembled computer lab construction management system based on BIM digital-analog separation
CN117078209A (en) Method, system and device for managing supervision project and computer storage medium
CN216014298U (en) Building supervisory systems based on BIM
Xu et al. The application of big data technology in the construction of smart campus in vocational colleges
CN102930361B (en) A kind of for employee be transferred and promoted planning management information system and for employee be transferred and promoted planning method
CN111008766A (en) Public building operation quality management system and method based on PDCA and target decomposition
Al-Zwainy et al. Predicting productivity in construction industry utilizing multiple linear regression technique and artificial neural network technique: A review for research and applications
Yan et al. Application of the BIM Technique in Modern Project Management
Li et al. Construction site safety management research based on BIM technology
Rasli et al. Project performance framework: The role of knowledge management and information technology infrastructure
Li PSO Algorithm-Based Management Method and Measurement of Enterprise Employee Performance Evaluation
JP2021026496A (en) Power generation cost price calculation server of hydroelectric power station, power generation cost price calculation system of hydroelectric power station, and power generation cost price calculation method of hydroelectric power station
Wang et al. Research on Design Quality Management Based on PDCA Quality Cycle Theory

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170630

RJ01 Rejection of invention patent application after publication